{{#Wiki_filter:_-(t-.l.94UPPS Standardized Nuclear Unit Power Plant Sy, tem 5 Choke Cherry Road Rockville, Maryland 20850 (301)869 8010 September 10, 1979 SLNRC 79 13 FILE: 0278.10 SUBJ: IE Bulletin No. 79-15: Deep
{{#Wiki_filter:_
' Draft Pump Deficiencies Mr. Harold D. Thornburg Director, Division of Reactor Ccnstruction Inspection United States Nuclear Regulatory Commission Office of Inspection and Enforcement Wassington, D.C.20555 Docket Nos.: STN 50-482, STN 50-483, STN 50-485, and STN 50 486
                                                                                        -(t l
94UPPS Standardized Nuclear Unit Power Plant Sy, tem 5 Choke Cherry Road Rockville, Maryland 20850 (301)869 8010 September 10, 1979 SLNRC     79 13         FILE: 0278.10 SUBJ:     IE Bulletin No. 79-15: Deep
                                                          ' Draft Pump Deficiencies Mr. Harold D. Thornburg Director, Division of Reactor Ccnstruction Inspection United States Nuclear Regulatory Commission Office of Inspection and Enforcement Wassington,         D.C. 20555 Docket Nos.: STN 50-482, STN 50-483, STN 50-485, and STN 50 486


==Dear Mr. Thornburg:==
==Dear Mr. Thornburg:==


This letter is submitted in response to the subject IE Bulletin for the SNUPPS Utilities, Kansas Gas and Electric Company, Union Electric Company, and Rochester Gas and Electric Corporation.
This letter is submitted in response to the subject IE Bulletin for the SNUPPS Utilities, Kansas Gas and Electric Company, Union Electric Company, and Rochester Gas and Electric Corporation.
The information requested by items 1, 2, and 3 of the subject Bulletin is provided in the attached table.
The information requested by items 1, 2, and 3 of the subject Bulletin is provided in the attached table. Since the deep draft pumps in the SNUPPS design are still in the manufacturing and testing stages, the startup, operational, and maintenance inforretion requested by items 4, 5, and 6 of the Bulletin is not available.
Since the deep draft pumps in the SNUPPS design are still in the manufacturing and testing stages, the startup, operational, and maintenance inforretion requested by items 4, 5, and 6 of the Bulletin is not available.
Very ruly yours, R4-At Nicholas A. Petrick RLS:heg
Very ruly yours, R4-At Nicholas A. Petrick RLS:heg  


==Enclosure:==
==Enclosure:==
Information required by IE Bulletin 79-15.
cc:              p. Boyce Grier, Director, Region 1, USNRC.
    .,                'Mr. James G. Keppler, Director, Region III, USNRC.
Mr. Karl V. Seyfreit, Director, Region IV, USNRC.
108L6 237 8"$              P SEP 131978


Information required by IE Bulletin 79-15.
i INFORMATION REQUIRED BY IE BULLETIN 79-15 Callaway             -
cc: p. Boyce Grier, Director, Region 1, USNRC.
Item                     Units 1 & 2             Wolf Creek           Stt.r i i ng
'Mr. James G. Keppler, Director, Region III, USNRC.
: 1. a) Safety related     Essential Service       Essential Service     Essential Service application       Water                   Water                 Water b)Numberofdeep                 2                       2                         4 draft pumps /
., Mr. Karl V. Seyfreit, Director, Region IV, USNRC.
unit 2.a)Nanufacturer         Byron-Jackson           Pyron-Jackson         Byron-Jackson b) Model             Vertical Turbine       Vertical Turbine     Vertical Turbine 37 KXH 2 stage VCT     37 KXH 2 stage VCT   37 XXH 2 stage VCT c) Capacity RatedFlow(gpm)         15,000                 15,000                   19,000 Rated Head (feet)         328                     361                     228 d)PlantApplication   Provides cooling to     Provides cooling to   Provides cooling essential plant com-   essential plant com- to essential plant ponents following an   ponents following an components during accident and/or loss   accident and/or loss normal and abnorma' of offsite power.       of offsite power. plant conditions.
108L6 237 8"$P SEP 131978
: 3. Overall pump dimensions a) Barrel dia.       2'-2" x 30'-10"         2'-2" x 42'-4"       2'-2" x 36'-10" x length b) Suction Bell     3'-6"                   3'-6"                 3'-6" dia.
;i.INFORMATION REQUIRED BY IE BULLETIN 79-15 Callaway-Item Units 1 & 2 Wolf Creek Stt.r i i ng
c) Overall length   44'-l 3/8"             55'-7 3/8"           50'-l 3/8" including motor d                         1086 G}}
: 1. a) Safety related Essential Service Essential Service Essential Service application Water Water Water b)Numberofdeep 2 2 4 draft pumps /
unit 2.a)Nanufacturer Byron-Jackson Pyron-Jackson Byron-Jackson b) Model Vertical Turbine Vertical Turbine Vertical Turbine 37 KXH 2 stage VCT 37 KXH 2 stage VCT 37 XXH 2 stage VCT c) Capacity RatedFlow(gpm) 15,000 15,000 19,000 Rated Head (feet) 328 361 228 d)PlantApplication Provides cooling to Provides cooling to Provides cooling essential plant com-essential plant com-to essential plant ponents following an ponents following an components during accident and/or loss accident and/or loss normal and abnorma' of offsite power.
of offsite power.
plant conditions.
: 3. Overall pump dimensions a) Barrel dia.
2'-2" x 30'-10" 2'-2" x 42'-4" 2'-2" x 36'-10" x length b) Suction Bell 3'-6" 3'-6" 3'-6" dia.c) Overall length 44'-l 3/8" 55'-7 3/8" 50'-l 3/8" including motor
.d 1086 G}}

