Category:CORRESPONDENCE-LETTERS
MONTHYEAR05000482/LER-1999-002, Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl 05000482/LER-1994-014, Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl1999-10-15015 October 1999 Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl ML20217F7481999-10-14014 October 1999 Informs That Based on Approval of Core Assessment Damage Guidance in WCAP-14696,rev 1 for Westinghouse Nuclear Power Plants,Licensee May Use WCAP-14696,rev 1 at Wolf Creek Generating Station ML20217F8701999-10-13013 October 1999 Provides Summary of Meeting on 991007 with Representatives of Wolf Creek Nuclear Station in Burlington,Kansas Re Status of Licensee Radiation Protection Program.List of Meeting Attendees & Licensee Presentation Encl ML20217C1721999-10-0707 October 1999 Forwards Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted.Purpose of Insp to Perform Routine Operational Status Insp of Emergency Preparedness Program & to Resolve Questions Re Revised Emergency Plan ML20217A4881999-09-29029 September 1999 Forwards Changes to Plant Data Point Library,Iaw 10CFR50,App E,Section VI.3.a.ERDS Point Affected Is RDS0001 ML20216H9291999-09-29029 September 1999 Informs That Licensee Responses to GL 97-06, Degradation of Steam Generator Internals Acceptable & Did Not Identify Any New Concerns with Condition of SG Intervals at Plant ML20212G1681999-09-24024 September 1999 Notifies NRC of Change in Status of Licensed Individual at Plant,Per 10CFR50.74.RL Acree Holds License OP-42654 at Plant,But Has Been Permanently Reassigned from Position for Which Plant Has Certified Need for RO License ML20216F9591999-09-22022 September 1999 Forwards Withdrawal of Amend Request Re Ultimate Heat Sink Temp for Wolf Creek Generating Station ML20212G5641999-09-20020 September 1999 Forwards Insp Rept 50-482/99-13 on 990725-0904.Three Violations Being Treated as Noncited Violations 05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I1999-09-17017 September 1999 Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I 05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util1999-09-16016 September 1999 Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util ML20212D9381999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of WCGS on 990818.Areas of EP & Engineering Warranted Increase in NRC Action.Nrc Plan to Conduct Add Insp Beyond Core Insp Program Over Next 7 Months to Address Listed Questions 05000482/LER-1999-006, Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl1999-09-15015 September 1999 Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl ML20212C9211999-09-15015 September 1999 Forwards NRC Form 536, Operating Licensing Examination Data, in Response to NRC Administrative Ltr 99-03 ML20216F1641999-09-14014 September 1999 Forwards Insp Rept 50-482/99-12 on 990816-20.No Violation Noted.Determined That Solid Radwaste Mgt & Radioactive Matls Transportation Programs Were Properly Implemented 05000482/LER-1999-009, Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER1999-09-10010 September 1999 Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER ML20212A5651999-09-10010 September 1999 Informs of Completion of Review of & Encl Objectives for Wolf Creek Generating Station 1999 Emergency Preparedness Exercise Scheduled for 991117.Determined Exercise Objectives Appropriate to Meet EP Requirements 05000482/LER-1999-008, Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER1999-09-0303 September 1999 Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER ML20211M7151999-09-0303 September 1999 Forwards Changes to Wolf Creek Generating Station Data Point Library.Emergency Response Data Sys Points Affected Are EJL0007 & EJL0008 ML20211N0081999-09-0202 September 1999 Informs That NRC Staff Has Reviewed Submittals & Concluded Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves ML20211K8301999-09-0202 September 