Letter Sequence RAI |
---|
|
|
MONTHYEARRA-18-092, License Amendment Request - Proposed Change of Effective and Implementation Dates of License Amendment No. 294, Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme2018-10-22022 October 2018 License Amendment Request - Proposed Change of Effective and Implementation Dates of License Amendment No. 294, Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme Project stage: Request ML18330A2922018-11-26026 November 2018 NRR E-mail Capture - Acceptance Review - Oyster Creek - Exemption Request - Proposed Change of the Effective Date Project stage: Acceptance Review ML19025A1172019-01-24024 January 2019 NRR E-mail Capture - for Your Action - RAI for Oyster Creek EP Exemption (Change to Adiabatic Heat-Up Calculation) Project stage: RAI RA-19-007, Response to RAI and Supplemental Information Re Request for Changing Emergency Preparedness License Amendment 294 Effective Date (Change to Adiabatic Heat-Up Calculation)2019-02-13013 February 2019 Response to RAI and Supplemental Information Re Request for Changing Emergency Preparedness License Amendment 294 Effective Date (Change to Adiabatic Heat-Up Calculation) Project stage: Supplement ML19093A0872019-04-26026 April 2019 Letter, Environmental Assessment and Finding of No Significant Impact Exemption from the Effective Date of Exemptions from Certain Emergency Planning Requirements, Change of Adiabatic Heat-up Calculation Project stage: Approval ML19093A0882019-04-26026 April 2019 FRN, Environmental Assessment and Finding of No Significant Impact Exemption from the Effective Date of Exemptions from Certain Emergency Planning Requirements, Change of Adiabatic Heat-up Calculation Project stage: Approval ML19095A8732019-06-11011 June 2019 Letter, Exemption from the Effective Date of Exemptions from Certain Emergency Planning Requirements, Change of Adiabatic Heat-up Calculation Project stage: Approval ML19095A9972019-06-11011 June 2019 Exemption - Oyster Creek - Change Adiabatic Heat-Up Calc Project stage: Request ML19095A8702019-06-11011 June 2019 Exemption from the Effective Date of Exemptions from Certain Emergency Planning Requirements, Change of Adiabatic Heat-up Calculation Project stage: Approval ML19095A8722019-06-13013 June 2019 FRN, Exemption from the Effective Date of Exemptions from Certain Emergency Planning Requirements, Change of Adiabatic Heat-up Calculation Project stage: Approval 2019-02-13
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML22235A7862022-08-23023 August 2022 Acceptance Review: Exemption Request from 10 CFR 20, Appendix G, LLW Shipping Investigation Requirements ML21181A1882021-06-30030 June 2021 E-mail from S. Johnston, Holtec, to A. Snyder and F. Bower, NRC - Oyster Creek Nuclear Generating Station - Readiness Status for ISFSI Only Inspection ML21175A2092021-06-24024 June 2021 E-mail from A. Sterdis to P. Longmire - Oyster Creek Nuclear Generating Station: ISFSI-only Physical Security Plan (Stating Implementation Intent) ML21162A3602021-06-11011 June 2021 E-mail Response from the State of New Jersey Regarding the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status ML21162A1172021-06-11011 June 2021 E-mail to HDI: Acceptance Review - FOF Exemption ML21168A0172021-06-10010 June 2021 E-mail from HDI: RAI Response ML21161A2572021-06-0707 June 2021 State Consultation: ISFSI-only Physical Security Plan (Email Response) ML21175A0712021-06-0202 June 2021 Issuance of Request for Additional Information: Oyster Creek Nuclear Generating Station. Request for Amendment to Technical Specifications ML21148A0562021-05-27027 May 2021 E-mail to State of New Jersey Informing of the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status ML21132A3182021-05-12012 May 2021 E-Mail from V. Gubbi, DEP to Z. Cruz, NRC - Oyster Creek Nuclear Generating Station - State of New Jersey Response to the Pending Revision to the Defueled Technical Specifications to Reflect Independent Spent Fuel Storage Installation Only ML21132A0312021-05-11011 May 2021 E-mail to State of New Jersey Informing of the Pending Revision to the Physical Security Plan to Reflect Independent Spent Fuel Storage Installation Only Status ML21119A1422021-04-28028 April 2021 E-mail to State of New Jersey Informing of the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status ML21113A0742021-04-23023 April 2021 Acceptance Review Email - April 20, 2021 Oyster Creek Request for Exemption from 10 CFR Part 73 Requirements Due to Covid ML21099A0382021-04-0808 April 2021 Email from Z. Cruz to A. Sterdis - Request for Additional Information - HDI Request for Approval of Oyster Creek Nuclear Generating Station Independent Spent Fuel Storage Installation Facility Only Emergency Plan ML21085A4872021-03-26026 March 2021 E-mail from Z. Cruz to A. Sterdis - Acceptance Review: Oyster Creek Nuclear Generating Station - Request for Approval of Independent Spent Fuel Storage Installation Only Permanently Defueled Technical Specifications ML21064A2432021-03-0505 March 2021 Email from Z. Cruz to A. Sterdis Acceptance Review_ Oyster Creek Nuclear Generating Station - Request for Approval of Independent Spent Fuel Storage Installation Facility Only Emergency Plan and Emergency Action Level Scheme ML21064A2392021-03-0202 March 2021 E-mail from Z. Cruz to A. Sterdis Acceptance Review - Oyster Creek Nuclear Generating Station - Request for Approval of Independent Spent Fuel Storage Installation Only Physical Security Plan ML20345A1462020-12-0909 December 2020 E-mail - Response to Request for Additional Information: HDI Request for One-Time Exemption from Part 73, Appendix B FOF Requirements ML20335A3112020-11-30030 November 2020 Request for Additional Information Regarding Request for a one-time Exemption from Part 73, Appendix B Requirements for Oyster Creek Nuclear Generating Station ML20332A1472020-11-24024 November 2020 Acceptance Review: November 20 2020 Exemption Request from 10 CFR Part 73 Appendix B Requirements for Oyster Creek ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20279A5082020-10-0505 October 2020 Email to Holtec - Response to Notification of Oyster Creek Onsite Property Insurance Coverage ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20134H8742020-05-12012 May 2020 Request for Additional Information Regarding Request for Temporary Exemption from Part 73, Appendix B Requirements ML20133J9182020-05-11011 May 2020 Acceptance Review Email - Oyster Creek Request for Exemption from Part 73 Qualification Requirements ML20120A0252020-04-22022 April 2020 NRR E-mail Capture - (External_Sender) Oyster Creek Sea Turtle Handling and Conservation Recommendation Obligations NRC-2019-0073, Response from NEIMA Local Community Advisory Board Questionnaire 10-30-2019 R Discenza2019-10-30030 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-30-2019 R Discenza ML19344C8022019-10-20020 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-20-2019 a Dressler ML19344C8002019-10-0909 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-09-2019 W Mcmullin ML19344C7982019-10-0909 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-09-2019 M Noto ML19344C7992019-10-0909 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-09-2019 s Feldman ML19344C7932019-10-0909 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-09-2019 C Bischoff ML19344C7962019-10-0909 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-09-2019 G Adams ML19344C7912019-10-0808 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-08-2019 J Branciforte ML19344C7902019-10-0808 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-08-2019 Anonymous ML19344C7892019-10-0505 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-05-2019 P Dressler ML19263D1222019-09-20020 September 2019 for Your Action Request for Additional Information Hdi Oyster Creek PSDAR ML19214A0452019-08-0202 August 2019 NRC to NMFS, Revised Proposed Action for Oyster Creek Endangered Species Act Section 7 Consultation ML19182A3422019-07-0101 July 2019 Transaction ML19178A0702019-06-26026 June 2019 Email to State of New Jersey - Oyster Creek - Request Comments on Proposed Amendment to Remove Reference to the Oyster Creek Cyber Security Plan and Update License Condition 2.C.(4) in the Renewed Facility License ML19196A3422019-06-20020 June 2019 Email: Courtesy Notice on the Issuance of the Oyster Creek License Transfer and Exemption (Sierra Club) ML19196A3342019-06-20020 June 2019 Email: Courtesy Notice on the Issuance of the Oyster Creek License Transfer and Exemption ML19162A2242019-06-11011 June 2019 NRC to NMFS, NRC Responses to NMFS Requests for Additional Information for Oyster Creek ESA Section 7 Consultation NRC-2018-0237, Comment from Paul Dressler of the Concerned Citizens for Lacey Coalition, Regarding the Oyster Creek Nuclear Plant License Transfer Application2019-06-0707 June 2019 Comment from Paul Dressler of the Concerned Citizens for Lacey Coalition, Regarding the Oyster Creek Nuclear Plant License Transfer Application ML19155A1182019-06-0404 June 2019 Incoming E-mail from State of New Jersey on the Oyster Creek