Framatome
Framatome
- has docket 05200020
Framatome | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
From | MONTHYEARML24031A5432024-01-230Site: Framatome ANP Richland
[table view]Start date: 23 January 2024 Title: Triennial Update to Decommissioning Funding Plan (DFP) for the Framatome Inc., Richland Nuclear Fuel Fabrication Facility Cover Letter Topic: Decommissioning Funding Plan ML24031A5442024-01-230Site: Framatome ANP Richland Start date: 23 January 2024 Title: Enclosuframatome Decommissioning Funding Plan Affidavit Topic: Decommissioning Funding Plan, Affidavit ML23354A2462023-12-200Site: Callaway Start date: 20 December 2023 Title: Cracking Assessment for Framatome RSG Channel Head Assembly Topic: Hydrostatic, Finite Element Analysis, Aging Management, License Renewal, Earthquake ML24019A1122023-12-140Site: Browns Ferry Start date: 14 December 2023 Title: Affidavit by Alan B. Meginnis for Presentation Slide Deck Entitled, Modification of Browns Ferry TS to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth Minimizer Inoperable During Reactor Startup, Dated December 2023 Topic: Affidavit ML24019A1722023-12-140Site: Browns Ferry Start date: 14 December 2023 Title: Affidavit by Alan B. Meginnis for ANP-3874P, Revision 2, Browns Ferry Atrium 11 Control Rod Drop Accident Analysis with the AURORA-B CRDA Methodology, Dated March 2021 Topic: Affidavit ML23348A1752023-12-140Site: 07109252 Start date: 14 December 2023 Title: Framatome Inc., Request for Five Year Renewal of Certificate of Compliance No. 9252 for the Model No. 51032-2 Packaging ML23348A1782023-12-140Site: 07109372 Start date: 14 December 2023 Title: Framatome Inc. Request for Five Year Renewal of Certificate of Compliance No. 9372 for the Model No. TN-B1 Packaging ML23348A1802023-12-140Site: 07109248 Start date: 14 December 2023 Title: Framatome Inc. Request for Five Year Renewal of Certificate of Compliance No. 9248 for the Model No. SP-1, SP-2, and SP-3 Packaging ML23341A1542023-12-070Site: 07109196, 07109362 Start date: 7 December 2023 Title: Framatome, Inc., 10 CFR 71.95 - 60 Day Report - Sob Cylinder Valve Installation ML23325A1612023-10-260Site: Palo Verde Start date: 26 October 2023 Title: Relief Request 70 - Proposed Alternatives in Accordance with 10 CFR 50.55a(z)(1) for Pressurizer Lower Shell Temperature Nozzle Topic: Boric Acid, Safe Shutdown Earthquake, Hydrostatic, Nondestructive Examination, Finite Element Analysis, Code Reconciliation, Earthquake, Pressure Boundary Leakage, Exclusive Use, Affidavit ML23291A2042023-10-180Site: Framatome ANP Richland Start date: 18 October 2023 Title: Framatome Inc., Richland Nuclear Fuel Fabrication Facility'S Request to Amend License No. SNM-1227 and Approval of Criticality Safety Methods Topic: Affidavit ML23291A2052023-10-180Site: Framatome ANP Richland Start date: 18 October 2023 Title: Framatome Inc., Affidavit Topic: Affidavit ML23282A0052023-10-090Site: 07109372 Start date: 9 October 2023 Title: Framatome, Inc., Submittal of 71-9372, TN-81 License Drawing Correction ML23282A0082023-10-090Site: 07109372 Start date: 9 October 2023 Title: Framatome, Inc. - 10 CFR 71.95 - 60 Day Report - TN-B1 Certificate Not Followed ML23215A1992023-08-310Site: Callaway Start date: 31 August 2023 Title: ANP-4012NP, Callaway, Unit 1, Rod Ejection Accident Analysis Revision 2, August 2023 Topic: Affidavit ML23248A2702023-07-310Site: 07007036 Start date: 31 July 2023 Title: Framatome July 12, 2023 Meeting Slides (Open Session) Topic: Accident Tolerant Fuel ML23198A3182023-07-170Site: Framatome ANP Richland Start date: 17 July 2023 Title: E10-08-001 NRC Materials License SNM-1227 