Summary of May 2, 2016, Meeting with Duke Energy Progress, Inc. to Discuss Fuel Reload Design Methodology Reports and Proposed Supplement to a License Amendment Request Regarding Shearon Harris and H.B. Robinson
ML16125A099
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/20/2016
From: Dennis Galvin
Plant Licensing Branch II
To:
Duke Energy Progress
Galvin D, NRR/DORL/LPLII-2, 301-415-6256
References
CAC MF7443, CAC MF7444
Download: ML16125A099 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 20, 2016 LICENSEE:

Duke Energy Progress, Inc.

FACILITY:

Shearon Harris Nuclear Power Plant, Unit 1 H. B. Robinson Steam Electric Plant, Unit No. 2

SUBJECT:

SUMMARY

OF MAY 2, 2016, MEETING WITH DUKE ENERGY PROGRESS, INC. TO DISCUSS FUEL RELOAD DESIGN METHODOLOGY REPORTS AND PROPOSED SUPPLEMENT TO A LICENSE AMENDMENT REQUEST REGARDING THE SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1, AND H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (CAC NOS.

MF7443 AND MF7444)

On May 2, 2016, a closed meeting was held between the U.S. Nuclear Regulatory Commission (NRG) staff and representatives of Duke Energy Progress, Inc. (the licensee) at NRG Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The meeting was closed to support the discussion of licensee proprietary information. The purpose of the meeting was to discuss the proposed submittal of the fuel reload design methodology report DPC-NE-3009-P, "UFSAR Chapter 15 Transient Analysis Methodology," regarding the Shearon Harris Nuclear Power Plant, Unit 1 (Harris), and H. B. Robinson Steam Electric Plant, Unit No. 2 (Robinson). The meeting notice and agenda, dated April 14, 2016, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML16103A255. A list of attendees is enclosed.

The licensee presented informational slides at the meeting (ADAMS Accession No. ML16112A293).

During the meeting, the licensee provided (1) a schedule update on proposed fuel reload design methodology report submittals for Harris and Robinson, (2) its licensing approach, (3) an overview of DPC-NE-3009-P, (4) the scope of demonstration analyses to be included in DPC-NE-3009-P, (5) the core physics and power distribution analysis methodology, and (6) methodology changes from previously approved reports. Regarding its licensing approach, the licensee proposed submitting DPC-NE-3009-P as a supplement to DPC-NE-3008-P, "Thermal-Hydraulic Models for Transient Analysis," which was submitted as part of a license amendment request in November 19, 2015 (ADAMS Accession No. ML15323A351 ). The licensee indicated that both DPC-NE-3009-P and DPC-NE-3008-P rely on the computer codes RETRAN-3D and VIPRE-01 and thus are interrelated. The licensee also described how it plans to address the interface with other fuel reload design methodology reports currently under review. The licensee indicated that the supplement will include applicable technical specification changes for Harris and Robinson.

The NRG staff and the licensee discussed the above topics, and the licensee indicated that they would consider NRG staff comments in the preparation of the supplement.

No regulatory decisions or commitments were made at the meeting.

Please direct any inquiries to me at 301-415-6256 or Dennis.Galvin@nrc.gov.

Docket Nos. 50-400 and 50-261

Enclosure:

List of Attendees cc w/enclosure: Distribution via Listserv Dennis Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation

LIST OF ATTENDEES MAY 2, 2016, MEETING WITH DUKE ENERGY PROGRESS, INC.

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 PROPOSED SUPPLEMENT TO A LICENSE AMENDMENT REQUEST REGARDING FUEL RELOAD DESIGN METHODOLOGY REPORTS AND TECHNICAL SPECIFICATION CHANGES U.S. Nuclear Regulatory Commission R. Anzalone M. Barillas B. Beasley J. Dean*

N. Domenico

  • D. Galvin E. Oesterle M. Panicker K. West*

Duke Energy Progress, Inc.

J. Due B. Harvey R. Schuff A. Zuremba

  • participated by phone Enclosure Please direct any inquiries to me at 301-415-6256 or Dennis.Galvin@nrc.gov.

IRA/

Dennis Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-400 and 50-261

Enclosure:

List of Attendees cc w/enclosure: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrPMRobinson Resource RidsNrrPMShearonHarris Resource RidsNrrDssSnpb Resource RidsNrrDssStsb Resource KWest, NRR RidsRgn2MailCenter Resource RidsNrrDorllpl2-2 Resource RidsACRS_MailCTR Resource RidsNrrDssSrxb Resource RAnzalone, NRR DGalvin, NRR RidsNrrLABClayton TWertz, NRR LPL2-2 R/F JBowen, OEDO MPanicker, NRR ADAMS A ccess1on N ML 1612 A099 o.:

5

  • 1 PKG ML16112A250 *b 1yema1 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA DSS/SNPB/BC*

DSS/SRXB/BC NAME DGalvin BClayton JDean EOesterle DATE 5/11/16 5/10/16 5/12/16 5/19/16 OFFICE DSS/STSB/BC*

DORL/LPL2-2/BC DORL/LPL2-2/PM NAME AKlein BBeasley DGalvin DATE 5/11/16 5/19/16 5/20/16 OFFICIAL RECORD COPY