Exemption for Reduced Insurances and Use of Decommissioning Trust Fund for Spent Fuel Management and Site Restoration ML19155A1192019-06-0404 June 2019 State of New Jersey Comments - Oyster Creek Conforming Amendment Associated with the Oyster Creek Generating Station License Transfer Application ML19154A0582019-05-31031 May 2019 E-mail Response from State of New Jersey Dated May 31, 2019, Notification-and-Request-Oyster Creek License Transfer Application L-2018-LLM-0002 ML19158A2912019-05-30030 May 2019 NRR E-mail Capture - Oyster Creek ESA Consultation: Information Requests from NMFS ML19158A2772019-05-28028 May 2019 NRR E-mail Capture - Oyster Creek ESA Consultation: Information Requests from NMFS ML19148A4392019-05-24024 May 2019 NMFS to NRC, Requests for Additional Information to Support Oyster Creek Reinitiated Section 7 Consultation 2022-08-23
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML21099A0442021-04-0808 April 2021 Enclosure - Request for Additional Information Related to Request for Approval of Oyster Creek Nuclear Generating Station Independent Spent Fuel Storage Installation Only Emergency Plan Holtec Decommissioning International, LLC ML20335A3102020-11-30030 November 2020 RAI November 2020 Part 73 FOF Exemption Request ML20297A2382020-10-22022 October 2020 Fleet DQAP RAIs - Enclosure ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20134H8732020-05-12012 May 2020 E-mail - Request for Additional Information: Oyster Creek Request for Temporary Exemption from Part 73, Appendix B Requirements ML19263D2142019-09-20020 September 2019 Hdi PSDAR Environmental RAI Enclosure (002) ML19158A2772019-05-28028 May 2019 NRR E-mail Capture - Oyster Creek ESA Consultation: Information Requests from NMFS ML19025A1172019-01-24024 January 2019 NRR E-mail Capture - for Your Action - RAI for Oyster Creek EP Exemption (Change to Adiabatic Heat-Up Calculation) ML18256A0022018-09-12012 September 2018 NRR E-mail Capture - for Your Action: RAIs for Oyster Creek Post Shutdown Decommissioning Activities Report (PSDAR) ML18135A0732018-05-15015 May 2018 NRR E-mail Capture - RAIs - Oyster Creek - Request Approval of the Decommissioning Quality Assurance Program ML18068A6582018-03-0909 March 2018 NRR E-mail Capture - RAIs - Oyster Creek Defueled TS LAR ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML18024B0642018-01-24024 January 2018 NRR E-mail Capture - for Your Action - RAI for Oyster Creek Permanently Defueled EP and EAL Scheme LAR (CAC No. MG0160; EPID: L-2017-LLA-0307) ML18012A0782018-01-12012 January 2018 NRR E-mail Capture - for Your Review - Draft RAI for Oyster Creek Permanently Defueled EP and EAL Scheme LAR (CAC No. MG0160; EPID: L-2017-LLA-0307) ML18003A4122018-01-0303 January 2018 NRR E-mail Capture - for Your Action - RAI - Oyster Creek BWRVIP LAR (CAC No. MG0180; EPID No. L-LLA-2017-0304) ML17320A6372017-11-16016 November 2017 NRR E-mail Capture - Oyster Creek Nuclear Generating Station - Request for Additional Information Regarding License Amendment Request for Emergency Plan Exemption (CAC No. MG0153; EPID L-2017-LLE-0020) ML17319A9422017-11-15015 November 2017 NRR E-mail Capture - Oyster Creek Nuclear Generating Station - Request for Additional Information Regarding License Amendment Request for Emergency Plan Exemption (CAC No. MG0153; EPID L-2017-LLE-0020) ML17208A7472017-09-14014 September 2017 Request for Additional Information, License Amendment Request to Revise the Site Emergency Plan for On-Shift and Emergency Response Organization Staffing for Permanently Defueled Condition ML17136A3852017-05-12012 May 2017 NRR E-mail Capture - (External_Sender) Oyster Creek Response to NRC Flood MSA Audit Review Questions ML17038A5152017-02-0303 February 2017 NRR E-mail Capture - (External_Sender) Oyster Creek Nuclear Generating Station Response to Environmental Questions Regarding the Mitigating Strategies Final Integrated Plan and SPF Instrumentation Compliance Letter ML16244A3112016-10-0707 October 2016 Request for Additional Information Regarding License Amendment Request for Technical Specifications Section 6.0, Administrative Controls for Permanently Defueled Condition ML16125A2452016-05-16016 May 2016 Request for Additional Information Regarding Request for Approval of a Certified Fuel Handler Training and Retraining Program ML16060A1722016-03-0707 March 2016 Request for Additional Information Regarding Preliminary Decommissioning Cost Estimate and Spent Fuel Management Program ML16056A0012016-02-24024 February 2016 NRR E-mail Capture - Request for Additional