1999 Forwards marked-up TS Page Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band,Per 990708 Application to Amend License NPF-42 ML20211K1941999-08-31031 August 1999 Forwards Rev 31 to WCGS Physical Security Plan,Safeguards Contingency Plan & Training & Qualification Plan,Iaw 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20211H1491999-08-26026 August 1999 Forwards Insp Rept 50-482/99-16 on 990809-13.No Violations Noted.Insp Focused on Low as Is Reasonably Achievable Program,Training Program for Contract Radiation Protection Personnel & Radiation Protection QA Program ML20211A8581999-08-18018 August 1999 Forwards Insp Rept 50-482/99-08 on 990316-0724.One Violation Being Treated as Noncited Violation ML20211G2201999-08-17017 August 1999 Forwards Exam Rept 50-482/99-301 on 990726-29.Exam Evaluated Six Applicants for SO Licenses & Three Applicants for RO Licenses ML20210U0991999-08-13013 August 1999 Forwards Insp Rept 50-482/99-11 on 990712-16.No Violations Noted.Insp Was to Review Radiological Environ Monitoring Program ML20210U9751999-08-13013 August 1999 Informs That Licensee Identified That Answer Key for One Question on 990720 Written Exam & Event Classification for on Job Performance Measure Required Mod.Description & Justification for Proposed Mod,Including Technical Ref,Encl ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210R5621999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Revised Repts for Apr,May & June 1999,correcting Number of Hours Reactor Critical,Encl ML20210P7491999-08-0909 August 1999 Ack Receipt of ,Which Transmitted Wolf Creek Radiological Emergency Response Plan 06-002,Rev 0,under Provisions of 10CFR50,App E,Section V ML20210N0061999-08-0303 August 1999 Forwards Response to NRC 990401 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Motor-Operated Gate Valves ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H2551999-07-29029 July 1999 Provides 180-day Response to NRC Request for Info Re GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210J1371999-07-29029 July 1999 Requests NRC Approval of Methodology for Determining RCS Pressure & Temp & Overpressure Mitigation Sys PORV Limits. Attachment I Provides Proposed Changes to Improved TS ML20210F5931999-07-27027 July 1999 Forwards semi-annual Fitness for Duty Performance Data Rept for Wcnoc,Per 10CFR26.71(d).Rept Covers Period of 990101- 0630 ML20210F5881999-07-23023 July 1999 Submits Response to Administrative Ltr 99-02, Operator Reactor Licensing Action Estimates, ML20210B8191999-07-20020 July 1999 Ack Receipt of ,Which Transmitted Wolf Creek EP Implementing Procedure 06-005,Rev 1.Implementation of Changes Will Be Subj to Insp to Confirm That Changes Does Not Decrease Effectiveness of EP ML20209H5411999-07-15015 July 1999 Forwards Insp Rept 50-482/99-07 on 990614-18.No Violations Noted.Insp Focused on Radiation Program During Normal Operating Conditions ML20209H0441999-07-14014 July 1999 Forwards Response to NRC 990326 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. Summary of Util Commitments Provided in Attachment 2 ML20209H0751999-07-14014 July 1999 Forwards Monthly Operating Rept for June 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Max Dependable Capacity Has Been Updated from 1163 to 1170,as Determined by Calculations Based on Capacity Test Results of July 1998 ML20209G9871999-07-14014 July 1999 Informs of Changes Affecting Wolf Creek Security Plan,Per 10CFR50.54(p)(2).Encl Provides Description of Changes & Justification for Changes ML20209E3581999-07-12012 July 1999 Discusses Util 980925 Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Wolf Creek Generating Station ML20209E0611999-07-0808 July 1999 Forwards Addl Pages to Rev 12 of USAR & Commitment Changes, Inadvertently Omitted from 990311 Submittal ML20196K8231999-07-0606 July 1999 Submits Kansas Electric Power Cooperative,Inc Ltr