UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 20, 2013 Mr. Ernie Kapopoulos Vice President Shearon Harris Nuclear Power Plant Carolina Power and Light Company P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165

SUBJECT:

PUBLIC MEETING - CATEGORY 3

SUMMARY

- NRC SPECIAL INSPECTION ON REACTOR VESSEL HEAD NOZZLE REPAIR OF SHEARON HARRIS NUCLEAR PLANT, DOCKET NO. 50-400

Dear Mr. Kapopoulos:

This letter refers to our meeting at the Holly Springs Cultural Center in Holly Springs, NC., on June 13, 2013, during which we discussed the results of the Nuclear Regulatory Commissions (NRC) Special Inspection Team review of the reactor vessel head nozzle repair at the Shearon Harris Nuclear Plant. The meeting accomplished the goal of communicating the results of the inspection in a public setting and presenting the methodology that was used to determine the licensees readiness to restart the facility. The meeting also afforded the members of the public the opportunity to ask questions and provide feedback to the NRC regarding NRCs inspection activities at the Shearon Harris site before and after the business portion of the meeting.

The list of meeting attendees is enclosed. The meeting slide presentations are available under accession number ML13170A335 in ADAMS. In addition, the meeting handout can be found under accession number ML13070A328 (Harris Special Inspection Question and Answers).

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System, (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

E. Kapopoulos 2 If you have any questions concerning this letter, please contact me at 404-997-4560 or Steven.Vias@NRC.gov.

Sincerely,

/RA/

Steven J. Vias, Chief Engineering Branch 3 Division of Reactor Safety Docket No.: 50-400 License No.: NPF-63

Enclosure:

List of Attendees cc: (See page 3)

E. Kapopoulos 3 cc: David H. Corlett Brian Bernard Supervisor Manager, Nuclear Services and EP Licensing/Regulatory Programs Nuclear Protective Services Progress Energy Shearon Harris Nuclear Power Plant Electronic Mail Distribution Electronic Mail Distribution David T. Conley Brian C. McCabe Senior Counsel Manager, Nuclear Oversight Legal Department Shearon Harris Nuclear Power Plant Progress Energy Progress Energy Electronic Mail Distribution Electronic Mail Distribution Donna B. Alexander George T. Hamrick Manager, Nuclear Regulatory Affairs Vice President (interim)

Carolina Power and Light Company Progress Energy Shearon Harris Nuclear Power Plant Electronic Mail Distribution Electronic Mail Distribution John H. O'Neill, Jr.

Lara S. Nichols Shaw, Pittman, Potts & Trowbridge Deputy General Counsel 2300 N. Street, NW Duke Energy Corporation Washington, DC 20037-1128 Electronic Mail Distribution Joseph W. Donahue M. Christopher Nolan Vice President Director - Regulatory Affairs Nuclear Oversight General Office Progress Energy Duke Energy Corporation Electronic Mail Distribution Electronic Mail Distribution W. Lee Cox, III Robert J. Duncan II Section Chief Senior Vice President Radiation Protection Section Progress Energy N.C. Department of Environmental Electronic Mail Distribution Commerce & Natural Resources Electronic Mail Distribution Sean T. O'Connor Manager, Support Services Public Service Commission Shearon Harris Nuclear Power Plant State of South Carolina Electronic Mail Distribution P.O. Box 11649 Columbia, SC 29211 Donald L. Griffith Training Manager Chairman Shearon Harris Nuclear Power Plant North Carolina Utilities Commission Progress Energy Electronic Mail Distribution Electronic Mail Distribution R. Keith Holbrook Manager, Support Services Shearon Harris Nuclear Power Plant (cc contd - See page 4)

Electronic Mail Distribution

E. Kapopoulos 4 (cc contd)

Terrence E. Slake Manager Nuclear Plant Security Shearon Harris Nuclear Power Plant Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Chair Board of County Commissioners of Wake County P.O. Box 550 Raleigh, NC 27602 Ernest J. Kapopoulos Jr.

Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution Chair Board of County Commissioners of Chatham County P.O. Box 1809 Pittsboro, NC 27312 Senior Resident Inspector U.S. Nuclear Regulatory Commission Shearon Harris Nuclear Power Plant U.S. NRC 5421 Shearon Harris Rd New Hill, NC 27562-9998

Letter to Ernie Kapopoulos from Steven J. Vias dated June 20, 21013.

SUBJECT:

PUBLIC MEETING - CATEGORY 3

SUMMARY

- NRC SPECIAL INSPECTION ON REACTOR VESSEL HEAD NOZZLE REPAIR OF SHEARON HARRIS NUCLEAR PLANT, DOCKET NO. 50-400 DISTRIBUTION:

T. Reis, RII R. Croteau, RII C. Christensen, RII B. Jones, RII S. Vias, RII G. Hopper, RII R. Williams, RII G. Woodruff, RII J. Ledford, RII J. Collins, NRR D. Alley, NRR C. Evans RII EICS (Part 72 Only)

L. Douglas, RII EICS (Linda Douglas)

PUBLIC RidsNrrSharonHarris Resource

LIST OF ATTENDEES NRC Region II T. Reis J. Ledford P. Lessard S. Vias G. Woodruff A. Kroeger R. Williams J. Austin A. Butcavage Duke M. Clayton J. Dufner E. Kapopoulos B. Mcabe L. Mergan R. Repko S. Volk Public C. Beard-WNCN-TV L. Cox-NC-DHHS K. Crawhil T. Glod M. Gillan K. Heffner G. Lawson N. Mirza R. Mirza V. Patterson R. Sipe E. Stevens B. Stevenson D. Waller-WNCN-TV J. Warren WTVD Reporter Enclosure