Information - Oyster Creek Security Plan - Revision 14 ML17144A3702015-05-0606 May 2015 NRC Email J. Hughey( NRC) to Dave Distel (Exelon)- Request for Additional Information Regarding Request for Extension to Comply with NRC Order EA-13-109, Dated May 6, 2015 ML15005A0692015-01-0606 January 2015 Request for Additional Information Regarding the Fourth 10-Year Interval Inservice Inspection Program Plan Requests for Relief ML14246A5182014-09-17017 September 2014 Request for Additional Information Regarding the Fourth 10-Year Interval Inservice Inspection Program Plan Requests for Relief ML14252A7032014-09-17017 September 2014 Request for Additional Information Regarding Preliminary Decommissioning Cost Estimate and Annual Decommissioning Funding Status Reports ML14247A5862014-09-16016 September 2014 Request for Additional Information Regarding License Amendment Request to Revise Snubber Surveillance Requirements (Tac No. MF4124) ML14114A5632014-09-10010 September 2014 Request for Additional Information Regarding License Amendment Request Related to Reactor Building Vital Area Access Control ML14220A0272014-08-27027 August 2014 Request for Additional Information Regarding Request for Extension to Comply with NRC Order EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML14083A1602014-03-31031 March 2014 Request for Additional Information Regarding Bulletin 2012-01, Design Vulnerability in Electric Power System ML13351A3142013-12-20020 December 2013 Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System. ML13268A0312013-11-0808 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13227A3042013-08-28028 August 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13196A3382013-07-15015 July 2013 2013 Decommissioning Fund Report RAI ML12229A4332012-09-0606 September 2012 Request for Additional Information Regarding Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 12 (TAC No. D91660) ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML12032A1872012-02-21021 February 2012 Request for Additional Information Related to the Response to License Renewal Commitment No. 10 Regarding Thermal Aging Irradiation Embrittlement of Cast Austenitic Stainless Steel ML12025A2542012-01-23023 January 2012 Request for Additional Information - License Renewal Commitment Regarding Thermal Aging and Neutron Irradiation Embrittlement of CASS Materials ML1200603242012-01-19019 January 2012 Fleet, RAI, Proposed Alternative to Use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-789 (N-789) ML1131200572011-11-22022 November 2011 Fleet - Bulletin 2011 01, Mitigating Strategies Request for Additional Information Regarding 60-Day Response ML1123604472011-08-24024 August 2011 E-mail, Miller to Loomis, Oyster Creek Flaw Evaluation Draft RAI Questions ML1120910012011-07-22022 July 2011 Generation Station - Licensed Operator Request for Additional Information ML1116805642011-07-0707 July 2011 Fleet, Request for Additional Information, 2011 Report on Status of Decommissioning Funding for Reactors 2021-04-08
[Table view] |
Text
NRR-DMPSPEm Resource From: Lamb, John Sent: Thursday, January 24, 2019 1:29 PM To: 'david.helker@exeloncorp.com' Cc: Richard.Gropp@exeloncorp.com; Bonnett, Frederick Paul:(GenCo-Nuc); Dostal, Jeffrey Paul:(GenCo-Nuc)
Subject:
For Your Action - RAI for Oyster Creek EP Exemption (Change to Adiabatic Heat-Up Calculation) (EPID: L-2018-LLA-0305)
Importance: High
Dear Mr. Helker:
By letter dated October 22, 2018 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML18295A384), Exelon Generation Company (Exelon) requested a change in the effective date of License Amendment No. 294, Oyster Creek Nuclear Generating Station - Issuance of Amendment Re:
Changes to The Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme (CAC NO. MG0160; EPID L-2017-LLA-0307) (ADAMS Accession No. ML18221A400), from 12 months (365 days) to 9.38 months (285 days) after permanent cessation of power operations. However, the exemptions from emergency planning requirements in 10 CFR 50.47, Emergency plans, and Appendix E to 10 CFR Part 50, Emergency Planning and Preparedness for Production and Utilization Facilities (ADAMS Accession No. ML18220A980) necessary for implementation of License Amendment No. 294 included the effective date as an integral part of the exemption. Therefore, by letter dated November 6, 2018, Exelon supplemented the request dated October 22, 2018, with a request to modify the effective date of the exemption to 9.38 months (285 days) after permanent cessation of power operations.
