ML20136A222
ML20136A222 | |
Person / Time | |
---|---|
Site: | Harris, Brunswick |
Issue date: | 05/15/2020 |
From: | Stewart Bailey NRC/RGN-II/DRP/RPB4 |
To: | Jeffrey Hamman NRC/RGN-II/DRP/RPB4 |
References | |
20200374 | |
Download: ML20136A222 (2) | |
Category:Meeting Summary
MONTHYEARML24124A0342024-05-0101 May 2024
[Table view]Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML24011A1652024-02-12012 February 2024 December 11, 2023, Summary of Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned Exemption Request Related to Turbine Control System and Reactor Protection System Circuitry ML23157A3202023-06-26026 June 2023 Summary of April 26, 2023, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned License Amendment Request Related to Turbine Control System and Reactor Protection System Circuitry ML23151A2532023-05-31031 May 2023 Meeting Summary of 2022 Annual Assessment Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324, Meeting Number 20230392 ML23151A1232023-05-31031 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Shearon Harris Nuclear Plant ML22167A1852022-06-30030 June 2022 Summary of June 6, 2022, Meeting with Duke Energy to Discuss Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI) 191 ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22130A0302022-05-0909 May 2022 Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21172A2672021-08-13013 August 2021 Regulatory Audit Summary Related to the Review of LAR to Revise 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to Reflect an Alternative Seis ML21131A1472021-05-11011 May 2021 Public Meeting Summary 2020 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20210385 ML21057A1172021-04-0101 April 2021 February 17, 2021 Summary of Public Meeting with Duke Energy Progress, LLC, to Discuss a Proposed License Amendment Request to Adopt TSTF-505 Risk-Informed Extended Completion Time ML21036A3112021-03-0303 March 2021 Summary of February 3, 2021, Public Meeting with Duke Energy Progress, LLC, to Discuss a Proposed LAR to Change the Standby Liquid Control System Technical Specifications for Brunswick Steam Electric Plant, Units 1 and 2 ML21028A6762021-02-24024 February 2021 Summary of January 21, 2021, Closed Meeting with Duke Energy Progress, LLC, to Discuss a Proposed Relief Request Related to Service Water Underground Piping Coating for Brunswick Steam Electric Plant ML20136A2222020-05-15015 May 2020 Har - Bru 2019 Aam Meeting Summary ML19331A8062020-01-29029 January 2020 Summary of November 13, 2019 Closed Meeting with Duke Energy Carolinas, LLC and Duke Energy Progress, LLC, to Discuss Security-Related Information for Its Licensed Facilities ML19329A0232019-11-27027 November 2019 Summary of October 29, 2019 Conference Call with Duke Energy Progress, LLC Regarding the Fall 2019 Steam Generator Tube Inspections ML19241A2902019-09-24024 September 2019 Summary of August 22, 2019, Meeting with Duke Energy Progress, LLC Proposed License Amendment Request to Adopt Risk-Informed Completion Times ML19220A6702019-08-26026 August 2019 Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan ML19113A0652019-05-14014 May 2019 Summary of Meeting with Duke Energy to Discuss Proposed License Amendment Request for Shearon Harris, Unit 1, Technical Specification Changes Associated with Departure from Nucleate Boiling Ratio Safety Limit ML19120A1342019-05-0606 May 2019 3/15/19 Summary of Public Meeting with Nuclear Entergy Institute, Duke Energy, and Southern Nuclear Operating Company Post-Pilot Implementation of Tornado Missile Risk Evaluator Methodology at Vogtle, Units 1 and 2 and Shearon Harris, Unit ML19123A3532019-05-0202 May 2019 Public Meeting Summary - Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 ML19123A3522019-05-0202 May 2019 Public Meeting Summary - Shearon Harris Nuclear Plant, Docket No. 50-400 ML19087A0622019-04-11011 April 2019 Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief Request ML18361A6712019-01-0808 January 2019 Summary of Meeting with Duke Energy Progress, LLC to Discuss License Amendment Request for Shearon Harris Unit 1, Regarding 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, ML18352A3572019-01-0808 January 2019 Summary of Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1, Regarding Emergency Plan Changes ML18355A8142019-01-0707 January 2019 Summary of December 20, 2018, Teleconference Meeting with Duke Energy Progress, LLC to Discuss a Proposed License Amendment Request for Shearon Harris Unit 1, Regarding