March 17, 2022 Ms. Kim Maza Site Vice President Duke Energy Progress, LLC 5413 Shearon Harris Road Mail Code HNP01 New Hill, NC 27562-9300

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

Dear Ms. Maza:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Shearon Harris Nuclear Power Plant during the weeks of May 23-27, 2022, and June 6-10, 2022. The inspection team will be led by Mr. Adam Wilson, a Senior Project Engineer from the NRC Region II office. This inspection will be conducted in accordance with the baseline inspection procedure (IP), 71152, Problem Identification and Resolution (ADAMS Accession No. ML14316A042).

The biennial PI&R inspection and assessment of the licensees Corrective Action Program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.

On March 15, 2022, Mr. Wilson confirmed with Mr. Charles Yarley, of Duke Energy, arrangements for the two-week inspection.

The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than May 9, 2022. Contact Mr. Wilson with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.

If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, NRC staff will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; and, if necessary, working space and arrangements for site access; and other applicable information.

K. Maza 2 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Wilson at (404) 997-4574 or the resident inspectors.

Sincerely, Signed by Bailey, Stewart on 03/17/22 Stewart N. Bailey, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 05000400 License No.: NPF-63

Enclosure:

Information Request for Shearon Harris PI&R Inspection cc: Distribution via ListServ PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

ML22075A359 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available OFFICE RII/DRP RII/DRP NAME AWilson SBailey DATE 03/15/2022 03/17/2022 INFORMATION REQUEST FOR SHEARON HARRIS PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (MAY 23-27, 2022, AND JUNE 6-10, 2022)

Note: Unless otherwise noted, the information requested below corresponds to documents generated since July 1, 2020. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.

1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to:

a) corrective action process b) cause evaluation c) operating experience program d) employee concerns program e) self-assessment program f) maintenance rule program and implementing procedures g) operability determination process h) degraded/non-conforming condition process (e.g., RIS 2005-20) i) system health process or equivalent equipment reliability improvement programs j) preventive maintenance deferral process If any of the procedures requested above were revised after July 1, 2020, please provide (or have available) copies of all revisions during the onsite inspection.

2. List of top ten risk-significant systems, top ten risk-significant components for each one of the top ten risk-significant systems, and top ten risk-significant operator manual actions.
3. List of all Nuclear Condition Reports (NCRs) initiated including the following information or each NCR:

a) NCR number b) brief, but complete problem description c) priority or level d) affected system e) affected component f) responsible plant department g) NCR completion status If possible, provide this list in a format compatible with spreadsheet software (i.e. Excel example shown below) and ensure the list is searchable and can be filtered by system.

NCR # Problem Priority System Component Org Status NCR001 A RHR Pump 2 RHR 2-RHR- ENG Open failed flow criteria PMP-A per SR 5.0.5.4 Enclosure

4. List of outstanding corrective actions including the following information for each action:

a) corrective action number b) corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc.)

c) brief, but complete corrective action description d) associated NCR number e) corrective action initiation date f) number of extensions g) corrective action due date h) completion status If possible, provide this list in a format compatible with spreadsheet software (i.e. Excel, example shown below) and ensure the list is searchable and can be filtered by system.

Corrective Type Description NCR System Initiation Extensions Due Status Action # Date Date 001 CAPR Revise NCR005 RHR 01/05/20 2 06/15/20 Awaiting Procedure CARB NGK-003-4585 review

5. List of control room deficiencies with a brief description and corresponding NCR and/or work order (WO) number.
6. List of operator workarounds and operator burdens with a brief description and corresponding NCR number, searchable and filtered by system.
7. List of all currently extended or overdue NCRs, searchable and filtered by system and sorted by initiation date, with the following information:

a) NCR number b) Priority or Significance c) NCR title and short description

8. List of all NCRs that have been voided, cancelled, or deleted searchable and filtered by system. Please provide the following information for each NCR:

a) NCR number b) brief, but complete problem description c) reason voided, cancelled, or deleted 2

9. List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule since July 2020. Please include the following information for each system in (a)(1):

a) date of classification in (a)(1) b) reason for being placed in (a)(1) c) planned actions and their status

10. List of Maintenance Preventable Functional Failures (MPFF) of risk-significant systems.

Please include actions completed and current status.

11. List of corrective maintenance work orders. Please include the following information for each work order:

a) WO number b) brief, but complete work description c) affected system and components d) date of initiation e) date of completion (if completed)

If possible, provide this list in a format compatible with spreadsheet software (i.e., Excel, example shown below) and ensure the list is searchable and can be filtered by system.

Work Description System Component Initiation Due Status Order # Date Date WO01345 Replace breaker SI 2A-SI-PMP, 01/05/21 03/15/21 Closed 2A-BKR-08-BB4 BKR-08-BB4 for 2A SI Pump.

12. Corrective action closeout packages, including NCRs with description of corrective actions for all NRC findings and licensee-identified violations (LIVs). Please include a cross-reference linking NRC finding numbers and LIVs to appropriate NCR numbers.
13. Corrective action closeout packages, including NCRs with description of corrective actions, for all licensee event reports (LERs) issued. Please include a cross reference linking LER number to appropriate NCR number.
14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.) and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g.,

NCR number) for the documents that evaluated the aforementioned OE information.

15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program.
16. Copies of all department self-assessments.
17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend reports, including any human performance and equipment reliability trends.

3

18. Copy of the latest Corrective Action Program statistics (if any exists) such as the number of NCRs initiated by department, human performance errors by department, and others as may be available.
19. Please provide a list of routine meetings involving the CAP to be held while team is onsite.

If those meetings will be conducted remotely, please provide bridge call in numbers or any other links, if available (i.e., WebEx, etc.).

20. List of NCRs related to equipment aging issues in the top ten risk- significant systems since May 1, 2018 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.; environmental qualification).

Please provide the following information for each NCR:

a) NCR number b) Priority c) NCR problem description

21. If performed, please provide any recent self-assessment of the site safety culture completed.
22. Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods
23. List of all root cause, apparent cause, common cause and related or similar equipment cause evaluations with a brief description.
24. Copy of Probabilistic Risk Assessment importance measures report, if available.
25. System health reports, system design basis documents, and system description information upon notification of system selections.