|
---|
Category:Memoranda
MONTHYEARML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML23151A1232023-05-31031 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Shearon Harris Nuclear Plant ML22130A0302022-05-0909 May 2022 Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350 ML22075A3592022-03-17017 March 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21131A1472021-05-11011 May 2021 Public Meeting Summary 2020 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20210385 RA-21-0097, Notification of Permit Revision Request Regarding Copper and Zinc Limits2021-03-15015 March 2021 Notification of Permit Revision Request Regarding Copper and Zinc Limits ML20136A2222020-05-15015 May 2020 Har - Bru 2019 Aam Meeting Summary ML19113A0652019-05-14014 May 2019 Summary of Meeting with Duke Energy to Discuss Proposed License Amendment Request for Shearon Harris, Unit 1, Technical Specification Changes Associated with Departure from Nucleate Boiling Ratio Safety Limit ML19123A3522019-05-0202 May 2019 Public Meeting Summary - Shearon Harris Nuclear Plant, Docket No. 50-400 ML18109A0912018-04-19019 April 2018 Summary of 2017 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear Plant, Docket No. 50-400 ML18074A0202018-03-20020 March 2018 Fpra FAQ 16-0011 Closure Memo ML17145A3142017-05-25025 May 2017 EOC Meeting Summary ML16300A1802016-10-27027 October 2016 Verbal Authorization of Relief Request I3R-16, for Reactor Vessel Closure Head Penetration Nozzle Repair Technique, Inservice Inspection Program -Third 10-Year Interval ML16138A0502016-05-24024 May 2016 Audit Report - Application For Amendment Shearon Harris Nuclear Power Plant, Unit 1 - The Proposed License Amendment Revises The As-Found Lift Setting Tolerance For Main Steam Line Code Safety Valves In Technical Specifications (TAC No. MF7195) ML16134A1552016-05-12012 May 2016 Public Meeting Summary - 2015 Annual Assessment Public Meeting Regarding Shearon Harris Nuclear Plant ML16103A2552016-04-14014 April 2016 05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444) ML15149A3222015-05-29029 May 2015 2014 Harris Annual Assessment Meeting Summary ML15107A4252015-04-17017 April 2015 4/20/2015, Forthcoming Closed Meeting with Duke Energy Progress, Inc. to Discuss Shearon Harris Nuclear Power Plant, Unit 1, Relief Request I3R-15 Revision and Supplement, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspe ML13330B6392013-11-27027 November 2013 Verbal Authorization of Relief Request 13R-13 for Reactor Vessel Closure Head Penetration Nozzle Repair Inservice Inspection Program - Third 10-Year Interval ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC ML13150A0712013-05-31031 May 2013 Verbal Authorization of Relief Request I3R-11 for Reactor Vessel Closure Head Penetration Nozzel Repair Inservice Inspection Program - Third 10-Year Interval ML13142A4672013-05-22022 May 2013 Special Inspection Charter to Evaluate Harris Reactor Vessel Head Nozzle 49 Flaw Issue ML13120A1372013-05-0202 May 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Regarding a Non-Conservative Technical Specification Loss-of-Offsite Power Voltage Setpoint License Amendment Request for Shearon Harris, Unit 1 ML13106A3372013-04-17017 April 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML12284A4612012-10-12012 October 2012 Forthcoming Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-Design-Basis External Events ML12261A0992012-09-17017 September 2012 10/2/12 - Notice of Forthcoming Public Conference Call with Duke Energy Carolinas Regarding Shearon Harris Nuclear Plant, Unit 1 ML12249A1702012-09-0606 September 2012 Notice of Forthcoming Conference Call Public Meeting with Duke Energy Regarding the Non Conservative Technical Specifications License Amendment Requests for Shearon Harris Nuclear Plant Unit 1 ML1219805572012-09-0505 September 2012 Close-Out of National Fire Protection Association Standard 805 Frequently Asked Question 12-0062: Updated Final Safety Analysis Report Content ML12144A4402012-05-24024 May 2012 Verbal Authorization of Relief Request I3R-06 for Reactor Vessel Closure Head Penetration Nozzles Repair Inservice Inspection Program - Third 10-Year Interval ML1127300822011-09-30030 September 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate ML1103804972011-02-0808 February 2011 Notice of Forthcoming Preapplication Meeting with Carolina Power & Light Company and Representatives Regarding Shearon Harris Nuclear Plant, Unit 1 ML1024301722010-10-0505 October 2010 Trip Report on Observing the National Fire Protection Association 805 Readiness Self Assessment Performed at the Shearon Harris Nuclear Plant ML1015805092010-06-0808 June 2010 the Nuclear Regulatory Commission Staff Spot-Check Review of North Carolina Eastern Municipal Power Agency'S Ownership Interest of Shearon Harris, Unit 1 and Brunswick, Units 1 and 2 on May 21, 2010 - Finding of No Potential Issues in Bank ML1015901992010-06-0808 June 2010 the Nuclear Regulatory Commission Staff Spot-Check Review of Progress Energy Carolina'S Ownership Interest of H.B. Robinson Steam Electric Plant Unit 2, Brunswick Steam Electric Plant Units 1 and 2 & Shearon Harris Nuclear Power Plant Unit ML1015900142010-06-0808 June 2010 the Nuclear Regulatory Commission Staff Spot-Check Review of North Carolina Eastern Municipal Power Agency'S Ownership Interest of Shearon Harris, Unit 1 and Brunswick, Units 1 and 2 on May 20, 2010 - Finding of No Potential Issues in Bank ML1005702002010-02-26026 February 2010 Notice of Closed Meeting with Progress Energy to Observe a Live Test Fire of Mackenzie River Partner'S Remotely Operated Weapon System at the Shearon Harris Nuclear Plant ML0936406952010-01-0707 January 2010 Notice of Meeting with Carolina Power & Light Company to Discuss Requests for Additional Information Associated with Generic Letter 2004-02 ML0916605042009-06-24024 June 2009 04/21-22/2009 Summary of Category 2 Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition Shearon, Unit 1 and Oconee to NFPA 805 ML0909604362009-05-28028 May 2009 Lessons from Regulatory Audits of the Pilot Plants That Are Transitioning to a Fire Protection Licensing Basis Based on the National Fire Protection Association (NFPA) Standard NFPA 805 as Allowed by 10 CFR 5.48 (C) ML0909905052009-04-29029 April 2009 03/20/09 Summary of Site Audit to Support the Review of a License Amendment Request for Shearon Harris to Transition to the National Fire Protection Association Standard 805 Fire Protection Licensing Basis ML0909900182009-04-10010 April 2009 04/21-22/2009, Notice of Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition the Shearon, Unit 1 and the Oconee, Units 1, 2 and 3 ML0829501872008-09-0909 September 2008 DHS Shearon Harris Consultation Report Cover Letter ML0814002922008-08-20020 August 2008 Close-out of National Fire Protection Association (NFPA) Standard 805 Frequently Asked Question 07-0032 ML0818302602008-07-0101 July 2008 Meeting Minutes of the ACRS Plant License Renewal Subcommittee Regarding Shearon Harris, May 7, 2008 ML0816901212008-06-17017 June 2008 Forthcoming Closed Meeting with Progress Energy Carolinas, Inc., to Discuss the May 29, 2008, License Amendment Request (LAR) to Transition the Shearon Harris Nuclear Plant, Unit 1 (Harris) to National Fire Protection Association (Nfpa).. ML0808501922008-03-26026 March 2008 Forthcoming Meeting with Cp&L to Discuss an Open Item Related to the License Renewal Review for Shearon Harris Nuclear Power Plant, Unit 1 ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0807203352008-03-0303 March 2008 Comment (7) of Chatham County Board of Commissioners Opposing Generic Environmental Impact Statement (GEIS) for License Renewal of the Shearon Harris Nuclear Power Plant 2024-05-01
[Table view] |
Text
October 5, 2010 MEMORANDUM TO: Alexander R. Klein, Chief Fire Protection Branch Office of Nuclear Reactor Regulation FROM: Harold T. Barrett /RA/
Fire Protection Branch Office of Nuclear Reactor Regulation Robert Vettori /RA/
Fire Protection Branch Office of Nuclear Reactor Regulation Marlayna Vaaler /RA/
Division of Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
TRIP REPORT ON OBSERVING THE NATIONAL FIRE PROTECTION ASSOCIATION 805 READINESS SELF ASSESSMENT PERFORMED AT THE SHEARON HARRIS NUCLEAR PLANT On June 7 - June 10, 2010, the U. S Nuclear Regulatory Commission (NRC) staff (Harry Barrett, Bob Vettori, Marlayna Vaaler, from the office of Nuclear Reactor Regulation (NRR) and Norm Merriweather of Region II) traveled to the Shearon Harris nuclear plant in New Hill, NC in order to observe the licensee perform a self assessment audit of their fire protection program.
