Other: ML20195G001, ML20196G562, ML20199G257, ML20202F772, ML20207A732, ML20217D579, ULNRC-03920, Forwards non-proprietary Rev 3 to BAW-10219, Electrosleeving Qualification for PWR Recirculating SG Tube Repair, ULNRC-04004, Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld, ULNRC-04005, Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.790, ULNRC-04034, Forwards Amerenues Risk Evaluation Summary & Provides Listing of Other Documents Which Have Been Previously Provided to Support Evaluation of Electrosleeves at High Temp Severe Accident Conditions
|
MONTHYEARML20155B5791998-10-27027 October 1998 Proposed Tech Specs for Use of Electrosleeves on Two Cycle Basis Project stage: Request ULNRC-03920, Forwards non-proprietary Rev 3 to BAW-10219, Electrosleeving Qualification for PWR Recirculating SG Tube Repair1998-11-13013 November 1998 Forwards non-proprietary Rev 3 to BAW-10219, Electrosleeving Qualification for PWR Recirculating SG Tube Repair Project stage: Other ML20198D1271998-12-16016 December 1998 Forwards RAI Re Request for Amend to TS & Bases to Allow Installation of Framatome Electrosleeves in Plant,Unit 1 SG for Max of 2 Operating Cycles Project stage: RAI ML20199G2571999-01-11011 January 1999 Provides Responses to 981216 RAI Re 981027 Amend Request to Revise TSs to Use Electrosleeves to Repair SG Tubes. Proprietary Encl Withheld Project stage: Other ML20202F7721999-01-29029 January 1999 Provides Changes to Further Clarify That Electrosleeve Use Is Limited to 2 Cycles Following Installation of First Electrosleeve Project stage: Other ML20205J6591999-04-0606 April 1999 Summary of 990318 Meeting with Union Electric & Framatome Technologies Re Electrosleeve Amend Application for Callaway Npp.List of Telcon Participants & Union Electric Fax with Callaway Probability Info Encl Project stage: Meeting ULNRC-04005, Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.7901999-04-0707 April 1999 Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.790 Project stage: Other ULNRC-04004, Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld1999-04-0707 April 1999 Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld Project stage: Other ULNRC-04034, Forwards Amerenues Risk Evaluation Summary & Provides Listing of Other Documents Which Have Been Previously Provided to Support Evaluation of Electrosleeves at High Temp Severe Accident Conditions1999-05-17017 May 1999 Forwards Amerenues Risk Evaluation Summary & Provides Listing of Other Documents Which Have Been Previously Provided to Support Evaluation of Electrosleeves at High Temp Severe Accident Conditions Project stage: Other ML20207A7321999-05-20020 May 1999 Submits Record of 990429 Telcon with Union Electric Personnel Re Electrosleeve Amend Application for Callaway Plant,Unit 1.Info Provided by UE Included in Attachments 1 & 2.List of Personnel That Participated in Telcon Encl Project stage: Other ML20207G5151999-06-0808 June 1999 Summary of 990422 Meeting with UE & NRC Staff Re Electrosleeved Repaired SG Tubes During Beyond Design Basis Accidents.List of Meeting Attendees,Nrc Staff Meeting Presentation Matls & UE Meeting Presentation Matls Encl Project stage: Meeting ML20195G0011999-06-11011 June 1999 Submits Record of 990430 Telcon Re Nondestructive Exam ISI Issues,Including Increased Sensitivity of UT Exam Performed After Electrosleeve Installation Versus Eddy Current Test Performed Prior to Sleeve Installation Project stage: Other ML20196G5621999-06-21021 June 1999 Informs NRC of Implementation of Amend 132 to Callaway License NPF-30 to Allows Installation of Electrosleeves for Steam Generator Tube Repair for Two Cycles Following Installation of First Electrosleeve Project stage: Other ML20217D5791999-09-15015 September 1999 Provides Formal Documentation of Reviews & Discussions Re Technical Ltr Rept for Proprietary Info.Review of Ltr Was Discussed in Telcon & Via e-mail Messages. Summary of Telcons as Documented on 990708,included Project stage: Other 1999-04-07
[Table View] |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _
f.
t
.5' Union Electric One Ameren Plaza e
1901 Chouteau Avenue PO Box 66149 St. Louis, MO 63166-6149 314.621.3222 June 21,1999 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station PI-137 Washington, D.C. 20555-0001 WJggggy Gentlemen:
ULNRC.4057 UE TAC No. M^3954 DOCKET NUMBER 50-483 CALLAWAY PLANT UNION ELECTRIC COMPANY AMENDMENT 132 - ELECTROSLEEVES This is to inform the Commission of the implementation of Amendment 132 to Callaway Facility Operating License NPF-30. Amendment 132 allows for the installation of Electrosleeves for steam generator tube repair for two cycles following installation of the first Electrosleeve. The changes have been issued to all controlled technical specification holders and became effective on June 17,1999.
Sincerely, Alan C. Passwater Manager, Corporate Nuclear Services DS/hdh P'
l.
(
/
9907010198 990621 PDR ADOC% 05000483 p
PDR e subsidiary of Ameren Corporation
,4,.#
.a.
,=
cc:-
M. H.
Fletcher Professional Nuclear Consulting, Inc.
19041'Raines Drive Derwood, MD 20855-2432 Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 Arlington, TX176011-8064 Senior Resident-Inspector Callaway Resident Office o
U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2).
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North,-Mail Stop 13E16 11555 Rockville Pike Rockville, MD 20852-2738 Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102 Ron Kucera Department of Natural Resources
.P.O. Box 176 Jefferson. City, MO 65102 Denny.Buschbaum TU Electric P.O.. Box 1002 Glen Rose, TX 76043 Pat Nugent Pacific Gas & Electric Regulatory Services P. O '. Box 56 Avila Beach, CA.93424