Chapter 1 General Information - Public Version Topic: High winds, Decommissioning Funding Plan, Earthquake ML23198A3172023-07-170Site: Framatome ANP Richland Start date: 17 July 2023 Title: Framatome Inc. Richland Nuclear Fuel Fabrication Facility'S Revised Chapter 1 of License No. SNM-1227 ML23202A0692023-06-300Site: Framatome ANP Richland Start date: 30 June 2023 Title: Affidavit for Slides for July 12, 2023 Pre-Licensing Meeting with Framatome ML23137A3972023-05-170Site: Framatome ANP Richland Start date: 17 May 2023 Title: Framatome, Inc., Richland Nuclear Fuel Fabrication Facility - Affidavit ML23137A4052023-05-170Site: Framatome ANP Richland Start date: 17 May 2023 Title: Framatome, Inc., Affidavit ML23137A3962023-05-170Site: Framatome ANP Richland Start date: 17 May 2023 Title: Framatome, Inc., Richland Nuclear Fuel Fabrication Facilitys Request to Amend License No. SNM-1227; and Approval of Criticality Safety Methods ML23137A4062023-05-170Site: Framatome ANP Richland Start date: 17 May 2023 Title: Framatome, Inc., Submittal of NRC Form 327s Which Report the Results of Material Balance Accounting and Seid Calculations for the Period March 22, 2022 to March 20, 2023 ULNRC-06808, Affidavit2023-04-270Site: Callaway Start date: 27 April 2023 Title: Affidavit Topic: Exclusive Use, Affidavit ML23117A0432023-04-200Site: Calvert Cliffs, Oconee, PROJ0728 Start date: 20 April 2023 Title: Framatome, Inc., Part 21 Notification of Existence of a Defect ML23100A1072023-04-100Site: Calvert Cliffs, Oconee, Watts Bar, South Texas Start date: 10 April 2023 Title: Framatome Part 21 Report Re Erroneous Change of State for Circuit Breaker ML23089A2602023-03-300Site: Framatome ANP Richland Start date: 30 March 2023 Title: Framatome, Inc. - 2023 Fee Increase for Fuel Cycle Licensees; License No. SNM-1227; Docket No. 70-1257 ML23093A1142023-03-300Site: Framatome ANP Richland Start date: 30 March 2023 Title: Comment (001) from Timothy J. Tate on Behalf of Framatome on PR-170 and 171 - Revision of Fee Schedules; Fee Recovery for Fiscal Year 2023 ML23054A2562023-02-230Site: Framatome ANP Richland Start date: 23 February 2023 Title: 60-Day Report to January 2, 2023, Incident Reported Under 10 CFR 70 Appendix a Concurrent Report (NRC Event No. 56292); Framatome Richland Facility; License No. SNWI-1227; Docket No. 70-1257 ML23031A2142023-01-310Site: 07109372 Start date: 31 January 2023 Title: Framatome, Inc., TN-B1 Shipping Container, Amendment Request for Increased Enrichment Values ML23031A2172023-01-310Site: 07109372 Start date: 31 January 2023 Title: Attachment B: Non-Proprietary Redacted Application, FS1-0014159, Rev. 11,0, Framatome TN-B1 Docket No. 71-9372 Safety Analysis Report Topic: Non-Destructive Examination, Finite Element Analysis, Fuel cladding, Liquid penetrant ML23025A3172023-01-250Site: Framatome ANP Richland Start date: 25 January 2023 Title: Submittal of Integrated Safety Analysis (ISA) Summary Annual Update for Framatome Inc.'S (Framatome'S) Richland, Washington Fuel Fabrication Facility ML23025A3182023-01-250Site: Framatome ANP Richland Start date: 25 January 2023 Title: Framatome, Inc., Richland, Washington Fuel Fabrication Facility Annual Update for Integrated Safety Analysis (Isa), Attachment C - Table of Contents (2022) ML23020A9442023-01-200Site: Arkansas Nuclear Start date: 20 January 2023 Title: Enclosure 3: Affidavit ML23013A3072023-01-130Site: 07109251 Start date: 13 January 2023 Title: Framatome, Inc. - Renewal Request for Certificate of Compliance No. 9251 for the Model No. BW-2901 Packaging ML23088A2172022-12-310Site: Arkansas Nuclear Start date: 31 December 2022 Title: Relief Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 - Technical Report, ANP-4023NP, Revision 0, December 2022 Topic: Boric Acid, Nondestructive Examination, Liquid penetrant ML22353A0902022-12-190Site: 07109372 Start date: 19 December 2022 Title: Enc-Meeting Between Framatome ML22353A0882022-12-130Site: 07109372 Start date: 13 December 2022 Title: NRC Pre-Application Meeting 12-13-2022 ML22341A1562022-12-070Site: Framatome ANP Richland Start date: 7 December 2022 Title: 60-day Follow Up Report for an Incident Reported Under 10 CFR 70 Appendix a (C) Concurrent Report (NRC Event No.56713); Framatome Richland Facility ML22336A1012022-11-290Site: Framatome ANP Richland Start date: 29 November 2022 Title: Framatome Affidavit LOI 11/29/2022 ULNRC-06783, Enclosure 2: Affidavit for Withholding2022-11-160Site: Callaway Start date: 16 November 2022 Title: Enclosure 2: Affidavit for Withholding Topic: Exclusive Use, Affidavit ML22335A5012022-11-160Site: Callaway Start date: 16 November 2022 Title: Enclosure 3: ANP-4012NP, Revision 1, Callaway Rod Ejection Accident Analysis Topic: Affidavit ML22305A5412022-10-310Site: 07109372 Start date: 31 October 2022 Title: Framatome, Inc. - 10 CFR 71.95 - 60 Day Report - TN-B1 Certificate Not Followed ML22292A0232022-10-180Site: Davis Besse Start date: 18 October 2022 Title: Framatome Inc., Document ANP-2718-007Q1NP, Revision 0, Response to Request for Additional Information on Appendix G Pressure-Temperature Limits for 52 EFPY for Davis-Besse Nuclear Power Station - First Energy Nuclear Operating Company 2024-01-23 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
To | MONTHYEARML24019A0862024-02-050Start date: 5 February 2024
[table view]Title: Verification for Approved Framatome Topical Report, ANP-10340, Revision 0, Supplement 1P-A, Revision 0, Incorporation of Chromia-doped Fuel Properties in Framatome PWR Methods (EPID L-2021-TOP-0015) - (Topical Report) ML24019A0852024-02-050Start date: 5 February 2024 Title: Verification for Approved Framatome Topical Report, ANP-10340, Revision 0, Supplement 1P-A, Revision 0, Incorporation of Chromia-doped Fuel Properties in Framatome PWR Methods Transmittal ML24038A3582024-02-050Site: 11006578 Start date: 5 February 2024 Title: Export License Issued to Framatome Inc for XSNM3837 ML24026A2792024-01-310Site: Framatome ANP Richland Start date: 31 January 2024 Title: Framatome - Richland Integrated Inspection Report 07001257/2023004 Topic: Uranium Hexafluoride ML24003A8952024-01-120Site: 07109248 Start date: 12 January 2024 Title: Revision No. 27 of Certificate of Compliance No. 9248, for the Model Nos. SP-1 SP-2, and Sp-3 Transportation Packages ML24005A2162024-01-120Site: 07109252 Start date: 12 January 2024 Title: Revision No. 11 of Certificate of Compliance No. 9252, for the Model No. 51032-2 Transportation Package ML23342A0692024-01-020Site: 07100003 Start date: 2 January 2024 Title: Framatome - U.S. Nuclear Regulatory Commission Inspection Report No. 71?0003/2023?201 ML23352A3912023-12-200Site: Framatome ANP Richland Start date: 20 December 2023 Title: Framatome Inc. - Richland Material Control and Accounting Program Inspection Report 07001257-2023401-Public Cover Letter Topic: Affidavit ML23349A0652023-12-150Start date: 15 December 2023 Title: NRR E-mail Capture - Opportunity to Review and Comment on an NRC Information Collection Pre-Application Communication and Scheduling for Licensing Actions Related to Digital Instrumentation and Controls (3150-XXXX) ML23313A0772023-11-270Site: Framatome ANP Richland Start date: 27 November 2023 Title: Framatome Inc. - Request to Amend License and Approve Criticality