Pursuant to Commission Direction in Memo & Order CLI-99-19.Addresses Disposition of Existing Antitrust Conditions Attached to License for Wolf Creek Unit 1 Re Proposed License Transfer ML20209C6031999-07-0606 July 1999 Provides Applicants View as Result of 990618 Memo & Order Directing Parties to Address Proper Disposition of Existing Antitrust License Condition Attached to OL for Facility Due to Planned Changes in Ownership of Facility.With Svc List ML20196K0501999-07-0202 July 1999 Forwards Insp Rept 50-482/99-06 on 990502-0612.Three Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20209B7131999-07-0101 July 1999 Submits Response to NRC Request for Info Re GL 98-01, Suppl 1, Y2K Readiness of Computer Sys at Npps. Response on Status of Facility Y2K Readiness Was Requested by 990701.Disclosure Encl ML20209A7461999-06-29029 June 1999 Informs of Changes in Project Mgt Staff Assigned to Wcgs. Effective 990628,J Donohew Will Assume PM Responsibilities ML20209B5151999-06-29029 June 1999 Informs That Util Completed Analyses & Modifications to Address Items Discussed in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions 1999-09-03
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR05000482/LER-1994-014, Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl1999-10-15015 October 1999 Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl 05000482/LER-1999-002, Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl ML20217A4881999-09-29029 September 1999 Forwards Changes to Plant Data Point Library,Iaw 10CFR50,App E,Section VI.3.a.ERDS Point Affected Is RDS0001 ML20212G1681999-09-24024 September 1999 Notifies NRC of Change in Status of Licensed Individual at Plant,Per 10CFR50.74.RL Acree Holds License OP-42654 at Plant,But Has Been Permanently Reassigned from Position for Which Plant Has Certified Need for RO License 05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I1999-09-17017 September 1999 Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I 05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util1999-09-16016 September 1999 Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util 05000482/LER-1999-006, Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl1999-09-15015 September 1999 Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl ML20212C9211999-09-15015 September 1999 Forwards NRC Form 536, Operating Licensing Examination Data, in Response to NRC Administrative Ltr 99-03 05000482/LER-1999-009, Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER1999-09-10010 September 1999 Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER 05000482/LER-1999-008, Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER1999-09-0303 September 1999 Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER ML20211M7151999-09-0303 September 1999 Forwards Changes to Wolf Creek Generating Station Data Point Library.Emergency Response Data Sys Points Affected Are EJL0007 & EJL0008 ML20211K8301999-09-0202 September 1999 Forwards marked-up TS Page Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band,Per 990708 Application to Amend License NPF-42 ML20211K1941999-08-31031 August 1999 Forwards Rev 31 to WCGS Physical Security Plan,Safeguards Contingency Plan & Training & Qualification Plan,Iaw 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20210U9751999-08-13013 August 1999 Informs That Licensee Identified That Answer Key for One Question on 990720 Written Exam & Event Classification for on Job Performance Measure Required Mod.Description & Justification for Proposed Mod,Including Technical Ref,Encl ML20210R5621999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Revised Repts for Apr,May & June 1999,correcting Number of Hours Reactor Critical,Encl ML20210N0061999-08-0303 August 1999 Forwards Response to NRC 990401 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Motor-Operated Gate Valves ML20210J1371999-07-29029 