Letter Sequence Meeting |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement
|
MONTHYEARML0725500632007-08-30030 August 2007 NFPA 805 Transition Pilot Plant FAQ 06-0019, Revision 2 Project stage: Request ML0730605502007-09-0707 September 2007 NFPA 805 Transition Pilot Plant FAQ 07-0040 Project stage: Request ML0727402622007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 07-0038 Project stage: Request ML0727402482007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 06-0011, Revision 2 Project stage: Request ML0727402682007-09-20020 September 2007 NFPA-805 Transition Pilot Plant FAQ 07-0039 Project stage: Request ML0727402552007-09-28028 September 2007 NFPA-805 Transition Pilot Plant FAQ 06-0019, Revision 3 Project stage: Request ML0728200152007-10-0808 October 2007 NFPA-805 Transition Pilot Plant FAQ 06-0005, Revision 2 - Definition of a Fire Protection Program (FPP) Change for Harris Project stage: Request ML0735100822007-11-12012 November 2007 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3 (Corrected Version) Project stage: Request ML0735500232007-11-12012 November 2007 NFPA 805 Transition Pilot Plant FAQ 07-0033, Revision 1 Project stage: Request ML0733200282007-11-26026 November 2007 NFPA 805 Transition Pilot Plant FAQ 06-0012, Revision 5, Determining Manual Actions That Require a Change Evaluation During Transition Project stage: Request ML0733700252007-12-0303 December 2007 NFPA 805 Transition Pilot Plant FAQ 06-0008, Revision 8, Alternative Method for Fire Protection Engineering Analyses Project stage: Request ML0734001472007-12-0606 December 2007 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 3 Project stage: Request ML0735500252007-12-20020 December 2007 NFPA 805 Transition Pilot Plant FAQ 07-0036, Revision 1 Project stage: Request ML0807004112008-03-10010 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0032, Revision 1, Clarification of 10 CFR 50.48(c), 50.48(a), and GDC 3 Project stage: Request ML0809101362008-03-28028 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 1, Lessons Learned - NEI 04-02 B-2 and B-3 Tables Project stage: Request ML0813006972008-05-0909 May 2008 NFPA 805 Transition Pilot Plant FAQ 07-0032, Revision 2 Project stage: Request ML0814300412008-05-22022 May 2008 NFPA 805 Transition Pilot Plant FAQ 07-0040, Revision 2 Project stage: Request ML0815606412008-05-29029 May 2008 Request for License Amendment to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Request HNP-08-061, Redacted Public Version of Transition Report NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition2008-05-29029 May 2008 Redacted Public Version of Transition Report NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition Project stage: Request ML0816504752008-05-30030 May 2008 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition). License Amendment Request (LAR) No. 2008-01 Project stage: Request ML0820410142008-05-30030 May 2008 Public Version of Enclosures 2 Through 6 of License Amendment Request to Adopt NFPA-805 Project stage: Request ML0816901212008-06-17017 June 2008 Forthcoming Closed Meeting with Progress Energy Carolinas, Inc., to Discuss the May 29, 2008, License Amendment Request (LAR) to Transition the Shearon Harris Nuclear Plant, Unit 1 (Harris) to National Fire Protection Association (Nfpa) Project stage: Meeting ML0818901932008-06-30030 June 2008 Completion Schedule for Part 2 of License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001) Edition, License Amendment Request No. 2008-01 Project stage: Request ML0818401392008-06-30030 June 2008 Submittal of 10 CFR 50.59 Annual Report Project stage: Request ML0818406962008-07-0707 July 2008 Meeting with Progress Energy Carolinas, Inc. and Duke Energy Carolinas, LLC, to Discuss the 05/29&30/2008, License Amendment Requests to Transition Shearon Harris, Unit 1, and Oconee, Units 1, 2, & 3 to NFPA Standard 805 Project stage: Meeting ML0818905292008-07-11011 July 2008 Summary of Closed Meeting with Progress Energy Carolinas Regarding May 29, 2008, License Amendment Request to Transition the Shearon Harris Nuclear Plant Unit 1, to National Fire Protection Association Standard 805, Performance-Based.. Project stage: Meeting ML0820703912008-07-17017 July 2008 Meeting Handouts from 7/17/08 Public Meeting on the Harris and Oconee LARs to Transition to NFPA-805 Project stage: Meeting ML0820605362008-08-0707 August 2008 Summary of Mtg. with Progress Energy Carolinas, and Duke Energy Carolinas to Discuss the LARs to Transition the Shearon Harris and Oconee Nuclear Plants to National Fire Protection Association Standard NFPA-805 Project stage: Approval ML0824202652008-09-0808 September 2008 Summary of Conference Call with Progress Energy Re License Amendment Request HNP-08-061 for Shearon Harris Project stage: Other ML0826007362008-09-17017 September 2008 Notice of Meeting with Progress Energy Carolinas, Inc. (Pec), to Discuss the Shearon Harris Nuclear Plant, Unit 1 (HNP) National Fire Protection Association (NFPA) Standard 805 License Amendment Request (LAR) Project stage: Meeting ML0827011582008-09-26026 September 2008 Acceptance Review Regarding the License Amendment Request to Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Acceptance Review ML0828700162008-09-26026 September 2008 Nc Warns Response to Board Notification - Enclosure P-1 - Shearon Harris Nuclear Power Plant, Unit 1 - Acceptance Review NFPA-805 License Amendment Request, September 26, 2008 Project stage: Request ML0828804552008-09-30030 September 2008 Preliminary Oconee LAR Acceptance Review Matrix Project stage: Acceptance Review ML0828902592008-10-16016 October 2008 And 10/08/2008 - Summary of Conference Calls with Duke Energy Carolinas to Discuss the Acceptance Review of the May 30, 2008, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 for Oconee Project stage: Acceptance Review ML0830900742008-11-12012 November 2008 Summary of Category 2 Public Meeting Held to Discuss National Fire Protection Association Standard 805 Pilot Plant Process: Current Lessons Learned from the Pilot License Amendment Request Reviews (TAC Nos. MD8807, MD8832, MD8833, & MD8834) Project stage: Meeting HNP-08-113, Supplement to Request for License Amendment, to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-11-14014 November 2008 Supplement to Request for License Amendment, to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement ML0829601532008-11-17017 November 2008 Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment Request Project stage: Meeting HNP-08-121, To Request for License Amendment to Adopt NFPA 805 Performance-based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)2008-12-11011 December 2008 To Request for License Amendment to Adopt NFPA 805 Performance-based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Request ML0903000302009-01-30030 January 2009 Acceptance Review Regarding Amendment to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Acceptance Review ML0903304962009-02-0202 February 2009 Acceptance Review of License Amendment Request to Adopt the National Fire Protection Association Standard No. 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, Project stage: Acceptance Review ML0902903272009-03-10010 March 2009 Regulatory Audit in Support of the License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program as Allowed by Title 10 of the Code of Federal Regulations, Paragraph 50.48(c) Fire Protection Project stage: Other ML0909900182009-04-10010 April 2009 04/21-22/2009, Notice of Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition the Shearon, Unit 1 and the Oconee, Units 1, 2 and 3 Project stage: Meeting ML0916002812009-06-11011 June 2009 Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing Project stage: Other ML0921707152009-08-0606 August 2009 Request for Additional Information Regarding Amendment to Adopt National Fire Protection Association Standard 805 (NFPA 805), Performance-Based Standard for Fire Protection for Light Water Reactor . Project stage: RAI HNP-09-076, 90-Day Inservice Inspection (ISI) Summary Report2009-08-0606 August 2009 90-Day Inservice Inspection (ISI) Summary Report Project stage: Request HNP-09-084, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Generating Plants2009-08-13013 August 2009 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Generating Plants Project stage: Response to RAI HNP-09-086, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Reactor.2009-08-28028 August 2009 Second Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-based