IR 05000382/2017007: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 21: Line 21:


==SUBJECT:==
==SUBJECT:==
WATERFORD STEAM ELECTRIC STATION, UNIT 3
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC LICENSE RENEWAL INSPECTION REPORT 05000382/2017007
- NRC LICENSE RENEWAL INSPECTION REPORT 05000382/2017007


==Dear Mr. Chisum:==
==Dear Mr. Chisum:==
On February 16, 2017, a U.S. Nuclear Regulatory Commission (NRC) team completed the onsite portion of an inspection of your application for license renewal for the Waterford Steam Electric Station, Unit 3. The team discussed the inspection results with you and other members  
On February 16, 2017, a U.S. Nuclear Regulatory Commission (NRC) team completed the onsite portion of an inspection of your application for license renewal for the Waterford Steam Electric Station, Unit 3. The team discussed the inspection results with you and other members of your staff.
 
of your staff.


This inspection examined activities that supported the application for a renewed license for the Waterford Steam Electric Station, Unit 3. The inspection addressed your processes for scoping and screening structures, systems, and components to select equipment subject to an aging management review. Further, the inspection addressed the development and implementation of aging management programs to support continued plant operation into the period of extended operation. As part of the inspection, the NRC examined procedures and representative records, interviewed personnel, and visually examined accessible portions of various structures, systems, and components to verify license renewal boundaries and to observe any effects of equipment aging. These NRC inspection activities constitute one of several inputs into the NRC review process for license renewal applications.
This inspection examined activities that supported the application for a renewed license for the Waterford Steam Electric Station, Unit 3. The inspection addressed your processes for scoping and screening structures, systems, and components to select equipment subject to an aging management review. Further, the inspection addressed the development and implementation of aging management programs to support continued plant operation into the period of extended operation. As part of the inspection, the NRC examined procedures and representative records, interviewed personnel, and visually examined accessible portions of various structures, systems, and components to verify license renewal boundaries and to observe any effects of equipment aging. These NRC inspection activities constitute one of several inputs into the NRC review process for license renewal applications.
Line 33: Line 30:
The team concluded that your staff appropriately implemented the scoping and screening of nonsafety-related structures, systems, and components that could affect safety-related structures, systems, and components as required in 10 CFR 54.4(a)(2). The team concluded that your staff conducted an appropriate review of the materials and environments, and established appropriate aging management programs as described in the license renewal application and as supplemented through your responses to requests for additional information from the NRC. The team concluded that your staff maintained the documentation supporting the application in an auditable and retrievable form. Based on the samples reviewed by the team the inspection results support a conclusion of reasonable assurance that actions have been identified and have been or will be taken to manage the effects of aging in the structures, systems, and components identified in your application, and that the intended functions of these structures, systems, and components will be maintained in the period of extended operation.
The team concluded that your staff appropriately implemented the scoping and screening of nonsafety-related structures, systems, and components that could affect safety-related structures, systems, and components as required in 10 CFR 54.4(a)(2). The team concluded that your staff conducted an appropriate review of the materials and environments, and established appropriate aging management programs as described in the license renewal application and as supplemented through your responses to requests for additional information from the NRC. The team concluded that your staff maintained the documentation supporting the application in an auditable and retrievable form. Based on the samples reviewed by the team the inspection results support a conclusion of reasonable assurance that actions have been identified and have been or will be taken to manage the effects of aging in the structures, systems, and components identified in your application, and that the intended functions of these structures, systems, and components will be maintained in the period of extended operation.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and its enclosure, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter, and its enclosure, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS).
 
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,
Sincerely,
/RA John Mateychick Acting for/  
/RA John Mateychick Acting for/
 
Gregory E. Werner, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-382 License No. NPF-38
Gregory E. Werner, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-382 License No. NPF-38  


===Enclosure:===
===Enclosure:===
Inspection Report 05000382/2017007 w/Attachments: 1. Supplemental Information 2. License Renewal Inspection Document Request  
Inspection Report 05000382/2017007 w/Attachments:
1. Supplemental Information 2. License Renewal Inspection Document Request


REGION IV Docket: 05000382 License: NPF-38  
REGION IV==
Docket: 05000382 License: NPF-38 Report: 05000382/2017007 Applicant: Entergy Operations, Inc.


Report: 05000382/2017007 Applicant: Entergy Operations, Inc.
Facility: Waterford Steam Electric Station, Unit 3 Location: 17265 River Road Killona, LA 70057 Dates: January 30 through February 16, 2017 Team Lead: S. Graves, Senior Reactor Inspector, Engineering Branch 2 Inspectors: G. Pick, Senior Reactor Inspector W. Sifre, Senior Reactor Inspector J. Melfi, Project Engineer I. Anchondo, Reactor Inspector Approved By: Gregory E. Werner Chief, Engineering Branch 2 Division of Reactor Safety Enclosure


Facility: Waterford Steam Electric Station, Unit 3 Location: 17265 River Road Killona, LA 70057 Dates: January 30 through February 16, 2017 Team Lead: S. Graves, Senior Reactor Inspector, Engineering Branch 2 Inspectors: G. Pick, Senior Reactor Inspector W. Sifre, Senior Reactor Inspector J. Melfi, Project Engineer I. Anchondo, Reactor Inspector Approved By: Gregory E. Werner Chief, Engineering Branch 2
=SUMMARY=
 
IR 05000382/2017007; 01/30/2017 - 02/16/2017; Waterford Steam Electric Station, Unit 3;
Division of Reactor Safety
 
2


=SUMMARY=
Scoping of Nonsafety-Related Systems Affecting Safety-Related Systems and Review of License Renewal Aging Management Programs.
IR 05000382/2017007; 01/30/2017 - 02/16/2017; Waterford Steam Electric Station, Unit 3; Scoping of Nonsafety-Related Systems Affecting Safety-Related Systems and Review of License Renewal Aging Management Programs.


NRC inspectors from Region IV performed onsite in spections of the applicant's license renewal activities. The team performed the evaluati ons in accordance with Manual Chapter 2516, "Policy and Guidance for the License Renewal Inspection Programs," and Inspection Procedure 71002, "License Renewal Inspection.The team did not identify any findings as defined in NRC Manual Chapter 0612.
NRC inspectors from Region IV performed onsite inspections of the applicant's license renewal activities. The team performed the evaluations in accordance with Manual Chapter 2516,
Policy and Guidance for the License Renewal Inspection Programs, and Inspection Procedure 71002, License Renewal Inspection. The team did not identify any findings as defined in NRC Manual Chapter 0612.


The team concluded the applicant adequately performed screening and scoping of nonsafety-related structures, systems, and components as required in 10 CFR 54.4(a)(2). The team concluded that the applicant conducted an appropriate review of the materials and environments and established appropriate aging management programs as described in the license renewal application and as supplemented through responses to requests for additional information from the NRC. The team concluded that the applicant provided the documentation that supported the application and inspection process in an auditable and retrievable form.
The team concluded the applicant adequately performed screening and scoping of nonsafety-related structures, systems, and components as required in 10 CFR 54.4(a)(2). The team concluded that the applicant conducted an appropriate review of the materials and environments and established appropriate aging management programs as described in the license renewal application and as supplemented through responses to requests for additional information from the NRC. The team concluded that the applicant provided the documentation that supported the application and inspection process in an auditable and retrievable form.
Line 62: Line 59:
Based on the samples reviewed by the team the inspection results support a conclusion of reasonable assurance that actions have been identified and have been or will be taken to manage the effects of aging in the structures, systems, and components identified in your application and that the intended functions of these structures, systems, and components will be maintained in the period of extended operation.
Based on the samples reviewed by the team the inspection results support a conclusion of reasonable assurance that actions have been identified and have been or will be taken to manage the effects of aging in the structures, systems, and components identified in your application and that the intended functions of these structures, systems, and components will be maintained in the period of extended operation.


===A. NRC-Identified Findings and Self-Revealing Findings===
===NRC-Identified Findings and Self-Revealing Findings===


None
None


===B. Licensee-Identified Violations===
===Licensee-Identified Violations===


None 5
None


=REPORT DETAILS=
=REPORT DETAILS=
Line 82: Line 79:
In order to evaluate scoping activities, the team selected a number of SSCs for review to evaluate whether the methodology used by the applicant appropriately addressed the nonsafety-related systems affecting the safety functions of a structure, system, or component within the scope of license renewal.
In order to evaluate scoping activities, the team selected a number of SSCs for review to evaluate whether the methodology used by the applicant appropriately addressed the nonsafety-related systems affecting the safety functions of a structure, system, or component within the scope of license renewal.


The team selected a sample of 23 of the 41 aging management programs developed by the applicant to verify the adequacy of the applicant's guidance, implementation activities, and documentation. The team evaluated the programs to determine whether the applicant would appropriately manage the effects of aging and to verify that the applicant would maintain the safety functions of the SSCs during the period of extended operation. The team evaluated the applicant's review and consideration of industry and plant-specific operating experience related to aging effects.
The team selected a sample of 23 of the 41 aging management programs developed by the applicant to verify the adequacy of the applicants guidance, implementation activities, and documentation. The team evaluated the programs to determine whether the applicant would appropriately manage the effects of aging and to verify that the applicant would maintain the safety functions of the SSCs during the period of extended operation. The team evaluated the applicants review and consideration of industry and plant-specific operating experience related to aging effects.


The team reviewed supporting documentation and interviewed applicant personnel to confirm the accuracy of the license renewal application conclusions. For a sample of plant structures and systems, the team walked down accessible portions of the systems to observe aging effects. During the plant walkdowns, the team reviewed the material condition of the SSCs.
The team reviewed supporting documentation and interviewed applicant personnel to confirm the accuracy of the license renewal application conclusions. For a sample of plant structures and systems, the team walked down accessible portions of the systems to observe aging effects. During the plant walkdowns, the team reviewed the material condition of the SSCs.


b.1 Evaluation of Scoping of Nonsafety-Related Structures, Systems, and Components For scoping of nonsafety-related SSCs affecting safety-related SSCs, as required by 10 CFR 54.4(a)(2), the team reviewed the applicant's program guidance and scoping results. The team assessed the thoroughness and accuracy of the methods used to identify the SSCs required to be within the scope of the license renewal application.
b.1 Evaluation of Scoping of Nonsafety-Related Structures, Systems, and Components For scoping of nonsafety-related SSCs affecting safety-related SSCs, as required by 10 CFR 54.4(a)(2), the team reviewed the applicants program guidance and scoping results. The team assessed the thoroughness and accuracy of the methods used to identify the SSCs required to be within the scope of the license renewal application.


The team verified that the applicant had established procedures consistent with the NRC-endorsed guidance contained in Nuclear Energy Institute 95-10, "Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule," Revision 6, Appendix F, Sections 3, 4, and 5. The team assessed whether the applicant evaluated
The team verified that the applicant had established procedures consistent with the NRC-endorsed guidance contained in Nuclear Energy Institute 95-10, Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule, Revision 6, Appendix F, Sections 3, 4, and 5. The team assessed whether the applicant evaluated
: (1) nonsafety-related SSCs within the scope of the current licensing basis,
: (1) nonsafety-related SSCs within the scope of the current licensing basis,
: (2) nonsafety-related SSCs directly connected to safety-related SSCs, and
: (2) nonsafety-related SSCs directly connected to safety-related SSCs, and
: (3) nonsafety-related SSCs not directly connected but spatially near safety-related  
: (3) nonsafety-related SSCs not directly connected but spatially near safety-related SSCs.


SSCs. The team reviewed the license renewal drawings listed in the appendix. The applicant had color coded the drawings to indicate in-scope systems and components required by 10 CFR 54.4(a)(1), (a)(2), and (a)(3). The team interviewed personnel, reviewed program documents, and independently walked down numerous areas within the plant. The areas walked down included:
The team reviewed the license renewal drawings listed in the appendix. The applicant had color coded the drawings to indicate in-scope systems and components required by 10 CFR 54.4(a)(1), (a)(2), and (a)(3). The team interviewed personnel, reviewed program documents, and independently walked down numerous areas within the plant.
 
The areas walked down included:
* Reactor auxiliary building
* Reactor auxiliary building
* Fuel handling building
* Fuel handling building
Line 102: Line 101:
* Firewater pump house and tanks
* Firewater pump house and tanks
* Yard fire main
* Yard fire main
* Portions of the electrical distribution system associated with station blackout recovery For SSCs selected because of potential spatial interactions, where failure of nonsafety-related components could adversely affect adjacent safety-related components, the team determined that the applicant accurately categorized the in-plant configuration within the license renewal documents. The team determined the personnel involved in the process were knowledgeable and appropriately trained.
* Portions of the electrical distribution system associated with station blackout recovery For SSCs selected because of potential spatial interactions, where failure of nonsafety-related components could adversely affect adjacent safety-related components, the team determined that the applicant accurately categorized the in-plant configuration within the license renewal documents. The team determined the personnel involved in the process were knowledgeable and appropriately trained.
 
For SSCs selected because of potential structural interaction (seismic design of


safety-related components potentially affected by nonsafety-related components), the team determined that the applicant accurately identified and categorized the structural boundaries within the program documents. Based on in-plant walkdowns and on independent sampling of the isometric drawings (identified by an asterisk (*) in the appendix) and the seismic boundary determinations, the team determined that the applicant appropriately identified the seismic design boundaries and correctly included the applicable components within the license renewal scope.
For SSCs selected because of potential structural interaction (seismic design of safety-related components potentially affected by nonsafety-related components), the team determined that the applicant accurately identified and categorized the structural boundaries within the program documents. Based on in-plant walkdowns and on independent sampling of the isometric drawings (identified by an asterisk (*) in the appendix) and the seismic boundary determinations, the team determined that the applicant appropriately identified the seismic design boundaries and correctly included the applicable components within the license renewal scope.


On June 27, 2016, the NRC issued a license amendment authorizing the transition of the applicant's fire protection program to a risk informed, performance-based program based on the 2001 Edition of National Fire Protection Association (NFPA) Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generation Plants.The applicant had transitioned their fire protection program in accordance with Amendment 248 of the facility operating license. In a response to a request for information letter (W3F1-2017-0002), dated January 16, 2017, the applicant identified they would update their License Renewal Application to reflect this change.
On June 27, 2016, the NRC issued a license amendment authorizing the transition of the applicants fire protection program to a risk informed, performance-based program based on the 2001 Edition of National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generation Plants. The applicant had transitioned their fire protection program in accordance with Amendment 248 of the facility operating license. In a response to a request for information letter (W3F1-2017-0002), dated January 16, 2017, the applicant identified they would update their License Renewal Application to reflect this change.


The team reviewed the applicant's scoping of systems affected by this change, and reviewed a sample of aging management programs affected by this change.
The team reviewed the applicants scoping of systems affected by this change, and reviewed a sample of aging management programs affected by this change.


In summary, the team concluded that the applicant had implemented an acceptable method of scoping nonsafety-related SSCs and that this method resulted in appropriate scoping determinations for the samples reviewed.
In summary, the team concluded that the applicant had implemented an acceptable method of scoping nonsafety-related SSCs and that this method resulted in appropriate scoping determinations for the samples reviewed.


b.2 Evaluation of New Aging Management Programs The team reviewed 7 of the 13 new aging management programs to determine whether the applicant had established appropriate actions or had actions planned to manage the  
b.2 Evaluation of New Aging Management Programs The team reviewed 7 of the 13 new aging management programs to determine whether the applicant had established appropriate actions or had actions planned to manage the effects of aging as specified in NUREG-1801, Generic Aging Lessons Learned (GALL)
 
Report, Revision 2 (the GALL Report). The team independently reviewed site-specific operating experience to determine whether there were any aging effects for the systems and components within the scope of these programs that had not been identified when considering applicable industry operating experience.
effects of aging as specified in NUREG-1801, "Generic Aging Lessons Learned (GALL) Report," Revision 2 (the GALL Report). The team independently reviewed site-specific operating experience to determine whether there were any aging effects for the systems and components within the scope of these programs that had not been identified when considering applicable industry operating experience.


The team selected in-scope SSCs to assess how the applicant maintained plant equipment material conditions under existing programs and to visually observe examples of nonsafety-related equipment determined to be within scope because of the proximity to safety-related equipment and the potential for failure as a result of aging effects.
The team selected in-scope SSCs to assess how the applicant maintained plant equipment material conditions under existing programs and to visually observe examples of nonsafety-related equipment determined to be within scope because of the proximity to safety-related equipment and the potential for failure as a result of aging effects.
Line 122: Line 118:
===.1 B.1.3 Buried and Underground Piping and Tanks Inspection (XI.M41)===
===.1 B.1.3 Buried and Underground Piping and Tanks Inspection (XI.M41)===


The applicant established this new aging management program, consistent with the GALL Report, as modified by LR-ISG-2011-03, "Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 Aging Management Program XI.M41, "Buried and Underground Piping and Tanks,"" to manage the loss of material, cracking or changes in  
The applicant established this new aging management program, consistent with the GALL Report, as modified by LR-ISG-2011-03, Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 Aging Management Program XI.M41, Buried and Underground Piping and Tanks, to manage the loss of material, cracking or changes in material properties resulting from general corrosion, and loss of material on external surfaces of buried and underground limited access components. The program specified prevention, mitigation, and inspection activities, including external coatings, quality of backfill, cathodic protection and periodic inspections. The applicant included all in-scope underground piping and components of carbon steel, gray cast iron, polymers, cementitious and concrete materials. This program is credited for plant drains, the emergency generator system, component cooling and auxiliary component cooling water systems, and the fire water system.
 
material properties resulting from general corrosion, and loss of material on external surfaces of buried and underground limited access components. The program specified prevention, mitigation, and inspection activities, including external coatings, quality of backfill, cathodic protection and periodic inspections. The applicant included all in-scope underground piping and components of carbon steel, gray cast iron, polymers, cementitious and concrete materials. This program is credited for plant drains, the emergency generator system, component cooling and auxiliary component cooling water systems, and the fire water system.


The applicant identified that they would manage the effects of aging through visual inspection either during opportunistic excavations for other maintenance or during planned excavations. The inspections will evaluate the condition of the external surfaces, the backfill, and protective coatings and wrappings of steel, stainless steel, and copper alloy on buried and underground components. The applicant will perform one excavation of each material type once every 10 years, beginning in the 10-year period prior to the period of extended operation.
The applicant identified that they would manage the effects of aging through visual inspection either during opportunistic excavations for other maintenance or during planned excavations. The inspections will evaluate the condition of the external surfaces, the backfill, and protective coatings and wrappings of steel, stainless steel, and copper alloy on buried and underground components. The applicant will perform one excavation of each material type once every 10 years, beginning in the 10-year period prior to the period of extended operation.
Line 134: Line 128:
===.2 B.1.4 Coating Integrity (XI.M42)===
===.2 B.1.4 Coating Integrity (XI.M42)===


The applicant established this new aging management program, consistent with the GALL Report, as modified by LR-ISG-2013-01, "Aging Management of Loss of Coating or Lining Integrity for Internal Coatings/Linings on In-Scope Piping, Piping Components, Heat Exchangers and Tanks," with exception, to manage aging effects where loss of coating or lining integrity could impact the component's current licensing basis intended functions. The applicant will perform periodic visual inspections of components with coated surfaces in environments of raw water, treated water, lubricating oil or fuel oil. For coated surfaces that do not meet the acceptance criteria, physical testing will be performed. The training and qualification of individuals must meet the standards endorsed in Regulatory Guide 1.54, "Service Level I, II, and III Protective Coatings Applied to Nuclear Power Plants.The applicant will implement this program within the 10-year period prior to entering the period of extended operation.
The applicant established this new aging management program, consistent with the GALL Report, as modified by LR-ISG-2013-01, Aging Management of Loss of Coating or Lining Integrity for Internal Coatings/Linings on In-Scope Piping, Piping Components, Heat Exchangers and Tanks, with exception, to manage aging effects where loss of coating or lining integrity could impact the components current licensing basis intended functions. The applicant will perform periodic visual inspections of components with coated surfaces in environments of raw water, treated water, lubricating oil or fuel oil.
 
For coated surfaces that do not meet the acceptance criteria, physical testing will be performed. The training and qualification of individuals must meet the standards endorsed in Regulatory Guide 1.54, Service Level I, II, and III Protective Coatings Applied to Nuclear Power Plants. The applicant will implement this program within the 10-year period prior to entering the period of extended operation.


The applicant requested an exception for this aging management program.
The applicant requested an exception for this aging management program.
Line 152: Line 148:
The program will inspect a sample of accessible bus bolted connections for increased connection resistance. Bus insulation or insulators will be visually inspected for signs of aging caused by thermal/thermoxidative degradation of organics/thermoplastics, radiation-induced oxidation, moisture/debris intrusion, or ohmic heating, as indicated by embrittlement, cracking, chipping, melting, discoloration, or swelling, which may indicate overheating or aging degradation. A combination of visual inspections and quantitative measurements such as thermography will be performed, as required. Internal bus supports or insulators will be visually inspected for structural integrity and signs of cracking.
The program will inspect a sample of accessible bus bolted connections for increased connection resistance. Bus insulation or insulators will be visually inspected for signs of aging caused by thermal/thermoxidative degradation of organics/thermoplastics, radiation-induced oxidation, moisture/debris intrusion, or ohmic heating, as indicated by embrittlement, cracking, chipping, melting, discoloration, or swelling, which may indicate overheating or aging degradation. A combination of visual inspections and quantitative measurements such as thermography will be performed, as required. Internal bus supports or insulators will be visually inspected for structural integrity and signs of cracking.


assembly external surfaces will be visually inspected for evidence of loss of material caused by general, pitting, and crevice corrosion. Accessible elastomers (e.g., gaskets, boots, and sealants) will be inspected for changes in material properties (elastomer degradation) including surface cracking, crazing, scuffing, dimensional changes (e.g., "ballooning" and "necking"), shrinkage, discoloration, hardening, and loss of strength at least once every 10 years. Enclosure assembly internal surfaces will be visually inspected for evidence of loss of material. Internal portions of the enclosure assemblies will also be inspected for cracks, corrosion, foreign debris, excessive dust buildup, and evidence of water intrusion.
assembly external surfaces will be visually inspected for evidence of loss of material caused by general, pitting, and crevice corrosion. Accessible elastomers (e.g., gaskets, boots, and sealants) will be inspected for changes in material properties (elastomer degradation) including surface cracking, crazing, scuffing, dimensional changes (e.g., ballooning and necking), shrinkage, discoloration, hardening, and loss of strength at least once every 10 years. Enclosure assembly internal surfaces will be visually inspected for evidence of loss of material. Internal portions of the enclosure assemblies will also be inspected for cracks, corrosion, foreign debris, excessive dust buildup, and evidence of water intrusion.
 
