ML060790260

From kanterella
Revision as of 12:34, 28 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

2006/03/20-Request for Additional Information for the Review of the Oyster Creek Nuclear Generating Station, License Renewal Application
ML060790260
Person / Time
Site: Oyster Creek
Issue date: 03/20/2006
From: Ashley D J
NRC/NRR/ADRO/DLR/RLRA
To: Swenson C N
AmerGen Energy Co
Ashley D J, NRR/DLR/RLRA, 415-3191
References
%dam200606, TAC MC7624
Download: ML060790260 (6)


Text

March 20, 2006C. N. SwensonSite Vice President AmerGen Energy Company, LLC

P.O. Box 388 Forked River, NJ 08731-0388

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THEOYSTER CREEK NUCLEAR GENERATING STATION, LICENSE RENEWALAPPLICATION (TAC NO. MC7624)

Dear Mr. Swenson:

By letter dated July 22, 2005, AmerGen Energy Company, LLC (AmerGen or the applicant)submitted to the U.S. Nuclear Regulatory Commission (NRC or the staff) an applicationpursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54), to renew theoperating license for Oyster Creek Nuclear Generating Station. The NRC staff is reviewing theinformation contained in the license renewal application and has identified, in the enclosure,areas where additional information is needed to complete the review.These questions were discussed with members of your staff during a conference call onFebruary 2, 2006. A mutually agreeable date for a response is within 30 days from the date ofthis letter. If you have any questions, please contact me at 301-415-3191 or via e-mail at DJA1@nrc.gov

.Sincerely,/RA/Donnie J. Ashley, Project ManagerLicense Renewal Branch A Division of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-219

Enclosure:

As statedcc w/encl: See next page

DOCUMENT NAME: E:\Filenet\ML060790260.wpdOFFICEPM:RLRALA:DLRBC:RLRANAMEDAshleyYEdmondsLLundDATE03/ 16 /0603/ 16 /0603/ 20 /06 Oyster Creek Nuclear Generating Station Site Vice President - Oyster Creek Nuclear Generating Station AmerGen Energy Company, LLC

P.O. Box 388 Forked River, NJ 08731Senior Vice President of Operations AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348Kathryn M. Sutton, EsquireMorgan, Lewis, & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004Kent Tosch, ChiefNew Jersey Department of Environmental Protection Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625Vice President - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555Regional Administrator, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415Mayor of Lacey Township818 West Lacey Road Forked River, NJ 08731Senior Resident InspectorU.S. Nuclear Regulatory Commission

P.O. Box 445 Forked River, NJ 08731Director - Licensing and Regulatory AffairsAmerGen Energy Company, LLC Correspondence Control

P.O. Box 160 Kennett Square, PA 19348Manager Licensing - Oyster CreekExelon Generation Company, LLC Correspondence Control

P.O. Box 160 Kennett Square, PA 19348Regulatory Assurance Manager Oyster Creek AmerGen Energy Company, LLC

P.O. Box 388 Forked River, NJ 08731Assistant General CounselAmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348Ron Bellamy, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415Correspondence Control DeskAmerGen Energy Company, LLC 200 Exelon Way, KSA 1--1 Kennett Square, PA 19348Oyster Creek Nuclear Generating StationPlant Manager AmerGen Energy Company, LLC

P.O. Box 388 Forked River, NJ 08731License Renewal ManagerExelon Generation Company, LLC 200 Exelon Way, Suite 230 Kennett Square, PA 19348 Oyster Creek Nuclear Generating Station Mr. James RossNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708Mr. Michael P. GallagherVice President License Renewal Exelon Generation Company, LLC 200 Exelon Way, Suite 230 Kennett Square, PA 19348Mr. Christopher M. CranePresident and Chief Nuclear Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 EnclosureOYSTER CREEK NUCLEAR GENERATING STATIONLICENSE RENEWAL APPLICATION (LRA)REQUEST FOR ADDITIONAL INFORMATION (RAI)RAI 2.5.2-1LRA Section 2.5.2.5 describes electrical commodity groups subject to AMR. The staff requeststhe applicant to confirm that, in addition to power circuits in the electrical systems, theassociated control circuits are also considered in the scoping and screening review, and are included in the electrical commodity groups subject to AMR.RAI 2.5.2.3-1In LRA Section 2.5.2.3 , the first bullet states: "Phase Bus exist only in the Main Generator andAuxiliaries System. The system has no electrical intended functions and is in scope for 10 CFR 54.4(a)(2) systems interaction only.

Because the phas e bus contains no fluid, it has nolicense renewal intended functions."The staff requests the applicant to address the following regarding the above statement:a.Provide cross-reference to the phase bus that exists in the SBO path.

b.Confirm whether the phase bus (in the main generator and auxiliaries system)provides interactions for 10 CFR 54.4 (a)(2) systems. If yes, list the 10 CFR 54.4(a)(2) systems. If 10 CFR 54.4(a)(2) is applicable to this phase bus,explain why this phase bus is not included as an electrical commodity group subject to AMR.c.Explain the purpose of the statement: "Because the phase bus contains no fluid,it has no license renewal intended functions."RAI 2.5.2.3-2In LRA Section 2.5.2.3, the second bullet states: "Switchyard Bus was eliminated because none perform a license renewal intended function. Rather, transmission conductors, high voltage insulators and insulated cables and connectors perform the functions of providing offsite power to cope with and recover from regulated events."The staff request the applicant to address the following regarding the above statement:a. List (providing reference to license renewal drawing No. LR-BR-3000) the circuitsthat may contain transmission conductors, high voltage insulators, and insulated cables and connectors that perform the functions of providing offsite power to cope with and recover from regulated events.b.List the regulated events. RAI 2.5.2.5-1LRA Section 2.5.2.5.3 states that the high voltage insulators are provided on the circuits used tosupply power from the switchyard to plant buses during recovery from a SBO or fire protection event.The staff requests the applicant to describe the circuit path (which may contain the high voltageinsulators) that is relied upon to supply power from the switchyard to plant buses in case of the fire protection event.RAI 2.5.2.5-2LRA Section 2.5.2.5.4 states that the transmission conductors provide a portion of the circuitsused to supply power from the switchyard to plant buses during recovery from a station blackout or fire protection event.The staff requests the applicant to describe the circuit path (which may contain transmissionconductors) that is relied upon to supply power from the switchyard to plant buses in case of the fire protection event.