ML20128M583

From kanterella
Jump to navigation Jump to search
Accepts Scope & Objectives for Emergency Preparedness Exercise Scheduled for 850910,transmitted in . Pulling of post-accident Sample Discussed & Agreed Upon During 850710 Telcon
ML20128M583
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/17/1985
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 8507260020
Download: ML20128M583 (1)


Text

, . -

JUL 171985 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN: Mr. C. W. Fay Vice President Nuclear Power Department 231 West Michigan, Room 308 Milwaukee, WI 53201 Gentlemen:

Thank you for your letter dated July 3,1985, which included a copy of Wisconsin Electric Power Company's scope and objectives for the Point Beach Nuclear Plant emergency preparedness exercise scheduled for September 10, 1985. We have reviewed the scope and objectives and they were determined to be acceptable. The pulling of a Post Accident Sample was not included in the scope and objectives, but a mutually agreeable way to handle that was discussed between Mr. J. Knorr of your staff and Mr. W. Snell of my staff on July 10, 1985. My staff will provide any future comments regarding the exercise scenario to Mr. Knorr via telephone.

If you have any questions, please contact Mr. W. Snell of my staff at (312) 790-5513.

Sincerely, 7 If^ /~-

C. J. Paperiello, Chief l Emergency Preparedness and Radiological Protection Branch 1

cc: J. J. Zach, Plant Manager DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII John J. Duffy, Chief /

Boiler Section Ness Flores, Chairperson Wisconsin Public Service Commission

/[ ga

[0 8507260020 850717 PDR ADOCK 05000266 F PDR-RI RIII RIII Jt*<>w/n Wh p Av ne 1/1d Phillips JacKiw P riello 07/15/85 fQllyx g ,s L