ML20212G022
| ML20212G022 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 09/22/1999 |
| From: | Johnson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Randolph G UNION ELECTRIC CO. |
| Shared Package | |
| ML20212G027 | List: |
| References | |
| 50-483-99-11, NUDOCS 9909290058 | |
| Download: ML20212G022 (5) | |
See also: IR 05000483/1999011
Text
F
.
%
p""%g
UNITED STATES
j
a
' ,:'
NUCLEAR REGULATORY COMMISSION
.
E
o
l
ls
REGION IV
611 RYAN PLAZA DRIVE, sulTE 400
,
, , , , , '
ARLINGTON, TEXAS 76011-8064
SEP 2 21999
Garry L. Randolph, Vice President and
Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, Missouri 65251
SUBJECT: NRC SPECIAL INSPECTION REPORT NUMBER 50-483/99-11
Dear Mr. Randolph:
This refers to the special inspection conducted on August 12-20,1999, at the Callaway Plant.
The inspection focused on the causes, circumstances, and corrective actions associated with
the August 11,1999, rupture of a 6-inch drain line between a moisture separator reheater first
stage reheater drain tank and feedwater Heater 6B.
Following the event, operator performance in shutting down the unit was good. The team found
that a weakness in your flow-accelerated corrosion monitoring program resulted in no previous
inspections of the pipe segment which failed. The enclosed report presents the results of this
,
inspection.
!
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response, if requested, will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
b
-
Wilh m D. Johnson, Chief
Project Branch B
Division of Reactor Projects
Docket No.:
50-483
I
License No.: NPF-30
Enclosure:
l,
NRC Inspection Report No.
I
50-483/99-11
9909290058 990922
ADOCK 05000483
G
1
L:
J
_
,_
.
Union Electric Company
-2-
1
. cc w/ enclosure:
Professional Nuclear Consulting, Inc.-
19041 Raines Drive
Derwood, Maryland 20855
John O'Neill, Esq.
Shaw, Pittman, Potts & Trowbridge
2300 N. Street, N.W.
Washington, D.C. 20037
~ H. D. Bono, Supervising Engineer
Quality Assurance Regulatory Support
Union Electric Company
P.O. Box 620 .
Fulton, Missouri 65251
Manager - Electric Department
Missouri Public Service Commission
301 W. High .
P.O. Box 360
Jefferson City, Missouri 65102
Ronald A. Kucera, Director
of Intergovernmental Cooperation
P.O. Box 176
Jefferson City, Missouri 65102
Otto L. Maynard, President and -
~ Chief Executive Officer
Wolf Creek _ Nuclear Operating Corporation
,
P.O. Box 411
!
' Burlington, Kansas 66839
Dan I. Bolef, President
! Kay Drey,-Representative
j
~ Board of Directors Coalition
i
for the Environment
!
6267 Delmar Boulevard
'
University City, Missouri 63130
. Lee Fritz, Presiding Commissioner
Callaway County Court House
10 East Fif th Street ,
Fulton, Missouri 65151'
i
i
1-
- .,
n
. Union Electric Company'
-3-
Alan C. Passwater, Manager -
- Licensing and Fuels
' AmerenUE
One Ameren Plaza
.1901 Chouteau Avenue
I
P.O. Box 66149 -
St. Louis, Missouri 63166-6149 --
J. V. Laux, Manager -
Quality Assurance
Union Electric Company
P.O. Box 620
' Fulton, Missouri 65251
Jerry Uhlmann, Director
State Emergency Management Agency
. P.O. Box 116
' Jefferson City, Missouri 65101
.c
h
. .
'
.
.
Union Electric Company
-4-
SrP 2 21999
,
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
'
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
RIV File
DRS Director
RITS Coordinator
Branch Chief (DRP/B)
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
DOCUMENT NAME: R:\\_CW\\CW911RP.JFM
To receive copy of document, indicate in box: *C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy
HO:ME
l .
ME
O[
RIV:SLE
RI
n ,
CGSantos G'- tf
JMedoff /6# GWJohnstorf]% JDHanna 1%> JFMelfi le
gggp== {
09/9/99 U
O
e
name
nunn
_
WDJohng6n
OFFICIAL RECORD COPY
4
i
i
1
e.
fa
le
Union Electric Company
-4-
c~P 2 2 299
E Mail repcrt to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E Mail report to Frank Talbot (FXT)
l
l
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
RIV File
DRS Director
91TS Coordinator
Branch Chief (DRP/B)
Project Engineer (DRP/B)-
Branch Chief (DRP/TSS)
DOCUMENT NAME: R:\\_CW\\CW911RP.JFM
To receive copy of document, indicate in box: "C" = Cor/ without enclosures "E" = Copy with enclosures 'N' = No copy
HQ:ME
ME
O[
RIV:SLE l
RI
l
n ,
CGSantos O'- ?f
JMedoff l & r** GWJohnstort]M JDHanna PAJ JFMelfi
1+
09W99
f
0961/99 '
09/d99
P
09/r799 'he
09h/99 v
DRP/B (f
WDJohnp6n
098999
OFFICIAL RECORD COPY
!
!
j
t? (
m.
.*
..
u .~: a. 0
.
J