ML20148K625: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:. . . . _ .      -    -    . _ _ . _            . _ . .
{{#Wiki_filter:.... _.
l
l Peach Bottom Atomic Power Station r
  .        ,                                                                                  Peach Bottom Atomic Power Station     l r
v
v l
.PECO NUCLEAR nco tee,ov cemneo, 1848 Lay HcwJ A Unit of PECO Energy Delta. PA 17314-9032 717 456 7014 i
              ,      .PECO NUCLEAR                                                           nco tee,ov cemneo, 1848 Lay HcwJ A Unit of PECO Energy                                                   Delta. PA 17314-9032 717 456 7014 I
June 9,1997 U.S. Nuclear Regulatory Commission Docunient Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:
i June 9,1997                                   ;
Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of May 1997 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.
U.S. Nuclear Regulatory Commission Docunient Control Desk l
i Sincerely, h%#
Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:                                                                                                               i Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of May 1997                       ,
Mark E. Warner Director, Site Engineering Peach Bottom Atomic Power Station MEW /MJM: cmc Enclosures cc:
forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.                                                                                                             i Sincerely, l
W. T. Henrick, Public Service Electric & Gas E. Salowitz, Public Service Electric & Gas
h%#
)
Mark E. Warner Director, Site Engineering Peach Bottom Atomic Power Station
W.P. Domsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region 1, USNRC W.L. Schmidt, USNRC, Senior Resident inspector T. M. Messick, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station r
                  ,%                                                                                                                l MEW /MJM: cmc                                                                                                             l Enclosures cc:     W. T. Henrick, Public Service Electric & Gas                                                                     l E. Salowitz, Public Service Electric & Gas                                                                       )
/
W.P. Domsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region 1, USNRC W.L. Schmidt, USNRC, Senior Resident inspector T. M. Messick, Atlantic Electric                                                                                 ;
/,'l/ \\
A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station r
DO K O 277 R
                                                                                                                            /
PDR.
                                                                                                                      /,'l/ \
g j
DO K         O 277 R                       PDR.                                                                       g j           ccn 97-14036                                                                                         \
ccn 97-14036
\\
l
l


          ,                                                                                                      l 4'         .                            PEACH COTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS  
l 4'
PEACH COTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS  


==SUMMARY==
==SUMMARY==
MAY 1997 UNIT 2 Unit 2 began the month at 100% power. On 5/18 a load drop occurred due to Hydraulic Control Unit Maintenance then returred te 100% power on 5/23. Another load drop occurred on 5/30 due to rod pattern adjustments, waterbox cleaning and MSIV stroking then returned to 100% power on 5/31.
MAY 1997 UNIT 2 Unit 2 began the month at 100% power. On 5/18 a load drop occurred due to Hydraulic Control Unit Maintenance then returred te 100% power on 5/23. Another load drop occurred on 5/30 due to rod pattern adjustments, waterbox cleaning and MSIV stroking then returned to 100% power on 5/31.
Unit 2 Net Generation for May was 790,248 MWH.
Unit 2 Net Generation for May was 790,248 MWH.
Line 46: Line 47:
t
t


  +
+
l Attachment to
Attachment to Monthly Operating Report for May 1997 1
                  .                                                                              Monthly Operating Report for May 1997       l 1
l t
l t
UNIT 2 REFUELING INFORMATION l
UNIT 2 REFUELING INFORMATION l
l               1. Name of facility:
l 1.
Peach Bottom Unit 2
Name of facility:
: 2. Scheduled date for next refueling shutdown:
Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
Reload 12 is scheduled for September 15,1998.
Reload 12 is scheduled for September 15,1998.
: 3. Scheduled date for restart following refueling:
3.
Scheduled date for restart following refueling:
J Restart following refueling forecast for October 10,1998.
J Restart following refueling forecast for October 10,1998.
: 4. Will refueling or resumption of operation therefore require a technical specification change or otherlicense amendment?
4.
Will refueling or resumption of operation therefore require a technical specification change or otherlicense amendment?
N/A If answer is yes, what, in general, will these be?
N/A If answer is yes, what, in general, will these be?
N/A
N/A 5.
: 5. Scheduled date(s) for submitting proposed licensing action snd supporting information:
Scheduled date(s) for submitting proposed licensing action snd supporting information:
: 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
6.
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool- 2720 Fuel Assemblies,52 Fuel Rods l
7.
l l
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
                                                                                . . _ .                            -    =
(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2720 Fuel Assemblies,52 Fuel Rods l
l
=


              ,                                                                                  Docket No. 50-277 Attichmint to Monthly Operating
Docket No. 50-277 Attichmint to Monthly Operating Report for May 1997 i
                  ,                                                                            Report for May 1997                 ;
Page 2
i Page 2               )
)
l
l UNIT 2 REFUELING INFORMATION (Continued) l l
;                                      UNIT 2 REFUELING INFORMATION (Continued)                                                   !
8.
l l
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
(
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed                   !
storage capacity that has been requested or is planned, in number of fuel assemblies:                           !
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
l l
l l
l              9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
l September 2002 without full core offload capability.
l September 2002 without full core offload capability.
September 1998 with full core offload capability.
September 1998 with full core offload capability.
Line 85: Line 88:
1
1


