ML12242A432

From kanterella
Jump to navigation Jump to search
Summary of Category 1 Public Meeting - Regulatory Conference and Predecisional Enforcement Conference
ML12242A432
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/28/2012
From: Randy Musser
NRC/RGN-II/DRP/RPB4
To: Hamrick G
Carolina Power & Light Co
References
EA-12-132
Download: ML12242A432 (43)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 28, 2012 EA-12-132 Mr. George Hamrick Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165

SUBJECT:

MEETING

SUMMARY

- CATEGORY 1 PUBLIC MEETING - REGULATORY CONFERENCE AND PREDECISIONAL ENFORCEMENT CONFERENCE, DOCKET NO. 50-400

Dear Mr. Hamrick:

This refers to the Regulatory Conference and Pre-decisional Enforcement Conference meeting conducted at the NRC Region II Office on August 24, 2012, at 8:00 a.m. The meetings purpose was for you to present to the NRC your perspectives on the facts and assumptions used by the NRC to arrive at the findings listed in inspection report 05000400/2012007 and their significance, the opportunity to provide your perspective on the apparent violations and any other information you believe the NRC should take into consideration before making an enforcement decision.

The topics discussed included Duke Energys position with regard to preliminary White findings and preliminary Severity Level III traditional enforcement violation documented in integrated inspection report 05000400/2012007. Enclosed are a list of attendees (Enclosure 1) and the presentation handouts (Enclosure 2).

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4603.

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-400 License No.: NPF-63

Enclosures:

As stated cc w/Encls: (See page 2)

___________________ X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE JSD /RA/ RAM /RA/

NAME JDodson RMusser DATE 08/28/2012 08/28/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO G. Hamrick 2 cc w/encls: R. Keith Holbrook Brian Bernard Manager, Support Services Manager, Nuclear Services and EP Shearon Harris Nuclear Power Plant Nuclear Protective Services Electronic Mail Distribution Shearon Harris Nuclear Power Plant Electronic Mail Distribution David H. Corlett Supervisor Brian C. McCabe Licensing/Regulatory Programs Manager, Nuclear Oversight Progress Energy Shearon Harris Nuclear Power Plant Electronic Mail Distribution Progress Energy Electronic Mail Distribution David T. Conley Senior Counsel George T. Hamrick Legal Department Vice President Progress Energy Carolina Power and Light Company Electronic Mail Distribution Shearon Harris Nuclear Power Plant Electronic Mail Distribution Donna B. Alexander Manager, Nuclear Regulatory Affairs Lara S. Nichols (interim)

Deputy General Counsel Progress Energy Duke Energy Corporation Electronic Mail Distribution Electronic Mail Distribution John H. O'Neill, Jr.

M. Christopher Nolan Shaw, Pittman, Potts & Trowbridge Director - Regulatory Affairs 2300 N. Street, NW Duke Energy Carolinas, LLC Washington, DC 20037-1128 Electronic Mail Distribution Joseph W. Donahue Robert J. Duncan II Vice President Senior Vice President Nuclear Oversight Progress Energy Progress Energy Electronic Mail Distribution Electronic Mail Distribution Sean T. O'Connor W. Lee Cox, III Manager, Support Services Section Chief Shearon Harris Nuclear Power Plant Radiation Protection Section Electronic Mail Distribution N.C. Department of Environmental Commerce & Natural Resources Donald L. Griffith Electronic Mail Distribution Training Manager Shearon Harris Nuclear Power Plant (cc w/encls continued next page)

Progress Energy Electronic Mail Distribution

G. Hamrick 3 (cc w/encls continued)

Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 Chairman North Carolina Utilities Commission Electronic Mail Distribution Terrence E. Slake Manager Nuclear Plant Security Shearon Harris Nuclear Power Plant Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Chair Board of County Commissioners of Wake County P.O. Box 550 Raleigh, NC 27602 Ernest J. Kapopoulos Jr.

Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution Chair Board of County Commissioners of Chatham County P.O. Box 1809 Pittsboro, NC 27312 Senior Resident Inspector U.S. Nuclear Regulatory Commission Shearon Harris Nuclear Power Plant U.S. NRC 5421 Shearon Harris Rd New Hill, NC 27562-9998

G. Hamrick 4 Letter to G. Hamrick from R. Musser dated August 28, 2012

SUBJECT:

MEETING

SUMMARY

- CATEGORY 1 PUBLIC MEETING - REGULATORY CONFERENCE AND PREDECISIONAL ENFORCEMENT CONFERENCE, DOCKET NO. 50-400 Distribution w/encl:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource