ML20154J504: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
| project = TAC:66852
| stage = Other
}}
}}


Line 29: Line 31:
==SUBJECT:==
==SUBJECT:==
ACCUMULATOR TANK PRESSURE AND LEVEL INSTRUMENTATION . SHEAR 0N HARRIS NUCLEAR POWER PLANT (SHNPP), UNIT 1 (TAC NO. 66852)
ACCUMULATOR TANK PRESSURE AND LEVEL INSTRUMENTATION . SHEAR 0N HARRIS NUCLEAR POWER PLANT (SHNPP), UNIT 1 (TAC NO. 66852)
In a letter dated January 21, 1986, the NRC transmitted its evaluation of the SHNPP compliance with Regulatory Guide 1.97.              In its evaluation, the staff stipulated that either the accumulators' level or pressure instrumentation be environmentally qualified prior to startup following the first refueling cutage. By letter of December 10, 1987, you requested deferral of such modifications until the staff completes its ongoing reevaluation of this requirement.
In a {{letter dated|date=January 21, 1986|text=letter dated January 21, 1986}}, the NRC transmitted its evaluation of the SHNPP compliance with Regulatory Guide 1.97.              In its evaluation, the staff stipulated that either the accumulators' level or pressure instrumentation be environmentally qualified prior to startup following the first refueling cutage. By letter of December 10, 1987, you requested deferral of such modifications until the staff completes its ongoing reevaluation of this requirement.
Taking into consideration (1) the low probability of an accident scenario that would require the use of the accumulators, (2) the accumulators are a passive system, and (3) the accumulators discharge valves are required by the Technical Specifications to be full-open with power removed during normal plant opera-tions, the staff finds that deferral of the above cited modifications is appropriate until the NRC staff completes its evaluation of this issue.
Taking into consideration (1) the low probability of an accident scenario that would require the use of the accumulators, (2) the accumulators are a passive system, and (3) the accumulators discharge valves are required by the Technical Specifications to be full-open with power removed during normal plant opera-tions, the staff finds that deferral of the above cited modifications is appropriate until the NRC staff completes its evaluation of this issue.
Upon the NRC staff resolution of this issue, the schedule to complete any required modifications will be coordinated with your staff.
Upon the NRC staff resolution of this issue, the schedule to complete any required modifications will be coordinated with your staff.

Latest revision as of 05:53, 10 December 2021

Discusses Accumulator Tank Pressure & Level Instrumentation of Facility,Per 871210 Request.Nrc Finds Deferral of Cited Mods Appropriate Until NRC Completes Evaluation of Issue
ML20154J504
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/19/1988
From: Buckley B
Office of Nuclear Reactor Regulation
To: Utley E
CAROLINA POWER & LIGHT CO.
References
TAC-66852, NUDOCS 8805270013
Download: ML20154J504 (2)


Text

_.

\

/ .

DISTRIBUTION MAY 191986 NDocket File 7 ~

NRC POR Docket No. 50-400 Local PDR S. Varga (14E4)

G. Lainas Mr. E. E. Utley E. Adensam Senior Executive Vice President P. Anderson Power Supply and Engineering & Construction B. Buckley Carolina Power & Light Company OGC P. 0. Box 1551 E. Jordan (MNBB 3302)

Raleigh, North Carolina 27602 J. Partlow (9A2)

ACRS (10)

Dear Mr. Utley:

SUBJECT:

ACCUMULATOR TANK PRESSURE AND LEVEL INSTRUMENTATION . SHEAR 0N HARRIS NUCLEAR POWER PLANT (SHNPP), UNIT 1 (TAC NO. 66852)

In a letter dated January 21, 1986, the NRC transmitted its evaluation of the SHNPP compliance with Regulatory Guide 1.97. In its evaluation, the staff stipulated that either the accumulators' level or pressure instrumentation be environmentally qualified prior to startup following the first refueling cutage. By letter of December 10, 1987, you requested deferral of such modifications until the staff completes its ongoing reevaluation of this requirement.

Taking into consideration (1) the low probability of an accident scenario that would require the use of the accumulators, (2) the accumulators are a passive system, and (3) the accumulators discharge valves are required by the Technical Specifications to be full-open with power removed during normal plant opera-tions, the staff finds that deferral of the above cited modifications is appropriate until the NRC staff completes its evaluation of this issue.

Upon the NRC staff resolution of this issue, the schedule to complete any required modifications will be coordinated with your staff.

Sincerely, u\

Bart C. Buckley, Project Manager l Project Directorate I N Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc: See next page s

V

.....:..)y 0FC :LA 1:DRPR:PM:P b,e...:___. HFqlCSB:

1, :D:[02):DRPR:

, g s....:.........__.:...__ ..... :...........

NAME : par on:ch: BBu ey  : SN berry : EMonsam  :  :  : ,

. . . . .::If'Y/88 DATE . . . : . . . .:Ir7/88

. . . _ _ _: _4/9488 .......:.... ./88

.. . . . . . d: . . d. . . . . . . . : . . . . . . . . . . . . : . .

J t' 0FFICIAL RECORD COPY 8805270013 880519 0 i PDR ADOCK 050 P 1

f .

Mr. E. E. Utley Carolina Power & Light Company Shearon Harris cc:

Mr. R. E. Jones, General Counsel Ms. Carol Love Carolina Power & Light Company 100 Park Drive P. 0. Box 1551 P.O. Box 12276 Raleigh, North Carolina 27602 Research Triangle Park, NC 27709 Mr. D. E. Hollar Regional Administrator, Region II Associate General Counsel U.S. Nuclear Regulatory Commission Carolina Power & Light Company 101 Marietta Street P.O. Box 1551 Suite 2900 Raleigh, North Carolina 27602 Atlanta, Georgia 30303 Resident Inspector / Harris NPS Mr. J. L. Willis c/o U.S. Nuclear Regulatory Commission Plant General Manager Route 1, Box 315B Harris Nuclear Plant New Hill, North Carolina 27562 P.O. Box 165 New Hill North Carolina 27562 Mr. R. A. Watson Mr. Dayne H. Brown, Chief Vice President Radiation Protection Section Harris Nuclear Plant Division of Facility Services P.O. Box 165 N.C. Department of Human Resources New Hill, North Carolina 27562 701 Barbour Drive Raleigh, North Carolina 27603-2008 l

l