Safety Methods - License Amendment 19 (Enterprise Project Identification Number L-2023-LLA-0073) ML23313A0792023-11-270Site: Framatome ANP Richland Start date: 27 November 2023 Title: Enclosure 2: Amendment 19 of SNM-1227 ML23321A1792023-11-010Site: 07109372 Start date: 1 November 2023 Title: E-mail - Request for Additional Information for the Review of the Model No. TN-B1 Package ML23296A0072023-10-250Site: Framatome ANP Richland Start date: 25 October 2023 Title: Framatome-Richland - Core Inspection Report 07001257/2023003 Topic: Emergency Lighting, Fire Protection Program, Fire Watch ML23229A1572023-09-150Site: 07007036 Start date: 15 September 2023 Title: Enclosure 2 Framatome Public Meeting Summary ML23229A157 ML23255A2892023-09-150Site: Framatome ANP Richland Start date: 15 September 2023 Title: Framatome-Richland Inspection Schedule for Calendar Year 2024 ML23229A1562023-09-150Site: 07007036 Start date: 15 September 2023 Title: Enclosure 1 Framatome Meeting List of Attendees ML23229A156 (Public) ML23254A2502023-09-130Site: Framatome ANP Richland Start date: 13 September 2023 Title: Request of Additional Information Letter to Framatome ML23207A0282023-07-260Start date: 26 July 2023 Title: Transmittal - Withholding Determination Regarding Response to Request for Review of Draft Safety Evaluation for ANP-10340P-A Incorporation of Chromia-doped Fuel Properties in Framatome PWR Methods ML23207A0592023-07-260Start date: 26 July 2023 Title: Response to Request for Comment on Draft SE for ANP-10340P-A, Rev. 0, Suppl. 1, Rev. 0, Incorporation of Chromia-doped Fuel Properties in Framatome PWR Methods ML23202A2022023-07-240Site: Framatome ANP Richland Start date: 24 July 2023 Title: Framatome Richland Core Inspection Report 07001257/2023002 ML23191A8742023-07-100Site: 11005789 Start date: 10 July 2023 Title: Export License Issued to Framatome Inc. XW015/02 ML23179A2422023-07-050Start date: 5 July 2023 Title: Transmittal of Verification for Publication of Approved Framatome Topical Report, ANP-10311, Revision 1, Supplement 1P-A, Revision 0, COBRA-FLX: ORFEO-HMP Critical Heat Flux Correlation ML23179A2432023-07-050Start date: 5 July 2023 Title: Verification for Publication of Approved Framatome Topical Report, ANP-10311, Revision 1, Supplement 1P-A, Revision 0, COBRA-FLX: ORFEO-HMP Critical Heat Flux Correlation (Form 896) ML23177A2292023-06-270Start date: 27 June 2023 Title: Withholding Determination for June 26, 2023, Framatome Pre-submittal Meeting Proprietary Presentation on High Burnup FFRD White Paper ML23144A3092023-06-210Site: Framatome ANP Richland Start date: 21 June 2023 Title: Acceptance Letter for Request by Framatome for a License Amendment for an Approval of Criticality Safety Methods ML23144A3372023-06-120Site: Framatome ANP Richland Start date: 12 June 2023 Title: Letter to Framatome Approval of Request to Withhold Proprietary Information ML23145A3082023-06-020Site: Framatome ANP Richland Start date: 2 June 2023 Title: Framatome - Licensing Project Manager Change Letter ML23111A0472023-05-020Start date: 2 May 2023 Title: Withholding Determination Regarding Approved Framatome Topical Report, EMF-2310, Revision 1, Supplement 2P, Revision 0, SRP Chapter 15 Non LOCA Methodology for Pressurized Water Reactors (Transmittal) ML23111A0482023-05-020Start date: 2 May 2023 Title: Withholding Determination Regarding Approved Framatome Topical Report, EMF-2310, Revision 1, Supplement 2P, Revision 0, SRP Chapter 15 Non LOCA Methodology for Pressurized Water Reactors - Form 897 ML22130A1212023-04-210Start date: 21 April 2023 Title: Draft Safety Evaluation for Framatome Topical Report