Standard for Fire Protection for Light Water Reactor. Project stage: Response to RAI HNP-09-094, Third Response to Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor..2009-10-0909 October 2009 Third Response to Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor.. Project stage: Response to RAI HNP-09-096, Additional Information Re License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2009-12-16016 December 2009 Additional Information Re License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request 05000400/LER-2010-002, Manual Actuation of the Reactor Protection System Due to Hydrogen Seal Oil Leak2010-01-14014 January 2010 Manual Actuation of the Reactor Protection System Due to Hydrogen Seal Oil Leak Project stage: Request 2008-05-09
[Table View] |
04/21-22/2009, Notice of Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition the Shearon, Unit 1 and the Oconee, Units 1, 2 and 3| ML090990018 |
| Person / Time |
|---|
| Site: |
Oconee, Harris  |
|---|
| Issue date: |
04/10/2009 |
|---|
| From: |
Vaaler M Plant Licensing Branch II |
|---|
| To: |
Boyce T, Melanie Wong Plant Licensing Branch II, Plant Licensing Branch II |
|---|
| Vaaler, Marlayna, NRR/DORL 415-1998 |
| References |
|---|
| TAC MD8807, TAC MD8832, TAC MD8833, TAC MD8834 |
| Download: ML090990018 (6) |
|
Text
April 10, 2009 MEMORANDUM TO: Melanie C. Wong, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Thomas H. Boyce, Chief
/RA/
Plant Licensing Branch II-2 Division of Operating Reactor Licensing FROM:
Marlayna Vaaler, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing
SUBJECT:
FORTHCOMING MEETING WITH PROGRESS ENERGY CAROLINAS, INC., AND DUKE ENERGY CAROLINAS, LLC, TO DISCUSS TOPICS INVOLVING THE LICENSE AMENDMENT REQUESTS TO TRANSITION THE SHEARON HARRIS NUCLEAR PLANT, UNIT 1 AND THE OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, TO THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) STANDARD 805, PERFORMANCE BASED STANDARD FOR FIRE PROTECTION DATE & TIME:
Tuesday, April 21, 2009, from 10:00 a.m. - 5:00 p.m.
Wednesday, April 22, 2009, from 8:00 a.m. - 12:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11545 Rockville Pike, Room O-3B4 Rockville, Maryland PURPOSE:
Discuss high level items associated with the Harris and Oconee LARs to transition to NFPA-805. NFPA-805 allows the use of performance-based methods, such as fire modeling, and risk-informed methods, such as Fire Probabilistic Risk Assessment (Fire PRA), to demonstrate compliance with the nuclear safety performance criteria. Regulatory audits were recently conducted at both sites, and several issues generic to both pilots were identified by the staff. This meeting will be an opportunity to further discuss these issues with the pilot plant licensees.
CONTACT:
Marlayna Vaaler, NRR 301-415-3178 Marlayna.Vaaler@nrc.gov
- Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in a meeting (e.g., sign language), or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
M. Wong and CATEGORY 2*:
This is a Category 2 meeting. The public is invited to participate in this meeting by providing comments and asking questions at designated points identified on the agenda.
Teleconferencing: Interested members of the public unable to travel to the NRC Headquarters may participate by telephone via a toll-free teleconference. For details, please call the NRC meeting contact listed or the toll-free number, 1-800-368-5642, and ask the operator for a connection to the meeting contact. Those interested in participating in this meeting by teleconference should call or email the meeting contact as soon as possible, but no later that April 20, 2009.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC S. Weerakkody (NRR)
M Vaaler (NRR)
A. Klein (NRR)
H. Barrett (NRR)
P. Lain (NRR)
S. Laur (NRR)
M. Stambaugh (NRR)
AFBP and APLA staff as needed UTILITIES J. Ertman D. Goforth D. Corlett Progress Energy and Duke Energy staff/contractors as needed Docket Nos. 50-400, 50-269, 50-270, and 50-287
Enclosure:
Agenda cc w/enclosure: Distribution via ListServ
M. Wong and CATEGORY 2*:
This is a Category 2 meeting. The public is invited to participate in this meeting by providing comments and asking questions at designated points identified on the agenda.