The applicant will perform inspections before the period of extended operation, and at least once every 10 years, unless visual inspections are used as the only method to inspect accessible bolted connections. If the applicant uses only visual inspection methods for accessible bolted connection inspection, the inspection will be completed prior to the period of extended operation and at least once every five years thereafter.


The applicant will perform inspections before the period of extended operation, and at least once every 10 years, unless visual inspections are used as the only method to inspect accessible bolted connections. If the applicant uses only visual inspection methods for accessible bolted connection inspection, the inspection will be completed prior to the period of extended operation and at least once every five years thereafter. This method is consistent with the alternative method described in the GALL Report.
This method is consistent with the alternative method described in the GALL Report.


The team reviewed applicable license r enewal program basis documents, aging management program evaluation report, existing maintenance procedures, plant specific operating experience, and preventive maintenance requirements. The team interviewed license renewal project personnel and the responsible plant and design engineers. The team walked down all the in-scope metal enclosed buses.
The team reviewed applicable license renewal program basis documents, aging management program evaluation report, existing maintenance procedures, plant specific operating experience, and preventive maintenance requirements. The team interviewed license renewal project personnel and the responsible plant and design engineers. The team walked down all the in-scope metal enclosed buses.


The team concluded that for the Metal Enclosed Bus Inspection program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging for the metal enclosed buses. The team concluded that, if implemented as described, the applicant developed guidance that would appropriately identify and address aging effects during the period of extended operation.
The team concluded that for the Metal Enclosed Bus Inspection program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging for the metal enclosed buses. The team concluded that, if implemented as described, the applicant developed guidance that would appropriately identify and address aging effects during the period of extended operation.
Line 162: Line 160:
===.4 B.1.24 Non-EQ Inaccessible Power Cables ( 400 V) (XI.E3)===
===.4 B.1.24 Non-EQ Inaccessible Power Cables ( 400 V) (XI.E3)===


The applicant established this new aging management program, consistent with the  
The applicant established this new aging management program, consistent with the GALL Report, with exception, to manage the effects of reduced insulation resistance on inaccessible power cables (greater than or equal to 400 V) exposed to adverse localized environments caused by significant moisture. The applicant had no in-scope safety-related cables installed below grade.
 
GALL Report, with exception, to manage the effects of reduced insulation resistance on inaccessible power cables (greater than or equal to 400 V) exposed to adverse localized environments caused by significant moisture. The applicant had no in-scope safety-related cables installed below grade.


The applicant requested an exception for this aging management program.
The applicant requested an exception for this aging management program.
Line 172: Line 168:
Periodic manhole inspections will be performed to minimize this exposure, but the inspection frequency cannot be increased to prevent these cables from being exposed to significant moisture.
Periodic manhole inspections will be performed to minimize this exposure, but the inspection frequency cannot be increased to prevent these cables from being exposed to significant moisture.


The applicant took this exception to the Preventive Actions element because of environmental conditions surrounding the in-scope cables. The applicant could not prevent the in-scope 480V electric-driven fire pump cables and the electric-driven jockey fire pump cables from being exposed to significant moisture resulting from site elevation. The manholes and duct banks housing these cables are continuously submerged above the cable support assemblies from ground water penetration since the site elevation is below river elevation. As a result the applicant had chosen to perform annual inspections of the cables and cable support assemblies. A review of site historical operating experience identified only one medium-voltage cable failure and that failure was not attributable to moisture intrusion.
The applicant took this exception to the Preventive Actions element because of environmental conditions surrounding the in-scope cables. The applicant could not prevent the in-scope 480V electric-driven fire pump cables and the electric-driven jockey fire pump cables from being exposed to significant moisture resulting from site elevation.
 
The manholes and duct banks housing these cables are continuously submerged above the cable support assemblies from ground water penetration since the site elevation is below river elevation. As a result the applicant had chosen to perform annual inspections of the cables and cable support assemblies. A review of site historical operating experience identified only one medium-voltage cable failure and that failure was not attributable to moisture intrusion.


The team held numerous discussions with the applicant about their efforts to mitigate the in-scope cables exposure to submergence and their current and proposed process for inspections. The applicant opened and dewatered an in-scope manhole for the team to inspect and observe the as-found conditions of the cables, cable support assemblies and the structural condition of the cable vault and ducting. The applicant had planned to use the site's maintenance program and existing model work orders to perform visual inspections of the in-scope cables and cable support assemblies. After reviewing existing work orders and the open manhole conditions, the applicant identified that enhancements to their work orders and inspection process for the cables and manholes would be appropriate. As part of their aging management program, the applicant was developing a cable reliability program using Procedure EN-DC-346, "Cable Reliability Program," Revision 6, and guidance from several industry guidance documents, including Electric Power Research Institute (EPRI) TR-1020804, "Aging Management Development Guidance AC and DC Low-Voltage Power Cable Systems for Nuclear Power Plants," to improve their cable management process. The in-scope cabling had ethylene propylene rubber (EPR) insulation with jacketing of black heavy-duty chlorosulphonated polyethylene for low moisture absorption. The cables were designed for underground and aboveground applications in wet or dry locations and direct burial.
The team held numerous discussions with the applicant about their efforts to mitigate the in-scope cables exposure to submergence and their current and proposed process for inspections. The applicant opened and dewatered an in-scope manhole for the team to inspect and observe the as-found conditions of the cables, cable support assemblies and the structural condition of the cable vault and ducting. The applicant had planned to use the sites maintenance program and existing model work orders to perform visual inspections of the in-scope cables and cable support assemblies. After reviewing existing work orders and the open manhole conditions, the applicant identified that enhancements to their work orders and inspection process for the cables and manholes would be appropriate. As part of their aging management program, the applicant was developing a cable reliability program using Procedure EN-DC-346, Cable Reliability Program, Revision 6, and guidance from several industry guidance documents, including Electric Power Research Institute (EPRI) TR-1020804, Aging Management Development Guidance AC and DC Low-Voltage Power Cable Systems for Nuclear Power Plants, to improve their cable management process. The in-scope cabling had ethylene propylene rubber (EPR) insulation with jacketing of black heavy-duty chlorosulphonated polyethylene for low moisture absorption. The cables were designed for underground and aboveground applications in wet or dry locations and direct burial.


The applicant stated the in-scope cables did not have splices.
The applicant stated the in-scope cables did not have splices.
Line 184: Line 182:
The program will trend and track the results for condition monitoring, and the applicant will use the Structures Monitoring program for inspection and management of the cable vault structures. After discussions and review, the team had no significant concerns with the exception and concluded the licensee could provide reasonable assurance that the aging effects for the in-scope cables would be appropriately managed through the enhanced inspection and testing program.
The program will trend and track the results for condition monitoring, and the applicant will use the Structures Monitoring program for inspection and management of the cable vault structures. After discussions and review, the team had no significant concerns with the exception and concluded the licensee could provide reasonable assurance that the aging effects for the in-scope cables would be appropriately managed through the enhanced inspection and testing program.


The team reviewed applicable license r enewal program basis documents, aging management program evaluation report, program procedures, and records for completed maintenance activities. In addition, the team reviewed condition records from the corrective action database for relevant plant operating experience documents. The team interviewed plant personnel and reviewed maintenance work orders, manhole inspection results, and records regarding water removed from manholes.
The team reviewed applicable license renewal program basis documents, aging management program evaluation report, program procedures, and records for completed maintenance activities. In addition, the team reviewed condition records from the corrective action database for relevant plant operating experience documents. The team interviewed plant personnel and reviewed maintenance work orders, manhole inspection results, and records regarding water removed from manholes.


The team concluded that for the Non-EQ Inaccessible Power Cables program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging for inaccessible cables. The team concluded that, if implemented as described, the applicant developed guidance that would appropriately identify and address aging effects during the period of extended operation.
The team concluded that for the Non-EQ Inaccessible Power Cables program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging for inaccessible cables. The team concluded that, if implemented as described, the applicant developed guidance that would appropriately identify and address aging effects during the period of extended operation.
Line 194: Line 192:
The applicant planned to monitor the aging effects through periodic visual inspections.
The applicant planned to monitor the aging effects through periodic visual inspections.


The program acceptance criteria established that accessible cables and connections  
The program acceptance criteria established that accessible cables and connections were to be free from unacceptable visual indications of surface anomalies. The applicant defined an unacceptable indication as a noted condition or situation that, if left unmanaged, could lead to a loss of intended function. The applicant will complete the first inspection sample of these components prior to entering the period of extended operation and once every 10 years thereafter.
 
were to be free from unacceptable visual indications of surface anomalies. The applicant defined an unacceptable indication as a noted condition or situation that, if left unmanaged, could lead to a loss of intended function. The applicant will complete the first inspection sample of these components prior to entering the period of extended operation and once every 10 years thereafter.


The team reviewed relevant license renewal program basis documents, aging management review documents, procedures, plant specific operating experience, and preventive maintenance requirements. The team interviewed the license renewal project personnel and walked down a sample of accessible areas within the plant where cable trays and exposed cables were installed in adverse localized environments. The applicant identified that EPRI TR 109619, "Guideline for Management of Adverse Localized Environments," dated June 1999 will be used as guidance in performing the inspections.
The team reviewed relevant license renewal program basis documents, aging management review documents, procedures, plant specific operating experience, and preventive maintenance requirements. The team interviewed the license renewal project personnel and walked down a sample of accessible areas within the plant where cable trays and exposed cables were installed in adverse localized environments. The applicant identified that EPRI TR 109619, Guideline for Management of Adverse Localized Environments, dated June 1999 will be used as guidance in performing the inspections.


The team concluded that for the Non-EQ Insulated Cables and Connections program, the applicant performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging for cables and connections exposed to adverse localized environments. The team concluded that, if implemented as described, the applicant developed guidance that would appropriately identify and address aging effects during the period of extended operation.
The team concluded that for the Non-EQ Insulated Cables and Connections program, the applicant performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging for cables and connections exposed to adverse localized environments. The team concluded that, if implemented as described, the applicant developed guidance that would appropriately identify and address aging effects during the period of extended operation.
Line 212: Line 208:
===.7 B.1.35 Selective Leaching (XI.M33)===
===.7 B.1.35 Selective Leaching (XI.M33)===


The applicant established this new aging management program, consistent with the GALL Report, to manage the aging of components subject to selective leaching of materials. The affected components included material made of gray cast iron and copper alloy with greater than 15 percent nickel (i.e., bronze or brass) exposed to raw water, treated water, and ground water that may lead to selective leaching. The program will include a one-time visual inspection and mechanical testing of a sample of components with metallurgical properties susceptible to selective leaching to  
The applicant established this new aging management program, consistent with the GALL Report, to manage the aging of components subject to selective leaching of materials. The affected components included material made of gray cast iron and copper alloy with greater than 15 percent nickel (i.e., bronze or brass) exposed to raw water, treated water, and ground water that may lead to selective leaching. The program will include a one-time visual inspection and mechanical testing of a sample of components with metallurgical properties susceptible to selective leaching to demonstrate the absence of this aging effect, or to implement an aging management program if a loss of material has occurred.
 
demonstrate the absence of this aging effect, or to implement an aging management program if a loss of material has occurred.


The team reviewed the license renewal application, the aging management program evaluation report, and the list of components subject to selective leaching. The majority of the components consisted of gray cast iron piping and valves in the fire protection system. The team discussed the program evaluations and planned activities with the responsible staff.
The team reviewed the license renewal application, the aging management program evaluation report, and the list of components subject to selective leaching. The majority of the components consisted of gray cast iron piping and valves in the fire protection system. The team discussed the program evaluations and planned activities with the responsible staff.
Line 220: Line 214:
For the Selective Leaching program the team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effect of aging in components and systems subject to this mechanism. The team concluded that, if implemented as described, the applicant developed guidance would appropriately identify and address aging effects during the period of extended operation.
For the Selective Leaching program the team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effect of aging in components and systems subject to this mechanism. The team concluded that, if implemented as described, the applicant developed guidance would appropriately identify and address aging effects during the period of extended operation.


b.3 Evaluation of Existing Aging Management Programs  
b.3 Evaluation of Existing Aging Management Programs The team reviewed 16 of the 28 existing programs credited with aging management to determine whether the applicant had taken or planned to take appropriate actions to manage the effects of aging as described in the GALL Report and any related License Renewal Interim Staff Guidance (LR-ISG).
 
The team reviewed 16 of the 28 existing programs credited with aging management to determine whether the applicant had taken or planned to take appropriate actions to manage the effects of aging as described in the GALL Report and any related License Renewal Interim Staff Guidance (LR-ISG).


The team reviewed site-specific operating experience to determine whether there were any aging effects for the systems and components within the scope of these programs that had not been identified from the applicant's review of industry operating experience.
The team reviewed site-specific operating experience to determine whether there were any aging effects for the systems and components within the scope of these programs that had not been identified from the applicants review of industry operating experience.


The team evaluated whether the applicant implemented or planned to implement appropriate actions to manage the effects of aging. These programs had established procedures, records of past corrective actions, and previous operating experience related to applicable components. Some programs required enhancements and took exceptions (i.e., changes to program aspects that will be implemented prior to the period of extended operation) to be consistent with the GALL Report.
The team evaluated whether the applicant implemented or planned to implement appropriate actions to manage the effects of aging. These programs had established procedures, records of past corrective actions, and previous operating experience related to applicable components. Some programs required enhancements and took exceptions (i.e., changes to program aspects that will be implemented prior to the period of extended operation) to be consistent with the GALL Report.
Line 232: Line 224:
===.1 B.1.1 Bolting Integrity (XI.M18)===
===.1 B.1.1 Bolting Integrity (XI.M18)===


This was an existing program, consistent with the GALL Report, after one exception and three enhancements, credited with managing aging of safety-related and nonsafety-related closure bolting for pressure retaining components. The program included the selection of bolting materials and use of lubricants and sealants consistent with guidance in EPRI NP-5769, "Degradation and Failure of Bolting in Nuclear Power Plants," and recommendations provided in NUREG-1339, "Resolution of Generic Safety Issue 29: Bolting Degradation or Failure in Nuclear Power Plants," to prevent or mitigate degradation and failure of safety-related bolting. The applicant selected bolting materials, lubricants, and sealants in accordance with industry guidance. In addition, the applicant established torque values and restricted the use of molybdenum disulfide as specified in industry guidelines and manufacturer recommendations. Maintenance practices and bolting replacement activities included proper gasket activation, preload, torqueing, and fit-up of bolting in accordance with manufacturer, vendor, or industry recommendations.
This was an existing program, consistent with the GALL Report, after one exception and three enhancements, credited with managing aging of safety-related and nonsafety-related closure bolting for pressure retaining components. The program included the selection of bolting materials and use of lubricants and sealants consistent with guidance in EPRI NP-5769, Degradation and Failure of Bolting in Nuclear Power Plants, and recommendations provided in NUREG-1339, Resolution of Generic Safety Issue 29:
Bolting Degradation or Failure in Nuclear Power Plants, to prevent or mitigate degradation and failure of safety-related bolting. The applicant selected bolting materials, lubricants, and sealants in accordance with industry guidance. In addition, the applicant established torque values and restricted the use of molybdenum disulfide as specified in industry guidelines and manufacturer recommendations. Maintenance practices and bolting replacement activities included proper gasket activation, preload, torqueing, and fit-up of bolting in accordance with manufacturer, vendor, or industry recommendations.


The applicant requested an exception for this aging management program.
The applicant requested an exception for this aging management program.
Line 248: Line 241:
The team had no significant concerns with the enhancements.
The team had no significant concerns with the enhancements.


The team reviewed license renewal pr ogram documents, the aging management program evaluation report, plant operating experience, implementing procedures, and corrective action documents.
The team reviewed license renewal program documents, the aging management program evaluation report, plant operating experience, implementing procedures, and corrective action documents.


The team concluded that for the Bolting Integrity program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging for pressure retaining bolting. The team concluded that, if implemented as described, including the enhancements and exception, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.
The team concluded that for the Bolting Integrity program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging for pressure retaining bolting. The team concluded that, if implemented as described, including the enhancements and exception, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.
Line 254: Line 247:
===.2 B.1.5 Compressed Air Monitoring (XI.M24)===
===.2 B.1.5 Compressed Air Monitoring (XI.M24)===


This was an existing program, consistent with the GALL Report after enhancement, credited with managing the loss of material in compressed air systems by periodically monitoring the system air for moisture and contaminants and by inspecting system internal surfaces. The applicant's air system quality was being maintained in accordance with manufacturer recommendations, EPRI guidelines, and ASME and ANSI specifications.
This was an existing program, consistent with the GALL Report after enhancement, credited with managing the loss of material in compressed air systems by periodically monitoring the system air for moisture and contaminants and by inspecting system internal surfaces. The applicants air system quality was being maintained in accordance with manufacturer recommendations, EPRI guidelines, and ASME and ANSI specifications.


The applicant identified that enhancements were necessary to ensure consistency with  
The applicant identified that enhancements were necessary to ensure consistency with the GALL Report.
 
the GALL Report.


Enhancements For the Scope of the Program element, revise procedures to include the EDG starting air system.
Enhancements For the Scope of the Program element, revise procedures to include the EDG starting air system.


Enhancements For the Preventive Actions element, revise procedures to apply consideration of the guidance of ASME OM-S/G-1998 (Part 17); EPRI NP-7079; and EPRI TR-108147 to the  
Enhancements For the Preventive Actions element, revise procedures to apply consideration of the guidance of ASME OM-S/G-1998 (Part 17); EPRI NP-7079; and EPRI TR-108147 to the limits specified for the air system contaminants.
 
limits specified for the ai r system contaminants.


For Parameters Monitored or Inspected, Detection of Aging Effects, and Monitoring and Trending elements, revise procedures to include periodic and opportunistic visual inspections of accessible internal surfaces of system components including accumulators, flex hoses, and tubing of compressed air systems. Specify inspections at frequencies recommended in ASME OM-S/G-1998 (Part 17).
For Parameters Monitored or Inspected, Detection of Aging Effects, and Monitoring and Trending elements, revise procedures to include periodic and opportunistic visual inspections of accessible internal surfaces of system components including accumulators, flex hoses, and tubing of compressed air systems. Specify inspections at frequencies recommended in ASME OM-S/G-1998 (Part 17).
Line 296: Line 285:
===.4 B.1.10 External Surfaces Monitoring (XI.M36)===
===.4 B.1.10 External Surfaces Monitoring (XI.M36)===


This was an existing program, consistent with the GALL Report as modified by LR-ISG-2011-03, "Changes to the Generic Lessons Learned (GALL) Report Revision 2 Aging Management Program XI.M41, "Buried and Underground Piping and Tanks,"" and LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion under Insulation," after enhancement, credited with managing aging effects of loss of material, cracking, and change in material properties to external plant surfaces. The program used periodic inspections and walkdowns to monitor for material degradation and leakage, including coatings and insulation degradation, and loss of material. The program included confirmation of the integrity of coated surfaces as a means to effectively manage the effects of corrosion on metallic surfaces. Accessible mechanical components are inspected at least once per refueling cycle; inaccessible mechanical components or areas that have limited access caused by safety, security, or other considerations will be inspected when plant conditions permit, but at a frequency that will ensure the component's intended function is maintained. When required by the ASME Code, inspections are conducted in accordance with the code requirements. In the absence of such requirements, plant-specific visual inspections are performed of metallic surfaces using procedures implemented by inspectors qualified through plant programs. Component surfaces that are insulated and in an environment of condensation and insulated outdoor components are periodically inspected at such intervals that would ensure the component's intended  
This was an existing program, consistent with the GALL Report as modified by LR-ISG-2011-03, Changes to the Generic Lessons Learned (GALL) Report Revision 2 Aging Management Program XI.M41, Buried and Underground Piping and Tanks, and LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion under Insulation, after enhancement, credited with managing aging effects of loss of material, cracking, and change in material properties to external plant surfaces. The program used periodic inspections and walkdowns to monitor for material degradation and leakage, including coatings and insulation degradation, and loss of material. The program included confirmation of the integrity of coated surfaces as a means to effectively manage the effects of corrosion on metallic surfaces. Accessible mechanical components are inspected at least once per refueling cycle; inaccessible mechanical components or areas that have limited access caused by safety, security, or other considerations will be inspected when plant conditions permit, but at a frequency that will ensure the components intended function is maintained. When required by the ASME Code, inspections are conducted in accordance with the code requirements. In the absence of such requirements, plant-specific visual inspections are performed of metallic surfaces using procedures implemented by inspectors qualified through plant programs. Component surfaces that are insulated and in an environment of condensation and insulated outdoor components are periodically inspected at such intervals that would ensure the components intended function.
 
function.


The applicant identified that several enhancements were necessary to ensure consistency with the GALL Report as modified by LR-ISG-2011-03.
The applicant identified that several enhancements were necessary to ensure consistency with the GALL Report as modified by LR-ISG-2011-03.
Line 304: Line 291:
Enhancements For the Detection of Aging Effects element, revise procedures to:
Enhancements For the Detection of Aging Effects element, revise procedures to:
* Include instructions to perform a 100 percent visual inspection of accessible polymeric component surfaces. The visual inspection should identify indicators of loss of material caused by wear to include dimensional change, surface cracking, crazing, scuffing, and for flexible polymeric materials with internal reinforcement, the exposure of reinforcing fibers, mesh, or underlying metal. In addition, 10 percent of the available flexible polymeric surface area should be physically manipulated to augment the visual inspection to confirm the absence of hardening and loss of strength;
* Include instructions to perform a 100 percent visual inspection of accessible polymeric component surfaces. The visual inspection should identify indicators of loss of material caused by wear to include dimensional change, surface cracking, crazing, scuffing, and for flexible polymeric materials with internal reinforcement, the exposure of reinforcing fibers, mesh, or underlying metal. In addition, 10 percent of the available flexible polymeric surface area should be physically manipulated to augment the visual inspection to confirm the absence of hardening and loss of strength;
* Conduct representative inspections during each 10-year period of insulated surfaces of each material type (e.g., steel, stainless steel, copper alloy, aluminum) in an air-outdoor or condensation environments;
* Conduct representative inspections during each 10-year period of insulated surfaces of each material type (e.g., steel, stainless steel, copper alloy, aluminum)in an air-outdoor or condensation environments;
* Remove insulation in order to perform a visual inspection of a representative sample of insulated indoor component surfaces in an environment of condensation and outdoor component surfaces. The inspections shall include a minimum of 20 percent of the in-scope piping length for each material type (e.g., steel, stainless steel, copper alloy, aluminum), or for components with a configuration which does not conform to a 1- foot axial length determination, 20 percent of the surface area.
* Remove insulation in order to perform a visual inspection of a representative sample of insulated indoor component surfaces in an environment of condensation and outdoor component surfaces. The inspections shall include a minimum of 20 percent of the in-scope piping length for each material type (e.g., steel, stainless steel, copper alloy, aluminum), or for components with a configuration which does not conform to a 1- foot axial length determination, 20 percent of the surface area.


