Summary of September 29, 2016, Duke Energy Progress, Llc. to Discuss Proposed License Amendment Request Regarding Shearon Harris Nuclear Power Plant, Unit 1, BWR Storage Rack Inserts and the Spent Fuel Pool Criticality Analysis
ML16286A015
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/01/2016
From: Martha Barillas
Plant Licensing Branch II
To:
Duke Energy Progress
Barillas M DORL/LPL2-2 301-415-2760
References
CAC MF8327
Download: ML16286A015 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 1, 2016 LICENSEE:

Duke Energy Progress, LLC FACILITY:

Shearon Harris Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF SEPTEMBER 29, 2016, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUEST FOR SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1, REGARDING BOILING-WATER REACTOR STORAGE RACK INSERTS AND SPENT FUEL POOL CRITICALITY ANALYSIS (CAC NO. MF8327)

On September 29, 2016, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Duke Energy Progress, LLC (the licensee), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the proposed license amendment request (LAR) regarding boiling-water reactor (BWR) storage rack inserts and spent fuel pool (SFP) criticality analysis for the Shearon Harris Nuclear Power Plant, Unit 1 (Harris). The meeting notice and agenda, dated September 9, 2016, are available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML16253A110.

A list of attendees is enclosed.

The licensee presented informational slides at the meeting (ADAMS Accession No. ML16267A029).

During the meeting, the licensee discussed the unique configuration of the Harris SFP in that Brunswick Steam Electric Plant BWR fuel assemblies are stored at Harris, which is a pressurized-water reactor (PWR) site. The SFPs at Harris have BWR and PWR racks. The licensee plans to remove credit for Boraflex in the BWR fuel storage racks. The licensee explained its proposed insert design, and the different accident scenarios it will model in its application. The design the licensee is proposing for the Harris SFP is a new design that is unprecedented. The licensee provided a list of the Technical Specifications that will be affected by the proposed LAR. The licensee plans to install the new inserts under the Title 10 of the Code of Federal Regulations (10 CFR) Section 50.59, "Changes, tests, and experiments," process. The NRC staff asked whether the new inserts would have any impact on the analysis of record and the licensee responded that the analysis of record would not be impacted by installation of the inserts. Currently, the Harris SFP is operable but degraded due to the Boraflex degradation. The licensee plans to request a 12-month review schedule and plans to submit the proposed LAR during the first quarter of 2017. The NRC staff informed the licensee that SFP criticality LARs currently in-house under review are taking over 12 months to be completed. Due to the unprecedented design and the uniqueness of the proposed LAR at Harris, the NRC staff informed the licensee that this review will likely be considered a complex licensing action and the licensee should plan for a review schedule that will exceed 12 months. The NRC staff will provide an estimate of the review schedule after completing an acceptance review of the licensee's submittal.

No regulatory decisions or commitments were made at the meeting.

No members of the public were in attendance.

Please direct any inquiries to me at 301-415-2760 or Martha.Barillas@nrc.gov.

Docket Nos. 50-400

Enclosure:

List of Attendees cc w/enclosure: Distribution via Listserv Martha Barillas, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation

LIST OF ATTENDEES SEPTEMBER 29, 2016, MEETING WITH DUKE ENERGY PROGRESS, LLC SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 PROPOSED LICENSE AMENDMENT REQUEST REGARDING BOILING-WATER STORAGE RACK INSERTS AND SPENT FUEL POOL CRITICALITY ANALYSIS U.S. Nuclear Regulatory Commission

  • Matthew Yoder

John Caves Dennis Earp, Jr.

Robert St. Clair David S. Orr

  • Matthew Kirkland
  • Linda Bugoci
  • Evan Rosenbaum
  • Brett Brickner
  • Bernie Brimm
  • participated by phone No regulatory decisions or commitments were made at the meeting.

No members of the public were in attendance.

Please direct any inquiries to me at 301-415-2760 or Martha.Barillas@nrc.gov.

Docket Nos. 50-400

Enclosure:

List of Attendees IRA/

Martha Barillas, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation cc w/enclosure: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrPMShearonHarris Resource RidsACRS_MailCTR Resource RidsNrrDssSnpb Resource RidsNrrDssStsb Resource KWood, NRR RidsRgn2MailCenter Resource RidsNrrDorllpl2-2 Resource LPL2-2 R/F RidsNrrDeEsgb Resource AChereskin, NRR MHamm, NRR ADAMS A ccess1on N ML16286A015 o.:

RidsNrrLABClayton TWertz, NRR APatel, NRR TClark, OEDO MBarillas, NRR MYoder, NRR

  • b
  • 1 1yema1 OFFICE NRR/DORULPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DSS/SNPB/BC NRR/DSS/STSB/BC NAME MBarillas BClayton (PBlechman for)

Rlukes*

AKlein*

DATE 10/26/16 10/21/16 10/27/16 10/26/16 OFFICE NRR/DE/ESGB/BC NRR/DORL/LPL2-2/BC(A) NRR/DORL/LPL2-2/PM NAME JPeralta*

JD ion MBarillas DATE 10/26/16 10/31/16 11/01/16 OFFICIAL RECORD COPY