Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23151A12331 May 2023Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Shearon Harris Nuclear Plant
ML22130A0309 May 2022Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350
ML22075A35917 March 2022Notification of Inspection and Request for Information for NRC Problem Identification and Resolution InspectionProbabilistic Risk Assessment
Operator Manual Action
Operability Determination
Maintenance Rule Program
ML22034A39316 February 2022Calendar Year 2021 Security Baseline Completion MemoCOVID-19
ML21131A14711 May 2021Public Meeting Summary 2020 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20210385Pandemic
Coronavirus
RA-21-0097, Notification of Permit Revision Request Regarding Copper and Zinc Limits15 March 2021Notification of Permit Revision Request Regarding Copper and Zinc Limits
ML20136A22215 May 2020Har - Bru 2019 Aam Meeting SummaryCoronavirus
COVID-19
ML19113A06514 May 2019Summary of Meeting with Duke Energy to Discuss Proposed License Amendment Request for Shearon Harris, Unit 1, Technical Specification Changes Associated with Departure from Nucleate Boiling Ratio Safety Limit
ML19123A3522 May 2019Public Meeting Summary - Shearon Harris Nuclear Plant, Docket No. 50-400
ML18109A09119 April 2018Summary of 2017 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear Plant, Docket No. 50-400Open House
ML18074A02020 March 2018Fpra FAQ 16-0011 Closure MemoProbabilistic Risk Assessment
Thermoset
Cable Tray Ignition
ML17145A31425 May 2017EOC Meeting SummaryOpen House
ML16300A18027 October 2016Verbal Authorization of Relief Request I3R-16, for Reactor Vessel Closure Head Penetration Nozzle Repair Technique, Inservice Inspection Program -Third 10-Year IntervalNon-Destructive Examination
Stress corrosion cracking
ML16138A05024 May 2016Audit Report - Application For Amendment Shearon Harris Nuclear Power Plant, Unit 1 - The Proposed License Amendment Revises The As-Found Lift Setting Tolerance For Main Steam Line Code Safety Valves In Technical Specifications (TAC No. MF7195)
ML16134A15512 May 2016Public Meeting Summary - 2015 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear PlantOpen House
ML16103A25514 April 201605/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444)
ML15149A32229 May 20152014 Harris Annual Assessment Meeting SummaryOpen House
ML15107A42517 April 20154/20/2015, Forthcoming Closed Meeting with Duke Energy Progress, Inc. to Discuss Shearon Harris Nuclear Power Plant, Unit 1, Relief Request I3R-15 Revision and Supplement, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspe
ML13330B63927 November 2013Verbal Authorization of Relief Request 13R-13 for Reactor Vessel Closure Head Penetration Nozzle Repair Inservice Inspection Program - Third 10-Year IntervalNon-Destructive Examination
ML13295A30622 October 2013Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC
ML13150A07131 May 2013Verbal Authorization of Relief Request I3R-11 for Reactor Vessel Closure Head Penetration Nozzel Repair Inservice Inspection Program - Third 10-Year IntervalNondestructive Examination
ML13142A46722 May 2013Special Inspection Charter to Evaluate Harris Reactor Vessel Head Nozzle 49 Flaw IssueNon-Destructive Examination
Stress corrosion cracking
ML13120A1372 May 2013Notice of Forthcoming Meeting with Duke Energy, Inc. Regarding a Non-Conservative Technical Specification Loss-of-Offsite Power Voltage Setpoint License Amendment Request for Shearon Harris, Unit 1
ML13106A33717 April 2013Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities
ML12300A40326 October 201211/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External EventsFLEX
ML12284A46112 October 2012Forthcoming Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-Design-Basis External EventsFLEX
ML12261A09917 September 201210/2/12 - Notice of Forthcoming Public Conference Call with Duke Energy Carolinas Regarding Shearon Harris Nuclear Plant, Unit 1
ML12249A1706 September 2012Notice of Forthcoming Conference Call Public Meeting with Duke Energy Regarding the Non Conservative Technical Specifications License Amendment Requests for Shearon Harris Nuclear Plant Unit 1
ML1219805575 September 2012Close-Out of National Fire Protection Association Standard 805 Frequently Asked Question 12-0062: Updated Final Safety Analysis Report ContentFire Protection Program