Alternatively, insulation can be removed and a minimum of 25 inspections performed that can be a combination of 1-foot axial length sections and individual components for each material type;
Alternatively, insulation can be removed and a minimum of 25 inspections performed that can be a combination of 1-foot axial length sections and individual components for each material type;
* Include inspection locations based on the likelihood of corrosion under insulation;
* Include inspection locations based on the likelihood of corrosion under insulation;
* Allow subsequent inspections to consist of an examination of the exterior surface of the insulation for indications of damage to the jacketing or protective outer layer of the insulation, if no loss of material caused by general, pitting or crevice corrosion, beyond that which could have been present during initial construction and no evidence of cracking is identified after the initial inspection;
* Allow subsequent inspections to consist of an examination of the exterior surface of the insulation for indications of damage to the jacketing or protective outer layer of the insulation, if no loss of material caused by general, pitting or crevice corrosion, beyond that which could have been present during initial construction and no evidence of cracking is identified after the initial inspection;
* Ensure that if the external visual inspections of the insulation reveal damage to the exterior surface of the insulation or there is evidence of water intrusion through the insulation, periodic inspections under the insulation will continue at such intervals that would ensure the component's intended function; Enhancements
* Ensure that if the external visual inspections of the insulation reveal damage to the exterior surface of the insulation or there is evidence of water intrusion through the insulation, periodic inspections under the insulation will continue at such intervals that would ensure the components intended function; Enhancements
* Provide guidance that removal of tightly adhering insulation that is impermeable to moisture is not required unless there is evidence of damage to the moisture barrier. However, the entire population of in-scope accessible piping component surfaces that have tightly adhering insulation will be visually inspected for damage to the moisture barrier with the same frequency as for other types of insulation inspections. These inspections will not be credited towards the inspection quantities for other types of insulation.
* Provide guidance that removal of tightly adhering insulation that is impermeable to moisture is not required unless there is evidence of damage to the moisture barrier.
 
However, the entire population of in-scope accessible piping component surfaces that have tightly adhering insulation will be visually inspected for damage to the moisture barrier with the same frequency as for other types of insulation inspections. These inspections will not be credited towards the inspection quantities for other types of insulation.


For the Acceptance Criteria element, include the following criteria:
For the Acceptance Criteria element, include the following criteria:
Line 323: Line 312:
The team reviewed the license renewal application, the NRC aging management program audit results, aging management program evaluation report, and program procedures. The team also reviewed site strategic external surfaces monitoring plans; operating experience evaluations, procedures, and external surfaces related condition reports. The team interviewed personnel and walked down areas of the plant containing in-scope external surfaces.
The team reviewed the license renewal application, the NRC aging management program audit results, aging management program evaluation report, and program procedures. The team also reviewed site strategic external surfaces monitoring plans; operating experience evaluations, procedures, and external surfaces related condition reports. The team interviewed personnel and walked down areas of the plant containing in-scope external surfaces.


For the External Surface Monitoring program, the team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended  
For the External Surface Monitoring program, the team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.
 
operation.


===.5 B.1.11 Fatigue Monitoring (X.M1)===
===.5 B.1.11 Fatigue Monitoring (X.M1)===
Line 331: Line 318:
This was identified as an existing program, consistent with the GALL Report after enhancement, credited with ensuring that fatigue usage remains within allowable limits for those components identified as having a fatigue Time-Limited Aging Analysis (TLAA).
This was identified as an existing program, consistent with the GALL Report after enhancement, credited with ensuring that fatigue usage remains within allowable limits for those components identified as having a fatigue Time-Limited Aging Analysis (TLAA).


The applicant implemented the program consistent with NUREG/CR-6260, "Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components," and NUREG/CR-6909, "Effects of LWR Coolant Environments on the Fatigue Life of Reactor Materials."
The applicant implemented the program consistent with NUREG/CR-6260, Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components, and NUREG/CR-6909, Effects of LWR Coolant Environments on the Fatigue Life of Reactor Materials.


The applicant implemented the objectives of the program by:
The applicant implemented the objectives of the program by:
: (1) tracking the number of critical thermal and pressure transients for selected components;
: (1) tracking the number of critical thermal and pressure transients for selected components;
: (2) verifying that the severity of monitored transients are bounded by the design transient definitions for which they are classified; and
: (2) verifying that the severity of monitored transients are bounded by the design transient definitions for which they are classified; and
: (3) assessing the impact of the reactor coolant environment on a sample set of critical components including those from NUREG/CR-6260 and those components identified to be more limiting than the components specified in NUREG/CR- 6260. The applicant's program provided for trending to ensure that the fatigue usage factor remains below the design limit during the period of extended  
: (3) assessing the impact of the reactor coolant environment on a sample set of critical components including those from NUREG/CR-6260 and those components identified to be more limiting than the components specified in NUREG/CR- 6260. The applicants program provided for trending to ensure that the fatigue usage factor remains below the design limit during the period of extended operation.
 
operation.


The applicant identified that enhancements were necessary to ensure consistency with the GALL Report.
The applicant identified that enhancements were necessary to ensure consistency with the GALL Report.
Line 344: Line 329:
Enhancements For the Scope of the Program element, revise procedures to:
Enhancements For the Scope of the Program element, revise procedures to:
* Monitor and track additional critical thermal and pressure transients for components that have been identified to have a TLAA including those high-energy line break locations with a cumulative usage factor (CUF) of greater than 0.1;
* Monitor and track additional critical thermal and pressure transients for components that have been identified to have a TLAA including those high-energy line break locations with a cumulative usage factor (CUF) of greater than 0.1;
* Develop a set of fatigue usage calculations that consider the effects of the reactor water environment on a sample of reactor coolant system components. This sample shall include the locations identified in NUREG/CR-6260 and additional plant-specific component locations in the reactor coolant pressure boundary if they are found to be more limiting than those considered in NUREG/CR-6260;  
* Develop a set of fatigue usage calculations that consider the effects of the reactor water environment on a sample of reactor coolant system components. This sample shall include the locations identified in NUREG/CR-6260 and additional plant-specific component locations in the reactor coolant pressure boundary if they are found to be more limiting than those considered in NUREG/CR-6260; For the Detection of Aging Effects element, revise procedures to provide updates of the fatigue usage calculations on an as-needed basis if an allowable cycle limit is approached or in a case where a transient definition has been changed, unanticipated new thermal events are discovered, or the geometry of components have been modified.
 
For the Detection of Aging Effects element, revise procedures to provide updates of the fatigue usage calculations on an as-needed basis if an allowable cycle limit is approached or in a case where a transient definition has been changed, unanticipated new thermal events are discovered, or the geometry of components have been modified.


The team had no significant concerns with the enhancements.
The team had no significant concerns with the enhancements.


The team reviewed the aging management program evaluation report, plant fatigue transient reviews, condition reports, and summaries of associated plant and industry operating experience. The team also reviewed the Procedure PE-002-003, "Fatigue Monitoring Program," Revision 5, which established a thermal and pressure transient and fatigue monitoring program. In addition, the team reviewed calculation 1400394.302, "Waterford-3 Plant Fatigue Transient Review," Revision 0, which established the set of plant transient events that needed to be tracked from plant start-up through April 5, 2014, and interviewed plant personnel.
The team reviewed the aging management program evaluation report, plant fatigue transient reviews, condition reports, and summaries of associated plant and industry operating experience. The team also reviewed the Procedure PE-002-003, Fatigue Monitoring Program, Revision 5, which established a thermal and pressure transient and fatigue monitoring program. In addition, the team reviewed calculation 1400394.302, Waterford-3 Plant Fatigue Transient Review, Revision 0, which established the set of plant transient events that needed to be tracked from plant start-up through April 5, 2014, and interviewed plant personnel.


The team concluded that for the Fatigue Monitoring program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the plant transient events that are required to be tracked under this program. The team concluded that, if implemented as described including the enhancements, the applicant pr ovided guidance that would appropriately identify and address aging effects during the period of extended operation.
The team concluded that for the Fatigue Monitoring program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the plant transient events that are required to be tracked under this program. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.


===.6 B.1.12 Fire Protection (XI.M26)===
===.6 B.1.12 Fire Protection (XI.M26)===


This was an existing program, consistent with the GALL Report after enhancement, credited with managing aging effects for penetration seals, fire barrier walls, ceilings, floors, other fire resistance materials that serve an intended fire barrier function, and all fire-rated doors that perform a fire barrier function. The applicant planned to manage the effects of aging through visual inspections and functional testing. The applicant visually inspected 10 percent of each type of fire-rated penetration seal every 18 months, and visually inspected fire barrier walls, ceilings, and floors, including coatings and wraps at least once every refueling cycle examining for any signs of aging such as cracking, spalling, and loss of material. Fire doors are visually inspected and are functionally  
This was an existing program, consistent with the GALL Report after enhancement, credited with managing aging effects for penetration seals, fire barrier walls, ceilings, floors, other fire resistance materials that serve an intended fire barrier function, and all fire-rated doors that perform a fire barrier function. The applicant planned to manage the effects of aging through visual inspections and functional testing. The applicant visually inspected 10 percent of each type of fire-rated penetration seal every 18 months, and visually inspected fire barrier walls, ceilings, and floors, including coatings and wraps at least once every refueling cycle examining for any signs of aging such as cracking, spalling, and loss of material. Fire doors are visually inspected and are functionally tested every 18 months in accordance with surveillance requirements. Where fire damper housings were in duct work, they are included in the HVAC systems program.
 
tested every 18 months in accordance with surveillance requirements. Where fire damper housings were in duct work, they are included in the HVAC systems program.


In-wall fire damper housings are included in structural aging management reviews.
In-wall fire damper housings are included in structural aging management reviews.


The applicant does not have Halon or CO 2 fire suppression systems. Freeze-thaw is not significant as the station is located in a temperate weather area, identified by ASTM C 33-90, "Standard Specification for Concrete Aggregates," and concrete structures and components are designed and constructed in accordance with ACI-318, "Building Code Requirements for Structural Concrete" requirements.
The applicant does not have Halon or CO2 fire suppression systems. Freeze-thaw is not significant as the station is located in a temperate weather area, identified by ASTM C 33-90, Standard Specification for Concrete Aggregates, and concrete structures and components are designed and constructed in accordance with ACI-318, Building Code Requirements for Structural Concrete requirements.


The applicant identified that enhancements were necessary to ensure consistency with  
The applicant identified that enhancements were necessary to ensure consistency with the GALL Report.
 
the GALL Report.


Enhancements For the Detection of Aging Effects element, revise procedures to:
Enhancements For the Detection of Aging Effects element, revise procedures to:
* Include an inspection of fire barrier walls, ceilings, and floors for any signs of degradation such as spalling or loss of material caused by chemical attack, or reaction with aggregates at least once every refueling cycle;
* Include an inspection of fire barrier walls, ceilings, and floors for any signs of degradation such as spalling or loss of material caused by chemical attack, or reaction with aggregates at least once every refueling cycle;
* Inspect fire-rated doors for any degradation of door surfaces at least once per refueling cycle;
* Inspect fire-rated doors for any degradation of door surfaces at least once per refueling cycle;
* Ensure fire barrier seals are inspected by personnel qualified in accordance with appropriate NFPA standards;  
* Ensure fire barrier seals are inspected by personnel qualified in accordance with appropriate NFPA standards; For the Acceptance Criteria element, revise procedures to provide the following acceptance criteria:
 
For the Acceptance Criteria element, revise procedures to provide the following acceptance criteria:
* No significant indications of concrete spalling, and loss of material of fire barrier walls, ceilings, and floors and in other fire barrier materials;
* No significant indications of concrete spalling, and loss of material of fire barrier walls, ceilings, and floors and in other fire barrier materials;
* No surface degradation of fire doors.
* No surface degradation of fire doors.
Line 379: Line 356:
The team identified no significant concerns with the enhancements.
The team identified no significant concerns with the enhancements.


On June 27, 2016, the NRC issued a license amendment authorizing the transition of the applicant's fire protection program to a risk informed, performance-based program based on the 2001 Edition of National Fire Protection Association (NFPA) Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generation Plants.The applicant had transitioned their fire protection program in accordance with Amendment 248 of the facility operating license. The team reviewed program documents associated with the approved fire protection program.
On June 27, 2016, the NRC issued a license amendment authorizing the transition of the applicants fire protection program to a risk informed, performance-based program based on the 2001 Edition of National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generation Plants. The applicant had transitioned their fire protection program in accordance with Amendment 248 of the facility operating license. The team reviewed program documents associated with the approved fire protection program.


The team reviewed the scoping drawings, implementing procedures, program enhancements including procedure markups to implement the enhancements, completed surveillance tests, work orders, plant operating experience, and corrective action documents. The team interviewed fire protection personnel, and walked down a sample of fire barriers and equipment to observe the material condition of the barriers and to assess the effectiveness of the existing program.
The team reviewed the scoping drawings, implementing procedures, program enhancements including procedure markups to implement the enhancements, completed surveillance tests, work orders, plant operating experience, and corrective action documents. The team interviewed fire protection personnel, and walked down a sample of fire barriers and equipment to observe the material condition of the barriers and to assess the effectiveness of the existing program.
Line 387: Line 364:
===.7 B.1.13 Fire Water System (XI.M27)===
===.7 B.1.13 Fire Water System (XI.M27)===


This was an existing program, consistent with the GALL Report as modified by LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion under Insulation," after enhancement and exception, credited with managing loss of material, flow blockage caused by fouling, and loss of coating integrity for in-scope long-lived, passive, water-based fire suppression system components using periodic flow testing and visual inspections in accordance with the 2011 edition of NFPA 25, "Standard for the Inspection, Testing, and Maintenance of  
This was an existing program, consistent with the GALL Report as modified by LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion under Insulation, after enhancement and exception, credited with managing loss of material, flow blockage caused by fouling, and loss of coating integrity for in-scope long-lived, passive, water-based fire suppression system components using periodic flow testing and visual inspections in accordance with the 2011 edition of NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems. The program is credited with managing loss of material in systems including dry-pipe systems downstream of manual isolation valves or deluge valves which may not drain correctly or allow water to collect in piping sections.
 
Water-Based Fire Protection Systems.The program is credited with managing loss of  
 
material in systems including dry-pipe systems downstream of manual isolation valves or deluge valves which may not drain correctly or allow water to collect in piping sections.


System flow testing, including that of underground headers, hose stations, main drains, and selected inspector test valves are performed to ensure the system maintains its intended function. Fire suppression water system parameters monitored during periodic flow testing are fire pump discharge pressure, pressure at fire hydrants and local areas being tested (e.g., local static and flow pressure at main drain valves being opened for testing). Fire water system pressure is continuously monitored such that a loss of pressure is immediately detected and corrective action is initiated. When visual inspections are used to detect loss of material and fouling, the inspection technique used will be capable of detecting surface irregularities that could indicate wall loss caused by corrosion, corrosion product deposition, and flow blockage caused by fouling.
System flow testing, including that of underground headers, hose stations, main drains, and selected inspector test valves are performed to ensure the system maintains its intended function. Fire suppression water system parameters monitored during periodic flow testing are fire pump discharge pressure, pressure at fire hydrants and local areas being tested (e.g., local static and flow pressure at main drain valves being opened for testing). Fire water system pressure is continuously monitored such that a loss of pressure is immediately detected and corrective action is initiated. When visual inspections are used to detect loss of material and fouling, the inspection technique used will be capable of detecting surface irregularities that could indicate wall loss caused by corrosion, corrosion product deposition, and flow blockage caused by fouling.
Line 399: Line 372:
Exceptions For the Detection of Aging Effects element:
Exceptions For the Detection of Aging Effects element:
* NFPA 25, Section 5.2.1 specifies annual sprinkler inspections. The applicant performs the sprinkler inspections every refueling cycle;
* NFPA 25, Section 5.2.1 specifies annual sprinkler inspections. The applicant performs the sprinkler inspections every refueling cycle;
* NFPA 25, Section 6.3.1 specifies flow test ing every five years at the hydraulically most remote hose connections of each zone of an automatic standpipe system to verify the water supply still provides the design pressure at the required flow. The applicant performs main header flow testing in the main headers that supply the standpipe system to verify the water supply provides the design pressure and required flow;
* NFPA 25, Section 6.3.1 specifies flow testing every five years at the hydraulically most remote hose connections of each zone of an automatic standpipe system to verify the water supply still provides the design pressure at the required flow. The applicant performs main header flow testing in the main headers that supply the standpipe system to verify the water supply provides the design pressure and required flow;
* NFPA 25, Section 13.2.5 specifies annual main drain tests at each water based system riser to determine if there is a change in the condition of the water piping and control valves. The applicant performs the main drain tests every refueling cycle;
* NFPA 25, Section 13.2.5 specifies annual main drain tests at each water based system riser to determine if there is a change in the condition of the water piping and control valves. The applicant performs the main drain tests every refueling cycle;
* NFPA 25, Section 14.2 specifies performing an internal inspection of the wet and dry fire water piping at least every five years. The applicant performs full flow testing of the piping downstream of the deluge valves for transformers, but does not perform an internal inspection on the dry piping downstream of the deluge  
* NFPA 25, Section 14.2 specifies performing an internal inspection of the wet and dry fire water piping at least every five years. The applicant performs full flow testing of the piping downstream of the deluge valves for transformers, but does not perform an internal inspection on the dry piping downstream of the deluge valves for the transformers;
* NFPA 25, Section 9.2.7.1 specifies an evaluation of interior tank coatings in accordance with the adhesion test of ASTM D 3359, Standard Test Methods for Measuring Adhesion by Tape Test, generally referred to as the cross-hatch test.


valves for the transformers;
The applicant inspects the tank interior coating for damage, chips, blisters, peeling, pinholes, rust, or any local or general failure of the coating every five years. In addition, the applicant performs ultrasonic thickness checks or mechanical measurements of any identified corroded areas. The applicant does not apply the cross-hatch test;
* NFPA 25, Section 9.2.7.1 specifies an evaluation of interior tank coatings in accordance with the adhesion test of ASTM D 3359, Standard Test Methods for Measuring Adhesion by Tape Test, generally referred to as the "cross-hatch test."  The applicant inspects the tank interior coating for damage, chips, blisters, peeling, pinholes, rust, or any local or general failure of the coating every five years. In addition, the applicant performs ultrasonic thickness checks or mechanical measurements of any identified corroded areas. The applicant does not apply the cross-hatch test;
* NFPA 25, Section 13.4.3.2.3 requires preaction valves to be trip tested every three years with the control valve fully open. The applicant trip tests the preaction valves with the manual isolation valve closed.
* NFPA 25, Section 13.4.3.2.3 requires preaction valves to be trip tested every three       years with the control valve fully open. The applicant trip tests the preaction valves     with the manual isolation valve closed.


