ML20148K625: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. . . . _ | {{#Wiki_filter:.... _. | ||
l | l Peach Bottom Atomic Power Station r | ||
v | |||
v | .PECO NUCLEAR nco tee,ov cemneo, 1848 Lay HcwJ A Unit of PECO Energy Delta. PA 17314-9032 717 456 7014 i | ||
June 9,1997 U.S. Nuclear Regulatory Commission Docunient Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen: | |||
Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of May 1997 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4. | |||
U.S. Nuclear Regulatory Commission Docunient Control Desk | i Sincerely, h%# | ||
Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen: | Mark E. Warner Director, Site Engineering Peach Bottom Atomic Power Station MEW /MJM: cmc Enclosures cc: | ||
forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4. | W. T. Henrick, Public Service Electric & Gas E. Salowitz, Public Service Electric & Gas | ||
h%# | ) | ||
Mark E. Warner Director, Site Engineering Peach Bottom Atomic Power Station | W.P. Domsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region 1, USNRC W.L. Schmidt, USNRC, Senior Resident inspector T. M. Messick, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station r | ||
/ | |||
W.P. Domsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region 1, USNRC W.L. Schmidt, USNRC, Senior Resident inspector T. M. Messick, Atlantic Electric | /,'l/ \\ | ||
A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station r | DO K O 277 R | ||
PDR. | |||
g j | |||
DO K | ccn 97-14036 | ||
\\ | |||
l | l | ||
l 4' | |||
PEACH COTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS | |||
==SUMMARY== | ==SUMMARY== | ||
MAY 1997 UNIT 2 Unit 2 began the month at 100% power. On 5/18 a load drop occurred due to Hydraulic Control Unit Maintenance then returred te 100% power on 5/23. Another load drop occurred on 5/30 due to rod pattern adjustments, waterbox cleaning and MSIV stroking then returned to 100% power on 5/31. | MAY 1997 UNIT 2 Unit 2 began the month at 100% power. On 5/18 a load drop occurred due to Hydraulic Control Unit Maintenance then returred te 100% power on 5/23. Another load drop occurred on 5/30 due to rod pattern adjustments, waterbox cleaning and MSIV stroking then returned to 100% power on 5/31. | ||
Unit 2 Net Generation for May was 790,248 MWH. | Unit 2 Net Generation for May was 790,248 MWH. | ||
Line 46: | Line 47: | ||
t | t | ||
+ | |||
Attachment to Monthly Operating Report for May 1997 1 | |||
l t | l t | ||
UNIT 2 REFUELING INFORMATION l | UNIT 2 REFUELING INFORMATION l | ||
l | l 1. | ||
Peach Bottom Unit 2 | Name of facility: | ||
Peach Bottom Unit 2 2. | |||
Scheduled date for next refueling shutdown: | |||
Reload 12 is scheduled for September 15,1998. | Reload 12 is scheduled for September 15,1998. | ||
3. | |||
Scheduled date for restart following refueling: | |||
J Restart following refueling forecast for October 10,1998. | J Restart following refueling forecast for October 10,1998. | ||
4. | |||
Will refueling or resumption of operation therefore require a technical specification change or otherlicense amendment? | |||
N/A If answer is yes, what, in general, will these be? | N/A If answer is yes, what, in general, will these be? | ||
N/A | N/A 5. | ||
Scheduled date(s) for submitting proposed licensing action snd supporting information: | |||
6. | |||
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures: | |||
(a) Core - 764 Fuel Assemblies (b) Fuel Pool- 2720 Fuel Assemblies,52 Fuel Rods l | 7. | ||
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: | |||
(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2720 Fuel Assemblies,52 Fuel Rods l | |||
l | |||
= | |||
Docket No. 50-277 Attichmint to Monthly Operating Report for May 1997 i | |||
Page 2 | |||
) | |||
l | l UNIT 2 REFUELING INFORMATION (Continued) l l | ||
8. | |||