Latest revision as of 14:12, 22 February 2020

Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies, Re safety-related Application,Mfg & Overall Dimensions
ML19209A394
Person / Time
Site: Wolf Creek, Callaway, Sterling  Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/10/1979
From: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 7910030782
Download: ML19209A394 (2)


Text

_

-(t l

94UPPS Standardized Nuclear Unit Power Plant Sy, tem 5 Choke Cherry Road Rockville, Maryland 20850 (301)869 8010 September 10, 1979 SLNRC 79 13 FILE: 0278.10 SUBJ: IE Bulletin No. 79-15: Deep

' Draft Pump Deficiencies Mr. Harold D. Thornburg Director, Division of Reactor Ccnstruction Inspection United States Nuclear Regulatory Commission Office of Inspection and Enforcement Wassington, D.C. 20555 Docket Nos.: STN 50-482, STN 50-483, STN 50-485, and STN 50 486

Dear Mr. Thornburg:

This letter is submitted in response to the subject IE Bulletin for the SNUPPS Utilities, Kansas Gas and Electric Company, Union Electric Company, and Rochester Gas and Electric Corporation.

The information requested by items 1, 2, and 3 of the subject Bulletin is provided in the attached table. Since the deep draft pumps in the SNUPPS design are still in the manufacturing and testing stages, the startup, operational, and maintenance inforretion requested by items 4, 5, and 6 of the Bulletin is not available.

Very ruly yours, R4-At Nicholas A. Petrick RLS:heg

Enclosure:

Information required by IE Bulletin 79-15.

cc: p. Boyce Grier, Director, Region 1, USNRC.

., 'Mr. James G. Keppler, Director, Region III, USNRC.

Mr. Karl V. Seyfreit, Director, Region IV, USNRC.

108L6 237 8"$ P SEP 131978

i INFORMATION REQUIRED BY IE BULLETIN 79-15 Callaway -

Item Units 1 & 2 Wolf Creek Stt.r i i ng

1. a) Safety related Essential Service Essential Service Essential Service application Water Water Water b)Numberofdeep 2 2 4 draft pumps /

unit 2.a)Nanufacturer Byron-Jackson Pyron-Jackson Byron-Jackson b) Model Vertical Turbine Vertical Turbine Vertical Turbine 37 KXH 2 stage VCT 37 KXH 2 stage VCT 37 XXH 2 stage VCT c) Capacity RatedFlow(gpm) 15,000 15,000 19,000 Rated Head (feet) 328 361 228 d)PlantApplication Provides cooling to Provides cooling to Provides cooling essential plant com- essential plant com- to essential plant ponents following an ponents following an components during accident and/or loss accident and/or loss normal and abnorma' of offsite power. of offsite power. plant conditions.

3. Overall pump dimensions a) Barrel dia. 2'-2" x 30'-10" 2'-2" x 42'-4" 2'-2" x 36'-10" x length b) Suction Bell 3'-6" 3'-6" 3'-6" dia.

c) Overall length 44'-l 3/8" 55'-7 3/8" 50'-l 3/8" including motor d 1086 G