The team noted that several exceptions were taken to the annual testing periodicity recommendations in Table 4a of LR-ISG-2012-02, because access for some inspections is feasible only during refueling outages. This exception is allowed by LR-ISG-2012-02.
The team noted that several exceptions were taken to the annual testing periodicity recommendations in Table 4a of LR-ISG-2012-02, because access for some inspections is feasible only during refueling outages. This exception is allowed by LR-ISG-2012-02.
Line 416: Line 389:
Enhancements
Enhancements
* Inspect for loss of fluid in the glass bulb heat responsive elements;
* Inspect for loss of fluid in the glass bulb heat responsive elements;
* Perform an inspection of each building's wet pipe fire water system every five years by opening a flushing connection at the end of one main and by removing a sprinkler toward the end of one branch line to allow for inspection of the interior for evidence of loss of material and the presence of foreign organic or inorganic material that could result in flow obstructions or blockage of a sprinkler head. The inspection method used shall be capable of detecting surface irregularities that could indicate wall loss below nominal pipe wall thickness caused by corrosion, corrosion product deposition, and flow blockage caused by fouling. Ensure procedures require a follow-up volumetric wall thickness evaluation where irregularities are detected;
* Perform an inspection of each buildings wet pipe fire water system every five years by opening a flushing connection at the end of one main and by removing a sprinkler toward the end of one branch line to allow for inspection of the interior for evidence of loss of material and the presence of foreign organic or inorganic material that could result in flow obstructions or blockage of a sprinkler head. The inspection method used shall be capable of detecting surface irregularities that could indicate wall loss below nominal pipe wall thickness caused by corrosion, corrosion product deposition, and flow blockage caused by fouling. Ensure procedures require a follow-up volumetric wall thickness evaluation where irregularities are detected;
* Perform an internal inspection every five years for evidence of loss of material and the presence of foreign organic or inorganic material that could result in flow obstructions or blockage of a sprinkler head of the dry piping downstream of preaction valves. The inspection shall be performed by opening a flushing connection, removing the most remote sprinkler head, and using a method capable of detecting surface irregularities that could indicate wall loss below nominal pipe wall thickness caused by corrosion, corrosion product deposition, and flow blockage caused by fouling;
* Perform an internal inspection every five years for evidence of loss of material and the presence of foreign organic or inorganic material that could result in flow obstructions or blockage of a sprinkler head of the dry piping downstream of preaction valves. The inspection shall be performed by opening a flushing connection, removing the most remote sprinkler head, and using a method capable of detecting surface irregularities that could indicate wall loss below nominal pipe wall thickness caused by corrosion, corrosion product deposition, and flow blockage caused by fouling;
* Perform preaction valve trip testing every three years with the manual isolation valve closed;
* Perform preaction valve trip testing every three years with the manual isolation valve closed;
* Perform an inspection of the nozzles associated with the charcoal filters for loss of material and foreign or organic material when the charcoal is replaced;
* Perform an inspection of the nozzles associated with the charcoal filters for loss of material and foreign or organic material when the charcoal is replaced;
* Inspect the interior of the fire water tanks in accordance with NFPA 25         (2011 Edition) Sections 9.2.6 and 9.2.7 including sub-steps;
* Inspect the interior of the fire water tanks in accordance with NFPA 25 (2011 Edition) Sections 9.2.6 and 9.2.7 including sub-steps;
* Remove strainers every 5 years and after each actuation to clean and inspect for damage and corroded parts;
* Remove strainers every 5 years and after each actuation to clean and inspect for damage and corroded parts;
* Specify that sprinkler heads are tested or replaced in accordance with NFPA-25 (2011 Edition), Section 5.3.1;
* Specify that sprinkler heads are tested or replaced in accordance with NFPA-25 (2011 Edition), Section 5.3.1;
* Conduct a flow test or flush sufficient to detect potential flow blockage, or conduct a visual inspection of 100 percent of the internal surface of piping segments that cannot be drained or piping segments that allow water to collect in each 5-year interval, beginning 5 years prior to the period of extended operation;
* Conduct a flow test or flush sufficient to detect potential flow blockage, or conduct a visual inspection of 100 percent of the internal surface of piping segments that cannot be drained or piping segments that allow water to collect in each 5-year interval, beginning 5 years prior to the period of extended operation;
* Perform volumetric wall thickness inspections of 20 percent of the length of piping segments that cannot be drained or piping segments that allow water to collect each 5-year interval of the period of extended operation. Measurement points shall be obtained to the extent that each potential degraded condition can be identified (e.g., general corrosion, microbiologically-induced corrosion). The         20 percent of piping that is inspected in each 5-year interval is in different                 locations than previously inspected piping; Enhancements
* Perform volumetric wall thickness inspections of 20 percent of the length of piping segments that cannot be drained or piping segments that allow water to collect each 5-year interval of the period of extended operation. Measurement points shall be obtained to the extent that each potential degraded condition can be identified (e.g., general corrosion, microbiologically-induced corrosion). The 20 percent of piping that is inspected in each 5-year interval is in different locations than previously inspected piping; Enhancements
* Perform a blockage evaluation if the flowing pressure decreases by more than 10 percent from the original main drain test or previous main drain tests;
* Perform a blockage evaluation if the flowing pressure decreases by more than 10 percent from the original main drain test or previous main drain tests;
* Trip test with flow the deluge valve systems for the main turbine lube oil tank and main feedwater pumps at least once every 18 months. If obstructions are found the system shall be cleaned and retested;
* Trip test with flow the deluge valve systems for the main turbine lube oil tank and main feedwater pumps at least once every 18 months. If obstructions are found the system shall be cleaned and retested;
* Open and close hydrant valves slowly wh ile performing flow tests to prevent surges in the system. The program shall also require full opening of the hydrant valve;
* Open and close hydrant valves slowly while performing flow tests to prevent surges in the system. The program shall also require full opening of the hydrant valve;
* Verify the hydrants drain within 60 minutes after flushing or flow testing;
* Verify the hydrants drain within 60 minutes after flushing or flow testing;
* Perform vacuum box testing on the bottom of the tank to identify leaks, or in the event the bottom of the fire water tank is uneven, the station will perform a suitable NDE technique rather than vacuum box testing to identify leaks;
* Perform vacuum box testing on the bottom of the tank to identify leaks, or in the event the bottom of the fire water tank is uneven, the station will perform a suitable NDE technique rather than vacuum box testing to identify leaks;
Line 439: Line 412:
: (5) ultrasonic testing is performed where there is evidence of pitting or corrosion to ensure the tank meets minimum wall thickness requirements;
: (5) ultrasonic testing is performed where there is evidence of pitting or corrosion to ensure the tank meets minimum wall thickness requirements;
: (6) an evaluation is performed to ensure downstream flow blockage is not a concern; and
: (6) an evaluation is performed to ensure downstream flow blockage is not a concern; and
: (7) a follow-up inspection is scheduled to be  
: (7) a follow-up inspection is scheduled to be performed within two years and every two years after that until the coating is repaired, replaced, or removed;
 
performed within two years and every two years after that until the coating is repaired, replaced, or removed;
* Determine the extent of coating defects on the interior of the fire water tanks by using one or more of the following methods when conditions such as cracking, peeling, blistering, delamination, rust, or flaking are identified during visual examination:
* Determine the extent of coating defects on the interior of the fire water tanks by using one or more of the following methods when conditions such as cracking, peeling, blistering, delamination, rust, or flaking are identified during visual examination:
: (1) lightly tapping and scraping the coating to determine the coating integrity;
: (1) lightly tapping and scraping the coating to determine the coating integrity;
: (2) dry film thickness measurements at random locations to determine Enhancements overall thickness of the coating;
: (2) dry film thickness measurements at random locations to determine Enhancements overall thickness of the coating;
: (3) wet-sponge testing or dry film testing to identify holidays in the coating;
: (3) wet-sponge testing or dry film testing to identify holidays in the coating;
: (4) adhesion testing in accordance with ASTM D3359, ASTM D4541, or equivalent testing endorsed by Regulatory         Guide 1.54 at a minimum of three locations;
: (4) adhesion testing in accordance with ASTM D3359, ASTM D4541, or equivalent testing endorsed by Regulatory Guide 1.54 at a minimum of three locations;
: (5) ultrasonic testing where there is evidence of pitting or corrosion to determine if the tank thickness meets the minimum thickness criteria; For the Acceptance Criteria element, include criteria for:
: (5) ultrasonic testing where there is evidence of pitting or corrosion to determine if the tank thickness meets the minimum thickness criteria; For the Acceptance Criteria element, include criteria for:
* Fire water tanks' interior coating that include:
* Fire water tanks interior coating that include:
: (1) indications of peeling and delamination are not acceptable;
: (1) indications of peeling and delamination are not acceptable;
: (2) blisters are evaluated by a coatings specialist qualified in accordance with an ASTM International standard endorsed in RG 1.54 including staff limitations associated with use of a particular standard;
: (2) blisters are evaluated by a coatings specialist qualified in accordance with an ASTM International standard endorsed in RG 1.54 including staff limitations associated with use of a particular standard;
: (3) blisters should be limited to a few intact small blisters that are completely surrounded by sound coating/lining bonded to the substrate. Blister size and frequency should not be increasing between inspections (e.g., reference ASTM D714-02, "Standard Test Method for Evaluating Degree of Blistering of Paints");
: (3) blisters should be limited to a few intact small blisters that are completely surrounded by sound coating/lining bonded to the substrate. Blister size and frequency should not be increasing between inspections (e.g., reference ASTM D714-02, Standard Test Method for Evaluating Degree of Blistering of Paints);
: (4) indications such as cracking, flaking, and rusting are to be ev aluated by a coatings specialist qualified in accordance with an ASTM International standard endorsed in RG 1.54 including staff limitations associated with use of a particular standard; As applicable, wall thickness measurements, projected to the next inspection, meet design minimum wall requirements;
: (4) indications such as cracking, flaking, and rusting are to be evaluated by a coatings specialist qualified in accordance with an ASTM International standard endorsed in RG 1.54 including staff limitations associated with use of a particular standard; As applicable, wall thickness measurements, projected to the next inspection, meet design minimum wall requirements;
: (5) when conducting adhesion testing, results meet or exceed the degree of adhesion recommended in plant-specific design requirements specific to the coating/lining and substrate;
: (5) when conducting adhesion testing, results meet or exceed the degree of adhesion recommended in plant-specific design requirements specific to the coating/lining and substrate;
* No abnormal debris (i.e., no corrosion products that could impede flow or cause downstream components to become clogged). Any signs of abnormal corrosion or blockage will be removed, its source and extent of condition determined and corrected, and entered into the corrective action program.
* No abnormal debris (i.e., no corrosion products that could impede flow or cause downstream components to become clogged). Any signs of abnormal corrosion or blockage will be removed, its source and extent of condition determined and corrected, and entered into the corrective action program.
Line 460: Line 431:
* Perform an obstruction evaluation if any of the following conditions exist:
* Perform an obstruction evaluation if any of the following conditions exist:
: (1) there is an obstructive discharge of material during routine flow tests;
: (1) there is an obstructive discharge of material during routine flow tests;
: (2) an inspector's test valve is clogged during routine testing;
: (2) an inspectors test valve is clogged during routine testing;
: (3) foreign materials are identified during internal inspections;
: (3) foreign materials are identified during internal inspections;
: (4) sprinkler heads are found clogged during removal or testing;
: (4) sprinkler heads are found clogged during removal or testing;
: (5) pin hole leaks are identified in fire water piping;
: (5) pin hole leaks are identified in fire water piping;
: (6) after an extended fire water system shutdown (greater than one year);
: (6) after an extended fire water system shutdown (greater than one year);
: (7) there is a         50 percent increase in time it takes for water to flow out the inspector test valve           after the associated dry valve is tripped when compared to the original acceptance criteria or last test.
: (7) there is a 50 percent increase in time it takes for water to flow out the inspector test valve after the associated dry valve is tripped when compared to the original acceptance criteria or last test.
* Evaluate for microbiologically-induced corrosion if tubercles or slime are identified during any internal inspections of fire water piping.
* Evaluate for microbiologically-induced corrosion if tubercles or slime are identified during any internal inspections of fire water piping.


The enhancements included revisions to program procedures to ensure compliance with applicable sections of Table 4a of LR-ISG-2012-02, "Fire Water System Inspection and Testing Recommendations.The applicant revised several of the originally identified enhancements in subsequent responses to NRC Request for Information correspondence. The team identified no significant concerns related to the enhancements.
The enhancements included revisions to program procedures to ensure compliance with applicable sections of Table 4a of LR-ISG-2012-02, Fire Water System Inspection and Testing Recommendations. The applicant revised several of the originally identified enhancements in subsequent responses to NRC Request for Information correspondence. The team identified no significant concerns related to the enhancements.


The team verified that the applicant performed the following types of specific activities, as required by their Technical Requirements Manual in accordance with applicable NFPA codes:
The team verified that the applicant performed the following types of specific activities, as required by their Technical Requirements Manual in accordance with applicable NFPA codes:
Line 475: Line 446:
: (3) visually inspecting spray and sprinkler headers for signs of degradation and blockage.
: (3) visually inspecting spray and sprinkler headers for signs of degradation and blockage.


The team reviewed license renewal doc uments, the aging management program evaluation report, implementing procedures, program enhancements including recent procedure revisions, plant operating experience, corrective action documents, completed work orders, and surveillance tests. The team interviewed plant personnel and walked down fire water system equipment, including the fire pumps, fire water storage tanks, and associated piping. On June 27, 2016, the NRC issued a license amendment authorizing the transition of the applicant's fire protection program to a risk informed, performance-based program based on the 2001 Edition of NFPA Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generation Plants.The applicant had transitioned their fire protection program in accordance with Amendment 248 of the facility operating license. The team reviewed program documents associated with the approved fire protection program.
The team reviewed license renewal documents, the aging management program evaluation report, implementing procedures, program enhancements including recent procedure revisions, plant operating experience, corrective action documents, completed work orders, and surveillance tests. The team interviewed plant personnel and walked down fire water system equipment, including the fire pumps, fire water storage tanks, and associated piping. On June 27, 2016, the NRC issued a license amendment authorizing the transition of the applicants fire protection program to a risk informed, performance-based program based on the 2001 Edition of NFPA Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generation Plants. The applicant had transitioned their fire protection program in accordance with Amendment 248 of the facility operating license. The team reviewed program documents associated with the approved fire protection program.


The team concluded that for the Fire Water System program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described including the enhancements and exceptions, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.
The team concluded that for the Fire Water System program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described including the enhancements and exceptions, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.
Line 481: Line 452:
===.8 B.1.14 Flow-Accelerated Corrosion (XI.M17)===
===.8 B.1.14 Flow-Accelerated Corrosion (XI.M17)===


This was an existing program, consistent with the GALL Report after enhancement, credited with maintaining the structural integrity of carbon steel piping and valve bodies containing two-phase and single-phase fluids. The applicant implemented the program consistent with EPRI NSAC-202L, "Recommendations for an Effective Flow Accelerated Corrosion Program," Revisions 2 and 3.
This was an existing program, consistent with the GALL Report after enhancement, credited with maintaining the structural integrity of carbon steel piping and valve bodies containing two-phase and single-phase fluids. The applicant implemented the program consistent with EPRI NSAC-202L, Recommendations for an Effective Flow Accelerated Corrosion Program, Revisions 2 and 3.


The applicant implemented the objectives of the program by:
The applicant implemented the objectives of the program by:
Line 487: Line 458:
: (2) conducting appropriate analysis to predict wall thinning;
: (2) conducting appropriate analysis to predict wall thinning;
: (3) performing wall thickness measurements based on wall thinning predictions and operating experience; and
: (3) performing wall thickness measurements based on wall thinning predictions and operating experience; and
: (4) evaluating measurement results to determine the remaining service life and the need for replacement or repair of components. The team determined the applicant used procedures and methods in the flow accelerated corrosion program consistent with their commitments to Bulletin 87-01, "Thinning of Pipe Wall in Nuclear Power Plants," and Generic Letter 89-08, "Erosion/Corrosion Induced Pipe Wall Thinning."
: (4) evaluating measurement results to determine the remaining service life and the need for replacement or repair of components. The team determined the applicant used procedures and methods in the flow accelerated corrosion program consistent with their commitments to Bulletin 87-01, Thinning of Pipe Wall in Nuclear Power Plants, and Generic Letter 89-08, Erosion/Corrosion Induced Pipe Wall Thinning.


The applicant identified that enhancements were necessary to ensure consistency with the GALL Report.
The applicant identified that enhancements were necessary to ensure consistency with the GALL Report.
Line 505: Line 476:
The team concluded that for the Flow-Accelerated Corrosion program, the applicant had performed appropriate evaluations and had considered pertinent industry experience and plant operating history to determine the effects of aging on carbon steel piping and valves. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.
The team concluded that for the Flow-Accelerated Corrosion program, the applicant had performed appropriate evaluations and had considered pertinent industry experience and plant operating history to determine the effects of aging on carbon steel piping and valves. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.


===.9 B.1.17 Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems (XI.M23)===
===.9 B.1.17 Inspection of Overhead Heavy Load and Light Load (Related to Refueling)===


Handling Systems (XI.M23)
This was an existing program, consistent with the GALL Report after enhancement, credited with managing the loss of material resulting from corrosion and rail wear for all cranes, trolley, and hoist structural components, fuel handling equipment, and rails. The cranes and hoists in the scope of the program are:
This was an existing program, consistent with the GALL Report after enhancement, credited with managing the loss of material resulting from corrosion and rail wear for all cranes, trolley, and hoist structural components, fuel handling equipment, and rails. The cranes and hoists in the scope of the program are:
* Reactor containment building polar crane
* Reactor containment building polar crane
Line 514: Line 486:
* Boom crane and monorails located in the reactor building, turbine building, auxiliary facilities, and yard structures.
* Boom crane and monorails located in the reactor building, turbine building, auxiliary facilities, and yard structures.


The team determined the applicant established inspection requirements consistent with the guidance contained in NUREG 0612, "Control of Heavy Loads at Nuclear Power Plants," for heavy load handling systems that can directly or indirectly cause a release of radioactive material, applicable industry standards (i.e., Crane Manufacturers Association of America Specification 70) for other cranes within the scope of license renewal, and applicable OSHA regulations (29 CFR Volume XVII, Section 1910.179).
The team determined the applicant established inspection requirements consistent with the guidance contained in NUREG 0612, Control of Heavy Loads at Nuclear Power Plants, for heavy load handling systems that can directly or indirectly cause a release of radioactive material, applicable industry standards (i.e., Crane Manufacturers Association of America Specification 70) for other cranes within the scope of license renewal, and applicable OSHA regulations (29 CFR Volume XVII, Section 1910.179).


The team determined that the applicant included the specific inspection requirements in preventative maintenance basis documents.
The team determined that the applicant included the specific inspection requirements in preventative maintenance basis documents.


The applicant identified enhancements were necessary to ensure consistency with the  
The applicant identified enhancements were necessary to ensure consistency with the GALL Report.


GALL Report.
Enhancements For the Parameters Monitored element, revise procedures to specify monitoring of crane rails for loss of material caused by wear, monitoring structural components of the bridge, trolley and hoists for deformation, cracking and loss of material caused by corrosion and monitor structural connections for loose or missing bolts, nuts, pins, or rivets and any other conditions indicative of loss of bolting integrity.


Enhancements For the Parameters Monitored element, revise procedures to specify monitoring of crane rails for loss of material caused by wear, monitoring structural components of the bridge, trolley and hoists for deformation, cracking and loss of material caused by corrosion and monitor structural connections for loose or missing bolts, nuts, pins, or rivets and any other conditions indicative of loss of bolting integrity.
For the Detection of Aging Effects element, revise procedures to specify inspection frequency in accordance with ASME B30.2 or other appropriate standard in the ASME B30 series. Infrequently used cranes and hoists will be inspected prior to use.


For the Detection of Aging Effects element, revise procedures to specify inspection frequency in accordance with ASME B30.2 or other appropriate standard in the ASME B30 series. Infrequently used cranes and hoists will be inspected prior to use. Bolted connections will be visually inspected for loose or missing bolts, nuts, pins, or rivets at the same frequency as crane rails and structural components.
Bolted connections will be visually inspected for loose or missing bolts, nuts, pins, or rivets at the same frequency as crane rails and structural components.


For the Acceptance Criteria element, revise procedures to require that significant loss of material caused by wear of crane rails and any sign of loss of bolting integrity will be evaluated in accordance with ASME B30.2 or other appropriate standard in the ASME B30 series; For the Corrective Action element, revise procedures to specify that maintenance and repair activities will utilize the guidance provided in ASME B30.2 or other appropriate standard in the ASME B30 series.
For the Acceptance Criteria element, revise procedures to require that significant loss of material caused by wear of crane rails and any sign of loss of bolting integrity will be evaluated in accordance with ASME B30.2 or other appropriate standard in the ASME B30 series; For the Corrective Action element, revise procedures to specify that maintenance and repair activities will utilize the guidance provided in ASME B30.2 or other appropriate standard in the ASME B30 series.


The team had no significant concerns with the enhancements.
The team had no significant concerns with the enhancements.


The team reviewed license renewal program basis documents, aging management review documents, existing procedures and surveillances, and surveillance results. In addition, the team searched the applicant's corrective action database for relevant condition reports. The team walked down accessible cranes and trolleys, interviewed maintenance personnel and engineers, and reviewed completed crane maintenance  
The team reviewed license renewal program basis documents, aging management review documents, existing procedures and surveillances, and surveillance results. In addition, the team searched the applicants corrective action database for relevant condition reports. The team walked down accessible cranes and trolleys, interviewed maintenance personnel and engineers, and reviewed completed crane maintenance work orders.
 
work orders.


For the Inspection of Overhead Heavy Load and Light Load (Related to Refueling)
For the Inspection of Overhead Heavy Load and Light Load (Related to Refueling)
Line 541: Line 511:
This was an existing program, consistent with the GALL Report after enhancement, credited with managing cracking of masonry walls, as well as degradation of the structural steel restraint systems of the masonry walls. This program contained inspection guidelines and listed attributes that caused aging of masonry walls, which were monitored during structural inspections, as well as established examination criteria, evaluation requirements, and acceptance criteria. The applicant included reinforced masonry walls in proximity to safety-related components within the scope of the program if the wall could collapse and damage the components or removable walls stacked to allow equipment removal. The team discussed the program with cognizant engineers and walked down and examined accessible masonry block walls including structural steel supports to assess their condition.
This was an existing program, consistent with the GALL Report after enhancement, credited with managing cracking of masonry walls, as well as degradation of the structural steel restraint systems of the masonry walls. This program contained inspection guidelines and listed attributes that caused aging of masonry walls, which were monitored during structural inspections, as well as established examination criteria, evaluation requirements, and acceptance criteria. The applicant included reinforced masonry walls in proximity to safety-related components within the scope of the program if the wall could collapse and damage the components or removable walls stacked to allow equipment removal. The team discussed the program with cognizant engineers and walked down and examined accessible masonry block walls including structural steel supports to assess their condition.


The applicant identified enhancements were necessary to ensure consistency with the  
The applicant identified enhancements were necessary to ensure consistency with the GALL Report.
 
GALL Report.


Enhancements For the Scope of Program element, revise procedures to ensure masonry walls located within in-scope structures are included in the scope of the Masonry Wall Program.
Enhancements For the Scope of Program element, revise procedures to ensure masonry walls located within in-scope structures are included in the scope of the Masonry Wall Program.
Line 549: Line 517:
For the Parameters Monitored or Inspected element, revise procedures to include monitoring gaps between the structural steel supports and masonry walls that could potentially affect wall qualification.
For the Parameters Monitored or Inspected element, revise procedures to include monitoring gaps between the structural steel supports and masonry walls that could potentially affect wall qualification.


For the Detection of Aging Effects element, revise procedures to specify that masonry walls will be inspected at least once every five years, with provisions for more frequent inspections in areas where significant aging effects are observed to ensure there is no loss of intended function between inspections. For the Acceptance Criteria element, revise procedures to include acceptance criteria for masonry wall inspections that ensure observed aging effects (cracking, loss of material or gaps between the structural steel supports and masonry walls) do not invalidate the wall's evaluation basis or impact its intended function.
For the Detection of Aging Effects element, revise procedures to specify that masonry walls will be inspected at least once every five years, with provisions for more frequent inspections in areas where significant aging effects are observed to ensure there is no loss of intended function between inspections.
 
For the Acceptance Criteria element, revise procedures to include acceptance criteria for masonry wall inspections that ensure observed aging effects (cracking, loss of material or gaps between the structural steel supports and masonry walls) do not invalidate the wall's evaluation basis or impact its intended function.


The team had no significant concerns with the enhancements.
The team had no significant concerns with the enhancements.


The team reviewed license renewal doc uments, the aging management program evaluation report, plant procedures, corrective action documents, and prior inspection results. The team searched the corrective action database for relevant corrective action program documents. The team walked down in-scope masonry walls, and interviewed plant personnel.
The team reviewed license renewal documents, the aging management program evaluation report, plant procedures, corrective action documents, and prior inspection results. The team searched the corrective action database for relevant corrective action program documents. The team walked down in-scope masonry walls, and interviewed plant personnel.


