ML20055E526
| ML20055E526 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 07/05/1990 |
| From: | Schnell D UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20055E529 | List: |
| References | |
| ULNRC-2241, NUDOCS 9007120104 | |
| Download: ML20055E526 (4) | |
Text
t t
^
1901 Otoutrou Avenue Post OMx Bcx 149 St lo:ss. M?ssovn 63t66 314 454 2650 l
1 Union 0"
sc'" >"
i Euicnuc au1r s.199o t'":',"' ^"*"'
U.
S. Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Station pl-137 l
Washington, D.
C.
20555 l
Gentlemen:
ULNRC-2241 DOCKET NUMBER 50-483 CALLAWAY PLANT.
REVISION.TO. TECHNICAL SPECIFICATIONS CONCERNING CYCLE SPECIFIC CORE OPERATING LIMITS
References:
1)
ULNRC-2168 dated March 6, 1990 2)
ULNRC-2223 dated June 5, 1990 The referenced letters transmitted an amendment application to revise Technical Specifications and associated Bases, which contain cycle specific core operating parameters.
The proposed revision would remove the cycle specific core parameters from the Technical I
Specifications and place them in the Core Operating Limits Report.
l Just prior to Union Electric's submittal of the original change application (Reference 1), NRC approved two unrelated amendments which contained common Technical i
Specification pages.
Because we did not realize there were common pages, Reference A contained six pages which were mark-ups of previously approved pages.
Attached are the correct mark-ups.
These changes are editorial in i'
nature.
i We apologize for any inconvenience this oversight may have caused the' Staff.
Very truly yours, onald F. Schnell l
DS/sla l
f
\\
l Attachment 0
9 90071SO104 900705 4
^
1f-PDR ADOCK 05000483 P
PDC r
)
STATE OF MISSOURI )
3
)
Donald F.
Schnell, of lawful age, being first duly sworn upon oath says that he is Senior Vice President-Nuclear and an officer of Union' Electric Company; that he-has read the foregoing document and I
knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his-knowledge, information and belief.
p By
_ Schnell Donald F.
Senior Vice President Nuclear SUBSC IBED and sworn to before me this-day of d4 1990.
FF r
i 1
b A.r / w x 0; f & J BARBARA J.
FAFF NOTARY PUBUC, STATE OF MISSOURI MY COMMISSION EXPIRES APRIL 22. 1993 ST. LOUIS COUNTY i
I l
ll
/
~'
I-cc:
Gerald Charnoff, Esq.
Shaw, Pittman, Potts & Trowbridge 2300 N.
Street, N.W.
Washington, D.C. 20037 Dr.
J.
O.
Cermak CFA, Inc.
4 Professional Drive (Suite 110)
Gaithersburg, MD 20879 R.
C.' Knop Chief, Reactor Project Branch 1 i
U.S.1 ' clear Regulatory Commission Region sII-799 Roosevelt Road 1
Glen Ellyn, Illinois 60137 4
i Bruce Bartlett Callaway Resident Office U.S. Nuclear Regulatory Commission RRH1 Steedman, Missouri.65077 Anthony T. Gody, Jr. (2)
Office of Nuclear Reactor Regulation i
U.S.. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville Pike Rockville, MD 20852 Manager, Electric Department 3
Missouri Public Service Commission P.O.
Box 360 Jefferson City, MO 65102 1
Ron Kucera j
Department of Natural Resources t
P.O. Box 176 Jefferson City, MO 65102 1
M
c bect D. Shafer/A160.761
/QA Record (CA-758)
Nuclear Date E210.01 DFS/ Chrono D.
F.
Schnell J. E. Birk J. V.
Laux M. A. Stiller G.
L. Randolph R.
J.
Irwin H. Wuertenbaecher W. R. Campbell A. C. Passwater R. P. Wendling D. E.
Shafer D.
J. Walker O. Maynard (WCNOC)
N. P. Goel (Bechtel)
T.
P. Sharkey NSRB (Sandra Auston) 1
_ _ _.... -...