                                                                              . _            .    ._      = _.
= _.
i     ",
i Docket No. 50-278 Attachm:nt to i
Docket No. 50-278         l Attachm:nt to         l i                                                                                           Monthly Operating         i l           ,                                                                            Report for May 1997         )
Monthly Operating i
l                                       UNIT 3 REFUELING INFORMATION                                                 !'
l Report for May 1997
l
)
: 1. Name of facility:
l UNIT 3 REFUELING INFORMATION l
I                     Peach Bottom Unit 3 l                                                                                                                     l l
1.
l       2. Scheduled date for next refueling shutdown:
Name of facility:
l                     Reload 11 scheduled for October 3,1997
I Peach Bottom Unit 3 l
: 3. Scheduled date for restart following refueling Restart following refueling scheduled for November 1,1997 l                                                                                                                   ,
l l
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
l 2.
l-                   Yes.
Scheduled date for next refueling shutdown:
l Reload 11 scheduled for October 3,1997 3.
Scheduled date for restart following refueling Restart following refueling scheduled for November 1,1997 l
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
l-Yes.
If answer is yes, what, in general, will these be?
If answer is yes, what, in general, will these be?
: 1. Wide Range Neutron Monitoring Modification 5395.
: 1. Wide Range Neutron Monitoring Modification 5395.
Line 102: Line 110:
: 3. ECCS/EDG Shutdown Specification Change.
: 3. ECCS/EDG Shutdown Specification Change.
: 4. Exclude MSIV leakage from 0.6 L..
: 4. Exclude MSIV leakage from 0.6 L..
l
l 5.
: 5. Scheduled date(s) for submilling proposed licensing action and supporting information:
Scheduled date(s) for submilling proposed licensing action and supporting information:
l j                     The first item has been submitted, including the response to an NRC RAl.
l j
The other items are planned te be submitted by May,1997.                                       j
The first item has been submitted, including the response to an NRC RAl.
: 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or       i supplier, unreviewed design or performance analysis methods, significant changes in fuel design,           I new operating procedures:
The other items are planned te be submitted by May,1997.
N/A
j 6.
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
Important licensing considerations associated with refueling, e.g., new or different fuel design or i
(a) Core - 764 Fuel Assemblies (b) Fuel Pool- 2485 Fuel Assemblies,16 Fuel Rods I
supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed
N/A 7.
.          storage capacity that has been requested or is planned, in number of fuel assemblies:
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2485 Fuel Assemblies,16 Fuel Rods I
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
l l
l l
Line 117: Line 128:
I
I


              -      .-.        . .. . . . - .      ..      --              .    .. ...    .- ,- = - .                    . . -- .
.-,- = -.
      ;*          .                                                                                          Dock't No. 50-278 AttachmInt to l                                                                                                             Monthly Operating
Dock't No. 50-278 AttachmInt to l
                          ,                                                                                Report for May 1997 Page 2 UNIT 3 REFUELING INFORMATION (Continued)                                                 ,
Monthly Operating Report for May 1997 Page 2 UNIT 3 REFUELING INFORMATION (Continued) l 9.
I l
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity.
September 2003 without full core offload capability.
l
l
: 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity.
. September 1999 with full core offload capability.
1 September 2003 without full core offload capability.                                              l l
l i
l                                      . September 1999 with full core offload capability.
l                                                                                                                                         '
i
(
(
t 1
t 1
Line 136: Line 145:
I
I


AVERAGE DAILY POWER LEVEL                                                                                                                                                                                         *:
AVERAGE DAILY POWER LEVEL DOCKET NO. 50-Ti7 UNIT PEACH BOTTOM UNIT 2 l
DOCKET NO. 50-Ti7                                                                                                                                                       <
DATE JUNE 5,1997 COMPT.NY PECO ENERGY COMPANY-L P. HYDRfCK i.
UNIT PEACH BOTTOM UNIT 2 DATE JUNE 5,1997                                                                                                                       -
BUSINESS SERVICES SITE SUPPORT DMSION l
* l' COMPT.NY PECO ENERGY COMPANY-L P. HYDRfCK                                                                                                                                 i.
PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)4SEM383 I
BUSINESS SERVICES SITE SUPPORT DMSION                                                                                                                           .
MONTH MAY,1997 s
l                                                                                                                                                                  PEACH BOTTOM ATOMIC POWER STATION                                                                                                             !
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
TELEPHONE (717)4SEM383 I
(MWE-NET) f 1
MONTH                                     MAY,1997 s
1126 17 1126 2
DAY   AVERAGE DAILY POWER LEVEL                                                                 DAY           AVERAGE DAILY POWER LEVEL (MWE-NET)                                                                                             (MWE-NET)                                                                                                                                     ;
1122 18 1014 j
1                                          1126                                                 17                                                 1126 2                                         1122                                                 18                                                 1014                                                                                                                               j 3                                         1121                                               19                                                     788                                                                                                                             .
3 1121 19 788 4
4                                          1126                                               20                                                     775 5                                         1126                                               21                                                   773                                                                                                                             l 6                                         1118                                               22                                                   777 7                                         1122                                               23                                                 1026 8                                         1125                                               24                                                 1119 9                                         1125                                               25                                                 1119-10                                         1126                                               26                                                 1120                                                                                                                               l
1126 20 775 5
.                          11                                         1122                                               27                                                 1120 12                                         1122                                               28                                                 1120                                                                                                                                 ;
1126 21 773 l
13                                         1126                                               29                                                 1116 i4                                         ii26                                               30                                                 111s 15                                         1118                                               31                                                   851 16                                         1122 i
6 1118 22 777 7
v -          -en         _
1122 23 1026 8
w -  -,ve   + _                             ---w+m---weew.. gerT--'w-we-t-ew1* - -m>T                                     LW-+wn-e---~w           ---  ----N 11-e-+r*       eWee ei
1125 24 1119 9
1125 25 1119-(
10 1126 26 1120 l
11 1122 27 1120 I
12 1122 28 1120 13 1126 29 1116 i4 ii26 30 111s 15 1118 31 851 16 1122 i
v
-en w
-,ve
+ _
---w+m---weew..
gerT--'w-we-t-ew1* - -m>T LW-+wn-e---~w
----N 11-e-+r*
eWee ei


