ML19263C032

From kanterella
Revision as of 05:20, 26 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs NRC That Const & Checkout of Hardware Mods Committed to in Modified Amended Security Plan Will Not Be Completed on 790223.Forwards Proposed Compensatory Measures.Details Withheld (Ref 10CFR2.790)
ML19263C032
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 01/19/1979
From: Lie L
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To: Harold Denton
Office of Nuclear Reactor Regulation
References
S79-50, NUDOCS 7902020166
Download: ML19263C032 (1)


Text

Copy 1 of 9 IOWA EtscTaic LIGHT AND Powsn COMPANY General Qffice CEDAR MPIDS. IOWA January 19, 1979 LEE LIU 579-50 SENIOR VICS PRESIDENT - ENGLNEERLNG Mr. Harold Denton Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Denton:

The completion of construction and checkout of the hardware modifications committed to in the Duane Arnold Energy Center (DAEC)

Modified Amended Security Plan (MASP) will not be completed on February 23, 1979.

Enclosed herewith are our proposed compensatory measures fcr those hardware elements that will not be completed. As an individual hardware element is completed and made operational, the commitments in the MASP will supersede the cor responding enclosed compensatory measure.

This letter and attachment hereto amends our MASP as specified above. The compensatory measures proposed meet the requirements of 10 CFR 73.55.

The enclosed amendment is to be withheld from public dis-closure in accordance with 10 CFR 2.790.

Very truly yours,

"

.)

/,j,(

be iiY ' d Senior Vice President, Engineering LL/KAM/1w cc: D. Arnold R. Lowenstein L. Root A58-Al A-53 OI b 5'(

\

7902026 %