By letter dated September 25, 2018, (ML18268A258), Exelon certified the permanent cessation of power operations at OCNGS on September 17, 2018, and permanent removal of all fuel from the reactor vessel as of September 25, 2018. Thus, the effect of the request would be to change the implementation date of the emergency plan changes approved in License Amendment No. 294 from September 17, 2019, to June 29, 2019.
The enclosure to this email provides the request for additional information (RAI). On January 22, 2019, the draft RAI questions were sent to Mr. Richard Gropp, and Mr. Paul Bonnet of your staff to ensure that they were understandable, the regulatory bases for the questions were clear, and to determine if the information was previously docketed. A teleconference was held on January 24, 2019, with Mr. Paul Bonnet and Mr. Richard Gropp of your staff to clarify the RAI questions. Exelon stated they would respond to the RAI within 30 days of the date of this email.
If you have any questions, please contact me at 301-415-3100 or via e-mail at John.Lamb@nrc.gov.
Sincerely, John G. Lamb, Senior Project Manager Special Projects and Process Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219
Enclosure:
Request for Additional Information 1
ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION (RAI)
REQUEST FOR ADDITIONAL INFORMATION RELATED TO EXEMPTION REQUEST FOR THE OYSTER CREEK NUCLEAR GENERATING STATION EMERGENCY PLAN (CHANGE TO THE ADIABATIC HEAT-UP CALCULATION)
EXELON GENERATION COMPANY, LLC OYSTER CREEK NUCLEAR GENERATING STATION DOCKET NO. 50-219 By letter dated October 22, 2018 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML18295A384), Exelon Generation Company (Exelon) requested a change in the effective date of License Amendment No. 294, Oyster Creek Nuclear Generating Station - Issuance of Amendment Re:
Changes to The Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme (CAC NO. MG0160; EPID L-2017-LLA-0307) (ADAMS Accession No. ML18221A400), from 12 months (365 days) to 9.38 months (285 days) after permanent cessation of power operations. However, the exemptions from emergency planning requirements in 10 CFR 50.47, Emergency plans, and Appendix E to 10 CFR Part 50, Emergency Planning and Preparedness for Production and Utilization Facilities (ADAMS Accession No. ML18220A980) necessary for implementation of License Amendment No. 294 included the effective date as an integral part of the exemption. Therefore, by letter dated November 6, 2018, Exelon supplemented the request dated October 22, 2018, with a request to modify the effective date of the exemption to 9.38 months (285 days) after permanent cessation of power operations.
By letter dated September 25, 2018, (ML18268A258), Exelon certified the permanent cessation of power operations at OCNGS on September 17, 2018, and permanent removal of all fuel from the reactor vessel as of September 25, 2018. Thus, the effect of the request would be to change the implementation date of the emergency plan changes approved in License Amendment No. 294 from September 17, 2019, to June 29, 2019.