a Risk-Informed Essential Services Chilled Water System TS ML18094A2632018-08-17017 August 2018 Summary of 01/18/2018, Public Meeting with Nuclear Energy Institute, Duke Energy, Southern Nuclear Operating Co., Entergy Operations, Inc. to Discuss Development of Tornado Missile Risk Evaluator Methodology ML18109A0912018-04-19019 April 2018 Summary of 2017 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear Plant, Docket No. 50-400 ML18088A0732018-04-0303 April 2018 March 27, 2018, Summary of Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Proposed Relief Request for Shearon Harris Nuclear Power Plant, Unit 1 ML18064A1332018-03-19019 March 2018 Summary of February 27, 2018, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1, Regarding Emergency Plan Emergency Action Level Scheme Changes (L-2017-LRM-00 ML17317A3302017-12-22022 December 2017 Summary of October 26, 2017, Second Pre-Submittal Meeting with Duke Energy Regarding Brunswick Advanced Areva Methods License Amendment Request (CAC Nos. MF9965 and MF9966; EPID L-2017-LRM-0033) ML17340A1302017-12-22022 December 2017 Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson ML17340A0612017-12-0808 December 2017 11/8/17 Summary of Teleconference with Entergy Operations, Inc., Tornado Missile Risk Evaluator with Applicability to Submittals from Duke Energy and Southern Nuclear Operating Co, Inc. ML17286A1222017-11-0101 November 2017 Summary of August 22, 2017, Pre-Submittal Meeting with Duke Energy Re. Brunswick Advanced Areva Methods License Amendment Request (CAC Nos. MF9965 and MF9966; EPID L-2017-LRM-0033) ML17244A0742017-09-28028 September 2017 8/17/2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 ML17257A0992017-09-26026 September 2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 ML17223A1212017-08-17017 August 2017 Summary of August 3, 2017, Meeting with Duke Energy Progress, LLC on Proposed License Amendment Request to Implement Fuel Reload Design Methodology Reports for Shearon Harris and H. B. Robinson ML17145A3142017-05-25025 May 2017 EOC Meeting Summary ML17137A3332017-05-17017 May 2017 Meeting Summary Regarding 2016 Annual Assessment of the Brunswick Steam Electric Plant for Period of January 01, 2016 Through December 31, 2016 ML16286A0152016-11-0101 November 2016 Summary Of September 29, 2016, Duke Energy Progress, LLC. To Discuss Proposed License Amendment Request Regarding Shearon Harris Nuclear Power Plant, Unit 1, BWR Storage Rack Inserts And The Spent Fuel Pool Criticality Analysis (CAC No. MF8327) ML16264A3352016-10-17017 October 2016 Summary of August 18, 2016, Pre-Submittal Meeting with Duke Energy Regarding Mella+ License Amendment Request ML16235A2382016-10-17017 October 2016 Summary of the July 12-13, 2016 Audit Supporting the U.S. Nuclear Regulatory Commission Review of DPC-NE-1008-P, Nuclear Design Methodology Using CASMO-5/SIMULATE-3 for Westinghouse Reactors ML16125A0992016-05-20020 May 2016 Summary of May 2, 2016, Meeting with Duke Energy Progress, Inc. to Discuss Fuel Reload Design Methodology Reports and Proposed Supplement to a License Amendment Request Regarding Shearon Harris and H.B. Robinson ML16134A1552016-05-12012 May 2016 Public Meeting Summary - 2015 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear Plant ML16134A1742016-05-12012 May 2016 Summary of Public Meeting - 2015 Annual Assessment Regarding Brunswick, Units 1 and 2 ML16112A3772016-04-25025 April 2016 Summary of Meeting with Duke Energy Progress, Inc. to Discuss the Shearon Harris Nuclear Plant, Unit 1, TSTF-425 LAR Request for Additional Information Reponses ML16034A5242016-03-11011 March 2016 Summary of February 1, 2016, Pre-submittal Meeting with Duke Energy Regarding Consolidation of Emergency Operations Facilities ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML15280A2532015-11-25025 November 2015 Summary of Mtg. with Duke Energy Progress Inc. to Discuss Fuel Reload Design Methodology Reports & Proposed License Amendment Request Shearon Harris Nuclear Power Plant Unit 1 and H.B. Robinson Steam Electric Plant Unit No. 2 (MF6701/MF6702 2024-05-01 Category:Memoranda MONTHYEARML24124A0342024-05-0101 May 2024