July 1999 Requests NRC Approval of Methodology for Determining RCS Pressure & Temp & Overpressure Mitigation Sys PORV Limits. Attachment I Provides Proposed Changes to Improved TS ML20210H2551999-07-29029 July 1999 Provides 180-day Response to NRC Request for Info Re GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210F5931999-07-27027 July 1999 Forwards semi-annual Fitness for Duty Performance Data Rept for Wcnoc,Per 10CFR26.71(d).Rept Covers Period of 990101- 0630 ML20210F5881999-07-23023 July 1999 Submits Response to Administrative Ltr 99-02, Operator Reactor Licensing Action Estimates, ML20209G9871999-07-14014 July 1999 Informs of Changes Affecting Wolf Creek Security Plan,Per 10CFR50.54(p)(2).Encl Provides Description of Changes & Justification for Changes ML20209H0441999-07-14014 July 1999 Forwards Response to NRC 990326 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. Summary of Util Commitments Provided in Attachment 2 ML20209H0751999-07-14014 July 1999 Forwards Monthly Operating Rept for June 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Max Dependable Capacity Has Been Updated from 1163 to 1170,as Determined by Calculations Based on Capacity Test Results of July 1998 ML20209E0611999-07-0808 July 1999 Forwards Addl Pages to Rev 12 of USAR & Commitment Changes, Inadvertently Omitted from 990311 Submittal ML20209C6031999-07-0606 July 1999 Provides Applicants View as Result of 990618 Memo & Order Directing Parties to Address Proper Disposition of Existing Antitrust License Condition Attached to OL for Facility Due to Planned Changes in Ownership of Facility.With Svc List ML20196K8231999-07-0606 July 1999 Submits Kansas Electric Power Cooperative,Inc Ltr Pursuant to Commission Direction in Memo & Order CLI-99-19.Addresses Disposition of Existing Antitrust Conditions Attached to License for Wolf Creek Unit 1 Re Proposed License Transfer ML20209B7131999-07-0101 July 1999 Submits Response to NRC Request for Info Re GL 98-01, Suppl 1, Y2K Readiness of Computer Sys at Npps. Response on Status of Facility Y2K Readiness Was Requested by 990701.Disclosure Encl ML20209B5151999-06-29029 June 1999 Informs That Util Completed Analyses & Modifications to Address Items Discussed in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20196G9681999-06-22022 June 1999 Informs NRC That BC Ryan Will Be Leaving Ks State Univ for Position with Wolf Creek Nuclear Operating Corp,Effective 990701 05000482/LER-1999-007, Forwards LER 99-007-00,re Condition in Which Wolf Creek Generating Station TS 3.3.2 Was Not Met.Commitments Made by Util Also Encl1999-06-18018 June 1999 Forwards LER 99-007-00,re Condition in Which Wolf Creek Generating Station TS 3.3.2 Was Not Met.Commitments Made by Util Also Encl ML20196A0251999-06-17017 June 1999 Requests That Written Exams for Reactor Operator & SRO for Plant Be Administered Beginning Wk of 990719 & Followed by Operating Exam During Wk of 990726 to Personnel Listed in Attachment.Proprietary Info Encl.Proprietary Info Withheld ML20195K0641999-06-15015 June 1999 Forwards MOR for May 1999 for Wolf Creek Generating Station & Corrected Page 2 of 2 of Apr 1999 Mor,Adding That Unit Entered Intomode 5 for Restart During Month of Apr & Correcting Shutdown Duration Hours from 672 to 671 ML20195G4391999-06-11011 June 1999 Provides Details for Missed Rept Re 10CFR50.46 Thirty Day Rept of ECCS Model Revs.Attachment I Provides Summary of Commitments Made in Submittal 05000482/LER-1999-005, Forwards LER 99-005-00,re Esfa.Commitments Made by Util Are Encl1999-06-11011 June 1999 Forwards LER 99-005-00,re Esfa.Commitments Made by Util Are Encl 05000482/LER-1997-027, Forwards LER 97-027-00 Re Identification of Missed Surveillance Required by TS 4.3.3.5.2.Encl 1 Identifies Actions Committed to by Util1999-06-0404 June 1999 Forwards LER 97-027-00 Re Identification of Missed Surveillance Required