ML12144A44024 May 2012Verbal Authorization of Relief Request I3R-06 for Reactor Vessel Closure Head Penetration Nozzles Repair Inservice Inspection Program - Third 10-Year IntervalNon-Destructive Examination
Nondestructive Examination
Liquid penetrant
ML11273008230 September 2011Request for Additional Information Regarding Measurement Uncertainty Recapture Power UprateAging Management
Stress corrosion cracking
License Renewal
Power Uprate
Measurement Uncertainty Recapture
ML1103804978 February 2011Notice of Forthcoming Preapplication Meeting with Carolina Power & Light Company and Representatives Regarding Shearon Harris Nuclear Plant, Unit 1
ML1024301725 October 2010Trip Report on Observing the National Fire Protection Association 805 Readiness Self Assessment Performed at the Shearon Harris Nuclear PlantFire Protection Program
ML1015805098 June 2010the Nuclear Regulatory Commission Staff Spot-Check Review of North Carolina Eastern Municipal Power Agency'S Ownership Interest of Shearon Harris, Unit 1 and Brunswick, Units 1 and 2 on May 21, 2010 - Finding of No Potential Issues in Bank
ML1015901998 June 2010the Nuclear Regulatory Commission Staff Spot-Check Review of Progress Energy Carolina'S Ownership Interest of H.B. Robinson Steam Electric Plant Unit 2, Brunswick Steam Electric Plant Units 1 and 2 & Shearon Harris Nuclear Power Plant Unit
ML1015900148 June 2010the Nuclear Regulatory Commission Staff Spot-Check Review of North Carolina Eastern Municipal Power Agency'S Ownership Interest of Shearon Harris, Unit 1 and Brunswick, Units 1 and 2 on May 20, 2010 - Finding of No Potential Issues in Bank
ML10057020026 February 2010Notice of Closed Meeting with Progress Energy to Observe a Live Test Fire of Mackenzie River Partner'S Remotely Operated Weapon System at the Shearon Harris Nuclear Plant
ML0936406957 January 2010Notice of Meeting with Carolina Power & Light Company to Discuss Requests for Additional Information Associated with Generic Letter 2004-02
ML09166050424 June 200904/21-22/2009 Summary of Category 2 Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition Shearon, Unit 1 and Oconee to NFPA 805Hot Short
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Continuous fire watch
Fire Watch
ML09096043628 May 2009Lessons from Regulatory Audits of the Pilot Plants That Are Transitioning to a Fire Protection Licensing Basis Based on the National Fire Protection Association (NFPA) Standard NFPA 805 as Allowed by 10 CFR 5.48 (C)Safe Shutdown
Probabilistic Risk Assessment
Large early release frequency
Fire Protection Program
ML09099050529 April 200903/20/09 Summary of Site Audit to Support the Review of a License Amendment Request for Shearon Harris to Transition to the National Fire Protection Association Standard 805 Fire Protection Licensing BasisProbabilistic Risk Assessment
ML09099001810 April 200904/21-22/2009, Notice of Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition the Shearon, Unit 1 and the Oconee, Units 1, 2 and 3Probabilistic Risk Assessment
Operator Manual Action
ML0829501879 September 2008DHS Shearon Harris Consultation Report Cover Letter
ML08140029220 August 2008Close-out of National Fire Protection Association (NFPA) Standard 805 Frequently Asked Question 07-0032Fire Protection Program
ML0818302601 July 2008Meeting Minutes of the ACRS Plant License Renewal Subcommittee Regarding Shearon Harris, May 7, 2008Ultimate heat sink
Weld Overlay
VT-2
Aging Management
License Renewal
Through-Wall Leak
Through-Wall Leakage
Power Uprate
Measurement Uncertainty Recapture
ML08169012117 June 2008Forthcoming Closed Meeting with Progress Energy Carolinas, Inc., to Discuss the May 29, 2008, License Amendment Request (LAR) to Transition the Shearon Harris Nuclear Plant, Unit 1 (Harris) to National Fire Protection Association (Nfpa)..Probabilistic Risk Assessment
ML08085019226 March 2008Forthcoming Meeting with Cp&L to Discuss an Open Item Related to the License Renewal Review for Shearon Harris Nuclear Power Plant, Unit 1License Renewal
ML08074008414 March 2008Draft Regulatory Guide for Comment
ML0807203353 March 2008Comment (7) of Chatham County Board of Commissioners Opposing Generic Environmental Impact Statement (GEIS) for License Renewal of the Shearon Harris Nuclear Power PlantLicense Renewal
Environmental Justice
ML07352051319 December 200701/07-08/2008 Pilot Observation Visit with Duke Energy and Progress Energy Regarding Oconee and Harris Transition to National Fire Protection Association Standard 805