t OPERATING DATA REPORT DOCKET NO. 50-277 DATE JUNE 5,1997                               -      -
t OPERATING DATA REPORT DOCKET NO. 50-277 DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY
COMPLETED BY PECO ENERGY COMPANY                                           [
[
L P. HYDRICK                                               g BUSINESS SERVICES ~                                         l SITE SUPPORT DIVISION                                       !
L P. HYDRICK g
PEACH BOTTOM ATOMIC DOWER STATION                           ,
BUSINESS SERVICES ~
t TELEOHONE (717) 456-4383                                               ,
l SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC DOWER STATION t
OPERATING STATUS
TELEOHONE (717) 456-4383 OPERATING STATUS
: 1. UNIT NAME ,                                               PEACH _ BOTTOM UNIT 2                                                                                       5 NOTES:                                                                 !
: 1. UNIT NAME,
: 2. REPORTING PERIOD:                                                    MAY. ,19._97..
PEACH _ BOTTOM UNIT 2 5
NOTES:
L
L
: 3. LICENSED THERMAL POWER (MWT)                                                   3458
: 2. REPORTING PERIOD:
: 4. NAMEPLATE RATING (GROSS MWE):                                                   1221                                                                                   i
MAY.,19._97..
: 5. DESIGN ELECTRICAL RATING (NET MWE):                                             1119
: 3. LICENSED THERMAL POWER (MWT) 3458
* l  6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):                                       1159
: 4. NAMEPLATE RATING (GROSS MWE):
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):                             _ ___1093 I
1221 i
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:                                                                             !
: 5. DESIGN ELECTRICAL RATING (NET MWE):
1119 l
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
1159
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
_ ___1093 I
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
t t
t t
: 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE):                                                                                                                       !
: 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE):
i 1
i 1
: 90. REASONS FOR RESTRICTIONS,IF ANY:                                                                                                                                       '
: 90. REASONS FOR RESTRICTIONS,IF ANY:
t 4
4 t
i l                                                                                   THIS MONTH                     YR-TO-DATE             CUMULATIVE
i l
: 11. HOURS IN REPORTING PERIOD                                                                 744                           3,623                 200,807
THIS MONTH YR-TO-DATE CUMULATIVE
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                                     744.0                         3,623.0               134,538.5                 i
: 11. HOURS IN REPORTING PERIOD 744 3,623 200,807
: 13. REACTOR RESERVE SHUTDOWN HOURS                                                             0.0                             0.0                     0.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,623.0 134,538.5 i
: 14. HOURS GENERATOR ON-LINE                                                                 744.0                         3,623.0               130,400.2
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
  $5. UNIT RESERVE SHUTDOWN HOURS                                                               0.0                             0.0                     0.0                 .
: 14. HOURS GENERATOR ON-LINE 744.0 3,623.0 130,400.2
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                                                 2,444,203                     12,307,486             394,283,088                 j
$5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                               811,800                     4,099,400             129,588,990                 ;
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,444,203 12,307,486 394,283,088 j
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 811,800 4,099,400 129,588,990 t
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 790.248 3,997,234 124,483,887
[
i PAGE 1 OF 2
 
,. ~ ~. - - - - - - - - - - -. - - - - - - - - - - - - _ - - - - - - - -. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
OPERATING DATA REPORT (CONTINUED) u DOCKET NO.
50 -277 DATE JUNE 5,1997 l
THIS MONTH YR-TO-DATE CUMULATIVE
: 19. UNIT SERVICE FACTOR 100.0 %
100.0 %
64.9 %
t
t
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                                                  790.248                      3,997,234              124,483,887 i
: 20. UNIT AVAILABILITY FACT.
PAGE 1 OF 2
100.0 %
 
100.0 %
  ---- ----. . . .          , . ~ ~ . - - - - - - - - - - - . - - - - - - - - - - - - _ - - - - - - - - . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
64.9 %
OPERATING DATA REPORT (CONTINUED)                                                                                                                                              ,
: 21. UNIT CAPACITY FACTC., SNG MDC NET) 97.2 %
                                                                                                                                                                                                                                                                                                                                                                                . u DOCKET NO. 50 -277                                                            .
100.9 %
DATE JUNE 5,1997 l
58 6 %
THIS MONTH                                    YR-TO-DATE                                                              CUMULATIVE
: 22. UNIT CAPACITY FACTOR (USING DER NET) 94.9 %
: 19. UNIT SERVICE FACTOR                                                                                                                                                                                                    100.0 %                                      100.0 %                                                                64.9 %            t
98 6 %
: 20. UNIT AVAILABILITY FACT .                                                                                                                                                                                               100.0 %                                       100.0 %                                                                 64.9 %             ;
57.7 %
: 21. UNIT CAPACITY FACTC . , SNG MDC NET)                                                                                                                                                                                   97.2 %                                       100.9 %                                                                 58 6 %
: 23. UNIT FORCED OUTAGE RATE
: 22. UNIT CAPACITY FACTOR (USING DER NET)                                                                                                                                                                                   94.9 %                                       98 6 %                                                                 57.7 %             ;
.0 %
: 23. UNIT FORCED OUTAGE RATE                                                                                                                                                                                                   .0 %                                         .0 %                                                                 11.4 %
.0 %
11.4 %
t
t
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
* I
I
: 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
: 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):                                                                                                                                                                         FORECAST                             ACHIEVED INITIAL CRITICALITY                                                                                                                                                                                     09/1&73                                                                                   l INITIAL ELECTRICITY                                                                                                                                                                                     02/1&74 COMMERCIAL OPERATION                                                                                                                                                                                     07/05/74                                                                                   '
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):
2 L
FORECAST ACHIEVED INITIAL CRITICALITY 09/1&73 l
t 1
INITIAL ELECTRICITY 02/1&74 COMMERCIAL OPERATION 07/05/74 2
5 1
L t
PAGE2OF2              }
1 5
1 PAGE2OF2
}


UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                                                                                                             *J DOCKET NO. 50-277                                                                                                                                   '. ~
UNIT SHUTDOWNS AND POWER REDUCTIONS
UNIT NAME PEACH BOTTOM UNIT 2 DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH                                                                         MAY,1997                                                             TELEPHONE (717)456-4383 METHOD OF     LICENSEE   SYSTEM   COMPONENT             CAUSE AND CORRECTIVE TYPE                                                                   DURATION             REASON   SHUTTING DOWN     EVENT     CODE         CODE                     ACTION TO NO.       DATE                               (1)                                                               (HOURS)           (2)       REACTOR (3)   REPORT #     (4)           (5)             PREVENT RECURRENCE 4         970518                                       S                                                                         B           4                       RB       CRDRVE           HCU MAINTENANCE (power reductm)
*J DOCKET NO. 50-277
Duration shown only for shutdowns 5         970530                                       S                                                                         B           4                       HC         XXXXXX         WATER BOX CLEANING, ROD PATTERN ADJUSTMENT, MSIV STROKING (power reducton) duration shown only for shutdown TOTAL HOURS (1)                                                                                                                   (2)                                                     (3)                                                                                                       (4)
'. ~
F-FORCED                                                                                                           REASON                                                   METHOD                                 EXHIBIT G -INSTRUCTIONS S - SCHEDULED                                                                                                     A - EQUIPMENT FAILURE (EXPLAIN)                           1 - MANUAL                             FOR PREPARATION OF DATA B - MAINTENANCE OR TEST                                   2 - MANUAL SCRAM                       ENTRY SHEETS FOR LICENSEE C - REFUELING                                             3 - AUTOMATIC SCRAM                   EVENT REPORT (LER)
UNIT NAME PEACH BOTTOM UNIT 2 DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH MAY,1997 TELEPHONE (717)456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
D - REGULATORY RESTRICTION                               4 - OTHER (EXPLAIN)                   FILE (NUREG4161)
DATE (1)
E - OPERATOR TRAINING + LICENSE EXAMINATION F- ADMINISTRATIVE                                                                                                                                                           (5)
(HOURS)
G - OPERATIONAL ERROR (EXPLAIN)                                                                 EXHIBIT I- SAME SOURCE H - OTHER (EXPLAIN)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 4
970518 S
B 4
RB CRDRVE HCU MAINTENANCE (power reductm)
Duration shown only for shutdowns 5
970530 S
B 4
HC XXXXXX WATER BOX CLEANING, ROD PATTERN ADJUSTMENT, MSIV STROKING (power reducton) duration shown only for shutdown TOTAL HOURS (1)
(2)
(3)
(4)
F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG4161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F-ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN)


AVERAGE DAILY POWER LEVEL                                                                                                                                                       *-
AVERAGE DAILY POWER LEVEL DOCKET NO. 50-278 UNIT PEACH BOTTOM UNIT 3 DATE JUNE 5,1997 i
DOCKET NO. 50-278                                                                                                 .      !
COMPANY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE - (717) 458-4383 MONTH MAY,1997 DAY AVdRAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
UNIT PEACH BOTTOM UNIT 3 DATE JUNE 5,1997                                                                         -
(MWE-NET)
* i COMPANY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES                                                                     '
-l 1
SITE SUPPORT DMSION                                                                                           '
1105 17 1097 1
PEACH BOTTOM ATOMIC POWER STATION TELEPHONE - (717) 458-4383 MONTH                                       MAY,1997 DAY           AVdRAGE DAILY POWER LEVEL                                                                                           DAY     AVERAGE DAILY POWER LEVEL (MWE-NET)                                                                                                 (MWE-NET)                                                                                                   -l 1                                                   1105                                                                         17               1097
2 1101 18 1089 3
* 1 2                                                   1101                                                                         18               1089 3                                                   1105                                                                         19               1085 4                                                       937                                                                       20               1080 5                                                       542                                                                       2*;               1073 6                                                       540                                                                       22               1088 7                                                     523                                                                       23               1080 8                                                     540                                                                       24               1059                                                                                                       i i
1105 19 1085 4
9                                                      571                                                                       25               1051 to                                                     530                                                                       28               1043 11                                                     588                                                                       27               1039                                                                                                       !
937 20 1080 5
12                                                     891                                                                       28               1068                                                                                                       :
542 2*;
i                                                                                                                                                                                                                                                                              i 13                                                   1054                                                                         29               1088 14                                                   1102                                                                         30               1052                                                                                                       i i                                                                                                                                                                                                                                                                             r 15                                                   1097                                                                         31               1068                                                                                                       ,
1073 6
16                                                   1097 i
540 22 1088 7
523 23 1080 8
540 24 1059 i
i 9
571 25 1051 to 530 28 1043 11 588 27 1039 12 891 28 1068 i
i 13 1054 29 1088 14 1102 30 1052 i
i r
15 1097 31 1068 16 1097 i
i i
i i
l                                                                                                                                                                                                                                                                               !
l
_ . _ . _      _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _                - _ _ . . _ _ _ _ . . . . _ _ _ _ _ , . . . ~ . , ,                             ._ _                              _,                      . _ _ _ . _ _ _ ._. _
- _ _.. _ _ _ _.... _ _ _ _ _,... ~.,,