by TS 4.3.3.5.2.Encl 1 Identifies Actions Committed to by Util ML20195B9811999-05-26026 May 1999 Forwards 1998 Annual Repts for Ks Electric Power Cooperative Inc,Ks City Power & Light Co & Western Resources,Inc, Including Wholly Owned Subsidiary Kg&E Co ML20196L3361999-05-18018 May 1999 Forwards Rev 1 to Cycle 11 COLR for WCGS, IAW TS Section 6.9.1.9 05000482/LER-1999-004, Forwards LER 99-004-00 Re Failure to Maintain Containment Closure During Fuel Movement as Required by TS 3.9.4.c. Attachment I to Ltr Identifies Actions Committed to by Plant in Encl LER1999-05-12012 May 1999 Forwards LER 99-004-00 Re Failure to Maintain Containment Closure During Fuel Movement as Required by TS 3.9.4.c. Attachment I to Ltr Identifies Actions Committed to by Plant in Encl LER ML20206Q8141999-05-11011 May 1999 Requests NRC Work with Industry to Resolve Generic Changes to Allow Permanent Change to TSs Prior to June 2000.Encl Provides TS Limited Duration Action Statement Until 990930 05000482/LER-1999-003, Forwards LER 99-003-00,re Failure to Perform TS SR 4.9.2.c Prior to Entering Mode 6.Commitments Made by Util Are Encl1999-05-10010 May 1999 Forwards LER 99-003-00,re Failure to Perform TS SR 4.9.2.c Prior to Entering Mode 6.Commitments Made by Util Are Encl ML20206K5141999-05-0707 May 1999 Provides Info Re Number of Tubes Plugged in Each Sg,As Required by TS 4.4.5.5.ISI of SGs B & C Completed on 990424,resulting in Mechanical Plugging of One Tube in SG B & Five Tubes in SG C ML20206J0711999-05-0505 May 1999 Forwards Guarantees of Payment of Deferred Premiums for Owners of Wolf Creek Generating Station,As Required by 10CFR140.21 ML20206D9551999-04-29029 April 1999 Forwards 1999 Annual Radioactive Effluent Release Rept 22, for Reporting Period Jan-Dec 1998,per Section 6.9.1.7 of WCGS Ts.Attachment to Ltr Identifies Commitments Resulting from Correspondence ML20206C7321999-04-22022 April 1999 Provides Notification of Changes at WCGS Affecting Plant Physical Security Plan,Per 10CFR50.54(p).Changes Identified in Attachment I Will Be Incorporated Into Plan by 990831. Commitments Made by Util Are Included in Attachment II ML20206B2051999-04-20020 April 1999 Forwards Revs to RERP Implementing Procedures,Including Rev 1 to EPP 06-001, CR Operations, Rev 1 to EPP 06-002, TSC Operations, Rev 3 to EPP 06-004, Public Info Organization & Rev 1 to EPP 06-005, Emergency.. ML20205L7431999-04-0606 April 1999 Confirms 990401 Telcon with NRC Re Late Payment Notice That Util Received for Invoice RL0295-99.Licensee Understands Invoice to Be Cancelled ML20205F1601999-03-30030 March 1999 Forwards Rept Re Status of Decommissioning Funding for WCGS, Per 10CFR50.75.Kansas Gas & Electric Co Decommissioning Trust Agreement,Encl ML20205K9481999-03-26026 March 1999 Responds to NRC Ltr Re Violations Noted in Insp Rept 50-482/98-05.Corrective Actions:Training Was Provided to Mrep Members Through Use of Contract Individual Experienced in Maint Rule Programs.Change to Commitment Date,Encl ML20196K7261999-03-26026 March 1999 Forwards Certified Copy of ITS & ITS Bases,As Committed in Licensee to Nrc.Summary of Editorial Corrections, Also Encl ML20205A1961999-03-25025 March 1999 Provides Suppl 2 to 970515 Application for Amend to License NPF-42,providing Changes to TS Based on 990310 & 19 Discussions with NRC Re Conversion to Improved TS 1999-09-03
[Table view] Category:VENDOR/MANUFACTURER TO NRC