The team concluded that for the Masonry Wall program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging for the masonry walls and their structural supports. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.
The team concluded that for the Masonry Wall program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging for the masonry walls and their structural supports. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.
Line 563: Line 533:
The applicant implemented the objectives of the program by performing periodic coupon inspection and testing to assure that the effects of aging do not cause degradation that impacts the required five-percent sub-criticality margin. The program monitors for loss of material, reduction in neutron absorbing capacity, and changes in dimension such as blisters, pits, and bulges that could result in a loss of neutron absorbing capability.
The applicant implemented the objectives of the program by performing periodic coupon inspection and testing to assure that the effects of aging do not cause degradation that impacts the required five-percent sub-criticality margin. The program monitors for loss of material, reduction in neutron absorbing capacity, and changes in dimension such as blisters, pits, and bulges that could result in a loss of neutron absorbing capability.


The applicant identified an enhancement was necessary to ensure consistency with the  
The applicant identified an enhancement was necessary to ensure consistency with the GALL Report.
 
GALL Report.


Enhancement For the Monitoring and Trending element, revise procedures to compare measurement results from periodic inspections to prior measurement results, and relate coupon measurement to the performance of the spent fuel neutron-absorber materials considering differences in exposure conditions, vented/non-vented test samples, spent fuel racks, etc. The enhancement also ensures the predicted Boron-10 areal density will be sufficient to maintain the subcritical conditions required by technical specifications until the next coupon test.
Enhancement For the Monitoring and Trending element, revise procedures to compare measurement results from periodic inspections to prior measurement results, and relate coupon measurement to the performance of the spent fuel neutron-absorber materials considering differences in exposure conditions, vented/non-vented test samples, spent fuel racks, etc. The enhancement also ensures the predicted Boron-10 areal density will be sufficient to maintain the subcritical conditions required by technical specifications until the next coupon test.
Line 571: Line 539:
The team had no significant concerns with the enhancement.
The team had no significant concerns with the enhancement.


The team reviewed the aging management program evaluation report, condition reports, and summaries of associated plant and industry operating experience. The team also reviewed Procedure NE-001-106, "SFSR Boral Surveillance Program," Revision 5, which monitors the integrity and performance of Boral on a continuing basis.
The team reviewed the aging management program evaluation report, condition reports, and summaries of associated plant and industry operating experience. The team also reviewed Procedure NE-001-106, SFSR Boral Surveillance Program, Revision 5, which monitors the integrity and performance of Boral on a continuing basis.


The team concluded that for the Neutron-Absorbing Material Monitoring program, the applicant had performed appropriate inspections and testing, as well as considered pertinent industry experience and plant operating history to satisfy the provisions under 10 CFR 50.68(b)(4). The team concluded that, if implemented as described including the enhancement, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.
The team concluded that for the Neutron-Absorbing Material Monitoring program, the applicant had performed appropriate inspections and testing, as well as considered pertinent industry experience and plant operating history to satisfy the provisions under 10 CFR 50.68(b)(4). The team concluded that, if implemented as described including the enhancement, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.
Line 579: Line 547:
The Oil Analysis program was an existing program, consistent with the GALL Report, credited with maintaining oil systems free of contaminants (primarily water and particulates), thereby preserving an environment that was not conducive to loss of material and reduction of heat transfer. The applicant performed sampling, analysis, and trending of results on the systems listed in the aging management program to provide an early indication of adverse equipment condition in the lube and hydraulic oil environments. The affected materials include aluminum, carbon and stainless steels, copper alloy, and gray cast iron.
The Oil Analysis program was an existing program, consistent with the GALL Report, credited with maintaining oil systems free of contaminants (primarily water and particulates), thereby preserving an environment that was not conducive to loss of material and reduction of heat transfer. The applicant performed sampling, analysis, and trending of results on the systems listed in the aging management program to provide an early indication of adverse equipment condition in the lube and hydraulic oil environments. The affected materials include aluminum, carbon and stainless steels, copper alloy, and gray cast iron.


During review of the components included in the oil analysis aging management program evaluation report, the team questioned what specific nonsafety-related components could impact safety-related systems. The applicant determined that they had mischaracterized nonsafety-related components identified during the team's review.
During review of the components included in the oil analysis aging management program evaluation report, the team questioned what specific nonsafety-related components could impact safety-related systems. The applicant determined that they had mischaracterized nonsafety-related components identified during the teams review.
 
Specifically, a tank had been included in the list of components, but the applicant subsequently determined the tank was abandoned-in-place and a section of tubing that


contained air instead of lubricating oil was identified. The applicant documented this error in Condition Report 2017-00655, initiated actions to revise the aging management program evaluation report, and began processing a revision to their license renewal application.
Specifically, a tank had been included in the list of components, but the applicant subsequently determined the tank was abandoned-in-place and a section of tubing that contained air instead of lubricating oil was identified. The applicant documented this error in Condition Report 2017-00655, initiated actions to revise the aging management program evaluation report, and began processing a revision to their license renewal application.


The team reviewed the aging management program evaluation report, license renewal application, plant operating experience, implementing procedures, condition reports, and 10-year trend graphs of the parameter monitored by the oil analysis for the in-scope components. The team interviewed plant personnel responsible who implemented the lubrication oil analysis program.
The team reviewed the aging management program evaluation report, license renewal application, plant operating experience, implementing procedures, condition reports, and 10-year trend graphs of the parameter monitored by the oil analysis for the in-scope components. The team interviewed plant personnel responsible who implemented the lubrication oil analysis program.
Line 593: Line 559:
This was an existing program, consistent with the GALL Report after enhancement, credited with managing loss of coating integrity of Service Level I coatings inside containment. The program included visual inspections of accessible coatings that covered steel and concrete surfaces inside containment (e.g., steel liner, steel shell, supports, concrete surfaces, and penetrations).
This was an existing program, consistent with the GALL Report after enhancement, credited with managing loss of coating integrity of Service Level I coatings inside containment. The program included visual inspections of accessible coatings that covered steel and concrete surfaces inside containment (e.g., steel liner, steel shell, supports, concrete surfaces, and penetrations).


The applicant identified an enhancement was necessary to ensure consistency with the  
The applicant identified an enhancement was necessary to ensure consistency with the GALL Report.
 
GALL Report.


Enhancement For the Detection of Aging Effects element, revise plant procedures to specify visual inspections of coatings near sumps or screens associated with the Emergency Core Cooling System.
Enhancement For the Detection of Aging Effects element, revise plant procedures to specify visual inspections of coatings near sumps or screens associated with the Emergency Core Cooling System.
Line 601: Line 565:
The team had no significant concerns with the enhancement.
The team had no significant concerns with the enhancement.


The team reviewed license renewal doc uments, the aging management program evaluation report, implementing procedures, corrective action documents, plant operating experience, and inspection results. The team also searched the corrective action program database for relevant corrective action requests. The team interviewed the program owner and license renewal project personnel.
The team reviewed license renewal documents, the aging management program evaluation report, implementing procedures, corrective action documents, plant operating experience, and inspection results. The team also searched the corrective action program database for relevant corrective action requests. The team interviewed the program owner and license renewal project personnel.


The team concluded that for the Protective Coating Monitoring and Maintenance program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described with the enhancement, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.
The team concluded that for the Protective Coating Monitoring and Maintenance program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described with the enhancement, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.
Line 607: Line 571:
===.14 B.1.36 Service Water Integrity (X1.M20)===
===.14 B.1.36 Service Water Integrity (X1.M20)===


This was an existing program, consistent with the GALL Report after enhancement, credited with managing aging effects resulting from material loss and reduction of heat transfer for components in, or cooled by, the Auxiliary Component Cooling Water systems. The applicant planned to manage the aging effects through surveillance tests and chemistry control techniques addressed by applicant commitments to Generic Letter 89-13, "Service Water System Problems Affecting Safety-Related Equipment,"
This was an existing program, consistent with the GALL Report after enhancement, credited with managing aging effects resulting from material loss and reduction of heat transfer for components in, or cooled by, the Auxiliary Component Cooling Water systems. The applicant planned to manage the aging effects through surveillance tests and chemistry control techniques addressed by applicant commitments to Generic Letter 89-13, Service Water System Problems Affecting Safety-Related Equipment, dated July 18, 1989.
dated July 18, 1989.


The applicant identified that enhancements were necessary to ensure consistency with  
The applicant identified that enhancements were necessary to ensure consistency with the GALL Report.
 
the GALL Report.


Enhancements For the Preventive Actions element, revise procedures to:
Enhancements For the Preventive Actions element, revise procedures to:
Line 628: Line 589:
===.15 B.1.38 Structures Monitoring (XI.S6)===
===.15 B.1.38 Structures Monitoring (XI.S6)===


This was an existing program, consistent with the GALL Report after enhancement, credited with managing aging effects associated with cracking, loss of bond, loss of material (spalling, scaling), cracking resulting from expansion, increase in porosity and permeability, loss of strength, and loss of form for concrete structures, steel, and structural supports, including the exterior of electrical duct manholes and vaults, masonry walls, and roofs. The current program was implemented consistent with the guidance of NUMARC 93-01, "Industry Guidelines for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," Revision 2, and Regulatory Guide 1.160, "Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," Revision 2.
This was an existing program, consistent with the GALL Report after enhancement, credited with managing aging effects associated with cracking, loss of bond, loss of material (spalling, scaling), cracking resulting from expansion, increase in porosity and permeability, loss of strength, and loss of form for concrete structures, steel, and structural supports, including the exterior of electrical duct manholes and vaults, masonry walls, and roofs. The current program was implemented consistent with the guidance of NUMARC 93-01, Industry Guidelines for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, Revision 2, and Regulatory Guide 1.160, Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, Revision 2.


The structures and structural components in the program are inspected by qualified personnel. Concrete structures are inspected for indications of deterioration and distress, using guidelines in ACI 201.1R, "Guide for Making a Condition Survey of Existing Buildings" and ACI 349.3R, "Evaluation of Existing Nuclear Safety-Related Concrete Structures.Elastomers are monitored for hardening, shrinkage and a loss of sealing. Component supports will be inspected for loss of material, and reduction in anchor capacity caused by local concrete degradation. Exposed surfaces of bolting are monitored for loss of material, loose or missing nuts, missing bolts, or other indications of loss of preload. Implementing plant procedures are written to ensure that the selection of bolting material, installation torque or tension, and the use of lubricants and sealants is appropriate. The program includes preventive actions described in NUREG-1339, "Resolution of Generic Issue 29: Bolting Degradation or Failure in Nuclear Power Plants," and other industry standards to ensure structural bolting integrity includes proper specification of bolting material, lubricant, and installation torque. Exposed surfaces of bolting are monitored for loss of material, loose or missing nuts, and/or bolts.
The structures and structural components in the program are inspected by qualified personnel. Concrete structures are inspected for indications of deterioration and distress, using guidelines in ACI 201.1R, Guide for Making a Condition Survey of Existing Buildings and ACI 349.3R, Evaluation of Existing Nuclear Safety-Related Concrete Structures. Elastomers are monitored for hardening, shrinkage and a loss of sealing. Component supports will be inspected for loss of material, and reduction in anchor capacity caused by local concrete degradation. Exposed surfaces of bolting are monitored for loss of material, loose or missing nuts, missing bolts, or other indications of loss of preload. Implementing plant procedures are written to ensure that the selection of bolting material, installation torque or tension, and the use of lubricants and sealants is appropriate. The program includes preventive actions described in NUREG-1339, Resolution of Generic Issue 29: Bolting Degradation or Failure in Nuclear Power Plants, and other industry standards to ensure structural bolting integrity includes proper specification of bolting material, lubricant, and installation torque.
 
Exposed surfaces of bolting are monitored for loss of material, loose or missing nuts, and/or bolts.


Thread lubricants containing molybdenum disulfide are not used by the applicant so stress corrosion cracking of structural bolting associated with the use of this lubricant is not an aging mechanism concern in this program. In addition, the applicant had no operating history of bolting failures caused by stress corrosion cracking.
Thread lubricants containing molybdenum disulfide are not used by the applicant so stress corrosion cracking of structural bolting associated with the use of this lubricant is not an aging mechanism concern in this program. In addition, the applicant had no operating history of bolting failures caused by stress corrosion cracking.
Line 636: Line 599:
The program contains provisions for increased inspection frequency and trending of structures and components in accordance with 10 CFR 50.65 (a)(1), if the extent of degradation indicates that the structure or component may not meet its design basis.
The program contains provisions for increased inspection frequency and trending of structures and components in accordance with 10 CFR 50.65 (a)(1), if the extent of degradation indicates that the structure or component may not meet its design basis.


The applicant identified that enhancements were necessary to ensure consistency with  
The applicant identified that enhancements were necessary to ensure consistency with the GALL Report.
 
the GALL Report.


Enhancements For the Scope of Program element, revise procedures to:
Enhancements For the Scope of Program element, revise procedures to:
* Add the following structures to the program:
* Add the following structures to the program:
o Battery house 230kV switchyard o Control house 230kV switchyard o Fire pump house o Fire water storage tank foundations o Fuel oil storage tank foundation Enhancements o Manholes, handholes, and duct banks o Plant stack o Transformer and switchyard support structures and foundations
o   Battery house 230kV switchyard o   Control house 230kV switchyard o   Fire pump house o   Fire water storage tank foundations o   Fuel oil storage tank foundation Enhancements o   Manholes, handholes, and duct banks o   Plant stack o   Transformer and switchyard support structures and foundations
* Include a list of structural components and commodities within the scope of license renewal to be monitored in the program;
* Include a list of structural components and commodities within the scope of license renewal to be monitored in the program;
* Include periodic sampling and chemical analysis of ground water; For the Preventive Actions element, revi se procedures to include the preventive actions for storage of ASTM A325, ASTM F1852, and/or ASTM A490 bolting from Section 2 of Research Council on Structural Connections publication "Specification for Structural Joints Using ASTM A325 or A490 Bolts."
* Include periodic sampling and chemical analysis of ground water; For the Preventive Actions element, revise procedures to include the preventive actions for storage of ASTM A325, ASTM F1852, and/or ASTM A490 bolting from Section 2 of Research Council on Structural Connections publication Specification for Structural Joints Using ASTM A325 or A490 Bolts.


For the Parameters Monitored or Inspected element, revise procedures to include the following parameters:
For the Parameters Monitored or Inspected element, revise procedures to include the following parameters:
Line 658: Line 619:
: (1) Anchor bolts (nuts and bolts) for loss of material; and
: (1) Anchor bolts (nuts and bolts) for loss of material; and
: (2) loose or missing nuts and/or bolts;
: (2) loose or missing nuts and/or bolts;
* Elastomeric vibration isolators and structural sealants for cracking, loss of material, loss of sealing and change in material properties (e.g., hardening);  
* Elastomeric vibration isolators and structural sealants for cracking, loss of material, loss of sealing and change in material properties (e.g., hardening);
 
For the Detection of Aging Effects element, revise procedures to include the following:
For the Detection of Aging Effects element, revise procedures to include the following:
* Visual inspection of elastomeric material should be supplemented by feel or touch to detect hardening if performance of intended function of the elastomeric material is suspect. Include instructions to augment the visual examination of elastomeric material with physical manipulation of at least ten percent of available surface area.
* Visual inspection of elastomeric material should be supplemented by feel or touch to detect hardening if performance of intended function of the elastomeric material is suspect. Include instructions to augment the visual examination of elastomeric material with physical manipulation of at least ten percent of available surface area.
Line 672: Line 632:
The team had no significant concerns with the enhancements.
The team had no significant concerns with the enhancements.


The team reviewed license renewal doc uments, the aging management program evaluation report, existing procedures, and corrective action program documents. The team searched the corrective action database for relevant condition records. The team interviewed cognizant engineers who conducted the structural inspections and walked down the structures.
The team reviewed license renewal documents, the aging management program evaluation report, existing procedures, and corrective action program documents. The team searched the corrective action database for relevant condition records. The team interviewed cognizant engineers who conducted the structural inspections and walked down the structures.


The team concluded that for the Structures Monitoring program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.
The team concluded that for the Structures Monitoring program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.
Line 678: Line 638:
===.16 B.1.40 Water Chemistry Control - Closed Treated Water Systems (XI.M21A)===
===.16 B.1.40 Water Chemistry Control - Closed Treated Water Systems (XI.M21A)===


This was an existing program, consistent with the GALL Report as modified by LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion under Insulation," after enhancement, credited with managing aging effects of loss of material, cracking, and reduction in heat transfer for components in closed-cycle cooling water systems.
This was an existing program, consistent with the GALL Report as modified by LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion under Insulation, after enhancement, credited with managing aging effects of loss of material, cracking, and reduction in heat transfer for components in closed-cycle cooling water systems.


The systems within the scope of this program included the diesel generator jacket water, component cooling water, auxiliary component cooling water, and chilled water heating, ventilation and air conditioning subsystems that serviced the switchgear ventilation and the mechanical auxiliary building. The program included monitoring and control of corrosion inhibitor and chemistry parameters consistent with the guidance of EPRI 1007820, "Closed Cooling Water Chemistry Guideline," April 2004. The applicant maintained water chemistry by adding a molybdate corrosion inhibitor, biocides and pH chemicals.
The systems within the scope of this program included the diesel generator jacket water, component cooling water, auxiliary component cooling water, and chilled water heating, ventilation and air conditioning subsystems that serviced the switchgear ventilation and the mechanical auxiliary building. The program included monitoring and control of corrosion inhibitor and chemistry parameters consistent with the guidance of EPRI 1007820, Closed Cooling Water Chemistry Guideline, April 2004. The applicant maintained water chemistry by adding a molybdate corrosion inhibitor, biocides and pH chemicals.


The applicant identified that enhancements were necessary to ensure consistency with the GALL Report as modified by LR-ISG-2012-02.
The applicant identified that enhancements were necessary to ensure consistency with the GALL Report as modified by LR-ISG-2012-02.
Line 690: Line 650:
Enhancements For the Detection of Aging Effects element, revise procedures to:
Enhancements For the Detection of Aging Effects element, revise procedures to:
* Inspect accessible components whenever a closed treated water system boundary is opened. Ensure that a representative sample of piping and components is inspected at a frequency of at least every ten years. These inspections will be conducted in accordance with applicable ASME Code requirements, industry standards, or other plant-specific inspection guidance by qualified personnel using procedures that are capable of detecting corrosion, fouling, or cracking. If visual examination identifies adverse conditions, additional examinations, including ultrasonic testing, are conducted;
* Inspect accessible components whenever a closed treated water system boundary is opened. Ensure that a representative sample of piping and components is inspected at a frequency of at least every ten years. These inspections will be conducted in accordance with applicable ASME Code requirements, industry standards, or other plant-specific inspection guidance by qualified personnel using procedures that are capable of detecting corrosion, fouling, or cracking. If visual examination identifies adverse conditions, additional examinations, including ultrasonic testing, are conducted;
* Define a representative sample as 20 percent of the population (defined as components having the same material, environment, and aging effect combination) with a maximum of 25 components. Components inspected will be those with the highest likelihood of corrosion, fouling, or cracking;
* Define a representative sample as 20 percent of the population (defined as components having the same material, environment, and aging effect combination)with a maximum of 25 components. Components inspected will be those with the highest likelihood of corrosion, fouling, or cracking;
* Perform treated water sampling and analysis of the closed treated water systems per industry standards and in no case greater than quarterly unless justified with an additional analysis.
* Perform treated water sampling and analysis of the closed treated water systems per industry standards and in no case greater than quarterly unless justified with an additional analysis.


Line 699: Line 659:
The team had no significant concerns with the enhancements.
The team had no significant concerns with the enhancements.


The team reviewed the implementing procedures and chemistry data for the monitored  
The team reviewed the implementing procedures and chemistry data for the monitored systems. The team walked down a sample of heat exchangers and pumps cooled by closed cooling water systems and interviewed a system engineer. From a review of the data, the team determined that the applicant appropriately monitored for both loss of heat transfer and loss of material for the in-scope systems.


systems. The team walked down a sample of heat exchangers and pumps cooled by closed cooling water systems and interviewed a system engineer. From a review of the data, the team determined that the applicant appropriately monitored for both loss of heat transfer and loss of material for the in-scope systems.
The team concluded that for the Water Chemistry Control - Closed Treated Water Systems program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.


The team concluded that for the Water Chemistry Control - Closed Treated Water Systems program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described including the enhancements, the applicant pr ovided guidance that would appropriately identify and address aging effects during the period of extended operation.
b.4 System Reviews The team performed an in-depth review of structures that were identified as potentially susceptible to Alkali-Silica reaction. The team made this selection based on the location of Waterford Steam Electric Station, surrounding industrial facilities, and the proximity of the Mississippi river. The team did not identify any significant indications of alkali-silica reaction in the sample of structures reviewed by the team.


b.4 System Reviews The team performed an in-depth review of structures that were identified as potentially susceptible to Alkali-Silica reaction. The team made this selection based on the location of Waterford Steam Electric Station, surrounding industrial facilities, and the proximity of the Mississippi river. The team did not identify any significant indications of alkali-silica reaction in the sample of structures reviewed by the team.
c.


c. Overall Conclusion Overall, based on the samples reviewed by the team, the inspection results supported a conclusion that there is reasonable assurance that actions have been identified and have been taken or will be taken to manage the effects of aging in the SSCs identified in the license renewal application and that the intended functions of these SSCs will be maintained in the period of extended operation.
Overall Conclusion Overall, based on the samples reviewed by the team, the inspection results supported a conclusion that there is reasonable assurance that actions have been identified and have been taken or will be taken to manage the effects of aging in the SSCs identified in the license renewal application and that the intended functions of these SSCs will be maintained in the period of extended operation.