l l | The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: | ||
storage capacity that has been requested or is planned, in number of fuel assemblies: | |||
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. | The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. | ||
l l | l l | ||
9. | |||
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity: | |||
l September 2002 without full core offload capability. | l September 2002 without full core offload capability. | ||
September 1998 with full core offload capability. | September 1998 with full core offload capability. | ||
Line 85: | Line 88: | ||
1 | 1 | ||
= _. | |||
i | i Docket No. 50-278 Attachm:nt to i | ||
Docket No. 50-278 | Monthly Operating i | ||
l | l Report for May 1997 | ||
l | ) | ||
l UNIT 3 REFUELING INFORMATION l | |||
I | 1. | ||
l | Name of facility: | ||
l | I Peach Bottom Unit 3 l | ||
l l | |||
l 2. | |||
l- | Scheduled date for next refueling shutdown: | ||
l Reload 11 scheduled for October 3,1997 3. | |||
Scheduled date for restart following refueling Restart following refueling scheduled for November 1,1997 l | |||
4. | |||
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? | |||
l-Yes. | |||
If answer is yes, what, in general, will these be? | If answer is yes, what, in general, will these be? | ||
: 1. Wide Range Neutron Monitoring Modification 5395. | : 1. Wide Range Neutron Monitoring Modification 5395. | ||
Line 102: | Line 110: | ||
: 3. ECCS/EDG Shutdown Specification Change. | : 3. ECCS/EDG Shutdown Specification Change. | ||
: 4. Exclude MSIV leakage from 0.6 L.. | : 4. Exclude MSIV leakage from 0.6 L.. | ||
l | l 5. | ||
Scheduled date(s) for submilling proposed licensing action and supporting information: | |||
l j | l j | ||
The other items are planned te be submitted by May,1997. | The first item has been submitted, including the response to an NRC RAl. | ||
The other items are planned te be submitted by May,1997. | |||
N/A | j 6. | ||
Important licensing considerations associated with refueling, e.g., new or different fuel design or i | |||
(a) Core - 764 Fuel Assemblies (b) Fuel Pool- 2485 Fuel Assemblies,16 Fuel Rods I | supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures: | ||
N/A 7. | |||
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: | |||
(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2485 Fuel Assemblies,16 Fuel Rods I | |||
8. | |||
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: | |||
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. | The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. | ||
l l | l l | ||
Line 117: | Line 128: | ||
I | I | ||
.-,- = -. | |||
Dock't No. 50-278 AttachmInt to l | |||
Monthly Operating Report for May 1997 Page 2 UNIT 3 REFUELING INFORMATION (Continued) l 9. | |||
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity. | |||
September 2003 without full core offload capability. | |||
l | l | ||
. September 1999 with full core offload capability. | |||
l i | |||
l | |||
i | |||
( | ( | ||
t 1 | t 1 | ||
Line 136: | Line 145: | ||
I | I | ||
AVERAGE DAILY POWER LEVEL | AVERAGE DAILY POWER LEVEL DOCKET NO. 50-Ti7 UNIT PEACH BOTTOM UNIT 2 l | ||
DOCKET NO. 50-Ti7 | DATE JUNE 5,1997 COMPT.NY PECO ENERGY COMPANY-L P. HYDRfCK i. | ||
UNIT PEACH BOTTOM UNIT 2 DATE JUNE 5,1997 | BUSINESS SERVICES SITE SUPPORT DMSION l | ||
PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)4SEM383 I | |||
BUSINESS SERVICES SITE SUPPORT DMSION | MONTH MAY,1997 s | ||
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) | |||
TELEPHONE (717)4SEM383 I | (MWE-NET) f 1 | ||
MONTH | 1126 17 1126 2 | ||
DAY | 1122 18 1014 j | ||
3 1121 19 788 4 | |||
1126 20 775 5 | |||
1126 21 773 l | |||
13 | 6 1118 22 777 7 | ||
v | 1122 23 1026 8 | ||
1125 24 1119 9 | |||
1125 25 1119-( | |||
10 1126 26 1120 l | |||
11 1122 27 1120 I | |||
12 1122 28 1120 13 1126 29 1116 i4 ii26 30 111s 15 1118 31 851 16 1122 i | |||
v | |||
-en w | |||
-,ve | |||
+ _ | |||
---w+m---weew.. | |||
gerT--'w-we-t-ew1* - -m>T LW-+wn-e---~w | |||
----N 11-e-+r* | |||
eWee ei | |||
t OPERATING DATA REPORT DOCKET NO. 50-277 DATE JUNE 5,1997 | t OPERATING DATA REPORT DOCKET NO. 50-277 DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY | ||
COMPLETED BY PECO ENERGY COMPANY | [ | ||
L P. HYDRICK | L P. HYDRICK g | ||
PEACH BOTTOM ATOMIC DOWER STATION | BUSINESS SERVICES ~ | ||
l SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC DOWER STATION t | |||
OPERATING STATUS | TELEOHONE (717) 456-4383 OPERATING STATUS | ||
: 1. UNIT NAME , | : 1. UNIT NAME, | ||
PEACH _ BOTTOM UNIT 2 5 | |||
NOTES: | |||
L | L | ||
: 3. LICENSED THERMAL POWER (MWT) | : 2. REPORTING PERIOD: | ||
: 4. NAMEPLATE RATING (GROSS MWE): | MAY.,19._97.. | ||
: 5. DESIGN ELECTRICAL RATING (NET MWE): | : 3. LICENSED THERMAL POWER (MWT) 3458 | ||
: 4. NAMEPLATE RATING (GROSS MWE): | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): | 1221 i | ||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS: | : 5. DESIGN ELECTRICAL RATING (NET MWE): | ||
1119 l | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): | |||
1159 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): | |||
_ ___1093 I | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS: | |||
t t | t t | ||
: 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE): | : 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE): | ||
i 1 | i 1 | ||
: 90. REASONS FOR RESTRICTIONS,IF ANY: | : 90. REASONS FOR RESTRICTIONS,IF ANY: | ||
t | 4 t | ||
i l | i l | ||
: 11. HOURS IN REPORTING PERIOD | THIS MONTH YR-TO-DATE CUMULATIVE | ||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL | : 11. HOURS IN REPORTING PERIOD 744 3,623 200,807 | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS | : 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,623.0 134,538.5 i | ||
: 14. HOURS GENERATOR ON-LINE | : 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 | ||
: 14. HOURS GENERATOR ON-LINE 744.0 3,623.0 130,400.2 | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) | $5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 | ||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) | : 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,444,203 12,307,486 394,283,088 j | ||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 811,800 4,099,400 129,588,990 t | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 790.248 3,997,234 124,483,887 | |||
[ | |||
i PAGE 1 OF 2 | |||
,. ~ ~. - - - - - - - - - - -. - - - - - - - - - - - - _ - - - - - - - -. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - | |||
OPERATING DATA REPORT (CONTINUED) u DOCKET NO. | |||
50 -277 DATE JUNE 5,1997 l | |||
THIS MONTH YR-TO-DATE CUMULATIVE | |||
: 19. UNIT SERVICE FACTOR 100.0 % | |||
100.0 % | |||
64.9 % | |||
t | t | ||
: 20. UNIT AVAILABILITY FACT. | |||
100.0 % | |||
100.0 % | |||
64.9 % | |||
: 21. UNIT CAPACITY FACTC., SNG MDC NET) 97.2 % | |||
100.9 % | |||
58 6 % | |||
: 22. UNIT CAPACITY FACTOR (USING DER NET) 94.9 % | |||
98 6 % | |||
: 20. UNIT AVAILABILITY FACT . | 57.7 % | ||
: 21. UNIT CAPACITY FACTC . , SNG MDC NET) | : 23. UNIT FORCED OUTAGE RATE | ||
: 22. UNIT CAPACITY FACTOR (USING DER NET) | .0 % | ||
: 23. UNIT FORCED OUTAGE RATE | .0 % | ||
11.4 % | |||
t | t | ||
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): | : 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): | ||
I | |||
: 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | : 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | ||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): | : 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): | ||
FORECAST ACHIEVED INITIAL CRITICALITY 09/1&73 l | |||
INITIAL ELECTRICITY 02/1&74 COMMERCIAL OPERATION 07/05/74 2 | |||
L t | |||
1 5 | |||
1 PAGE2OF2 | |||
} | |||
UNIT SHUTDOWNS AND POWER REDUCTIONS | UNIT SHUTDOWNS AND POWER REDUCTIONS | ||
UNIT NAME PEACH BOTTOM UNIT 2 DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH | *J DOCKET NO. 50-277 | ||
Duration shown only for shutdowns 5 | '. ~ | ||
F-FORCED | UNIT NAME PEACH BOTTOM UNIT 2 DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH MAY,1997 TELEPHONE (717)456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. | ||
D - REGULATORY RESTRICTION | DATE (1) | ||
E - OPERATOR TRAINING + LICENSE EXAMINATION F- ADMINISTRATIVE | (HOURS) | ||
G - OPERATIONAL ERROR (EXPLAIN) | (2) | ||
REACTOR (3) | |||
REPORT # | |||
(4) | |||
(5) | |||
PREVENT RECURRENCE 4 | |||
970518 S | |||
B 4 | |||
RB CRDRVE HCU MAINTENANCE (power reductm) | |||
Duration shown only for shutdowns 5 | |||
970530 S | |||
B 4 | |||
HC XXXXXX WATER BOX CLEANING, ROD PATTERN ADJUSTMENT, MSIV STROKING (power reducton) duration shown only for shutdown TOTAL HOURS (1) | |||
(2) | |||
(3) | |||
(4) | |||
F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) | |||
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) | |||
FILE (NUREG4161) | |||
E - OPERATOR TRAINING + LICENSE EXAMINATION F-ADMINISTRATIVE (5) | |||
G - OPERATIONAL ERROR (EXPLAIN) | |||
EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN) | |||
AVERAGE DAILY POWER LEVEL | AVERAGE DAILY POWER LEVEL DOCKET NO. 50-278 UNIT PEACH BOTTOM UNIT 3 DATE JUNE 5,1997 i | ||
DOCKET NO. 50-278 | COMPANY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE - (717) 458-4383 MONTH MAY,1997 DAY AVdRAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) | ||
UNIT PEACH BOTTOM UNIT 3 DATE JUNE 5,1997 | (MWE-NET) | ||
-l 1 | |||
SITE SUPPORT DMSION | 1105 17 1097 1 | ||
PEACH BOTTOM ATOMIC POWER STATION TELEPHONE - (717) 458-4383 MONTH | 2 1101 18 1089 3 | ||
1105 19 1085 4 | |||
937 20 1080 5 | |||
12 | 542 2*; | ||
1073 6 | |||
16 | 540 22 1088 7 | ||
523 23 1080 8 | |||
540 24 1059 i | |||
i 9 | |||
571 25 1051 to 530 28 1043 11 588 27 1039 12 891 28 1068 i | |||
i 13 1054 29 1088 14 1102 30 1052 i | |||
i r | |||
15 1097 31 1068 16 1097 i | |||
i i | i i | ||
l | l | ||
- _ _.. _ _ _ _.... _ _ _ _ _,... ~.,, | |||
OPERATING DATA REPORT | OPERATING DATA REPORT DOCKET NO. 50-278 DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY i | ||
DOCKET NO. 50-278 | l L P. HYDRICK - | ||
DATE JUNE 5,1997 | l BUSINESS SERVICES SITE SUPPORT DMSION I | ||
COMPLETED BY PECO ENERGY COMPANY | PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 i | ||
SITE SUPPORT DMSION | OPERATING STATUS 2 | ||
i | |||
: 1. UNIT NAME: | |||
: 1. UNIT NAME: | PEA...C. H...B.O. T..T..O..M... UNIT 3 | ||
: 2. REPORTING PERIOD: | : 2. REPORTING PERIOD: | ||
: 3. LICENSED THERMAL POWER (MWT). _ | MAY,1,997 | ||
: 4. NAMEPLATE RATING (GROSS MWE): _ _ _ _ | : 3. LICENSED THERMAL POWER (MWT). _ | ||
: 5. DESIGN ELECTRICAL RATING (NET MWE): | 3458 I | ||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): | : 4. NAMEPLATE RATING (GROSS MWE): _ _ _ _ | ||
7, MAXIMUM DEPENDABLE CAPACITY (NET MWE): | 1221 | ||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST RFPORT, GIVE REASONS: | : 5. DESIGN ELECTRICAL RATING (NET MWE): | ||
1119 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): | |||
11_50 I | |||
t 7, MAXIMUM DEPENDABLE CAPACITY (NET MWE): | |||
1093 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST RFPORT, GIVE REASONS: | |||
) | |||
{ | { | ||
i 9 POWEF. LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE); | i 9 POWEF. LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE); | ||
: 10. REASONS FOR RESTRICTIONS,IF ANY: | i i | ||
THIS MONTH | : 10. REASONS FOR RESTRICTIONS,IF ANY: | ||
: 11. HOURS IN REPORTING PERIOD | l l | ||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL | THIS MONTH YR-TO-DATE CUMULATIVE F | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS | : 11. HOURS IN REPORTING PERIOD 744 3,623 196,703 i | ||
t f | |||
: 14. HOURS GENERATOR ON-LINE | : 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,563.5 133,545.8 | ||
: 15. UNIT RESERVE SHUTDOWN HOURS | : 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 00 0.0 | ||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) | -I t | ||
: 14. HOURS GENERATOR ON-LINE 744.0 3,551.0 129,988 2 I | |||
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 00 0.0 I | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,224,147 11,519,184 390,521,162 | |||
[ | [ | ||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) | : 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 726,100 3,785,500 128,103,932 f | ||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) | : 18. NET ELECTRICAL ENERGY GENERATED (MWH) 704,228 3,683,005 123,121,545 L | ||
l I | |||
PAGE 1 OF 2 | i PAGE 1 OF 2 l | ||
't OPERATING DATA REPORT (CONTINUED) | |||
DOCKET NO. | DOCKET NO. | ||
DATE JUNE 5,1997 THIS MONTH | 50 - 278 DATE JUNE 5,1997 THIS MONTH YR-TO-DATE CUMULATIVE | ||
: 19. UNIT SERVICE FACTOR | : 19. UNIT SERVICE FACTOR 100.0 % | ||
: 20. UNIT AVAILABILITY FACTOR | 96.0 % | ||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) | 66.1 % | ||
: 22. UNIT CAPACITY FACTOR (USING DER NET) | : 20. UNIT AVAILABILITY FACTOR 100.0 % | ||
: 23. UNIT FORCED OUTAGE RATE | 98.0 % | ||
66.1 % | |||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 86.6 % | |||
93.0 % | |||
80.1 % | |||
: 22. UNIT CAPACITY FACTOR (USING DER NET) 84.6 % | |||
90.8 % | |||
58.4 'n | |||
: 23. UNIT FORCED OUTAGE RATE | |||
.0 % | |||
2.0 % | |||
10.3 % | |||
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): | : 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): | ||
: 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTl.YATED DATE OF STARTUP: | : 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTl.YATED DATE OF STARTUP: | ||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): | : 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): | ||
COMMERCIAL OPERATION | FORECAST ACHIEVED INITIAL CRITICALITY O&t)7/74 INITIAL ELECTRICITY f.M)1/74 i | ||
COMMERCIAL OPERATION 17/23/74 L | |||
+ | |||
PAGE 2 OF 2 | PAGE 2 OF 2 | ||
= | |||
UNIT SHUTDOWNS AND POWER REDUCTIONS | UNIT SHUTDOWNS AND POWER REDUCTIONS | ||
r | *J l | ||
DOCKET NO. 50-278 | r DOCKET NO. 50-278 UNIT NAME PEACH BOTTOM UNIT 3 j | ||
DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES l | |||
SITE SUPPORT DMSION l | |||
PEACH BOTTOM ATOMIC POWER STATION l | |||
TYPE | REPORT MONTH MAY,1997 TELEPHONE (717)456-4383 i | ||
METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE. | |||
CODE ACTION TO NO. | |||
DATE (1) | |||
(HOURS) | |||
(2) | |||
REACTOR (3) | |||
REPORT # | |||
(4) | |||
(5) | |||
PREVENT RECURRENCE 6 | |||
970504 S | |||
B 4 | |||
RB CRDRVE HCU MAINTENANCE (power reducten) durshons shown only for shutdowns TOTAL HOURS h | |||
I I | |||
i i | i i | ||
(1) | (1) | ||
F-FORCED | (2) | ||
D - REGULATORY RESTRICTION | (3) | ||
E - OPERATOR TRAINING + LICENSE EXAMtNATION F- ADMINISTRATIVE | (4) f F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR UCENSEE l | ||
G -OPERATIONAL ERROR (EXPLAIN) | C - REFUELING 3-AUTOMATIC SCRAM EVENT REPORT (LER) | ||
H - OTHER (EXPLAIN) | D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN) | ||
FILE (NUREG-0161) | |||
E - OPERATOR TRAINING + LICENSE EXAMtNATION F-ADMINISTRATIVE (5) | |||
G -OPERATIONAL ERROR (EXPLAIN) | |||
EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN) | |||
L i | |||
-}} |
Latest revision as of 12:10, 11 December 2024
ML20148K625 | |
Person / Time | |
---|---|
Site: | Peach Bottom ![]() |
Issue date: | 05/31/1997 |
From: | Hydrick L, Warner M PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
NUDOCS 9706180221 | |
Download: ML20148K625 (14) | |
Text
.... _.
l Peach Bottom Atomic Power Station r
v
.PECO NUCLEAR nco tee,ov cemneo, 1848 Lay HcwJ A Unit of PECO Energy Delta. PA 17314-9032 717 456 7014 i
June 9,1997 U.S. Nuclear Regulatory Commission Docunient Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:
Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of May 1997 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.
i Sincerely, h%#
Mark E. Warner Director, Site Engineering Peach Bottom Atomic Power Station MEW /MJM: cmc Enclosures cc:
W. T. Henrick, Public Service Electric & Gas E. Salowitz, Public Service Electric & Gas
)
W.P. Domsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region 1, USNRC W.L. Schmidt, USNRC, Senior Resident inspector T. M. Messick, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station r
/
/,'l/ \\
DO K O 277 R
PDR.
g j
ccn 97-14036
\\
l
l 4'
PEACH COTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS
SUMMARY
MAY 1997 UNIT 2 Unit 2 began the month at 100% power. On 5/18 a load drop occurred due to Hydraulic Control Unit Maintenance then returred te 100% power on 5/23. Another load drop occurred on 5/30 due to rod pattern adjustments, waterbox cleaning and MSIV stroking then returned to 100% power on 5/31.
Unit 2 Net Generation for May was 790,248 MWH.
UNIT 3 Unit 3 began the month at 100% power. On 5/4 a load drop occurred due to Hydraulic Control Unit Maintenance and retumed to 100% power on 5/15. A rod pattem adjustment was performed between 5/27 and 5/28 to improve the thermal limit margins. The Unit ended the month at 96.6% power.
Unit 3 Net Generation for May was 704,228 MWH.
l l
t
+
Attachment to Monthly Operating Report for May 1997 1
l t
UNIT 2 REFUELING INFORMATION l
l 1.
Name of facility:
Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
Reload 12 is scheduled for September 15,1998.
3.
Scheduled date for restart following refueling:
J Restart following refueling forecast for October 10,1998.
4.
Will refueling or resumption of operation therefore require a technical specification change or otherlicense amendment?
N/A If answer is yes, what, in general, will these be?
N/A 5.
Scheduled date(s) for submitting proposed licensing action snd supporting information:
6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2720 Fuel Assemblies,52 Fuel Rods l
l
=
Docket No. 50-277 Attichmint to Monthly Operating Report for May 1997 i
Page 2
)
l UNIT 2 REFUELING INFORMATION (Continued) l l
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
l l
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
l September 2002 without full core offload capability.
September 1998 with full core offload capability.
l i
l l
1
= _.
i Docket No. 50-278 Attachm:nt to i
Monthly Operating i
l Report for May 1997
)
l UNIT 3 REFUELING INFORMATION l
1.
Name of facility:
I Peach Bottom Unit 3 l
l l
l 2.
Scheduled date for next refueling shutdown:
l Reload 11 scheduled for October 3,1997 3.
Scheduled date for restart following refueling Restart following refueling scheduled for November 1,1997 l
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
l-Yes.
If answer is yes, what, in general, will these be?
- 1. Wide Range Neutron Monitoring Modification 5395.
- 2. Large Primary Containment Purge and Vent isolation Valve Boot Seal Replacement Frequency Change.
- 3. ECCS/EDG Shutdown Specification Change.
- 4. Exclude MSIV leakage from 0.6 L..
l 5.
Scheduled date(s) for submilling proposed licensing action and supporting information:
l j
The first item has been submitted, including the response to an NRC RAl.
The other items are planned te be submitted by May,1997.
j 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or i
supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2485 Fuel Assemblies,16 Fuel Rods I
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
l l
l l
I
.-,- = -.
Dock't No. 50-278 AttachmInt to l
Monthly Operating Report for May 1997 Page 2 UNIT 3 REFUELING INFORMATION (Continued) l 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity.
September 2003 without full core offload capability.
l
. September 1999 with full core offload capability.
l i
(
t 1
i l
I r
l l
l l
4 e
I
AVERAGE DAILY POWER LEVEL DOCKET NO. 50-Ti7 UNIT PEACH BOTTOM UNIT 2 l
DATE JUNE 5,1997 COMPT.NY PECO ENERGY COMPANY-L P. HYDRfCK i.
BUSINESS SERVICES SITE SUPPORT DMSION l
PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)4SEM383 I
MONTH MAY,1997 s
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) f 1
1126 17 1126 2
1122 18 1014 j
3 1121 19 788 4
1126 20 775 5
1126 21 773 l
6 1118 22 777 7
1122 23 1026 8
1125 24 1119 9
1125 25 1119-(
10 1126 26 1120 l
11 1122 27 1120 I
12 1122 28 1120 13 1126 29 1116 i4 ii26 30 111s 15 1118 31 851 16 1122 i
v
-en w
-,ve
+ _
---w+m---weew..
gerT--'w-we-t-ew1* - -m>T LW-+wn-e---~w
N 11-e-+r*
eWee ei
t OPERATING DATA REPORT DOCKET NO. 50-277 DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY
[
L P. HYDRICK g
BUSINESS SERVICES ~
l SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC DOWER STATION t
TELEOHONE (717) 456-4383 OPERATING STATUS
- 1. UNIT NAME,
PEACH _ BOTTOM UNIT 2 5
NOTES:
L
- 2. REPORTING PERIOD:
MAY.,19._97..
- 3. LICENSED THERMAL POWER (MWT) 3458
- 4. NAMEPLATE RATING (GROSS MWE):
1221 i
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1119 l
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
1159
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
_ ___1093 I
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
t t
- 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE):
i 1
- 90. REASONS FOR RESTRICTIONS,IF ANY:
4 t
i l
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 3,623 200,807
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,623.0 134,538.5 i
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 744.0 3,623.0 130,400.2
$5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,444,203 12,307,486 394,283,088 j
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 811,800 4,099,400 129,588,990 t
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 790.248 3,997,234 124,483,887
[
i PAGE 1 OF 2
,. ~ ~. - - - - - - - - - - -. - - - - - - - - - - - - _ - - - - - - - -. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
OPERATING DATA REPORT (CONTINUED) u DOCKET NO.
50 -277 DATE JUNE 5,1997 l
THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 %
100.0 %
64.9 %
t
- 20. UNIT AVAILABILITY FACT.
