ML20138C921: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20138C921
| number = ML20138C921
| issue date = 10/18/1985
| issue date = 10/18/1985
| title = Responds to 851003 Ltr Re Changes in Procedures for Contacting NRC Operations Officer Following Activation of Facility Emergency Plan.Revised Procedures Adequately Meet All NRC Concerns.Meeting Unnecessary
| title = Responds to Re Changes in Procedures for Contacting NRC Operations Officer Following Activation of Facility Emergency Plan.Revised Procedures Adequately Meet All NRC Concerns.Meeting Unnecessary
| author name = Shafer W
| author name = Shafer W
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8510230105
| document report number = NUDOCS 8510230105
| title reference date = 10-03-1985
| package number = ML20138C926
| package number = ML20138C926
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE

Latest revision as of 03:50, 13 December 2021

Responds to Re Changes in Procedures for Contacting NRC Operations Officer Following Activation of Facility Emergency Plan.Revised Procedures Adequately Meet All NRC Concerns.Meeting Unnecessary
ML20138C921
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/18/1985
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20138C926 List:
References
NUDOCS 8510230105
Download: ML20138C921 (1)


Text

- ,

OCT 18 085 Docket No. 50-266 i

Docket No. 50-301 Wisconsin Electric Power Company ATTN: Mr. C. W. Fay Vice President Nuclear Power Department

- 231 West Michigan, Room 308 Milwaukee, WI 53201 Gentlemen:

, We have reviewed your letter from Mr. C. W. Fay to Mr. J. G. Keppler dated October 3,1985 (NRC-85-111) discussing the changes you are making in your procedures for contacting the NRC Operations Officer following the activation of the Point Beach Emergency Plan. Our review has determined that your revised procedures should be adequate to meet all of the NRC's concerns in this matter. We are pleased that you have identified our concerns and satisfactorily responded to them in a timely manner. Because of this we have decided that a meeting to discuss this further is not necessary.

In regards to your recommendation that the NRC actively participate in your next emergency exercise, we agree that this would help ascertain the workability of your procedural changes. We will plan on including some form of NRC participation during the next exercise.

Sincerely,

" Original signed by W.D. Shafer" W. D. Shafer, Chief Emergency Preparedness and Radiological Protection Branch

Enclosure:

Ltr dtd 10/3/85 '

l. cc w/ encl: l
i. J. J. Zach, Plant Manager  ;
DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII i John J. Duffy,~ Chief Boiler Section '

Ness Flores, Chairperson, Wisconsin Public Service Commission W. Weaver, FEMA, RIV D. Matthews, 0IE, EPB h510230105851018ADOCK F

DR 0%2

/

ips r 10/9/85- yv l t

1

- . - _ _ _ _ , _._