{{a|4OA6}}
{{a|4OA6}}
Line 719: Line 679:


Applicant Personnel
Applicant Personnel
A. Harris Regulatory Assurance B. Briner System Engineer
A. Harris       Regulatory Assurance
C. Pickering Engineering Supervisor C. Tara System Engineer C. Zenon System Engineer
B. Briner       System Engineer
D. Garretson System Engineer
C. Pickering   Engineering Supervisor
D. Marse Senior Chemistry Specialist
C. Tara         System Engineer
D. Viener Design Engineer D. Williams System Engineer E. Begley Predictive Maintenance Engineer
C. Zenon       System Engineer
J. Hoss Design Engineer
D. Garretson   System Engineer
J. Jung System Engineer
D. Marse       Senior Chemistry Specialist
J. Lanci System Engineer L. Milster License Renewal Coordinator L. Murray License Renewal Project Manager
D. Viener       Design Engineer
M. Besse Design Engineer
D. Williams     System Engineer
M. Chisum Site Vice President
E. Begley       Predictive Maintenance Engineer
M. Groome System Engineer
J. Hoss         Design Engineer
M. Provensal Mechanical Design Engineer M. Sandusky Project Coordinator P. Linger System Engineer
J. Jung         System Engineer
P. Prejean Senior Chemistry Specialist  
J. Lanci       System Engineer
: [[contact::R. Porter Supervisor]], Design Engineer
L. Milster     License Renewal Coordinator
R. Tran Design Engineer S. Brown Project Coordinator S. Nelson Fire Marshall
L. Murray       License Renewal Project Manager
S. Picard Civil Design Engineer
M. Besse       Design Engineer
T. House System Engineer
M. Chisum       Site Vice President
M. Groome       System Engineer
M. Provensal   Mechanical Design Engineer
M. Sandusky     Project Coordinator
P. Linger       System Engineer
P. Prejean     Senior Chemistry Specialist
: [[contact::R. Porter       Supervisor]], Design Engineer
R. Tran         Design Engineer
S. Brown       Project Coordinator
S. Nelson       Fire Marshall
S. Picard       Civil Design Engineer
T. House       System Engineer
Entergy Services, Inc. License Renewal Corporate Team
Entergy Services, Inc. License Renewal Corporate Team
A. Cox Consultant D. Lach Project Manager
A. Cox         Consultant
D. Wootten Consultant
D. Lach         Project Manager
H. Rideout Senior License Renewal Engineer K. Ehren Consultant
D. Wootten     Consultant
M. Spinelli Senior License Renewal Engineer R. Rucker Consultant  
H. Rideout     Senior License Renewal Engineer
K. Ehren       Consultant
M. Spinelli     Senior License Renewal Engineer
R. Rucker       Consultant
===NRC Personnel===
===NRC Personnel===
F. Ramirez Senior Resident Inspector C. Speer Resident Inspector
F. Ramirez     Senior Resident Inspector
C. Speer       Resident Inspector
TABLES OF DOCUMENTS REVIEWED
TABLES OF DOCUMENTS REVIEWED
General Fleet Administrative Procedures
General
Number Title Revision EN-FAP-LR-001 License Renewal Project Overview 9 EN-FAP-LR-003 System and Structure Scoping for License Renewal 3
Fleet Administrative Procedures
EN-FAP-LR-004 Mechanical System Screening and Aging Management Reviews 8 EN-FAP-LR-005 Electrical System Scoping, Screening and Aging Management Reviews
Number                 Title                                                   Revision
EN-FAP-LR-006 Structural Screening and Aging Management Reviews 7 EN-FAP-LR-012 Operating Experience Review for License Renewal 5
EN-FAP-LR-001         License Renewal Project Overview                       9
EN-FAP-LR-012
EN-FAP-LR-003         System and Structure Scoping for License Renewal       3
7.5 OE-AMP Effectiveness Review Process 5
EN-FAP-LR-004         Mechanical System Screening and Aging Management       8
Reviews
EN-FAP-LR-005         Electrical System Scoping, Screening and Aging         6
Management Reviews
EN-FAP-LR-006         Structural Screening and Aging Management Reviews       7
EN-FAP-LR-012         Operating Experience Review for License Renewal         5
EN-FAP-LR-012         OE-AMP Effectiveness Review Process                     5
7.5
Letters/Correspondence
Letters/Correspondence
Number Title Date W3F1-2016-0063 Responses to Request for Additional Information Set 1 Regarding the License Renewal Application
Number               Title                                             Date
W3F1-2016-0063 Responses to Request for Additional Information         October 13, 2016
Set 1 Regarding the License Renewal Application
for Waterford Steam Electric Station, Unit 3
W3F1-2016-0069      Responses to Request for Additional Information    November 10, 2016
Set 2 Regarding the License Renewal Application
for Waterford Steam Electric Station, Unit 3
W3F1-2016-0070      Responses to Request for Additional Information    December 12, 2016
Set 3 Regarding the License Renewal Application
for Waterford Steam Electric Station, Unit 3
for Waterford Steam Electric Station, Unit 3
October 13, 2016 W3F1-2016-0069 Responses to Request for Additional Information Set 2 Regarding the License Renewal Application
W3F1-2016-0071      Responses to Request for Additional Information   January 9, 2017
for Waterford Steam Electric Station, Unit 3 November 10, 2016 W3F1-2016-0070 Responses to Request for Additional Information Set 3 Regarding the License Renewal Application
Set 4 Regarding the License Renewal Application
for Waterford Steam Electric Station, Unit 3 December 12, 2016 W3F1-2016-0071 Responses to Request for Additional Information Set 4 Regarding the License Renewal Application
for Waterford Steam Electric Station, Unit 3
for Waterford Steam Electric Station, Unit 3
January 9, 2017
Letters/Correspondence
Letters/Correspondence
Number Title Date W3F1-2016-0074 Responses to Request for Additional Information Set 5 Regarding the License Renewal Application
Number             Title                                             Date
for Waterford Steam Electric Station, Unit 3 December 7, 2016 W3F1-2016-0075 Responses to Request for Additional Information Set 6 Regarding the License Renewal Application
W3F1-2016-0074 Responses to Request for Additional Information       December 7, 2016
for Waterford Steam Electric Station, Unit 3 December 7, 2016 W3F1-2016-0077 Responses to Request for Additional Information Set 7 Regarding the License Renewal Application
Set 5 Regarding the License Renewal Application
for Waterford Steam Electric Station, Unit 3 December 15, 2016 W3F1-2017-0002 Responses to Request for Additional Information Sets 8 and 9 Regarding the License Renewal Application for Waterford Steam Electric Station, Unit 3 January 16, 2017 W3F1-2017-0003 Responses to Request for Additional Information Set 10 Regarding the License Renewal Application
for Waterford Steam Electric Station, Unit 3
W3F1-2016-0075     Responses to Request for Additional Information   December 7, 2016
Set 6 Regarding the License Renewal Application
for Waterford Steam Electric Station, Unit 3
W3F1-2016-0077     Responses to Request for Additional Information   December 15, 2016
Set 7 Regarding the License Renewal Application
for Waterford Steam Electric Station, Unit 3
W3F1-2017-0002     Responses to Request for Additional Information   January 16, 2017
Sets 8 and 9 Regarding the License Renewal
Application for Waterford Steam Electric Station,
Unit 3
W3F1-2017-0003     Responses to Request for Additional Information   January 19, 2017
Set 10 Regarding the License Renewal Application
for Waterford Steam Electric Station, Unit 3
for Waterford Steam Electric Station, Unit 3
January 19, 2017 W3F1-2017-0005 Responses to Request for Additional Information Set 11 Regarding the License Renewal Application
W3F1-2017-0005     Responses to Request for Additional Information   February 1,2017
Set 11 Regarding the License Renewal Application
for Waterford Steam Electric Station, Unit 3
for Waterford Steam Electric Station, Unit 3
February 1,2017 ML020920464 NRC letter to NEI, Staff guidance on scoping of equipment relied on to meet the requirements of
ML020920464       NRC letter to NEI, Staff guidance on scoping of   April 1, 2002
the Station Blackout (SBO) Rule (10 CFR 50.63) for license renewal (10 CFR 54.4(a)(3)), (ISG-02) April 1, 2002
equipment relied on to meet the requirements of
the Station Blackout (SBO) Rule (10 CFR 50.63)
for license renewal (10 CFR 54.4(a)(3)), (ISG-02)
License Renewal
License Renewal
Number Title Revision/Date W3F1-2016-0012 License Renewal Application, Waterford Steam
Number             Title                                             Revision/Date
W3F1-2016-0012     License Renewal Application, Waterford Steam     March 23, 2016
Electric Station, Unit 3
Electric Station, Unit 3
March 23, 2016 NUREG-1801 Generic Aging Lessons Learned (GALL) 2 NEI 95-10 Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The license
NUREG-1801         Generic Aging Lessons Learned (GALL)             2
NEI 95-10         Industry Guideline for Implementing the           6
Requirements of 10 CFR Part 54 - The license
Renewal Rule
Renewal Rule
Miscellaneous
Miscellaneous
Number Title Date Nuclear Plant Operating Agreement for Waterford III Nuclear Power Plant - Amended
Number               Title                                           Date
Nuclear Plant Operating Agreement for           January 29, 2016
Waterford III Nuclear Power Plant - Amended
and Restated
and Restated
January 29, 2016
Miscellaneous
Miscellaneous
Number Title Date WLP-ESPC-ENG_WALKDOWNS Issue Resolution Walkdowns July 28, 2015 LO-WLO-2016-0055 License Renewal Pre-NRC Inspection December 12, 2016
Number               Title                                         Date
WLP-ESPC-           Issue Resolution Walkdowns                   July 28, 2015
ENG_WALKDOWNS
LO-WLO-2016-0055 License Renewal Pre-NRC Inspection               December 12, 2016
Operating Experience
Operating Experience
Number Title Revision WF3-EP-14-00002 Operating Experience Review Results - AERM 0 WF3-EP-14-00003 Operating Experience Review Results - Aging Management Program Effectiveness
Number               Title                                         Revision
WF3-EP-14-00002 Operating Experience Review Results - AERM         0
WF3-EP-14-00003     Operating Experience Review Results - Aging   0
Management Program Effectiveness
Project Documents
Project Documents
Number Title Date WF3-EE-14-00001 Electrical Screening and Aging Management Review February 1, 2016 WF3-EE-14-00001 Electrical Screening and Aging Management Review February 14, 2017 WF3-EP-14-00009 Aging Management Program Evaluation Results -
Number               Title                                         Date
WF3-EE-14-00001     Electrical Screening and Aging Management     February 1, 2016
Review
WF3-EE-14-00001     Electrical Screening and Aging Management     February 14, 2017
Review
WF3-EP-14-00009     Aging Management Program Evaluation Results - February 1, 2016
Electrical
Electrical
February 1, 2016
Procedures
Procedures
Number Title Revision EN-LI-102 Corrective Action Program 28 EN-LI-121 Trending and Performance Review Process 17
Number               Title                                         Revision
Scoping Calculation
EN-LI-102           Corrective Action Program                     28
Number Title Revision Safety-Related Design Calculation C-CE-4 5 IAA48 Foot Print Loads Safety-Related Hanger Calculation
EN-LI-121           Trending and Performance Review Process       17
Condition Report 2017-00241
Scoping
Drawings Number Title Revision LRA-G285 Main One Line Diagram 0
Calculation
Drawings Number Title Revision G285 Main One Line Diagram 19 L006S01 Waterford 3 230kV SW Station One line Diagram In-Service 9
Number               Title                                         Revision
B430-V24.1 Instrument Installation Details 8
Safety-Related Design Calculation C-CE-4     5
G152, sheet 4* Flow Diagram - Instru
IAA48               Foot Print Loads Safety-Related Hanger
ment Air System, Reactor Auxiliary Building EL. 4.00' & 7.00'
Calculation
G152, sheet 9* Flow Diagram - Instrument Air System, Miscellaneous Building 0 G153, sheet 4* Flow Diagram - Feedwater, Condensate & Air Evacuation Systems 0 G160, sheet 1 Flow Diagram - Component Closed Cooling Water Systems 0 G160, sheet 2 Flow Diagram - Component Closed Cooling Water Systems 0 G160, sheet 3 Flow Diagram - Component Closed Cooling Water Systems 0 G160, sheet 4 Flow Diagram - Component Closed Cooling Water Systems 0
Condition Report
G160, sheet 5 Flow Diagram - Component Closed Cooling Water Systems 0
2017-00241
Drawings
Number             Title                                                   Revision
LRA-G285           Main One Line Diagram                                   0
Drawings
Number         Title                                                   Revision
G285           Main One Line Diagram                                   19
L006S01       Waterford 3 230kV SW Station One line Diagram In-Service 9
B430-V24.1     Instrument Installation Details                         8
G152, sheet 4* Flow Diagram - Instrument Air System, Reactor Auxiliary 0
Building EL. 4.00 & 7.00
G152, sheet 9* Flow Diagram - Instrument Air System, Miscellaneous     0
Building
G153, sheet 4* Flow Diagram - Feedwater, Condensate & Air Evacuation   0
Systems
G160, sheet 1 Flow Diagram - Component Closed Cooling Water Systems 0
G160, sheet 2 Flow Diagram - Component Closed Cooling Water Systems 0
G160, sheet 3 Flow Diagram - Component Closed Cooling Water Systems 0
G160, sheet 4 Flow Diagram - Component Closed Cooling Water Systems 0
G160, sheet 5 Flow Diagram - Component Closed Cooling Water Systems 0
G160, sheet 6* Flow Diagram - Component Closed Cooling Water Systems 0
G160, sheet 6* Flow Diagram - Component Closed Cooling Water Systems 0
G161, sheet 1 Flow Diagram - Fire, Make-up & Domestic Water Systems 0 G161, sheet 2* Flow Diagram - Fire, Make-up & Domestic Water Systems 0 G161, sheet 3* Flow Diagram - Fire, Make-up & Domestic Water Systems 0
G161, sheet 1 Flow Diagram - Fire, Make-up & Domestic Water Systems   0
G161, sheet 5 Flow Diagram - Fire, Make-up & Domestic Water Systems 0
G161, sheet 2* Flow Diagram - Fire, Make-up & Domestic Water Systems   0
G164, sheet 1* Flow Diagram - Miscellaneous Reactor Auxiliary Systems 0 G166, sheet 1* Flow Diagram - N2, H2, and CO2 Systems 0
G161, sheet 3* Flow Diagram - Fire, Make-up & Domestic Water Systems   0
G166, sheet 2* Flow Diagram - N2, H2, and CO2 Systems 0 G167, sheet 1 Flow Diagram - Safety Injection Systems 0 G167, sheet 2 Flow Diagram - Safety Injection Systems 0
G161, sheet 5 Flow Diagram - Fire, Make-up & Domestic Water Systems   0
G167, sheet 3 Flow Diagram - Safety Injection Systems 0
G164, sheet 1* Flow Diagram - Miscellaneous Reactor Auxiliary Systems   0
G167, sheet 4 Flow Diagram - Safety Injection Systems 0
G166, sheet 1* Flow Diagram - N2, H2, and CO2 Systems                   0
G168, sheet 1 Flow Diagram - Chemical and Volume Control Systems 0 G168, sheet 2 Flow Diagram - Chemical and Volume Control Systems 0
G166, sheet 2* Flow Diagram - N2, H2, and CO2 Systems                   0
Drawings Number Title Revision G168, sheet 3 Flow Diagram - Chemical and Volume Control Systems 0 G169, sheet 1 Flow Diagram - Fuel Pool Systems 0
G167, sheet 1 Flow Diagram - Safety Injection Systems                 0
G172, sheet 1 Flow Diagram - Reactor Coolant System 0
G167, sheet 2 Flow Diagram - Safety Injection Systems                 0
G179, sheet 1 Flow Diagram - Reactor Coolant Pump Seals 0
G167, sheet 3 Flow Diagram - Safety Injection Systems                 0
ISO-4305-8643 CW-ISO-IC-892 2
G167, sheet 4 Flow Diagram - Safety Injection Systems                 0
ISO E3029LW3IA7 Instrument Air 10 ISO V8.20-1001-2 Chemical Feed 3 ISO V8.20-1001-4 Chemical Feed 3
G168, sheet 1 Flow Diagram - Chemical and Volume Control Systems       0
G168, sheet 2 Flow Diagram - Chemical and Volume Control Systems       0
Drawings
Number             Title                                                     Revision
G168, sheet 3       Flow Diagram - Chemical and Volume Control Systems         0
G169, sheet 1       Flow Diagram - Fuel Pool Systems                           0
G172, sheet 1       Flow Diagram - Reactor Coolant System                     0
G179, sheet 1       Flow Diagram - Reactor Coolant Pump Seals                 0
ISO-4305-8643       CW-ISO-IC-892                                             2
ISO E3029LW3IA7 Instrument Air                                                 10
ISO V8.20-1001-2   Chemical Feed                                             3
ISO V8.20-1001-4   Chemical Feed                                             3
License Renewal
License Renewal
Number Title Revision WF3-EP-14-00001 System and Structural Scoping Results 0 WF3-ME-14-00026 Aging Management Review of Nonsafety-Related Systems and Components Affecting Safety-Related
Number                   Title                                               Revision
Systems Miscellaneous
WF3-EP-14-00001         System and Structural Scoping Results               0
Title Date Photographs - Waterford-3 230-kV Switchyard Station Blackout Recovery Components August, 2014
WF3-ME-14-00026         Aging Management Review of Nonsafety-Related         1
Systems and Components Affecting Safety-Related
Systems
Miscellaneous
Title                                                                   Date
Photographs - Waterford-3 230-kV Switchyard Station Blackout Recovery   August, 2014
Components
Procedures
Procedures
Number Title Revision OP-902-005 Emergency Operating Procedure - Station Blackout Recovery Procedure
Number                   Title                                         Revision
20 OP-902-009, Attachment 12-A  Electrical Restoration: Energize 1A(B) and 2A(B) from Off-Site Power
OP-902-005               Emergency Operating Procedure - Station       020
315  NEW PROGRAMS
Blackout Recovery Procedure
OP-902-009,               Electrical Restoration: Energize 1A(B) and   315
2-A          2A(B) from Off-Site Power
NEW PROGRAMS
B.1.3 Buried and Underground Piping and Tanks (XI.M41)
B.1.3 Buried and Underground Piping and Tanks (XI.M41)
License Renewal
License Renewal
Number Title Revision WF3-EP-14-00003 Operating Experience Review Results - Aging Management Program Effectiveness
Number                 Title                                           Revision
WF3-EP-14-00003         Operating Experience Review Results - Aging     0
Management Program Effectiveness
License Renewal
License Renewal
Number Title Revision WF3-EP-14-00007 Aging Management Program Evaluation Results -
Number                   Title                                             Revision
WF3-EP-14-00007           Aging Management Program Evaluation Results - 0
Non-Class 1 Mechanical
Non-Class 1 Mechanical
Miscellaneous
Miscellaneous
Number Title Revision/Date LR-ISG-2011-03 Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 Aging Management Program XI.M41, "Buried and Underground Piping
Number                   Title                                               Revision/Date
and Tanks"
LR-ISG-2011-03           Changes to the Generic Aging Lessons Learned       2
NACE SP0169-2007 Control of External Corrosion on Underground or Submerged Metallic Piping Systems
                        (GALL) Report Revision 2 Aging Management
March 15, 2007
Program XI.M41, Buried and Underground Piping
Report No.
and Tanks
1000002.400 APEC Native Survey and CP Testing Waterford Steam Electric Station - WSES Entergy
NACE SP0169-2007 Control of External Corrosion on Underground or             March 15, 2007
Corporation Inspection Dates: October 2010 &
Submerged Metallic Piping Systems
Report No.               APEC Native Survey and CP Testing Waterford         0
1000002.400              Steam Electric Station - WSES Entergy
Corporation Inspection Dates: October 2010 &
June 2012
June 2012
Operating Experience
Operating Experience
Title Buried Piping 2
Title
nd QTR 2013 Semi-Annual Health Report
Buried Piping 2nd QTR 2013 Semi-Annual Health Report
B.1.4 Coating Integrity (XI.M42)
B.1.4 Coating Integrity (XI.M42)
License Renewal
License Renewal
Number Title Revision LR-ISG-2013-01 Aging Management of Loss of Coating or Lining Integrity for Internal Coatings/Linings on In-Scope
Number                 Title                                               Revision
LR-ISG-2013-01         Aging Management of Loss of Coating or Lining
Integrity for Internal Coatings/Linings on In-Scope
Piping, Piping Components, Heat Exchangers, and
Piping, Piping Components, Heat Exchangers, and
Tanks WF3-ME-14-00030 License Renewal Topical Report on Coating
Tanks
WF3-ME-14-00030         License Renewal Topical Report on Coating           0
Integrity
Integrity
WF3-EP-14-00003 Operating Experience Review Results - Aging Management Program Effectiveness
WF3-EP-14-00003         Operating Experience Review Results - Aging         0
WF3-EP-14-00007 Aging Management Program Evaluation Results
Management Program Effectiveness
WF3-EP-14-00007         Aging Management Program Evaluation Results         1
Non-Class 1 - Coating Integrity
Non-Class 1 - Coating Integrity
B.1.20 Metal Enclosed Bus Inspection (XI.E4)
B.1.20 Metal Enclosed Bus Inspection (XI.E4)
Drawings Number Title Revision 1564-8891 Armor-Clad Busway, 1600A 4
Drawings
Drawings Number Title Revision 1564-8892 Metal-Enclosed Bus Duct, 5kV 1200A
Number       Title                                                         Revision
1564-8891     Armor-Clad Busway, 1600A                                     4
Drawings
Number       Title                                                       Revision
1564-8892     Metal-Enclosed Bus Duct, 5kV 1200A
Procedure
Procedure
Number Title Revision EN-DC-349 Metal Enclosed Bus Inspection Procedure 3
Number                 Title                                               Revision
EN-DC-349             Metal Enclosed Bus Inspection Procedure             3
Project Document
Project Document
Number Title Date WF3-EP-14-00009, Section 3.1 Aging Management Program Evaluation Results -
Number                 Title                                               Date
Electrical
WF3-EP-14-00009, Aging Management Program Evaluation Results -             February 1, 2016
February 1, 2016
Section 3.1            Electrical
Vendor Documents
Vendor Documents
Number Title Revision TD-G080.0735 General Electric Important Instructions for Armor-Clad Indoor Feeder Busway, GEH-2636
Number             Title                                                 Revision
TD-C012.0035 Calvert Switch and Bus Support, Class A, Indoor 0 TD-C012.0025 Calvert Field Service Manual 0 TD-C012.0045 Calvert Minimum Air Clearance Phase Rigid Bus 0
TD-G080.0735       General Electric Important Instructions for Armor-Clad 0
Indoor Feeder Busway, GEH-2636
TD-C012.0035       Calvert Switch and Bus Support, Class A, Indoor       0
TD-C012.0025       Calvert Field Service Manual                           0
TD-C012.0045       Calvert Minimum Air Clearance Phase Rigid Bus         0
Work Orders
Work Orders
00120374 52195668 00121064 00183173
00120374       52195668         00121064     00183173
B.1.24 Non-EQ Inaccessible Power Cables ( 400V) Program (XI.E3)
B.1.24 Non-EQ Inaccessible Power Cables ( 400V) Program (XI.E3)
Condition Report 2017-00961*   *Written as a result of this inspection
Condition Report
Drawing Number Title Revision G349 Yard Duct Runs and Outdoor Lighting 20
2017-00961*
Letters Number Title Date W3F1-2007-0065 Response to NRC RAI on GL 2007-01, "Inaccessible or Underground Power Cable Failures that Disable
*Written as a result of this inspection
Accident Mitigation Systems or Cause Plant Transients." December 18, 2007
Drawing
Letters Number Title Date W3F1-2007-0017 Response to Generic Letter 2007-01 Waterford Steam Electric Station, Unit 3 (Waterford 3) May 3, 2007
Number             Title                                                 Revision
G349               Yard Duct Runs and Outdoor Lighting                   20
Letters
Number             Title                                                 Date
W3F1-2007-0065 Response to NRC RAI on GL 2007-01, "Inaccessible December 18, 2007
or Underground Power Cable Failures that Disable
Accident Mitigation Systems or Cause Plant
Transients."
Letters
Number           Title                                               Date
W3F1-2007-0017 Response to Generic Letter 2007-01 Waterford           May 3, 2007
Steam Electric Station, Unit 3 (Waterford 3)
License Renewal
License Renewal
Number Title Revision WF3-EE-14-00001, Section 4.1 Electrical Screening and Aging Management Review 1
Number             Title                                                     Revision
WF3-EE-14-00001, Attachment 11 WF3 Technical Evaluation of Aging Management Activities
WF3-EE-14-00001, Electrical Screening and Aging Management Review             1
for the Non-EQ Underground Power Cable (400V) Circuits Subject to Aging Management Review
Section 4.1
WF3-EP-14-00009, Section 3.3 Aging Management Program Evaluation Results - Electrical 1
WF3-EE-14-00001, WF3 Technical Evaluation of Aging Management Activities 2
11      for the Non-EQ Underground Power Cable (400V) Circuits
Subject to Aging Management Review
WF3-EP-14-00009, Aging Management Program Evaluation Results - Electrical 1
Section 3.3
Miscellaneous
Miscellaneous
Number Title Date Photographs - dewatered manhole MH-M329 February 2017 EPRI TR-1020804 Plant Support Engineering: Aging Management Program Development Guidance for AC and DC
Number               Title                                             Date
Photographs - dewatered manhole MH-M329           February 2017
EPRI TR-1020804       Plant Support Engineering: Aging Management       June 2010
Program Development Guidance for AC and DC
Low-Voltage Power Cable Systems for Nuclear
Low-Voltage Power Cable Systems for Nuclear
Power Plants June 2010
Power Plants
Procedure
Procedure
Number Title Revision EN-DC-346 Cable Reliability Program 6
Number               Title                                             Revision
Work Orders 00352718 00466126 52605139
EN-DC-346             Cable Reliability Program                         6
Work Orders
00352718         00466126           52605139
B.1.26 Non-EQ Insulated Cables and Connections (XI.E1)
B.1.26 Non-EQ Insulated Cables and Connections (XI.E1)
Condition Report 2008-01841
Condition Report
2008-01841
License Renewal
License Renewal
Number Title Revision WF3-EP-14-00009, Section 3.5 Aging Management Program Evaluation Results - Electrical - Non-EQ Insulated Cables and Connections
Number                 Title                                                   Revision
Program 1
WF3-EP-14-00009,       Aging Management Program Evaluation Results -           1
Section 3.5            Electrical - Non-EQ Insulated Cables and Connections
Program
Miscellaneous
Miscellaneous
Number Title Date EPRI TR-109619 Guideline for the Management of Adverse Localized Equipment Environments June 1999
Number                   Title                                                   Date
EPRI TR-109619           Guideline for the Management of Adverse Localized       June 1999
Equipment Environments
Procedure
Procedure
Number Title Revision EN-DC-348 Non-EQ Insulated Cables and Connections Inspection 5
Number                   Title                                                   Revision
EN-DC-348               Non-EQ Insulated Cables and Connections Inspection     5
B.1.28 One-Time Inspection (XI.M32)
B.1.28 One-Time Inspection (XI.M32)
License Renewal
License Renewal
Number Title Revision WF3-EP14-00007 Aging Management Program Evaluation Results Non-Class 1 - Selective Leaching
Number                   Title                                                   Revision
WF3-EP14-00007           Aging Management Program Evaluation Results             0
Non-Class 1 - Selective Leaching
B.1.35 Selective Leaching (XI.M33)
B.1.35 Selective Leaching (XI.M33)
License Renewal
License Renewal
Number Title Revision License Renewal Information System Selective Leaching Program Component List
Number                   Title                                                   Revision
WF3-EP14-00007 Aging Management Program Evaluation Results Non-Class 1 - Selective Leaching
License Renewal Information System Selective Leaching
Program Component List
WF3-EP14-00007           Aging Management Program Evaluation Results             0
Non-Class 1 - Selective Leaching
EXISTING PROGRAMS
EXISTING PROGRAMS
B.1.1 Bolting Integrity (XI.M18)
B.1.1 Bolting Integrity (XI.M18)
Condition Reports 2014-05715 2015-07280 2015-09258 2015-09262 2015-09264 2015-9278 2016-00168 2016-00277 2016-03103 2016-04690
Condition Reports
2016-04694 2016-04843 2016-04844 2016-06651 2016-06655
2014-05715             2015-07280           2015-09258     2015-09262       2015-09264
2015-9278             2016-00168           2016-00277     2016-03103       2016-04690
2016-04694             2016-04843           2016-04844     2016-06651       2016-06655
License Renewal
License Renewal
Number Title Revision WF3-EP-14-00006 Bolting Integrity (Section 4.1) 0
Number                   Title                                                   Revision
WF3-EP-14-00006         Bolting Integrity (Section 4.1)                         0
Miscellaneous
Miscellaneous
Number Title Revision CEP-UPT-0100 Underground Piping and Tanks Inspection and Monitoring 4 SEP-UIP-WF3 Underground Components Inspection Plan 3
Number                   Title                                                   Revision
CEP-UPT-0100             Underground Piping and Tanks Inspection and Monitoring 4
SEP-UIP-WF3             Underground Components Inspection Plan                 3
Miscellaneous
Miscellaneous
Number Title Revision NP-5769 Degradation and Failure of Bolting in Nuclear Power Plants (Research Project 2520-7)
Number                 Title                                                     Revision
UNT-005-007 Plant Lubrication Program 304
NP-5769               Degradation and Failure of Bolting in Nuclear Power       1
Plants (Research Project 2520-7)
UNT-005-007           Plant Lubrication Program                                 304
Procedure
Procedure
Number Title Revision EN-MA-145 Maintenance Standard for Torque Application 8
Number                 Title                                                     Revision
EN-MA-145             Maintenance Standard for Torque Application               8
B.1.5 Compressed Air Monitoring (XI.M24)
B.1.5 Compressed Air Monitoring (XI.M24)
Condition Reports 2013-02290 2014-00021 2014-02354 2014-01061
Condition Reports
2013-02290         2014-00021           2014-02354         2014-01061
License Renewal
License Renewal
Number Title Revision WF3-EP-14-00007 Aging Management Program Evaluation Results - Non-Class 1 Mechanical - Compressed Air Monitoring
Number               Title                                                       Revision
WF3-EP-14-00007       Aging Management Program Evaluation Results - Non-         0
Class 1 Mechanical - Compressed Air Monitoring
Procedures
Procedures
Number Title Revision CE-002-032 Maintaining Instrument Air System 305 CE-001-004 Periodic Analysis Scheduling Program 315
Number                 Title                                                     Revision
CE-002-032             Maintaining Instrument Air System                         305
CE-001-004             Periodic Analysis Scheduling Program                       315
B.1.8 Diesel Fuel Monitoring (XI.M30)
B.1.8 Diesel Fuel Monitoring (XI.M30)
Drawings Number Title Revision/Date 5817-446-R2 Auxiliary Diesel Generator Day Oil Tank Outline September 5, 1978 1564-2525 12'-6" Diesel Oil Storage Tank - A & B General
Drawings
Plan 4 1564-2526 12'-6" Diesel Oil Storage Tank - Shell Details 5 1564-2527 12'-6" Diesel Oil Storage Tank - Bottom and
Number                 Title                                               Revision/Date
5817-446-R2             Auxiliary Diesel Generator Day Oil Tank Outline     September 5,
1978
1564-2525               12-6 Diesel Oil Storage Tank - A & B General     4
Plan
1564-2526               12-6 Diesel Oil Storage Tank - Shell Details     5
1564-2527               12-6 Diesel Oil Storage Tank - Bottom and         2
Anchor Ring Layout
Anchor Ring Layout
1564-2528 12'-6" Diesel Oil Storage Tank - Roof Details 1 1564-4559 48" O.D. * 6'-6" Tangential Line Diesel Oil Storage
1564-2528               12-6 Diesel Oil Storage Tank - Roof Details       1
1564-4559               48 O.D. * 6-6 Tangential Line Diesel Oil Storage 3
Feed Tanks
Feed Tanks
License Renewal
License Renewal
Number Title Revision License Renewal Information System Diesel Fuel Monitoring Program Component List
Number                   Title                                             Revision
WF3-EP14-00003 Operating Experience Review Results - Aging Management Program Effectiveness
License Renewal Information System Diesel Fuel
WF3-EP14-00007 Aging Management Program Evaluation Results Non-Class 1 - Diesel Fuel Monitoring
Monitoring Program Component List
WF3-EP14-00003           Operating Experience Review Results - Aging       0
Management Program Effectiveness
WF3-EP14-00007           Aging Management Program Evaluation Results       1
Non-Class 1 - Diesel Fuel Monitoring
Miscellaneous
Miscellaneous
Title   10-year graphs of water/sediment and particulates for diesel Fuel Oil Storage Tank A and Tank B, diesel Day Tank A and diesel Day Tank B
Title
Fuel Oil Storage Tanks A and B Diesel Fuel Oil Analysis Reports dated April 22 and July 6, 2016
10-year graphs of water/sediment and particulates for diesel Fuel Oil
Storage Tank A and Tank B, diesel Day Tank A and diesel Day Tank B
Fuel Oil Storage Tanks A and B Diesel Fuel Oil Analysis Reports dated
April 22 and July 6, 2016
Procedures
Procedures
Number Title Revision CE-001-004 Periodic Analysis Scheduling Program 315 CE-002-030 Maintaining Diesel Fuel Oil 27
Number                   Title                                             Revision
CE-003-608 Determination of Biologicals in Diesel Fuel 3
CE-001-004               Periodic Analysis Scheduling Program               315
EN-LI-121 Trending and Performance Review Process 17
CE-002-030               Maintaining Diesel Fuel Oil                       27
MM-003-019 Diesel Generator Fuel Oil Storage Tank Inspection 10
CE-003-608               Determination of Biologicals in Diesel Fuel       3
EN-LI-121               Trending and Performance Review Process           17
MM-003-019               Diesel Generator Fuel Oil Storage Tank Inspection 10
Work Orders
Work Orders
244684 52648830 00400699 00293713 52651825 00401851
244684       52648830         00400699       00293713         52651825     00401851
B.1.10 External Surfaces Monitoring (XI.M36)
B.1.10 External Surfaces Monitoring (XI.M36)
Calculations
Number            Title                                                  Revision/Date
ECM06-002          Insulation Removal Limits - Piping Inspections in      1
Safeguards Pump Room, SDC HX Room and Wing
Area
LOU 1564.101      Heat, Antisweat and Process Heating Insulation for      January 15, 1985
Nuclear and Non-Nuclear Piping and Equipment
SEP-ISI-104        Program Section for ASME Section XI, Division 1        2
Inservice Inspection Program
Condition Reports
Condition Reports
2011-07651 2014-05520 2014-04930 2013-05270
2011-07651               2014-05520             2014-04930             2013-05270
Calculations
2005-04705               2013-01420             2005-03983           2015-00463
Number Title  Revision/Date ECM06-002 Insulation Removal Limits - Piping Inspections in Safeguards Pump Room, SDC HX Room and Wing
Area 1 LOU 1564.101 Heat, Antisweat and Process Heating Insulation for Nuclear and Non-Nuclear Piping and Equipment
January 15, 1985 SEP-ISI-104 Program Section for ASME Section XI, Division 1 Inservice Inspection Program
2005-04705 2013-01420 2005-03983 2015-00463
License Renewal:
License Renewal:
Number Title Revision WF3-EP-14-00007 Aging Management Program Evaluation Results -
Number               Title                                             Revision
WF3-EP-14-00007       Aging Management Program Evaluation Results -     0
Non-Class 1 Mechanical - External Surface
Non-Class 1 Mechanical - External Surface
Monitoring
Monitoring
Procedures
Procedures
Number Title Revision EN-DC-178 System Walkdowns 7 EN-LI-121 Trending and Performance Review Process 17
Number           Title                                                 Revision
PMC-004-004 Maintenance / Installation of Thermal Insulation 5
EN-DC-178         System Walkdowns                                     7
EN-LI-121         Trending and Performance Review Process               17
PMC-004-004       Maintenance / Installation of Thermal Insulation     5
B.1.11 Fatigue Monitoring (XI.M1)
B.1.11 Fatigue Monitoring (XI.M1)
Calculation
Calculation
Number Title Revision CN-RIDA-09-38 Design Reconciliation of Waterford 3 Reactor Vessel Internals for Operation at 3716 MWt with Replacement
Number           Title                                                 Revision
CN-RIDA-09-38     Design Reconciliation of Waterford 3 Reactor Vessel   0
Internals for Operation at 3716 MWt with Replacement
Steam Generator
Steam Generator
Condition Reports 2004-01751 2015-00044
Condition Reports
2004-01751                       2015-00044
License Renewal
License Renewal
Number Title Revision WF3-EP-14-00006 Fatigue Monitoring Program (Section 4.2) 0 WF3-EP-14-00004 TLAA and Exemption Evaluation Results 0 WF3-EP-14-00005 TLAA - Mechanical Fatigue 0 WF3-ME-15-00001 Survey of Design Transients for Thermal Cycle
Number               Title                                             Revision
WF3-EP-14-00006       Fatigue Monitoring Program (Section 4.2)         0
WF3-EP-14-00004       TLAA and Exemption Evaluation Results             0
WF3-EP-14-00005       TLAA - Mechanical Fatigue                         0
WF3-ME-15-00001 Survey of Design Transients for Thermal Cycle           0
Counting - 1300394.301
Counting - 1300394.301
WF3-ME-15-00002 Plant Transient Analysis for Waterford - Plant Startup through 4/5/2014 - 1400394.302
WF3-ME-15-00002 Plant Transient Analysis for Waterford - Plant         0
Startup through 4/5/2014 - 1400394.302
Procedures
Procedures
Number Title Revision PE-002-003 Fatigue Monitoring Program Coordinator 5  
Number               Title                                             Revision
 