[Table view]Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion ML23151A2532023-05-31031 May 2023 Meeting Summary of 2022 Annual Assessment Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324, Meeting Number 20230392 ML23151A1232023-05-31031 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Shearon Harris Nuclear Plant ML22130A0302022-05-0909 May 2022 Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350 ML22075A3592022-03-17017 March 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21131A1472021-05-11011 May 2021 Public Meeting Summary 2020 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20210385 RA-21-0097, Notification of Permit Revision Request Regarding Copper and Zinc Limits2021-03-15015 March 2021 Notification of Permit Revision Request Regarding Copper and Zinc Limits ML20136A2222020-05-15015 May 2020 Har - Bru 2019 Aam Meeting Summary ML19254B4692019-09-0909 September 2019 (FEMA Letter NRC 09-09-19) Preliminary Capabilities Assessment - Brunswick Nuclear Power Plant ML19266A5332019-09-0909 September 2019 (FEMA Memo to NRC 9-9-19) Preliminary Capabilities Assessment - Brunswick Nuclear Plant ML19113A0652019-05-14014 May 2019 Summary of Meeting with Duke Energy to Discuss Proposed License Amendment Request for Shearon Harris, Unit 1, Technical Specification Changes Associated with Departure from Nucleate Boiling Ratio Safety Limit ML19123A3532019-05-0202 May 2019 Public Meeting Summary - Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 ML19123A3522019-05-0202 May 2019 Public Meeting Summary - Shearon Harris Nuclear Plant, Docket No. 50-400 ML18116A1082018-04-26026 April 2018 Summary of Meeting on Annual Assessment Public Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 ML18109A0912018-04-19019 April 2018 Summary of 2017 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear Plant, Docket No. 50-400 ML18074A0202018-03-20020 March 2018 Fpra FAQ 16-0011 Closure Memo ML17145A3142017-05-25025 May 2017 EOC Meeting Summary ML17137A3332017-05-17017 May 2017 Meeting Summary Regarding 2016 Annual Assessment of the Brunswick Steam Electric Plant for Period of January 01, 2016 Through December 31, 2016 ML17129A3022017-05-17017 May 2017 Office of Nuclear Security and Incident Response Observation of 2017 Security Baseline Inspection at Brunswick Steam Electric Plant, Units 1 & 2 ML17096A3332017-05-0909 May 2017 Verbal Authorization of Relief Request for Reactor Vessel Closure Head Penetration Nozzle N9 Repair ML16300A1802016-10-27027 October 2016 Verbal Authorization of Relief Request I3R-16, for Reactor Vessel Closure Head Penetration Nozzle Repair Technique, Inservice Inspection Program -Third 10-Year Interval ML16286A2372016-10-12012 October 2016 FEMA Assessment of Offsite Plans and Preparedness Post-Hurricane Matthew (October 2016) ML16138A0502016-05-24024 May 2016 Audit Report - Application For Amendment Shearon Harris Nuclear Power Plant, Unit 1 - The Proposed License Amendment Revises The As-Found Lift Setting Tolerance For Main Steam Line Code Safety Valves In Technical Specifications (TAC No. MF7195) ML16134A1552016-05-12012 May 2016 Public Meeting Summary - 2015 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear Plant ML16134A1742016-05-12012 May 2016 Summary of Public Meeting - 2015 Annual Assessment Regarding Brunswick, Units 1 and 2 ML16103A2552016-04-14014 April 2016 05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444) ML16034A5082016-02-0404 February 2016 Audit Report; Brunswick Steam Electric Plant, Units 1 & 2 Nuclear Facility Request for License Amendments - Adoption of Topical Report ANP-10298P-A, Revision 1 (TAC No. MF5852) ML15303A3962015-12-0808 December 2015 Safety Evaluation Input on Emergency Action Level Scheme Upgrade for Brunswick Steam Electric Plant Units 1 and 2 (TAC No'S. MF5766 and MF5767 ML15149A3222015-05-29029 May 2015 2014 Harris Annual Assessment Meeting Summary ML15125A4602015-05-0505 May 2015 Summary of Public Meeting to Discuss the Annual Assessment of the Brunswick Steam Electric Plant with the Public for the Period of January 1, 2014, Through December 31, 2014 ML15107A4252015-04-17017 April 2015 4/20/2015, Forthcoming Closed Meeting with Duke Energy Progress, Inc. to Discuss Shearon Harris Nuclear Power Plant, Unit 1, Relief Request I3R-15 Revision and Supplement, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspe ML14140A1882014-05-19019 May 2014 Summary of Public Meeting - 2013 Annual Assessment Regrading Brunswick Steam Electric Plant ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13330B6392013-11-27027 November 2013 Verbal Authorization of Relief Request 13R-13 for Reactor Vessel Closure Head Penetration Nozzle Repair Inservice Inspection Program - Third 10-Year Interval ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC ML13221A5122013-08-12012 August 2013 8/20/2013 - Closed Notice of Forthcoming Meeting with Duke Energy Regarding Mella Brunswick Steam Electric Plant, Units 1 and 2 ML13150A0712013-05-31031 May 2013 Verbal Authorization of Relief Request I3R-11 for Reactor Vessel Closure Head Penetration Nozzel Repair Inservice Inspection Program - Third 10-Year Interval ML13142A4672013-05-22022 May 2013 Special Inspection Charter to Evaluate Harris Reactor Vessel Head Nozzle 49 Flaw Issue ML13120A1372013-05-0202 May 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Regarding a Non-Conservative Technical Specification Loss-of-Offsite Power Voltage Setpoint License Amendment Request for Shearon Harris, Unit 1 ML13106A3372013-04-17017 April 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities ML12346A2842012-12-18018 December 2012 Forthcoming Public Conference Call Meeting with Duke Energy Carolinas Re Mellla+ for Brunswick Steam Electric Plant, Units 1 and 2, to Discuss the Maximum Extended Load Limit Analysis Plus (Mellla+) Implementation ML12177A4302012-11-0909 November 2012 Task Interface Agreement (Concurrence)-Operability of Brunswick, Unit 2, Reactor Water Cleanup System Isolation Instrumentation with the Inlet Flow Orifice Installed Backwards (TIA 2012-09) ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML12284A4612012-10-12012 October 2012 Forthcoming Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-Design-Basis External Events ML12261A0992012-09-17017 September 2012 10/2/12 - Notice of Forthcoming Public Conference Call with Duke Energy Carolinas Regarding Shearon Harris Nuclear Plant, Unit 1 ML12249A1702012-09-0606 September 2012 Notice of Forthcoming Conference Call Public Meeting with Duke Energy Regarding the Non Conservative Technical Specifications License Amendment Requests for Shearon Harris Nuclear Plant Unit 1 ML1219805572012-09-0505 September 2012 Close-Out of National Fire Protection Association Standard 805 Frequently Asked Question 12-0062: Updated Final Safety Analysis Report Content ML12160A5732012-06-11011 June 2012 Meeting Notice - Forthcoming Pre-Application Conference Call with Carolina Power and Light Company Regarding National Fire Protection Association Standard 805 for Brunswick Steam Electric Plant, Units 1 and 2 2024-05-01 |
Text
May 14, 2020 MEMORANDUM TO: Stewart Bailey, Chief /RA/
Reactor Projects Branch 4 Division of Reactor Projects FROM: Jeff Hamman, Senior Project Engineer /RA/
Reactor Projects Branch 4 Division of Reactor Projects
SUBJECT:
PUBLIC MEETING
SUMMARY
- 2019 ANNUAL ASSESSMENT MEETING REGARDING SHEARON HARRIS NUCLEAR POWER PLANT, DOCKET NO. 50-400; AND BRUNSWICK STEAM ELECTRIC PLANT, DOCKET NOS. 50-325 AND 50-324, MEETING NUMBER 20200374 On April 29, 2020, the Nuclear Regulatory Commission (NRC) conducted a live virtual meeting concerning the Shearon Harris Nuclear Power Plant and the Brunswick Steam Electric Plant.
The purpose of the meeting was to provide opportunities for the public to discuss the annual assessment for the period of January 1, 2019, through December 31, 2019.
In response to the COVID-19 coronavirus and updated Federal Government guidance on travel and social distancing, the meeting was held remotely through the Skype for Business application. The following documents related to the meeting are available in ADAMS: Meeting Notice (ML20100J150), Assessment Meeting Presentations (Harris - ML20099C999; Brunswick - ML20100G634).
The meeting was conducted from 3:00 PM to 4:00 PM local time. There were 44 attendees, which consisted of representatives from the NRC, Duke Energy, the State of North Carolina and members of the public. Due to the nature of the meeting, no official list of attendees is included.
NRC staff were available for questions following each presentation. There was minimal interaction with the public which was consistent with the normal meetings conducted near the station. One member of the public asked for information related to inspection of the steam leak into the drywell of Brunswick Unit 1 in March 2019. In response, the staff provided the ADAMS Accession Number relating to the inspection report (ML19289A011).
The meeting was listed in the Public Meeting Feedback System under Meeting Code 20200374 and as of the date of this memo, there were no public responses to the meeting.
Docket Nos.: 50-400, and 50-325, 50-324 License Nos.: NPF-63, and DPR-71, DPR-62 CONTACT: Jeff Hamman, RII/DRP/RPB4 404-997-5304
ML20136A222 OFFICE RII: DRP RII: DRP NAME J. Hamman S. Bailey DATE 5/8/2020 5/14/2020