ML20128M583: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20128M583
| number = ML20128M583
| issue date = 07/17/1985
| issue date = 07/17/1985
| title = Accepts Scope & Objectives for Emergency Preparedness Exercise Scheduled for 850910,transmitted in 850703 Ltr. Pulling of post-accident Sample Discussed & Agreed Upon During 850710 Telcon
| title = Accepts Scope & Objectives for Emergency Preparedness Exercise Scheduled for 850910,transmitted in . Pulling of post-accident Sample Discussed & Agreed Upon During 850710 Telcon
| author name = Paperiello C
| author name = Paperiello C
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8507260020
| document report number = NUDOCS 8507260020
| title reference date = 07-03-1985
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1
Line 18: Line 19:
{{#Wiki_filter:, . -
{{#Wiki_filter:, . -
JUL 171985 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:    Mr. C. W. Fay Vice President Nuclear Power Department 231 West Michigan, Room 308 Milwaukee, WI 53201 Gentlemen:
JUL 171985 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:    Mr. C. W. Fay Vice President Nuclear Power Department 231 West Michigan, Room 308 Milwaukee, WI 53201 Gentlemen:
Thank you for your letter dated July 3,1985, which included a copy of Wisconsin Electric Power Company's scope and objectives for the Point Beach Nuclear Plant emergency preparedness exercise scheduled for September 10, 1985. We have reviewed the scope and objectives and they were determined to be acceptable. The pulling of a Post Accident Sample was not included in the scope and objectives, but a mutually agreeable way to handle that was discussed between Mr. J. Knorr of your staff and Mr. W. Snell of my staff on July 10, 1985. My staff will provide any future comments regarding the exercise scenario to Mr. Knorr via telephone.
Thank you for your {{letter dated|date=July 3, 1985|text=letter dated July 3,1985}}, which included a copy of Wisconsin Electric Power Company's scope and objectives for the Point Beach Nuclear Plant emergency preparedness exercise scheduled for September 10, 1985. We have reviewed the scope and objectives and they were determined to be acceptable. The pulling of a Post Accident Sample was not included in the scope and objectives, but a mutually agreeable way to handle that was discussed between Mr. J. Knorr of your staff and Mr. W. Snell of my staff on July 10, 1985. My staff will provide any future comments regarding the exercise scenario to Mr. Knorr via telephone.
If you have any questions, please contact Mr. W. Snell of my staff at (312) 790-5513.
If you have any questions, please contact Mr. W. Snell of my staff at (312) 790-5513.
Sincerely, 7      If^ /~-
Sincerely, 7      If^ /~-

Latest revision as of 19:56, 21 August 2022

Accepts Scope & Objectives for Emergency Preparedness Exercise Scheduled for 850910,transmitted in . Pulling of post-accident Sample Discussed & Agreed Upon During 850710 Telcon
ML20128M583
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/17/1985
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 8507260020
Download: ML20128M583 (1)


Text

, . -

JUL 171985 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN: Mr. C. W. Fay Vice President Nuclear Power Department 231 West Michigan, Room 308 Milwaukee, WI 53201 Gentlemen:

Thank you for your letter dated July 3,1985, which included a copy of Wisconsin Electric Power Company's scope and objectives for the Point Beach Nuclear Plant emergency preparedness exercise scheduled for September 10, 1985. We have reviewed the scope and objectives and they were determined to be acceptable. The pulling of a Post Accident Sample was not included in the scope and objectives, but a mutually agreeable way to handle that was discussed between Mr. J. Knorr of your staff and Mr. W. Snell of my staff on July 10, 1985. My staff will provide any future comments regarding the exercise scenario to Mr. Knorr via telephone.

If you have any questions, please contact Mr. W. Snell of my staff at (312) 790-5513.

Sincerely, 7 If^ /~-

C. J. Paperiello, Chief l Emergency Preparedness and Radiological Protection Branch 1

cc: J. J. Zach, Plant Manager DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII John J. Duffy, Chief /

Boiler Section Ness Flores, Chairperson Wisconsin Public Service Commission

/[ ga

[0 8507260020 850717 PDR ADOCK 05000266 F PDR-RI RIII RIII Jt*<>w/n Wh p Av ne 1/1d Phillips JacKiw P riello 07/15/85 fQllyx g ,s L