MONTHYEARML20214R4761987-05-18018 May 1987 Documents Deviations Noted at Facility Re Existence of RTV Foam Seals Not Conforming to Requirements,Per 870515 Telcon W/Region Iv.Preliminary Evaluations on Acceptable Methods of Repair Will Be Completed by 870522 NRC-87-3194, Documents 861231 Telcon Re Anomalous Plant Data at Callaway & Wolf Creek.Investigation Initiated.Data Specs for McGuire, Catawba & Millstone Will Be Transmitted1987-01-0707 January 1987 Documents 861231 Telcon Re Anomalous Plant Data at Callaway & Wolf Creek.Investigation Initiated.Data Specs for McGuire, Catawba & Millstone Will Be Transmitted ML20129A2891985-05-30030 May 1985 Requests Withholding of Proprietary Safety Evaluation for Increased Rdf Co Resistance Temp Detector Uncertainty & Rosemount Transmitter Installation,Per 10CFR2.790 NRC-85-3034, Informs of Status of Investigations Into Repts by Two Plants of Resistance Temp Detector Calibr Anomalies in Detectors Manufactured by Rdf Co1985-05-0606 May 1985 Informs of Status of Investigations Into Repts by Two Plants of Resistance Temp Detector Calibr Anomalies in Detectors Manufactured by Rdf Co ML20101G0081984-12-21021 December 1984 Application for Withholding Info Re post-critical Testing (Ref 10CFR2.790) ML20101K2601984-12-19019 December 1984 Authorizes Utilization of Encl Affidavit AW-80-27 Requesting Withholding Proprietary Info on Revised Draft Equipment Qualification Justification for Interim Operation Per 10CFR2.790 ML20101C1941984-11-26026 November 1984 Informs of Upcoming Insp of Mechanical Interlock Starters at Listed Facilities ML20106F6201984-10-18018 October 1984 Requests Withholding Proprietary Technical Bases for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for Callaway & Wolf Creek Plants, (Ref 10CFR2.790) ML20083M8441984-04-11011 April 1984 Application for Withholding Proprietary Westinghouse Interconnecting Wiring Diagrams & Process Control Block Diagrams Associated W/Pressurizer Pressure Input (Ref 10CFR2.790).W/affidavit ML20088A2721984-04-0303 April 1984 Authorizes Use of Encl 761201 Affidavit Re Withholding Proprietary Westinghouse Info from Public Disclosure ML20087N6181984-03-22022 March 1984 Application for Withholding Proprietary Response to NRC Questions on Setpoint Methodology ML20091K8861984-03-0202 March 1984 Requests Withholding Proprietary Info Re Power Plant Licensing or Rulemaking Proceedings,(Ref 10CFR2.790). Affidavit Encl ML20080D9631984-01-20020 January 1984 Application for Withholding Rept, Snupps Steam Generator Tube Plugging Margin Evaluation (Ref 10CFR2.790) ML20024F0991983-08-24024 August 1983 Forwards Proprietary Thermocouple/Core Cooling Monitor,Vols 1 & 2. Repts Withheld (Ref 10CFR2.790) ML20009G4751981-07-27027 July 1981 Advises That 16-cylinder PC-2.5 Engine for Marine Contract Suffered Burned Exhaust Valve Cage During Factory Tests. Specified Cages Will Be Inspected for Adequate Torquing of Holdowns Prior to Startup of Facilities ML19268C0321979-10-0505 October 1979 Responds to IE Bulletin 79-03 Followup Rept.Data Developed on Generic Basis & Considered Applicable to All Snupps Units.Fabrication & Installation of Youngstown Pipe Spools Will Proceed W/All Matl Analyzed Prior to Use ML19209A3941979-09-10010 September 1979 Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies, Re safety-related Application,Mfg & Overall Dimensions ML20027A5511978-12-0606 December 1978 Repts Noncompliance of Motor Actuators on Active,Safety Related Valves to Meet Customer Procurement Requirements. Corrections Will Be Made by Replacing Valve Actuators W/Qual Valve Actuators 1987-05-18
[Table view] |
Text
'
I 1 hf&fhllff
, m' :
!l EN t n trWr7
.: . . . , - ; p 3
~
PROGRESSIVE MATERIALS AND TECHNOLOGILS,INC.
,gg Q.100.87.72 May 18, 1987 Mr. Robert Martin United States Nuclear Regulatory Commission 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011
Reference:
Notification of deviations at Wolf Creek Generating Station Gentlemen:
Pursuant to discussions with Mr. James Gagliardo of USNRC Region IV on Friday, May 15,1987 at 10:45 a.m. thin report constitutes written notification of the existence of silicone RTV foam seals at the Wolf Creek Generating Station that do not conform to minimum requirements. This report in a culmination of information collected by both Wolf Creek Nuclear Operating Corporation and B & B PROMATEC, Inc.
On Friday, May 8, 1987 at approximately 4:30 p.m. PROMATEC was contacted by representatives of the Wolf Creek Generating Station and advised that a cample inspection of allicone RTV foam nealo revealed several discrepancies which were raining concerns that a generic problem may exist with silicone RTV foam seals. The cample inspection consisted of forty (40) seals of which twenty-one (21) were determined as not meeting minimum requirements for reasono such an voida, ohrinkage and lack of fill. PROMATEC concurred that the discrepancy rate was cause for concern and dispatched a representative to Wolf Creek with the objective of determining the nature and extent of the problem.
On Monday, May 11, 1987 the PROMATEC repreacntative began an independent re-inspection of the twenty-one rejected seals in an effort to gain firsthand knowledge of the extent of the problem. Although the reinspection indicated that the actual number of rejectable ceals wan fourteen (14), PROMATEC and Wolf Creek representatives continued to be in agreement that the discrepancy rate wan cause for concern.
On Wednesday, May 13, 1987 the writer met with Wolf Creek representativen to evaluate the information collected to date and to determine the proper courne of action. Daaed on the fact that the typen of ceal discrepancies identified would allow at least limited operability and adequate fire watch personnel were posted, it was determined that the nafe operation of the plant was not compromined; however, it was agreed that due to the ponnibly generic nature of 8706000161 070510 '
PDR ADOCK 05000402 P pon y g .q W P.O. BOX 4672
- HOUSTON, TEXAS 77210 * (713) 690 5240 E riuo
I i To: Mr. Robert Martin Q.100.87.72 From: Mr. R.W. Brown Page 2 of 2 the problem and the lack of conclusive evidence concerning the potential for a substantial safety hazard, the condition would be reported to the Nuclear Regulatory Commission for assistance in determining appropriate disposition.
The number and location of discrepant seals is presently limited to the four-teen (14) previously identified in this report; however, the reject rate of the first sampling taken indicates a need to perform additional inspections to either rule out or substantiate a generic problem with RTV foam seals. The existence of similar problems at other facilities is indeterminate at this time; however, considering the industry wide use of silicone RTV foam as a fire sealant, the potential exists for such conditions elsewhere.
PROMATEC and Wolf Creek Nuclear Operating Corporation are presently evaluating various methods for correcting each discrepant seal, including any identified during the reinspection process. Until such time that the cause of shrinkage and voids in some seals is determined, we have recommended that silicone RTV foam not be used as a repair material at Wolf Creek. Alternate methods of repair under consideration include the following:
- 1) fire rated adhesive sealant for voids and shrinkage. An evaluation is currently in progress to determine the design limitations of this method based on an extrapolation of fire tests previously conducted which qualified certain types of adhesive sealant as a primary seal.
- 2) PROMATEC LDSE or TS-MS-0045B for seals with inadequate fill. In cases where sufficient depth in the penetration exists these products may be installed against the existing foam seal without necessitating removal. We are also in the process of evaluating both products as a potential repair material for voids and shrinkage that exceed limita-tions established for adhesive sealant.
- 3) PROMATEC Promarlex in cases where existing seals must be removed or when design movement of penetrating items preclude the use of rigid seals such as LDSE or TS-MS-00450.
Due to the indeterminate scope of this problem, we are unable to provide an accurate schedule for completion of corrective actions at this time. Prelim-Inary evaluations on acceptable methods of repair will be completed by Friday, May 22, 1987. Additionni information will be provided as it becomes avail-able.
Sincerely yours, PROMAIEC
/
a h A M.41 H.W. Brown Quality Assurance Manager RWB/dje lHRMEGTIDTC
I GA d-L I A K0 0 sY ~
I%(&jllf I
o l:
i L ' ,
..- PROGRESSIVE MATERIALS AND TECHNOLCKAES,INC.
1 Q.100.87.72 May 18, 1987 Mr. Robert Martin United States Nuclear Regulatory Commission 611 Ryan Plaza Drive Sulte 1000 Arlington, Texas 76011
Reference:
Notification of deviations at Wolf Creek Generating Station Gentlemen:
Pursuant to discussions with Mr. James Gagliardo of USNRC Region IV on Friday, May 15, 1987 at 10:45 a.m. this report constitutes written notification of the existence of silicone RTV foam ceals at the Wolf Creek Generating Station that do not conform to minimum requirements. This report is a culmination of information collected by both Wolf Creek Nuclear Operating Corporation and B & B PROMATEC, Inc.
On Friday, May 8, 1987 at approximately 4:30 p.m. PROMATEC was contacted by representat ives of the Wolf Creek Generating Station and adviced that a sample inspection of allicone RIV foam seals revealed several discrepancies which were raising concerns that a generic problem may exist with silicone RTV foam seals. The sample inspection consisted of forty (40) seals of which twenty-one (21) were determined as not meeting minimum requirements for reasons such as voids, shrinkage and lack of fill. PROMAlfC concurred that the discrepancy rate was cause for concern and dispatched a representative to Wolf Creek with the objective of determining the nature and extent of the problem.
On Monday, May 11, 1987 the PROMATEC representative began an independent re-inspection of the twent; anc rejected seals in an effort to gain firsthand knowledge of the extent of the problem. Although the reinspection indicated that the actual number of rejectable seals was fourteen (14), PROMATEC and Wolf Creek representat ives continued to be in agreement that the discrepancy rate was cause for concern.
On Wednesday, May 13, 1987 the writer met with Wolf Creek representatives to evaluate the information collected to date and to determine the proper course of action. Based on the fact that the types of seal discrepancies identified would allow at least limited operability and adequate fire watch personnel were posted, it was determined thnt the safe operation of the plant was not compromised; however, it was agreed that due to the possibly generic nature of M
11u s t P.O. BOX 4672
- HOU$ TON, TEXA5 77210 e (713) 690 5240 N
__n___---------
To: Mr. Robert Martin Q.100.87.72 from: Mr. R.W. Brown j Page 2 of 2 the problem and the lack of conclusive evidence concerning the potential for a substantial safety hazard, the condition would be reported to the Nuclear 4
i Regulatory Commission for assistance in determining appropriate disposition.
l The number and location of discrepant seals is presently limited to the four-1 teen (14) previously identified in this report; however, the reject rate of j the first sampling taken indicates a need to perform additional inspections to p j either rule out or substantiate a generic problem with RTV foam seals. The existence of similar problems at other facilities is indeterminate at this
- time; however, considering the industry wide use of silicone RTV foam as a j fire sealant, the potential exists for such conditions elsewhere.
i i PROMATEC and Wolf Creek Nuclear Operating Corporation are presently evaluating various methods for correcting each discrepant seal, including any identified l during the reinspection process. Until such time that the cause of shrinkage
! and voids in some seals is determined, we have recommended that silicone RTV 3
foam not be used as a repair material at Wolf Creek. Alternate methods of
- j repair under consideration include the following:
" r
- 1) fire rated adhesive sealant for voids and shrinkage. An evaluation is 4
currently in progress to determine the design limitations of this j method based on on extrapolation of fire tests previously conducted which qualifted certain types of adhesive sealant as a primary seal. l
) 2) PROMATEC LDSE or TS-MS-00459 for seals with inadequate fill. In cases
- where sufficient depth in the penetration exists these products may i be incialled against the existing foam seal without necessitating ,
removal. We are also in the process of evaluating both products as a !
I potential repair material for volds and shrinkage that exceed limito-l tions established for adhesive sealant.
- 3) PROMATEC Promarlex in cases where existing seals must be removed or when design movement of penetrating items preclude the use of rigid
! seals such as LDSE or TS-MS-00450.
l j Due to the indeterminate scope of this problem, we ate unable to provide an j accurate schedule for completion of corrective actions at this time. Prelim-j inary evaluations on acceptable methods of repair will be completed by friday, j May 22, 1987. Additional information will be provided as it becomes avull-j able. i i
i a
Sincerely yours, PROMATEC l
./M.+1
- l. H.W. Brown j,
Quality Annurance Manager j RWB/dje i,
\ (MMMlk1MC