ANP-10340P, Revision 0, Supplement 1, Revision 0, Incorporation of Chromia-Doped Fuel Properties in Framatome PWR Methods (Transmittal) ML23089A2592023-04-100Site: Framatome ANP Richland Start date: 10 April 2023 Title: 2023-001 Framatome-Richland - NRC Integrated Inspection Report 07001257/2023001 ML23047A1192023-03-270Start date: 27 March 2023 Title: Letter to Gayle Elliott in Response to Request from Gary Peters (Framatome) Fee Exemption NRC Review of a Topical Report for Single-Phase Computational Fluid Dynamics Licensing Topic: Exemption Request ML23060A2042023-03-010Site: 11005789 Start date: 1 March 2023 Title: NRC Receipt of Export Application, XW015/02 ML23045A1192023-02-150Site: Browns Ferry Start date: 15 February 2023 Title: Proprietary Determination Letter Enclosure - Browns Ferry Atrium 11 LAR Supp. 6 ML23041A0162023-02-100Site: 11005788 Start date: 10 February 2023 Title: Email - NRC Receipt of Export Application_ XCOM1202.03 ML23033A3482023-02-060Site: 07109319 Start date: 6 February 2023 Title: Certificate of Compliance No. 9319, Revision 14 ML23033A3472023-02-060Site: 07109319 Start date: 6 February 2023 Title: Letter - Revision No. 14 of Certificate of Compliance No. 9319, for the Model Nos. MAP-12 and MAP-13 Transportation Packages ML22336A0992023-02-030Site: Framatome ANP Richland Start date: 3 February 2023 Title: Cover Letter - Framatome Proprietary Approval 3x Letter of Intent Submittals 11/21/2022 and 11/29/2022 ML23030B6172023-01-310Site: Framatome ANP Richland Start date: 31 January 2023 Title: Framatome-Richland - Core Inspection Report 07001257/2022004 ML23020A0862023-01-300Site: 07109251 Start date: 30 January 2023 Title: Encl 1: Certificate of Compliance No. 9251, Rev. 17 ML23020A0872023-01-300Site: 07109251 Start date: 30 January 2023 Title: Revision No. 17 of Certificate of Compliance No. 9251, for the Model No. BW-2901 Package ML22298A2692022-12-050Start date: 5 December 2022 Title: U.S. NRC Draft Safety Evaluation for Framatome Topical Report, ANP-10353P, Rev. 0, Increased Enrichment for PWRs (EPID L-2021-TOP-0004) (Transmittal) ML22298A0732022-11-300Start date: 30 November 2022 Title: U.S. NRC Draft Safety Evaluation for Framatome Topical Report, EMF-2310, Revision 1, Supplement 2P, Revision 0, SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors ML22313A1332022-11-170Start date: 17 November 2022 Title: Withholding Determination for Request for Concurrence on a Minor Difference in Gaia Fuel Geometry Range for Critical Heat Flux Regarding Framatome Topical Report, ANP-10341P-A, Revision 0 - Email - ML22028A1912022-10-300Site: 07109372 Start date: 30 October 2022 Title: Attachment 6: Proposed Changes to CoC ML22272A0252022-10-040Site: Framatome ANP Richland Start date: 4 October 2022 Title: Framatome-Richland -Integrated Inspection Report 07001257/2022003 ML22238A0642022-08-250Start date: 25 August 2022 Title: NRR E-mail Capture - Action: Opportunity to Review and Comment on an NRC Information Collection, Scheduling Information for the Licensing of Accident Tolerant, Higher Burnup, and Increased Enrichment Fuels (3150-XXXX) ML22234A1382022-08-230Site: 07100003 Start date: 23 August 2022 Title: Quality Assurance Program Approval for Radioactive Material Packages No. 0003, Revision 31 ML22234A1522022-08-230Site: 07100003 Start date: 23 August 2022 Title: Quality Assurance Program Approval for Radioactive Material Packages No. 0003, Revision 31 ML22217A0512022-08-100Site: 07109372 Start date: 10 August 2022 Title: Certificate of Compliance for Radioactive Material Packages - 71-9372.r3 2024-02-05 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||