Teleconferencing: Interested members of the public unable to travel to the NRC Headquarters may participate by telephone via a toll-free teleconference. For details, please call the NRC meeting contact listed or the toll-free number, 1-800-368-5642, and ask the operator for a connection to the meeting contact. Those interested in participating in this meeting by teleconference should call or email the meeting contact as soon as possible, but no later that April 20, 2009.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC S. Weerakkody (NRR)
M Vaaler (NRR)
A. Klein (NRR)
H. Barrett (NRR)
P. Lain (NRR)
S. Laur (NRR)
M. Stambaugh (NRR)
AFBP and APLA staff as needed UTILITIES J. Ertman D. Goforth D. Corlett Progress Energy and Duke Energy staff/contractors as needed Docket Nos. 50-400, 50-269, 50-270, and 50-287
Enclosure:
Agenda cc w/enclosure: Distribution via ListServ Accession Number: ML090990018 NRR-001 OFFICE NRR/LPL2-2/PM NRR/LPL2-2/LA NRR/LPL2-2/BC NAME MVaaler RSola TBoyce (MVaaler for)
DATE 04/10/2009 04/10/2009 04/10/2009 OFFICIAL RECORD
Memo to Melanie C. Wong and Thomas H. Boyce from Marlayna Vaaler dated April 10, 2009
SUBJECT:
FORTHCOMING MEETING WITH PROGRESS ENERGY CAROLINAS, INC.,
AND DUKE ENERGY CAROLINAS, LLC, TO DISCUSS TOPICS INVOLVING THE LICENSE AMENDMENT REQUESTS TO TRANSITION THE SHEARON HARRIS NUCLEAR PLANT, UNIT 1 AND THE OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, TO THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) STANDARD 805, PERFORMANCE BASED STANDARD FOR FIRE PROTECTION DISTRIBUTION:
NON-PUBLIC JAdams, EDO, Rgn II LPL2-1 R/F Receptionist OWFN and TWFN (hard copy)
LPL2-2 R/F PMNS RidsNrrDorlLpl2-1 (MWong)
AKlein, NRR RidsNrrDorlLpl2-2 (TBoyce)
Plain, NRR RidsNrrPMJStang HBarrett, NRR RidsPMMVaaler DHarrison, NRR RidsNrrLAMOBrien SLaur, NRR RidsNrrLACSola MGalloway, NRR RidsNrrDorl RGallucci, NRR RidsRgn2MailCenter JCircle, NRR RidsOpaMail SDinsmore, NRR KClark, OPA Rgn II MStambaugh, NRR RidsAcrs_Acnw&mMailCenter MCuningham, NRR RidsOgcMailCenter
CATEGORY 2 MEETING TO DISCUSS THE LICENSE AMENDMENT REQUESTS TO TRANSITION THE SHEARON HARRIS NUCLEAR PLANT, UNIT 1, AND THE OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, TO THE NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805, PERFORMANCE BASED STANDARD FOR FIRE PROTECTION APRIL 21 & 22, 2009 AGENDA APRIL 21, 2009 10:00 a.m. - 10:15 a.m.
NRC and Industry Introductory Remarks 10:15 a.m. - 11:30 a.m.
Progress Energy Discussion of the Planned Treatment of Incipient Detection 11:30 a.m. - 11:45 a.m.
Opportunity for Public Comment 11:45 a.m. - 12:30 p.m.
LUNCH 12:30 p.m. - 2:15 p.m.
Continued Discussion of the Planned Treatment of Incipient Detection 2:15 p.m. - 2:30 p.m.
Opportunity for Public Comment 2:30 p.m. - 2:45 p.m.
BREAK 2:45 p.m. - 3:45 p.m.
Pilot Plant Discussion of Fire Modeling Verification and Validation 3:45 p.m. - 4:00 p.m.
Opportunity for Public Comment 4:00 p.m. - 5:00 p.m.
Pilot Plant Discussion on the Impact of Recovery Actions -
Transition of Operator Manual Actions into Recovery Actions 5:00 p.m.
ADJOURN
APRIL 22, 2009 8:00 a.m. - 9:00 a.m.
Continued Discussion on the Impact of Recovery Actions 9:00 a.m. - 9:15 a.m.
Opportunity for Public Comment 9:15 a.m. - 9:30 a.m.
BREAK 9:30 a.m. - 11:00 a.m.
Pilot Plant Discussion of Prior Approval of Fire PRA Methods to be Used in NFPA 805 Change Evaluations Post Transition 11:00 a.m. - 11:15 a.m.
Opportunity for Public Comment 11:15 a.m. - 11:45 a.m.
Discussion of License Amendment Request and NFPA 805 Infrastructure Schedules 11:45 a.m. - 12:00 p.m.
Closing Remarks and Final Opportunity for Public Comment 12:00 p.m.
ADJOURN