The purpose of the self assessment was to determine the readiness of the site to implement a risk-informed, performance-based fire protection program in accordance with National Fire Protection Association (NFPA) 805.
The self assessment audit was performed under the requirements of the quality assurance program at the Harris plant. The self assessment audit was performed by a diverse, multi-disciplinary team that included both Progress Energy and industry expert personnel.
The self assessment audit team utilized a draft version of the NFPA 805 license amendment request safety evaluation as the basis of the audit. The primary focus of the audit was the CONTACT: Harold Barrett, NRR.DRA/APFB (301) 415-1402
A. Klein planned activities to close those items called out in the safety evaluation that had not been completed at the time the safety evaluation was drafted (identified in the safety evaluation as Implementation Items).
The licensees audit team found that in general, Progress Energy was ready to implement the NFPA 805 program. However, the team did have audit findings that were communicated to management. The audit findings broke down into findings (deficiencies) and recommendations.
There were three findings and one recommendation. The first finding related to the awareness of the NFPA 805 Fire Protection Program outside the Fire Protection Group at Harris. The second finding identified numerous procedure issues, including significant issues related to the Fire Protection Program Change Process. The third finding identified issues related to the design and installation of the Incipient Fire Detection System modification. The recommendation suggested that the licensee consider developing a high level roadmap or flowchart for the NFPA 805 process.
The staff noted that it is important for the licensee to inform station staff about the NFPA 805 Program in the early stages of the NFPA 805 pilot program, so they understand their new responsibilities under NFPA 805 to assure compliance.
The NRC staff observed that the licensee had several hundred procedure revisions and numerous calculations that needed to be revised. The licensee indicated that their plans were to complete this work before the fall refueling outage at Harris.
It is also noteworthy that the licensee is planning a significant change to their combustible control program prior to the refueling outage. The staff observed that there are several fire areas at Harris that rely on the lack of combustibles to maintain the risk to an acceptable level.
Making a significant change to the combustible control program immediately prior to a refueling outage will require diligence and good communications.
The NRC staff was interested to see how the licensee completed the NFPA 805 Monitoring Program at Harris. At the time of the Readiness Self-Assessment, only some of the monitoring program tasks had been completed. Based on the completion status and the remaining work to be done, the staff expressed interest in observing the completion of the monitoring program later in the implementation window.
A. Klein Based on the volume of work that needs to be done, and the nature of some of the tasks, the staff recommends that NRR staff plan a visit to Harris later in the implementation window to observe progress and learn any additional lessons with respect to NFPA 805 implementation.
ML102430172 OFFICE NRR/DRA/AFPB NRR/DRA/AFPB NRR/DORL NRR/DRA/AFPB NAME HBarrett RVettori MVaaler A Klein DATE 08/ 31 /2010 08/ 31 /2010 09/ 03 /2010 10/ 05 /2010