OPERATING DATA REPORT                                                                                                                                         ,
OPERATING DATA REPORT DOCKET NO. 50-278 DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY i
DOCKET NO. 50-278                                                                                         :'
l L P. HYDRICK -
DATE JUNE 5,1997                                                   -
l BUSINESS SERVICES SITE SUPPORT DMSION I
COMPLETED BY PECO ENERGY COMPANY                                                                                   i l                                                                                                                                                             L P. HYDRICK -                                                                             l BUSINESS SERVICES                                                     '
PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 i
SITE SUPPORT DMSION                                                                       I PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383                                                                                   ,
OPERATING STATUS 2
i                      OPERATING STATUS                                                                                                                                                                                                                   ,
i
2 i
: 1. UNIT NAME:
: 1. UNIT NAME:                                                     PEA...C. H. ..B.O. T..T..O..M. .. UNIT 3
PEA...C. H...B.O. T..T..O..M... UNIT 3
: 2. REPORTING PERIOD:                                                                         MAY,1,997
: 2. REPORTING PERIOD:
: 3. LICENSED THERMAL POWER (MWT). _                                                                 3458 I
MAY,1,997
: 4. NAMEPLATE RATING (GROSS MWE): _ _ _ _                                                           1221
: 3. LICENSED THERMAL POWER (MWT). _
: 5. DESIGN ELECTRICAL RATING (NET MWE):                                                             1119
3458 I
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):                                                       11_50                                                                                                                             I t
: 4. NAMEPLATE RATING (GROSS MWE): _ _ _ _
7, MAXIMUM DEPENDABLE CAPACITY (NET MWE):                                                         1093                                                                                                                               !
1221
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST RFPORT, GIVE REASONS:                                                                                                                                       )
: 5. DESIGN ELECTRICAL RATING (NET MWE):
1119
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
11_50 I
t 7, MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1093
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST RFPORT, GIVE REASONS:
)
{
{
i 9 POWEF. LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE);                                                                                                                                                                                   i i
i 9 POWEF. LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE);
: 10. REASONS FOR RESTRICTIONS,IF ANY:                                                                                                                                                                                                   l l
i i
THIS MONTH                                 YR-TO-DATE                     CUMULATIVE F
: 10. REASONS FOR RESTRICTIONS,IF ANY:
: 11. HOURS IN REPORTING PERIOD                                                                                   744                                                 3,623             196,703                                         i t
l l
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                                                     744.0                                             3,563.5             133,545.8
THIS MONTH YR-TO-DATE CUMULATIVE F
: 13. REACTOR RESERVE SHUTDOWN HOURS                                                                               0.0                                                     00                   0.0                                 -I
: 11. HOURS IN REPORTING PERIOD 744 3,623 196,703 i
!                                                                                                                                                                                                                                                          t
t f
: 14. HOURS GENERATOR ON-LINE                                                                                   744.0                                             3,551.0             129,988 2                                         I
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,563.5 133,545.8
: 15. UNIT RESERVE SHUTDOWN HOURS                                                                                 0.0                                                     00                   0.0                                     I
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 00 0.0
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                                                                 2,224,147                                     11,519,184                 390,521,162
-I t
: 14. HOURS GENERATOR ON-LINE 744.0 3,551.0 129,988 2 I
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 00 0.0 I
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,224,147 11,519,184 390,521,162
[
[
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                                                 726,100                                       3,785,500               128,103,932                                         f
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 726,100 3,785,500 128,103,932 f
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                                                                   704,228                                       3,683,005               123,121,545 l
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 704,228 3,683,005 123,121,545 L
I i
l I
PAGE 1 OF 2                                         l
i PAGE 1 OF 2 l


                                                                                                                                                                                                                                                                                                                                                                                                't OPERATING DATA REPORT (CONTINUED)                                                                                                                                                                                                   ,
't OPERATING DATA REPORT (CONTINUED)
DOCKET NO.                       50 - 278                                     .                      .-
DOCKET NO.
DATE JUNE 5,1997 THIS MONTH               YR-TO-DATE                                             CUMULATIVE
50 - 278 DATE JUNE 5,1997 THIS MONTH YR-TO-DATE CUMULATIVE
: 19. UNIT SERVICE FACTOR                                                                                                                                                                                                         100.0 %               96.0 %                                                                       66.1 %
: 19. UNIT SERVICE FACTOR 100.0 %
: 20. UNIT AVAILABILITY FACTOR                                                                                                                                                                                                     100.0 %               98.0 %                                                                       66.1 %
96.0 %
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                                                                                                                                                                                         86.6 %               93.0 %                                                                       80.1 %
66.1 %
: 22. UNIT CAPACITY FACTOR (USING DER NET)                                                                                                                                                                                         84.6 %               90.8 %                                                                       58.4 'n
: 20. UNIT AVAILABILITY FACTOR 100.0 %
: 23. UNIT FORCED OUTAGE RATE                                                                                                                                                                                                         .0 %               2.0 %                                                                       10.3 %
98.0 %
66.1 %
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 86.6 %
93.0 %
80.1 %
: 22. UNIT CAPACITY FACTOR (USING DER NET) 84.6 %
90.8 %
58.4 'n
: 23. UNIT FORCED OUTAGE RATE
.0 %
2.0 %
10.3 %
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
: 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTl.YATED DATE OF STARTUP:
: 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTl.YATED DATE OF STARTUP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):                                                                                                                                                                           FORECAST       ACHIEVED INITIAL CRITICALITY                                                                                                                                                                             O&t)7/74 INITIAL ELECTRICITY                                                                                                                                                                             f.M)1/74 i
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):
COMMERCIAL OPERATION                                                                                                                                                                             17/23/74
FORECAST ACHIEVED INITIAL CRITICALITY O&t)7/74 INITIAL ELECTRICITY f.M)1/74 i
                                                                                                                                                                                                                                                                                                                                                                                                          +
COMMERCIAL OPERATION 17/23/74 L
+
PAGE 2 OF 2
PAGE 2 OF 2
_  - _ _ _                        . - - . _ - _ ___- _ - - ._- _                                                              __-- - - _ _ _ _ - ___ _ _ _ __ - -_ _ - _.___ - ____-_-____- --_ =______-______ _ _. _ __                                                                                                            _- . - - _ _ _ _ _ _ .
=


UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                                                                                                                   *J l
UNIT SHUTDOWNS AND POWER REDUCTIONS
r                                                                                                                                                                                                                                                                                                                               .*
*J l
DOCKET NO. 50-278
r DOCKET NO. 50-278 UNIT NAME PEACH BOTTOM UNIT 3 j
* UNIT NAME PEACH BOTTOM UNIT 3                                         *
DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES l
* j                                                                                                                                                                                                                                                    DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES                         _
SITE SUPPORT DMSION l
l                                                                                                                                                                                                                                                          SITE SUPPORT DMSION l                                                                                                                                                                                                                                                           PEACH BOTTOM ATOMIC POWER STATION l                                                                     REPORT MONTH         MAY,1997                                                                                                                   TELEPHONE (717)456-4383                                                                                     i METHOD OF     LICENSEE             SYSTEM   COMPONENT                                                                                   CAUSE AND CORRECTIVE                                                 '
PEACH BOTTOM ATOMIC POWER STATION l
TYPE   DURATION         REASON   SHUTTING DOWN     EVENT               CODE.                           CODE                                                                       ACTION TO NO.       DATE                         (1)   (HOURS)           (2)       REACTOR (3)   REPORT #               (4)                                         (5)                                                     PREVENT RECURRENCE 6         970504                         S                       B             4                                 RB                     CRDRVE                                                                 HCU MAINTENANCE (power reducten) durshons shown only for shutdowns TOTAL HOURS I
REPORT MONTH MAY,1997 TELEPHONE (717)456-4383 i
METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE.
CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 6
970504 S
B 4
RB CRDRVE HCU MAINTENANCE (power reducten) durshons shown only for shutdowns TOTAL HOURS h
I I
i i
i i
(1)                                                 (2)                                                                                                   (3)                                                                               (4)
(1)
F-FORCED                                         REASON                                                               METHOD                                                                                                     EXHIBIT G -INSTRUCTIONS S - SCHEDULED                                     A - EQUIPMENT FAILURE (EXPLAIN)                                       1 - MANUAL                                                                                               FOR PREPARATION OF DATA B MAINTENANCE OR TEST                                               2 - MANUAL SCRAM                                                                                           ENTRY SHEETS FOR UCENSEE                             l C - REFUELING                                                       3- AUTOMATIC SCRAM                                                                                         EVENT REPORT (LER)
(2)
D - REGULATORY RESTRICTION                                           4- OTHER (EXPLAIN)                                                                                         FILE (NUREG-0161)                                     .
(3)
E - OPERATOR TRAINING + LICENSE EXAMtNATION F- ADMINISTRATIVE                                                                                                                                                                               (5)
(4) f F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR UCENSEE l
G -OPERATIONAL ERROR (EXPLAIN)                                                                                                                                                 EXHIBIT I- SAME SOURCE                                 '
C - REFUELING 3-AUTOMATIC SCRAM EVENT REPORT (LER)
H - OTHER (EXPLAIN)                                                                                                                                                                                                                   L i
D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN)
                                                                                                                                          .              . __                                                                      .                      -      -                      .              - _ - _ _ _}}
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMtNATION F-ADMINISTRATIVE (5)
G -OPERATIONAL ERROR (EXPLAIN)
EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN)
L i
-}}

Latest revision as of 12:10, 11 December 2024

Monthly Operating Repts for May 1997 for Peach Bottom Atomic Power Station Units 2 & 3
ML20148K625
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/31/1997
From: Hydrick L, Warner M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9706180221
Download: ML20148K625 (14)


Text

.... _.

l Peach Bottom Atomic Power Station r

v

.PECO NUCLEAR nco tee,ov cemneo, 1848 Lay HcwJ A Unit of PECO Energy Delta. PA 17314-9032 717 456 7014 i

June 9,1997 U.S. Nuclear Regulatory Commission Docunient Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of May 1997 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.

i Sincerely, h%#

Mark E. Warner Director, Site Engineering Peach Bottom Atomic Power Station MEW /MJM: cmc Enclosures cc:

W. T. Henrick, Public Service Electric & Gas E. Salowitz, Public Service Electric & Gas

)

W.P. Domsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region 1, USNRC W.L. Schmidt, USNRC, Senior Resident inspector T. M. Messick, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station r

/

/,'l/ \\

DO K O 277 R

PDR.

g j

ccn 97-14036

\\

l

l 4'

PEACH COTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS

SUMMARY

MAY 1997 UNIT 2 Unit 2 began the month at 100% power. On 5/18 a load drop occurred due to Hydraulic Control Unit Maintenance then returred te 100% power on 5/23. Another load drop occurred on 5/30 due to rod pattern adjustments, waterbox cleaning and MSIV stroking then returned to 100% power on 5/31.

Unit 2 Net Generation for May was 790,248 MWH.

UNIT 3 Unit 3 began the month at 100% power. On 5/4 a load drop occurred due to Hydraulic Control Unit Maintenance and retumed to 100% power on 5/15. A rod pattem adjustment was performed between 5/27 and 5/28 to improve the thermal limit margins. The Unit ended the month at 96.6% power.

Unit 3 Net Generation for May was 704,228 MWH.

l l

t

+

Attachment to Monthly Operating Report for May 1997 1

l t

UNIT 2 REFUELING INFORMATION l

l 1.

Name of facility:

Peach Bottom Unit 2 2.

Scheduled date for next refueling shutdown:

Reload 12 is scheduled for September 15,1998.

3.

Scheduled date for restart following refueling:

J Restart following refueling forecast for October 10,1998.

4.

Will refueling or resumption of operation therefore require a technical specification change or otherlicense amendment?

N/A If answer is yes, what, in general, will these be?

N/A 5.

Scheduled date(s) for submitting proposed licensing action snd supporting information:

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2720 Fuel Assemblies,52 Fuel Rods l

l

=

Docket No. 50-277 Attichmint to Monthly Operating Report for May 1997 i

Page 2

)

l UNIT 2 REFUELING INFORMATION (Continued) l l

8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

l l

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

l September 2002 without full core offload capability.

September 1998 with full core offload capability.

l i

l l

1

= _.

i Docket No. 50-278 Attachm:nt to i

Monthly Operating i

l Report for May 1997

)

l UNIT 3 REFUELING INFORMATION l

1.

Name of facility:

I Peach Bottom Unit 3 l

l l

l 2.

Scheduled date for next refueling shutdown:

l Reload 11 scheduled for October 3,1997 3.

Scheduled date for restart following refueling Restart following refueling scheduled for November 1,1997 l

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

l-Yes.

If answer is yes, what, in general, will these be?

1. Wide Range Neutron Monitoring Modification 5395.
2. Large Primary Containment Purge and Vent isolation Valve Boot Seal Replacement Frequency Change.
3. ECCS/EDG Shutdown Specification Change.
4. Exclude MSIV leakage from 0.6 L..

l 5.

Scheduled date(s) for submilling proposed licensing action and supporting information:

l j

The first item has been submitted, including the response to an NRC RAl.

The other items are planned te be submitted by May,1997.

j 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or i

supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2485 Fuel Assemblies,16 Fuel Rods I

8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

l l

l l

I

.-,- = -.

Dock't No. 50-278 AttachmInt to l

Monthly Operating Report for May 1997 Page 2 UNIT 3 REFUELING INFORMATION (Continued) l 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity.

September 2003 without full core offload capability.

l

. September 1999 with full core offload capability.

l i

(

t 1

i l

I r

l l

l l

4 e

I

AVERAGE DAILY POWER LEVEL DOCKET NO. 50-Ti7 UNIT PEACH BOTTOM UNIT 2 l

DATE JUNE 5,1997 COMPT.NY PECO ENERGY COMPANY-L P. HYDRfCK i.

BUSINESS SERVICES SITE SUPPORT DMSION l

PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)4SEM383 I

MONTH MAY,1997 s

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET) f 1

1126 17 1126 2

1122 18 1014 j

3 1121 19 788 4

1126 20 775 5

1126 21 773 l

6 1118 22 777 7

1122 23 1026 8

1125 24 1119 9

1125 25 1119-(

10 1126 26 1120 l

11 1122 27 1120 I

12 1122 28 1120 13 1126 29 1116 i4 ii26 30 111s 15 1118 31 851 16 1122 i

v

-en w

-,ve

+ _

---w+m---weew..

gerT--'w-we-t-ew1* - -m>T LW-+wn-e---~w


N 11-e-+r*

eWee ei

t OPERATING DATA REPORT DOCKET NO. 50-277 DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY

[

L P. HYDRICK g

BUSINESS SERVICES ~

l SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC DOWER STATION t

TELEOHONE (717) 456-4383 OPERATING STATUS

1. UNIT NAME,

PEACH _ BOTTOM UNIT 2 5

NOTES:

L

2. REPORTING PERIOD:

MAY.,19._97..

3. LICENSED THERMAL POWER (MWT) 3458
4. NAMEPLATE RATING (GROSS MWE):

1221 i

5. DESIGN ELECTRICAL RATING (NET MWE):

1119 l

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

1159

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

_ ___1093 I

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:

t t

9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE):

i 1

90. REASONS FOR RESTRICTIONS,IF ANY:

4 t

i l

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 3,623 200,807
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,623.0 134,538.5 i
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 744.0 3,623.0 130,400.2

$5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH) 2,444,203 12,307,486 394,283,088 j
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 811,800 4,099,400 129,588,990 t
18. NET ELECTRICAL ENERGY GENERATED (MWH) 790.248 3,997,234 124,483,887

[

i PAGE 1 OF 2

,. ~ ~. - - - - - - - - - - -. - - - - - - - - - - - - _ - - - - - - - -. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

OPERATING DATA REPORT (CONTINUED) u DOCKET NO.