PE-002-003           Fatigue Monitoring Program Coordinator           5
B.1.12 Fire Protection (XI.M26)
B.1.12 Fire Protection (XI.M26)
Condition Report
Condition Report
2015-00405
2015-00405
License Renewal
License Renewal
Number Title Revision WF3-EP-14-00007, Section 4.6 Aging Management Program Evaluation Results Non-Class 1 Mechanical - Fire Protection
Number                   Title                                             Revision
WF3-EP-14-00007,         Aging Management Program Evaluation Results       1
Section 4.6              Non-Class 1 Mechanical - Fire Protection
Miscellaneous
Miscellaneous
Number Title Date Q4-2016 Program Health Report - Fire Protection 2016 Q3-2016 Program Health Report - Fire Protection 2016 NFPA 25 Standard for the Inspection, Testing, and Maintenance of
Number         Title                                                     Date
Q4-2016         Program Health Report - Fire Protection                   2016
Q3-2016         Program Health Report - Fire Protection                   2016
NFPA 25         Standard for the Inspection, Testing, and Maintenance of 2011
Water-Based Fire Protection Systems
Water-Based Fire Protection Systems
2011  Procedures
Procedures
Number Title Revision ME-003-006 Fire Barrier Penetration Seals 306 ME-003-006 Fire Barrier Penetration Seals 310
Number               Title                                                     Revision
ME-003-007 Fire Wrap Barriers 15
ME-003-006           Fire Barrier Penetration Seals                           306
ME-003-007 Fire Wrap Barriers 17
ME-003-006           Fire Barrier Penetration Seals                           310
ME-003-009 Fire Rated Walls, Floors, and Ceilings 302 ME-003-009 Fire Rated Walls, Floors, and Ceilings 306
ME-003-007           Fire Wrap Barriers                                       15
PS-015 111  (PMC-003-006) Fire Door Surveillance 301 UNT-005-013 Fire Protection Program 13 UNT-005-013 Fire Protection Program 14
ME-003-007           Fire Wrap Barriers                                       17
ME-003-009           Fire Rated Walls, Floors, and Ceilings                   302
ME-003-009           Fire Rated Walls, Floors, and Ceilings                   306
PS-015 111           Fire Door Surveillance                                    301
  (PMC-003-006)
UNT-005-013         Fire Protection Program                                   13
UNT-005-013         Fire Protection Program                                   14
Work Orders
Work Orders
00324922 00324921
00324922         00324921
B.1.13 Fire Water System (XI.M27)
B.1.13 Fire Water System (XI.M27)
Condition Reports 2011-00224 2012-00509 2014-00521 2016-06184 2017-00935* CR-HQN-
Condition Reports
2017-00241* * Written as a result of this inspection  
2011-00224     2012-00509       2014-00521     2016-06184     2017-00935*   CR-HQN-
 
2017-00241*
Drawings Number Title Revision G161, Sheet 1 Flow Diagram Fire, Make Up & Domestic Water Systems 0 G161, Sheet 2 Flow Diagram Fire, Make Up and Domestic Water Systems 0
* Written as a result of this inspection
G161, Sheet 3 Flow Diagram Fire, Make Up & Domestic Water Systems 0
Drawings
G161, Sheet 5 Flow Diagram Fire, Make Up & Domestic Water Systems 0
Number           Title                                                           Revision
G161, Sheet 6 Flow Diagram Fire, Make Up & Domestic Water Systems 0
G161, Sheet 1   Flow Diagram Fire, Make Up & Domestic Water Systems             0
G164, Sheet 3 Flow Diagram, Miscellaneous Reactor Auxiliary Systems 0 15641660 Fire Water Storage Tank A 2
G161, Sheet 2   Flow Diagram Fire, Make Up and Domestic Water Systems           0
G161, Sheet 3   Flow Diagram Fire, Make Up & Domestic Water Systems             0
G161, Sheet 5   Flow Diagram Fire, Make Up & Domestic Water Systems             0
G161, Sheet 6   Flow Diagram Fire, Make Up & Domestic Water Systems             0
G164, Sheet 3   Flow Diagram, Miscellaneous Reactor Auxiliary Systems           0
15641660         Fire Water Storage Tank A                                       2
License Renewal
License Renewal
Number Title Revision WF3-EP-14-00007, Section 4.7 Aging Management Program Evaluation Results Non-Class 1 Mechanical - Fire Water System
Number               Title                                                       Revision
WF3-ME-14-00010 Aging Management Review of the Fire Protection: Water
WF3-EP-14-00007, Aging Management Program Evaluation Results Non-                 1
System 1 LR-ISG-2012-02 Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion under Insulation
Section 4.7          Class 1 Mechanical - Fire Water System
WF3-ME-14-00010 Aging Management Review of the Fire Protection: Water 1
System
LR-ISG-2012-02       Aging Management of Internal Surfaces, Fire Water
Systems, Atmospheric Storage Tanks, and Corrosion
under Insulation
Miscellaneous
Miscellaneous
Number Title Date NFPA 25 Standard for the Inspection, Testing, and Maintenance of
Number               Title                                                       Date
NFPA 25               Standard for the Inspection, Testing, and Maintenance of 2011
Water-Based Fire Protection Systems
Water-Based Fire Protection Systems
2011 Technical Requirements
Technical             Fire Suppression Water Systems
Manual 3/4.7.10 Fire Suppression Water Systems  Q4-2016 Program Health Report - Fire Protection Q3-2016 Program Health Report - Fire Protection
Requirements
NRC Regulatory
Manual 3/4.7.10
Guide 1.54
Q4-2016               Program Health Report - Fire Protection
Service Level I, II, AND III Protective Coatings Applied to
Q3-2016               Program Health Report - Fire Protection
Nuclear Power Plants
NRC Regulatory       Service Level I, II, AND III Protective Coatings Applied to October 2010
October 2010
Guide 1.54            Nuclear Power Plants
Procedures
Procedures
Number Title Revision MM-003-021 Sprinkler System Inspection (Safety Areas) 10 MM-003-021 Sprinkler System Inspection (Safety Areas) 12 MM-003-032 Maintenance Surveillance Procedure Diesel Fire Pump Engine Inspection
Number         Title                                                             Revision
MM-003-021     Sprinkler System Inspection (Safety Areas)                         10
MM-003-021     Sprinkler System Inspection (Safety Areas)                         12
MM-003-032     Maintenance Surveillance Procedure Diesel Fire Pump Engine 14
Inspection
Procedures
Procedures
Number Title Revision MM-004-422 Sprinkler System Inspection (Nonsafety Areas) 8 MM-004-422 Sprinkler System Inspection (Nonsafety Areas) 10
Number         Title                                                       Revision
MM-004-423 Yard Fire Hydrant Hose House Inspection and House
MM-004-422     Sprinkler System Inspection (Nonsafety Areas)               8
MM-004-422     Sprinkler System Inspection (Nonsafety Areas)               10
MM-004-423     Yard Fire Hydrant Hose House Inspection and House           14
Replacement
Replacement
MM-004-423 Yard Fire Hydrant Hose House Inspection and House
MM-004-423     Yard Fire Hydrant Hose House Inspection and House           17
Replacement
Replacement
MM-004-424 Building Fire Hose Station Inspection and Hose Replacement 304 MM-004-424 Building Fire Hose Station Inspection and Hose Replacement 307
MM-004-424     Building Fire Hose Station Inspection and Hose Replacement 304
MM-007-008 Fire Hose Hydrostatic Test 301
MM-004-424     Building Fire Hose Station Inspection and Hose Replacement 307
MM-007-008 Fire Hose Hydrostatic Test 308
MM-007-008     Fire Hose Hydrostatic Test                                 301
OP-903-055 Fire Main Flush and Hydrant Inspection 11 OP-903-057 Fire Protection System Flow Test 18 OP-903-057 Fire Protection System Flow Test 21
MM-007-008     Fire Hose Hydrostatic Test                                 308
OP-903-058 Fire Hose Station Valve Cycling Check 14
OP-903-055     Fire Main Flush and Hydrant Inspection                     11
OP-903-059 Sprinkler System Functional Test 12
OP-903-057     Fire Protection System Flow Test                           18
UNT-005-013 Fire Protection Program 13 UNT-005-013 Fire Protection Program 14
OP-903-057     Fire Protection System Flow Test                           21
Work Orders 00232209 52681255 52517633 52283342 52487901 52732060 52610650
OP-903-058     Fire Hose Station Valve Cycling Check                       14
232586 52727119 52606298 52321112 52489432 52508563 52603247
OP-903-059     Sprinkler System Functional Test                           12
UNT-005-013     Fire Protection Program                                     13
UNT-005-013     Fire Protection Program                                     14
Work Orders
232209    52681255       52517633     52283342     52487901   52732060   52610650
232586     52727119       52606298     52321112     52489432   52508563   52603247
B.1.14 Flow Accelerated Corrosion (XI.M17)
B.1.14 Flow Accelerated Corrosion (XI.M17)
Condition Reports 2013-01360 2014-02147 2014-04226
Condition Reports
2013-01360                     2014-02147                   2014-04226
Calculation
Calculation
Number Title Revision 030709-02 Flow Accelerated Corrosion CHECWORKS FAC Model 0  
Number               Title                                               Revision
 
