|
---|
Category:Letter
MONTHYEARML24303A2822024-10-29029 October 2024 License Termination Plan Supplemental Submittal for Technical Bases Documents ML24284A1972024-10-10010 October 2024 Cover Letter Oyster Creek, License Termination Plan Acceptance Review ML24269A0462024-10-0404 October 2024 Cover Letter for Oyster Creek Nuclear Generating Station, License Amendment Request, License Termination Plan, Acceptance Review Request for Additional Information ML24274A0822024-09-25025 September 2024 Independent Spent Fuel Storage Installation Security Plan, Training Qualification Plan, Safeguards Contingency Plan, Revisions 1 and 2 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000219/20240022024-09-0505 September 2024 – NRC Inspection Report 05000219/2024002 and 07200015/2024001 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24214A0372024-08-0101 August 2024 License Amendment Request to Revise Renewed Facility Operating License to Add License Condition 2.C.(18) to Include License Termination Plan Requirements ML24179A1842024-07-23023 July 2024 June 20, 2024, Clarification Call on Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000219/20240012024-05-14014 May 2024 Decommissioning Intl, LLC Oyster Creek Nuclear Generating Station - NRC Inspection Report No. 05000219/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24120A0402024-04-29029 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24120A0412024-04-29029 April 2024 Annual Radioactive Environmental Operating Report for 2023 ML24094A2142024-04-19019 April 2024 Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24089A2492024-03-29029 March 2024 Reply to Notice of Violation EA-2024-024 L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24085A7902024-03-28028 March 2024 – Preapplication Readiness Assessment of the License Termination Plan ML24081A2882024-03-21021 March 2024 Request Preliminary Review and Feedback on Chapter 6 of the Draft License Termination Plan ML24046A1242024-02-29029 February 2024 – NRC Inspection Report 05000219/2023003 ML24033A3272024-02-0202 February 2024 Request Preliminary Review and Feedback on Chapter 5 of the Draft License Termination Plan ML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E 2024-09-05
[Table view] |
Text
SAFEGUARDS INFORMATION
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104.
HOLTE C -----------,--;._;:___.;:___ ______ ~---
oecoMM1ss10N1Nc Telephone (856) 797-0900 INTERNATl6NA1
. Fax (856) 797-0909
10 CFR 50.54(p) 10 CFR 50.4(b)(4)
September 25, 2024
ATTN: Document Control Desk U.~. Nuclear Regulatory Commission Washington, DC 20555-0001
Oyster.Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 Docket Nos. 50-219 and 72-15
Subject:
Oyster Creek Independent Spent Fuel Storage Installation Security Plan, training Qualification Plan, Safeguards Contingency Plan, Revisions 1. and 2
Dear Sir or Madam:
Pursuant to the provisions of 1 O Code of Federal Regulations {CFR) 50.4, 1 O CFR 50.54(p ), 1 O CFR 73.55(r), and 10 CFR 50.90, Holtec Decorimiissioning International, LLC (HDI) is svbmitting Revision 2 to the Independent Spent Fuel Storage Installation Only (ISFSIO) Security Plan.
(Security Plan). The changes to the ISFSIO Security Plan Revision 2 were implemented September 24, 2024. Additionally, Revision 1 of the Security Plan was implemented on August 1, 2024. In accordance with 1 O CFR 50.54(p)(2), HDI is submitting this change within 60 days of implementation of Revision 1 and Revision 2 (s1,1bmiss;on required no later than September 30, 2024).,
The ISFSIO Security Plan was revised as follows:
- 1. Provide updated Aerial Photos of the facility. (Revision 1)
- 2. The Owner Controlled Area (OCA) is red.efined. (Revision 1) 3.* Change to reference Code of Federal Regulations as. it!pertains to reportability. (Revision 2)
The revised ISFSIO Security Plan Revisions 1 and 2 change packages are attachments to this letter. The attachments include de.tails of the changes, 50.54(p) review and other change supporting documents..
- The attachments to this submittal contain "Safeguards Information" as defined by 10 CFR 73.22 and its disclosure to unauthorized individuais is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended, and must be protected accordingly. S O b /
This letter contains no new regulatory commitments.
SAFEGUA..RDS INFORMATION {\\)H 55 z (.,o
NOTE: WHEN SEPARATED FROM SAFEGUARDS INFORMATION ATTACHMENT(S), THIS DOCUMENT IS DECONTROLLED AND THE TRANS MITT AL DOCUMENT DOES NOT OTHERWISE WARRANT PROTECTION FROM UNAUTHORIZED DISCLOSURE"*
HDI-OC-24-035 Page 1 of2 SAFEGUARDS INFORMATION
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 HOLTE C -------------------------
0EcoMM1ss1ON1Nc Telephone (856) 797-0900 INTfRNAl IONAI Fax (856) 797-0909
If you have any questions or need further information, please contact the Holtec Decommissioning International LLC, Security Decommissioning Manager Thomas G. Miller Jr at (609) 312-1436 or Site Security Manager, Joseph Dwyer at (609) 971-2115.
Sincerely,
Dlg!tally signed by William Noval William DN: cn=WJlllam Naval, c=US, o=HDI, ou=Regulatory Affa!rs, emaU=w.noval@holtec.com Naval Date: 2024.09.25 09:22:25 -04'00' William Noval Director, Regulatory Affairs Holtec Decommissioning International, LLC
Attachment:
1 ). Independent Spent Fuel Installation Only Security Plan, Training Qualification Plan, Safeguards Contingency Plan, Revision 1 (Contains Safeguards Information)
2). Independent Spent Fuel Installation Only Security Plan, Training Qualification Plan, Safeguards Contingency Plan, Revision 2 (Contains Safeguards Information)
cc: * (without Attachment)
USNRC Regional Administrator, Region I USN RC Project Manager, NMSS - Oyster Creek Nuclear Generating Station USN RC Region I, Lead Inspector:.. Oyster Creek Nuclear Generating Station Assistant Commissioner, Air Quality, Energy and Sustainability, NJ DEP Assistant Director Radiation Protection Element, NJ Bureau of Nuclear Engineering
SAFEGUARDS.INFORMATION NOTE: WHEN SEPARATED FROM SAFEGUARDS INFORMATION ATTACHMENT(S), THIS DOCUMENT JS DECONTROLLED AND THE TRANSMITTAL DOCUMENT DOES NOT OTHERWISE WARRANT PROTECTION FROM UNAUTHORIZED DISCLOSURE" HDI-OC-24-035 Page 2 of2