Applicable Regulation and Guidance The current 10 CFR 50 regulatory requirements for emergency planning, developed for operating reactors, ensure protection of the health and safety of the public. However, once a power plant is permanently shutdown and defueled, some of these requirements exceed what is necessary to protect the health and safety of the public. Therefore, pursuant to 10 CFR 50.12 Specific Exemptions, Exelon requested exemptions from certain emergency planning regulations in 10 CFR 50.47 and 10 CFR Part 50, Appendix E, for the Oyster Creek Nuclear Generation Station (OCNGS).
2
The NRC staff reviewed this previously granted exemption from certain emergency plan requirements of 10 CFR Part 50 using the guidance provided in Interim Staff Guidance (ISG) NSIR/DPR-ISG-02, Emergency Planning Exemption requests for Decommissioning Nuclear Power Plants (ADAMS Accession No. ML14106A057). This guidance notes that the provisions of 10 CFR 50.12 permit the NRC to grant exemptions from the requirements of 10 CFR Part 50 regulations in circumstances where the application of the regulation is not necessary to achieve the underlying purpose of the rule. The staff concluded that a minimum of 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> would provide adequate time to initiate mitigative actions to cool the fuel or, if needed, for offsite authorities to implement protective actions using a comprehensive emergency management plan (CEMP) approach. Thus, a formal offsite radiological emergency plan would not be necessary for permanently shutdown and defueled nuclear power reactor licensees when at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> would be necessary for the fuel to heat-up to the cladding ignition temperature following a complete loss of coolant. The decay heat rate is an important parameter in determining the time available to initiate mitigative actions or offsite protective actions, and the limiting decay heat rate is determined by the fuel power history and the time after permanent cessation of power operations.
Issue to Exelons submittal dated October 22, 2018, contains Revision 1 to the Oyster Creek Nuclear Generating Station Zirconium Fire Analysis for Drained Spent Fuel Pool, C-1302-226-E310-457. The revision changed the decay heat rate used in the analysis to one specifically based on the final operating cycle power history rather than a projected bounding decay heat rate and increased the assumed heat sinks by including additional hardware masses (such as channel box and upper and lower tie plates). The analysis credited this additional heat sink capacity and revised decay heat rate to show that a 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> heat up time to the ignition temperature (900°C) would be available with a 9.38 month decay time.
The NRC staff found that the document does not adequately justify an assumption used in the analysis that all fuel components heat up at a uniform rate (Assumption 3.6). This assumption is present in the analysis because the heat-up time was calculated by dividing the product of the temperature change and the fuel assembly heat capacity (including the heat capacity of the added fuel assembly components) by the decay heat rate. However, the temperature of the upper and lower tie plates may differ significantly from other fuel assembly components because distance and complex design slow heat transfer via conduction, these components have a poor view factor for radiative heat transfer, and significant convective heat transfer is inconsistent with the adiabatic heat-up assumption. While it is common to assume components within an adiabatic envelope are at the same temperature, this assumption must be justified or the envelope boundary should be moved to ensure the assumption is valid.
Request for Additional Information Provide justification that all components within the assumed adiabatic envelope that have not been previously accepted (specifically, the channel box and upper and lower tie plates) heat-up uniformly with the fuel pellets and cladding in the active fuel region. The justification should consider the complex design of the fuel assembly, the heat transfer mode, and the maximum rate of heat transfer supported by the fuel assembly design in that heat transfer mode relative to the heat capacity of the component.
3
Hearing Identifier: NRR_DMPS Email Number: 773 Mail Envelope Properties (John.Lamb@nrc.gov20190124132800)
Subject:
For Your Action - RAI for Oyster Creek EP Exemption (Change to Adiabatic Heat-Up Calculation) (EPID: L-2018-LLA-0305)
Sent Date: 1/24/2019 1:28:47 PM Received Date: 1/24/2019 1:28:00 PM From: Lamb, John Created By: John.Lamb@nrc.gov Recipients:
"Richard.Gropp@exeloncorp.com" <Richard.Gropp@exeloncorp.com>
Tracking Status: None "Bonnett, Frederick Paul:(GenCo-Nuc)" <Frederick.Bonnett@exeloncorp.com>
Tracking Status: None "Dostal, Jeffrey Paul:(GenCo-Nuc)" <Jeffrey.Dostal@exeloncorp.com>
Tracking Status: None
"'david.helker@exeloncorp.com'" <david.helker@exeloncorp.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 8788 1/24/2019 1:28:00 PM Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: