ML20212A492

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-483/99-08 on 990725-0904.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy
ML20212A492
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/13/1999
From: Johnson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Randolph G
UNION ELECTRIC CO.
Shared Package
ML20212A496 List:
References
50-483-99-08, NUDOCS 9909170028
Download: ML20212A492 (5)


See also: IR 05000483/1999008

Text

'

.

I

tsa u%c UNITED STATES

/p 4 NUCLEAR REGULATORY COMMISSION

a  ;

{ j REGloN IV

I

% 611 RYAN PLAZA DRIVE, SUITE 400

l

4 , , g *[ APLINGToN, TEXAS 76011-8064

l

SEP I 31999

Garry L. Randolph, Vice President and

i

Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

SUBJECT: NRC INSPECTION REPORT NUMBER 50-483/99-08

i

l

Dear Mr Randolph:

This refers to the inspection conducted on July 25 through September 4,1999, at the Callaway

Plant. The enclosed report presents the results of this inspection.

Based on the results of this inspection, the NRC has determined that two Severity Level IV

violations of NRC requirements occurred. These violations are being treated as noncited

violations, consistent with Appendix C of the Enforcement Policy. These noncited violations are

described in the subject inspection report. If you contest these violations or the severity level of

these noncited violations, you should provide a response within 30 days of the date of this

insucction report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:

Cocument Control Desk, Washington, DC 20555-0001, with copies to the Regional l

administrator, U.S. Nuclear Regulatory Commission, Region IV,611 Ryan Plaza Dnve,  !

Suite 400, Arlington, Texas 76011; the Director, Office of Enforcement, United States Nuclear

Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident inspector at the

Callaway Plant.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response, if requested, will be placed in the NRC Public Document Room.

i

Should you have any questions concerning this inspection, we will be pleased to discuss them  !

I

with you.

Sincerely,

l

"

-

William D. Johnson, Chief

Project Branch B

Division of Reactor Projects

l Docket No.: 50-483

l License No.: NPF-30

!

i

9909170028 990913

PDR ADOCK 05000483

G PDR

-.

.

Union Electric Company -2-

. Enclosure:

NRC inspection Report No.

50-483/99-08

cc w/ enclosure:

Professional Nuclear Consulting, Inc.

19041 Raines Drive

Derwood, Maryland 20855

John O'Neill, Esq.

Shaw, Pittman, Potts & Trowbridge

2300 N. Street, N.W.

Washington, D.C.' 20037

H. D. Bono, Supervising Engineer

Quality Assurance Regulatory Support

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

Manager - Electric Department

Missouri Public Service Commission

301 W. High i

P.O. Box 360

i

Jefferson City, Missouri 65102

Ronald A. Kucera, Director. I

of Intergovernmental Cooperation

P.O. Box 176 l

Jefferson City, Missouri 65102

Otto L. Maynard, President and - l

Chief Executive Officer i

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, Kansas 66839

Dan 1. Bolef, President

- Kay Drey, Representative

!

Board of Directors Coalition

for the Environment

6267 Delmar Boulevard

University City, Missouri 63130 ,

I-

,

[

.

4

Union Electric Company -3-

Lee Fritz, Presiding Commissioner

Callaway County Court House

10 East Fifth Street

Fulton, Missouri 65151

Alan C. Passwater, Manager-

Licensing and Fuels

AmerenUE

One Ameren Plaza .

1901 Chouteau Avenue

P.O. Box 66149

St. Louis, Misscuri 63166-6149

J. V. Laux, Manager

Quality Assurance

Union Electric Company

P.O. Box 620

Fu!!on, Missouri 65251

Jerry Uhlmann, Director-

State Emergency Management Agency

P.O. Box 116

Jefferson City, Missouri 65101

l

FN

.

l

l

.

Union Electric Company -4- SEP 131999 3

i

!

l

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator Resident inspector 1

'

DRP Director RIV File

DRS Director RITS Coordinator

Branch Chief (DRP/B)

Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

t

)

l

!

t

1

I

DOCUMENT NAME: R:LCW\CW908RP.JFM

To receive copy of document, Indicateh box: 'C" = Copy without enclosures *E' = Copy with enclosures 'N" = No copy -

'

RIV:RI (// O SRI L//to Ril:RG RIV:DRS l C:DRP/I L I

JDHannli/f8l**^ JFMsff/f4fM" RGi6 tis 1*]??ff GMGood GM(f WDJohnsgn )

09/0/99 09/f%9 09P199 hr;)?#9/ff99 09/ft99 l

OFFICIAL RECORD COPY

,

..

m

.-

.

- Union Electric Company -4- SEP I 31999

- E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System'(IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E Mail report to Frank Talbot (FXT) ,

bec to DCD (IE01)

bec distrib. by RIV: )

Regional Administrator Resident inspector

DRP Director RIV File

.DRS Director RITS Coordinator

.. Branch Chief (DRP/B)

Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

.

1

1~l0037

\

.)

,

DOCUMENT NAME
R:\_CW\CW908RP.JFM

i

To receive copy of document, indicate hbox: *C" = Copy without enclosures *E" = Cofy with enclosures 'N" = No eggy _,

f RIV:RI ()/v' SRI L/do .

Rll:RL] RIV:DRS C:DRP/5 h

l JDHanniff4l* *^ JFMeifit4fr# RGitMs*!??fO GMGood (A W' WDJohnsgn

09/i>/99 09/P199 09P199 hgf#9/ff99 09/l'/99/

OFFICIAL RECORD COPY