W$LF CREEK NUCLEAR OPERATING CORPORATION -
John A. Bausy vies pr. ems.u Nuoteer Operemone August 10,.1990-NO 90-0228 U. S. Nuclear Regulatory Comission ATTN:
Document Control Desk Mail Station P1-137
- Washington, D. C.
20555 4
l
Reference:
WH 89-0099, dated April 3, 1989 from B.-D. Withers, WCNOC to NRC
Subject:
Docket No.-50-482:= Inservice Inspection Summary Report
.l for Refuel IV H
l Gentlemen:
-. provides the Inservice Inspection' Summary Report for the fourth-refueling outage at Wolf Creek Generating Station:(WCGS).
- Thit-report is i
being submitted in accordance with ASME Boiler:and Pressure Vessel Code;1980
- Edition through Winter 1981 Addenda, Section XI~ Article IWA 6000 Paragraph
~
6230.
Records and reports documenting the inspecti 'us are maintained -at WCGS-and are available for review upon request.-
The Reference transmitted the Inservice Inspection'(ISI)' Summary Report for the third refueling outage.
. Attachment 2 to thisiletter 'provides. revised
.j pages to the Reference which delete enubber supports AE05-R003-242 and AB01-l R504-145 from'the Results section of the' report. During routine maintenance activities.
-nonconforming conditions-were identified-that. required repair / replacement 'of the supports which is : documented in-,the-Repair / Replacement Sumary section of the-report.
A further;revief of=the
- nonconforming conditions has determined'that a failure analysis is not
~
Q i
9 13a 7 2 0 0 0 ? 1. 9..
1
[qhp( ' 3,'sbdi.rs O U N']f, d RO. Box 411/ Burimgton, KS 66839 / Phone:(316) 364-8831 An Equal Opportunny Employer MF41c/ VET
I l
NO 90-0228 Page 2 of'2 l
i required by the ISI Program Plan since the conditions were not discovered during a scheduled ISI examination.
Therefore,.the supports should not have L
been listed in the Results section of the summary ' report.
Additionally, these. two supports were examined during the fourth refueling outage with no reportable indications identified.
'If you have any questions concerning this matter,
-please-contact me or i
Mr. H. K. Chernoff of my staff.
Very truly yours,
.Tohn A. Bailey Vice President Nuclear Operations JABlaem Attachments l
cc:
R. D. Martin (NRC), w/a D. V. Pickett (NRC), w/a M. E. Skow (NRC), w/a J. S. Wiebe (NRC), w/a b