100.0 %
100.0 %
64.9 %
- 21. UNIT CAPACITY FACTC., SNG MDC NET) 97.2 %
100.9 %
58 6 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 94.9 %
98 6 %
57.7 %
- 23. UNIT FORCED OUTAGE RATE
.0 %
.0 %
11.4 %
t
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
I
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):
FORECAST ACHIEVED INITIAL CRITICALITY 09/1&73 l
INITIAL ELECTRICITY 02/1&74 COMMERCIAL OPERATION 07/05/74 2
L t
1 5
1 PAGE2OF2
}
UNIT SHUTDOWNS AND POWER REDUCTIONS
- J DOCKET NO. 50-277
'. ~
UNIT NAME PEACH BOTTOM UNIT 2 DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH MAY,1997 TELEPHONE (717)456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 4
970518 S
B 4
RB CRDRVE HCU MAINTENANCE (power reductm)
Duration shown only for shutdowns 5
970530 S
B 4
HC XXXXXX WATER BOX CLEANING, ROD PATTERN ADJUSTMENT, MSIV STROKING (power reducton) duration shown only for shutdown TOTAL HOURS (1)
(2)
(3)
(4)
F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG4161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F-ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN)
AVERAGE DAILY POWER LEVEL DOCKET NO. 50-278 UNIT PEACH BOTTOM UNIT 3 DATE JUNE 5,1997 i
COMPANY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE - (717) 458-4383 MONTH MAY,1997 DAY AVdRAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET)
-l 1
1105 17 1097 1
2 1101 18 1089 3
1105 19 1085 4
937 20 1080 5
542 2*;
1073 6
540 22 1088 7
523 23 1080 8
540 24 1059 i
i 9
571 25 1051 to 530 28 1043 11 588 27 1039 12 891 28 1068 i
i 13 1054 29 1088 14 1102 30 1052 i
i r
15 1097 31 1068 16 1097 i
i i
l
- _ _.. _ _ _ _.... _ _ _ _ _,... ~.,,
OPERATING DATA REPORT DOCKET NO. 50-278 DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY i
l L P. HYDRICK -
l BUSINESS SERVICES SITE SUPPORT DMSION I
PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 i
OPERATING STATUS 2
i
- 1. UNIT NAME:
PEA...C. H...B.O. T..T..O..M... UNIT 3
- 2. REPORTING PERIOD:
MAY,1,997
- 3. LICENSED THERMAL POWER (MWT). _
3458 I
- 4. NAMEPLATE RATING (GROSS MWE): _ _ _ _
1221
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1119
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
11_50 I
t 7, MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1093
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST RFPORT, GIVE REASONS:
)
{
i 9 POWEF. LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE);
i i
- 10. REASONS FOR RESTRICTIONS,IF ANY:
l l
THIS MONTH YR-TO-DATE CUMULATIVE F
- 11. HOURS IN REPORTING PERIOD 744 3,623 196,703 i
t f
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,563.5 133,545.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 00 0.0
-I t
- 14. HOURS GENERATOR ON-LINE 744.0 3,551.0 129,988 2 I
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 00 0.0 I
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,224,147 11,519,184 390,521,162
[
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 726,100 3,785,500 128,103,932 f
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 704,228 3,683,005 123,121,545 L
l I
i PAGE 1 OF 2 l
't OPERATING DATA REPORT (CONTINUED)
DOCKET NO.
50 - 278 DATE JUNE 5,1997 THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 %
96.0 %
66.1 %
- 20. UNIT AVAILABILITY FACTOR 100.0 %
98.0 %
66.1 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 86.6 %
93.0 %
80.1 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 84.6 %
90.8 %
58.4 'n
- 23. UNIT FORCED OUTAGE RATE
.0 %
2.0 %
10.3 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTl.YATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):
FORECAST ACHIEVED INITIAL CRITICALITY O&t)7/74 INITIAL ELECTRICITY f.M)1/74 i
COMMERCIAL OPERATION 17/23/74 L
+
PAGE 2 OF 2
=
UNIT SHUTDOWNS AND POWER REDUCTIONS
- J l
r DOCKET NO. 50-278 UNIT NAME PEACH BOTTOM UNIT 3 j
DATE JUNE 5,1997 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES l
SITE SUPPORT DMSION l
PEACH BOTTOM ATOMIC POWER STATION l
REPORT MONTH MAY,1997 TELEPHONE (717)456-4383 i
METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE.
CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 6
970504 S
B 4
RB CRDRVE HCU MAINTENANCE (power reducten) durshons shown only for shutdowns TOTAL HOURS h
I I
i i
(1)
(2)
(3)
(4) f F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR UCENSEE l
C - REFUELING 3-AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMtNATION F-ADMINISTRATIVE (5)
G -OPERATIONAL ERROR (EXPLAIN)
EXHIBIT I-SAME SOURCE H - OTHER (EXPLAIN)
L i
-