50 -277 DATE JUNE 5,1997 l

THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 %

100.0 %

64.9 %

t

20. UNIT AVAILABILITY FACT.

100.0 %

100.0 %

64.9 %

21. UNIT CAPACITY FACTC., SNG MDC NET) 97.2 %

100.9 %

58 6 %

22. UNIT CAPACITY FACTOR (USING DER NET) 94.9 %

98 6 %

57.7 %

23. UNIT FORCED OUTAGE RATE

.0 %

.0 %

11.4 %

t

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

I

25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):

FORECAST ACHIEVED INITIAL CRITICALITY 09/1&73 l

INITIAL ELECTRICITY 02/1&74 COMMERCIAL OPERATION 07/05/74 2

L t

1 5

1 PAGE2OF2

}

UNIT SHUTDOWNS AND POWER REDUCTIONS

  • J DOCKET NO. 50-277

'. ~

UNIT NAME PEACH BOTTOM UNIT 2 DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH MAY,1997 TELEPHONE (717)456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECURRENCE 4

970518 S

B 4

RB CRDRVE HCU MAINTENANCE (power reductm)

Duration shown only for shutdowns 5

970530 S

B 4

HC XXXXXX WATER BOX CLEANING, ROD PATTERN ADJUSTMENT, MSIV STROKING (power reducton) duration shown only for shutdown TOTAL HOURS (1)

(2)

(3)

(4)

F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG4161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F-ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN)

AVERAGE DAILY POWER LEVEL DOCKET NO. 50-278 UNIT PEACH BOTTOM UNIT 3 DATE JUNE 5,1997 i

COMPANY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE - (717) 458-4383 MONTH MAY,1997 DAY AVdRAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET)

-l 1

1105 17 1097 1

2 1101 18 1089 3

1105 19 1085 4

937 20 1080 5

542 2*;

1073 6

540 22 1088 7

523 23 1080 8

540 24 1059 i

i 9

571 25 1051 to 530 28 1043 11 588 27 1039 12 891 28 1068 i

i 13 1054 29 1088 14 1102 30 1052 i

i r

15 1097 31 1068 16 1097 i

i i

l

- _ _.. _ _ _ _.... _ _ _ _ _,... ~.,,

OPERATING DATA REPORT DOCKET NO. 50-278 DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY i

l L P. HYDRICK -

l BUSINESS SERVICES SITE SUPPORT DMSION I

PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 i

OPERATING STATUS 2

i

1. UNIT NAME:

PEA...C. H...B.O. T..T..O..M... UNIT 3

2. REPORTING PERIOD:

MAY,1,997

3. LICENSED THERMAL POWER (MWT). _

3458 I

4. NAMEPLATE RATING (GROSS MWE): _ _ _ _

1221

5. DESIGN ELECTRICAL RATING (NET MWE):

1119

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

11_50 I

t 7, MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1093

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST RFPORT, GIVE REASONS:

)

{

i 9 POWEF. LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE);

i i

10. REASONS FOR RESTRICTIONS,IF ANY:

l l

THIS MONTH YR-TO-DATE CUMULATIVE F

11. HOURS IN REPORTING PERIOD 744 3,623 196,703 i

t f

12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,563.5 133,545.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 00 0.0

-I t

14. HOURS GENERATOR ON-LINE 744.0 3,551.0 129,988 2 I
15. UNIT RESERVE SHUTDOWN HOURS 0.0 00 0.0 I
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,224,147 11,519,184 390,521,162

[

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 726,100 3,785,500 128,103,932 f
18. NET ELECTRICAL ENERGY GENERATED (MWH) 704,228 3,683,005 123,121,545 L

l I

i PAGE 1 OF 2 l

't OPERATING DATA REPORT (CONTINUED)

DOCKET NO.

50 - 278 DATE JUNE 5,1997 THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 %

96.0 %

66.1 %

20. UNIT AVAILABILITY FACTOR 100.0 %

98.0 %

66.1 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 86.6 %

93.0 %

80.1 %

22. UNIT CAPACITY FACTOR (USING DER NET) 84.6 %

90.8 %

58.4 'n

23. UNIT FORCED OUTAGE RATE

.0 %

2.0 %

10.3 %

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTl.YATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):

FORECAST ACHIEVED INITIAL CRITICALITY O&t)7/74 INITIAL ELECTRICITY f.M)1/74 i

COMMERCIAL OPERATION 17/23/74 L

+

PAGE 2 OF 2

=

UNIT SHUTDOWNS AND POWER REDUCTIONS

  • J l

r DOCKET NO. 50-278 UNIT NAME PEACH BOTTOM UNIT 3 j

DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES l

SITE SUPPORT DMSION l

PEACH BOTTOM ATOMIC POWER STATION l

REPORT MONTH MAY,1997 TELEPHONE (717)456-4383 i

METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE.

CODE ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECURRENCE 6

970504 S

B 4

RB CRDRVE HCU MAINTENANCE (power reducten) durshons shown only for shutdowns TOTAL HOURS h

I I

i i

(1)

(2)

(3)

(4) f F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR UCENSEE l

C - REFUELING 3-AUTOMATIC SCRAM EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMtNATION F-ADMINISTRATIVE (5)

G -OPERATIONAL ERROR (EXPLAIN)

EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN)

L i

-