030709-02             Flow Accelerated Corrosion CHECWORKS FAC Model       0
Engineering Change
Engineering Change
Number Title Revision 35912 RF-18 Flow Accelerated Corrosion (FAC) project Tcrit
Number                 Title                                                   Revision
Values 0 46350 RF-19 Flow Accelerated Corrosion (FAC) project Tcrit
35912                 RF-18 Flow Accelerated Corrosion (FAC) project Tcrit   0
Values License Renewal
Values
Number Title Revision WF3-EP-14-00006 Flow-Accelerated Corrosion (Section 4.8) 0
46350                 RF-19 Flow Accelerated Corrosion (FAC) project Tcrit   0
Values
License Renewal
Number                 Title                                                   Revision
WF3-EP-14-00006       Flow-Accelerated Corrosion (Section 4.8)               0
Miscellaneous
Miscellaneous
Number Title Revision/Date RFO-19 Flow Accelerated Corrosion Summary
Number                 Title                                               Revision/Date
Report RFO-18 Flow Accelerated Corrosion Summary
RFO-19 Flow Accelerated Corrosion Summary           0
Report Program Health Report - Q2-2012 June 30, 2012 Program Health Report - Q2-2013 June 30, 2013 Program Health Report - Q2-2014 June 30, 2014
Report
Program Health Report - Q2-2015 June 30, 2015
RFO-18 Flow Accelerated Corrosion Summary           0
LR-ISG-2012-01 Wall Thinning Due to Erosion Mechanisms
Report
Waterford 3 FAC program System Susceptibility Evaluation (SSE)
Program Health Report - Q2-2012                     June 30, 2012
October 26, 2014
Program Health Report - Q2-2013                     June 30, 2013
Program Health Report - Q2-2014                     June 30, 2014
Program Health Report - Q2-2015                     June 30, 2015
LR-ISG-2012-01         Wall Thinning Due to Erosion Mechanisms
Waterford 3 FAC program System Susceptibility       October 26, 2014
Evaluation (SSE)
Procedures
Procedures
Number Title Revision EN-DC-315 Flow Accelerated Corrosion Program 12 EN-LI-121 Trending and Performance Review Process 22 NSAC-202L Recommendations for an Effective Flow-Accelerated
Number           Title                                                     Revision
EN-DC-315       Flow Accelerated Corrosion Program                       12
EN-LI-121       Trending and Performance Review Process                   22
NSAC-202L       Recommendations for an Effective Flow-Accelerated         3
Corrosion Program
Corrosion Program
EN-DC-315 Flow Accelerated Corrosion Program 12
EN-DC-315       Flow Accelerated Corrosion Program                       12
B.1.17 Inspection of Overhead Heavy Load and Light Load (related to refueling) Handling Systems (XI.M23)
B.1.17 Inspection of Overhead Heavy Load and Light Load (related to refueling) Handling
Systems (XI.M23)
Condition Reports
Condition Reports
2009-02108 2007-01250 2014-03161
2009-02108                       2007-01250                   2014-03161
2014-01628 2011-00215 2007-03574 2011-02935 2014-05435 LO-WLO-2004-00033
2014-01628                       2011-00215                     2007-03574
2011-02935                       2014-05435                     LO-WLO-2004-00033
License Renewal
License Renewal
Number Title Revision WF3-EP-14-00008 Waterford 3 License Renewal Project - Aging Management Program Evaluation Report
Number                 Title                                                 Revision
Civil/Structural - Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems 1 WF3-CS-14-00001 WF3 License Renewal Project - Aging Management Review of the Reactor Building
WF3-EP-14-00008       Waterford 3 License Renewal Project - Aging           1
WF3-CS-14-00003 WF3 License Renewal Project - Aging Management Review of the Turbine Building and Other Structures
Management Program Evaluation Report
WF3-EP-14-00003 WF3 License Renewal Project - Operating Experience Review Results - Aging Management Effectiveness
Civil/Structural - Inspection of Overhead Heavy Load
Program Miscellaneous
and Light Load (Related to Refueling) Handling
Title Revision Quality Assurance Program Manual 29
Systems
WF3-CS-14-00001       WF3 License Renewal Project - Aging Management       1
Review of the Reactor Building
WF3-CS-14-00003       WF3 License Renewal Project - Aging Management       1
Review of the Turbine Building and Other Structures
WF3-EP-14-00003       WF3 License Renewal Project - Operating Experience   0
Review Results - Aging Management Effectiveness
Program
Miscellaneous
Title                                                                       Revision
Quality Assurance Program Manual                                             29
Procedures
Procedures
Number Title Revision MM-002-201 Containment Building Polar Crane PM 303 MM-004-401 Fuel Handling Building Crane PM 7
Number           Title                                                       Revision
MM-004-870 Kranco Overhead Cranes PM 301
MM-002-201       Containment Building Polar Crane PM                         303
MM-004-877 Containment Building Auxiliary Pedestal Crane PM 302
MM-004-401       Fuel Handling Building Crane PM                             7
MM-006-018 Miscellaneous Hoist Maintenance 7 MM-007-002 Crane and Hoist Inspection and Testing 9
MM-004-870       Kranco Overhead Cranes PM                                   301
MM-004-877       Containment Building Auxiliary Pedestal Crane PM           302
MM-006-018       Miscellaneous Hoist Maintenance                             7
MM-007-002       Crane and Hoist Inspection and Testing                     9
B.1.19 Masonry Wall (XI.S5)
B.1.19 Masonry Wall (XI.S5)
Condition Reports
Condition Reports
2002-01613 2004-01281 2004-01293
2002-01613                       2004-01281                     2004-01293
Drawings Number Title Revision G-554 Reactor Auxiliary Building Floor Slab at El-4.00 Masonry 17
Drawings
G-560, Sheet 2 Reactor Auxiliary Building Roof Slab at El +60.00 Masonry 11 G-599 Turbine Generator Pedestal Mat-Masonry 5
Number       Title                                                           Revision
G-554       Reactor Auxiliary Building Floor Slab at El-4.00 Masonry       17
G-560,       Reactor Auxiliary Building Roof Slab at El +60.00 Masonry       11
Sheet 2
G-599       Turbine Generator Pedestal Mat-Masonry                         5
License Renewal
License Renewal
Number Title Revision WF3-CS-14-00002 Aging Management Review of the Nuclear Plant Island
Number               Title                                                 Revision
WF3-CS-14-00002       Aging Management Review of the Nuclear Plant Island   1
Structure
Structure
WF3-CS-14-00003 Aging Management Review of the Turbine Building and
WF3-CS-14-00003       Aging Management Review of the Turbine Building and 1
Other Structures
Other Structures
WF3-EP-14-00003 Operating Experience Review Results - Aging Management Program Effectiveness
WF3-EP-14-00003       Operating Experience Review Results - Aging           0
WF3-EP-14-00008 Operating Experience Review Results - Aging Management Program Evaluation Report
Management Program Effectiveness
WF3-EP-14-00008       Operating Experience Review Results - Aging           1
Management Program Evaluation Report
Civil/Structural
Civil/Structural
Miscellaneous
Miscellaneous
Number Title Date Information Notice No.
Number                 Title                                               Date
87-67 Lessons Learned from Regional Inspections of Licensee Actions in Response to IE Bulletin 80-1 December 31, 1987 IE Bulletin No. 80-11 Masonry Wall Design May 8, 1980 Letter
Information Notice No. Lessons Learned from Regional Inspections of         December 31,
: [[contact::D. W. Herrin to Files]], W3P83-3187, IE Bulletin 80-11 Masonry Wall Design September 19, 1983 EPRI Report 107933 Aging Assessment Field Guide December
87-67                  Licensee Actions in Response to IE Bulletin 80-1     1987
2003 Procedure
IE Bulletin No. 80-11   Masonry Wall Design                                 May 8, 1980
Number Title Revision EN-DC-150 Condition Monitoring of Maintenance Rule Structures 6
Letter                
: [[contact::D. W. Herrin to Files]], W3P83-3187, IE Bulletin 80-11 September 19,
Masonry Wall Design                                 1983
EPRI Report 107933     Aging Assessment Field Guide                         December
2003
Procedure
Number               Title                                                   Revision
EN-DC-150             Condition Monitoring of Maintenance Rule Structures     6
B.1.21 Neutron-Absorbing Material Monitoring (XI.M40)
B.1.21 Neutron-Absorbing Material Monitoring (XI.M40)
Drawing Number Title Revision G141 General Arrangement Fuel Handling Plans 23
Drawing
Number               Title                                                   Revision
G141                 General Arrangement Fuel Handling Plans                 23
License Renewal
License Renewal
Number Title Revision WF3-EP-14-00006 Neutron-Absorbing Material Monitoring (Section 4.9) 0
Number               Title                                                   Revision
WF3-EP-14-00006       Neutron-Absorbing Material Monitoring (Section 4.9)     0
Miscellaneous
Miscellaneous
Number Title Revision NET-28083-001-01 Inspection and Testing of Waterford BORAL Surveillance
Number               Title                                                   Revision
Coupons 0
NET-28083-001-01     Inspection and Testing of Waterford BORAL Surveillance   0
Coupons
Miscellaneous
Miscellaneous
Number Title Revision LR-ISG-2009-01 Aging Management of Spent Fuel Pool Neutron-Absorbing
Number                 Title                                                       Revision
LR-ISG-2009-01         Aging Management of Spent Fuel Pool Neutron-Absorbing
Materials Other Than Boraflex
Materials Other Than Boraflex
SNM-SFP-C21 Spent Fuel Pool Inventory Map Cycles 21 4
SNM-SFP-C21             Spent Fuel Pool Inventory Map Cycles 21                     4
Procedure
Procedure
Number Title Revision NE-001-106 SFSR Boral Surveillance Program 5
Number                 Title                                                       Revision
NE-001-106             SFSR Boral Surveillance Program                             5
B.1.27 Oil Analysis (XI.M39)
B.1.27 Oil Analysis (XI.M39)
Drawings Number Title Revision G164, sheet 1 Flow Diagram - Miscellaneous Reactor Auxiliary Systems 0 1564-2044 Emergency Diesel Generator B, Oil Schematic and Notes 0
Drawings
Number                 Title                                                       Revision
G164, sheet 1           Flow Diagram - Miscellaneous Reactor Auxiliary Systems       0
1564-2044               Emergency Diesel Generator B, Oil Schematic and Notes       0
License Renewal
License Renewal
Number Title Revision Table 3.3.2-15-17 Emergency Diesel Generator System Nonsafey-Related Components Affecting Safety-Related Systems Summary
Number                 Title                                                       Revision
Table 3.3.2-15-17       Emergency Diesel Generator System Nonsafey-Related
Components Affecting Safety-Related Systems Summary
of Aging Management Evaluation
of Aging Management Evaluation
WF3-EP14-00003 Operating Experience Review Results - Aging Management Program Effectiveness
WF3-EP14-00003         Operating Experience Review Results - Aging                 0
WF3-EP14-00007 Aging Management Program Evaluation Results
Management Program Effectiveness
WF3-EP14-00007         Aging Management Program Evaluation Results                 0
Non-Class 1 - Oil Analysis
Non-Class 1 - Oil Analysis
Miscellaneous
Miscellaneous
Number Title Revision Condition Report 2017-00655   Information related to ISO cleanliness codes for lubricating
Number                 Title                                                       Revision
oils   Lubrication Manual specification sheets for auxiliary feedwater pump, auxiliary component cooling water pump,
Condition Report 2017-00655
Information related to ISO cleanliness codes for lubricating
oils
Lubrication Manual specification sheets for auxiliary
feedwater pump, auxiliary component cooling water pump,
and diesel generator
and diesel generator
Lubrication oil laboratory test results for auxiliary feedwater pump and diesel generator
Lubrication oil laboratory test results for auxiliary
SEP-LUB-WF3-001 Waterford 3 Lubrication Analysis & Monitoring Program Implementation
feedwater pump and diesel generator
EPRI 1019518 Lubrication Guide 4
SEP-LUB-WF3-001         Waterford 3 Lubrication Analysis & Monitoring Program       0
Implementation
EPRI 1019518           Lubrication Guide                                           4
Procedures
Procedures
Number Title Revision EN-DC-310 Predictive Maintenance Program 7 EN-LI-121 Trending and Performance Review Process 17
Number               Title                                                     Revision
UNT-005-007 Plant Lubrication Procedure 304
EN-DC-310           Predictive Maintenance Program                             7
EN-LI-121           Trending and Performance Review Process                   17
UNT-005-007         Plant Lubrication Procedure                               304
B.1.31 Protective Coating Monitoring and Maintenance (XI.S8)
B.1.31 Protective Coating Monitoring and Maintenance (XI.S8)
Condition Reports
Condition Reports
2003-03425 2006-04317 2011-02987 2013-01020 2014-02804
2003-03425         2006-04317         2011-02987         2013-01020       2014-02804
License Renewal
License Renewal
Number Title Revision WF3-EP-14-00003 Waterford 3 License Renewal Project Aging Management Program Effectiveness
Number                 Title                                                     Revision
WF3-EP-14-00008 Waterford 3 License Renewal Project Aging Management Program Evaluation Report Civil/Structural
WF3-EP-14-00003         Waterford 3 License Renewal Project Aging Management     0
WF3-CS-14-00001 Waterford 3 License Renewal Project Aging Management Review of the Reactor Building
Program Effectiveness
WF3-EP-14-00008         Waterford 3 License Renewal Project Aging Management     1
Program Evaluation Report Civil/Structural
WF3-CS-14-00001         Waterford 3 License Renewal Project Aging Management     1
Review of the Reactor Building
Miscellaneous
Miscellaneous
Number Title Revision/Date
Number               Title                                                   Revision/Date
EPRI Topical Report
EPRI Topical Report Guideline on Nuclear Safety-Related Coatings,             2
No. 1019157 Guideline on Nuclear Safety-Related Coatings, (Formerly TR-109937 and 1003102)
No. 1019157          (Formerly TR-109937 and 1003102)
NRC IN 2011-20 Concrete Degradation by Alkali-Silica Reaction November 18, 2011 GL 98-04 Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System after a Loss-of-Coolant Accident because of Construction and Protective Coating Deficiencies and
NRC IN 2011-20       Concrete Degradation by Alkali-Silica Reaction         November 18,
2011
GL 98-04             Potential for Degradation of the Emergency Core
Cooling System and the Containment Spray System
after a Loss-of-Coolant Accident because of
Construction and Protective Coating Deficiencies and
Foreign Material in Containment
Foreign Material in Containment
GL 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at
GL 2004-02           Potential Impact of Debris Blockage on Emergency       July 14, 1998
Recirculation during Design Basis Accidents at
Pressurized Water Reactors
GL 2004-02            Potential Impact of Debris Blockage on Emergency        September 13,
Recirculation during Design Basis Accidents at          2004
Pressurized Water Reactors
Pressurized Water Reactors
July 14, 1998 GL 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at
NRC Bulletin 96-03: Potential Plugging of Emergency Core Cooling Suction     May 6, 1996
Pressurized Water Reactors September 13, 2004 NRC Bulletin 96-03: Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Boiling Water Reactors May 6, 1996
Strainers by Debris in Boiling Water Reactors
 
Procedures
Procedures
Number Title Revision EN-DC-220 Safety-Related Coatings Program 2 EN-FAP-LR-006 Structural Screening and Aging Management Reviews 7
Number               Title                                                       Revision
WF3-CS-14-00001 Aging Management Review of the Reactor Building 1
EN-DC-220           Safety-Related Coatings Program                             2
WF3-EP-14-00003 Operating Experience Review Results - Aging Management Program Effectiveness
EN-FAP-LR-006       Structural Screening and Aging Management Reviews           7
NOECP-451 Conducting Engineering Inspection of Reactor Containment
WF3-CS-14-00001     Aging Management Review of the Reactor Building             1
WF3-EP-14-00003     Operating Experience Review Results - Aging Management     0
Program Effectiveness
NOECP-451           Conducting Engineering Inspection of Reactor Containment   1
Building Protective Coatings
Building Protective Coatings
B.1.36 Service Water Integrity (XI.M20) Calculation
B.1.36 Service Water Integrity (XI.M20)
Number Title Revision SEP-HX-WF3-001 Generic Letter 89-13 Heat Exchanger Test Basis 0
Calculation
Condition Reports LO-WLO-2008-00043 2006-033402008-006692010-07206   LO-WLO-2006-0048 2008-044882008-04996
Number                 Title                                                   Revision
CR-HQN-2007-0893 2007-023642011-15424
SEP-HX-WF3-001         Generic Letter 89-13 Heat Exchanger Test Basis           0
Condition Reports
LO-WLO-2008-00043       2006-03340 2008-00669 2010-07206
LO-WLO-2006-0048         2008-04488 2008-04996
CR-HQN-2007-0893         2007-02364 2011-15424
License Renewal
License Renewal
Number Title Revision WF3-EP-14-00007 WF3 License Renewal Project - Aging Management Program Evaluation Results - Non-Class 1 Mechanical -
Number                 Title                                                   Revision
WF3-EP-14-00007         WF3 License Renewal Project - Aging Management           0
Program Evaluation Results - Non-Class 1 Mechanical -
Service Water Integrity
Service Water Integrity
Miscellaneous
Miscellaneous
Number Title Revision/Date W3-DBD-4 Waterford SES Unit No.3 Design Basis Document - Component Cooling Water, Auxiliary Component
Number               Title                                               Revision/Date
W3-DBD-4             Waterford SES Unit No.3 Design Basis Document -     303
Component Cooling Water, Auxiliary Component
Cooling Water
Cooling Water
303 CTI Code ATC-105 Cooling Technology Institute - CTI Code Tower Standard Specifications - Acceptance Test Code for
CTI Code ATC-105 Cooling Technology Institute - CTI Code Tower           February 2000
Standard Specifications - Acceptance Test Code for
Water Cooling Towers
Water Cooling Towers
February 2000
Procedures
Procedures
Number Title Revision CE-002-003 Maintaining Auxiliary Component Cooling Water Chemistry 302 EN-DC-184 NRC Generic Letter 89-13 Service Water Program
Number                 Title                                                     Revision
CE-002-003             Maintaining Auxiliary Component Cooling Water Chemistry   302
EN-DC-184             NRC Generic Letter 89-13 Service Water Program           3
Procedures
Procedures
Number Title Revision EN-DC-340 Microbiologically Induced Corrosion (MIC) Monitoring
Number                 Title                                                   Revision
Program 3 EN-LI-121 Trending and Performance Review Process 17 PE-004-021 CCW Heat Exchanger Performance Test 4
EN-DC-340             Microbiologically Induced Corrosion (MIC) Monitoring   3
UNT-006-032 Coating and Corrosion Program 1
Program
PE-004-003 Wet Cooling Tower A(B) Thermal Performance Test 306
EN-LI-121             Trending and Performance Review Process                 17
Work Orders 52514794 00451255-32
PE-004-021             CCW Heat Exchanger Performance Test                     4
UNT-006-032           Coating and Corrosion Program                           1
PE-004-003             Wet Cooling Tower A(B) Thermal Performance Test         306
Work Orders
2514794          00451255-32
B.1.38 Structures Monitoring (XI.S6)
B.1.38 Structures Monitoring (XI.S6)
Condition Reports
Condition Reports
2006-00755 2009-06945 2010-05582 2012-04684 2016-04481 2016-04484
2006-00755     2009-06945       2010-05582     2012-04684       2016-04481 2016-04484
2012-07645 2014-05375 2015-00947 2016-04480 2016-04482
2012-07645     2014-05375       2015-00947     2016-04480       2016-04482
License Renewal
License Renewal
Number Title Revision WF3-EP-14-00001 Waterford 3 License Renewal Project System and Structure Scoping Results Civil/Structural
Number                 Title                                                 Revision
WF3-EP-14-00003 Waterford 3 License Renewal Project Operating Experience Review Results - Aging Management Program Effectiveness
WF3-EP-14-00001         Waterford 3 License Renewal Project System and         0
WF3-EP-14-00008 Waterford 3 License Renewal Project Aging Management Program Evaluation Report Civil/Structural
Structure Scoping Results Civil/Structural
WF3-EP-14-00003         Waterford 3 License Renewal Project Operating         0
Experience Review Results - Aging Management
Program Effectiveness
WF3-EP-14-00008         Waterford 3 License Renewal Project Aging Management   1
Program Evaluation Report Civil/Structural
Operating Experiences
Operating Experiences
Number Title Revision WF3-CS-14-00002 Aging Management Review of the Nuclear Plant Island
Number               Title                                                   Revision
WF3-CS-14-00002 Aging Management Review of the Nuclear Plant Island           1
Structure
Structure
WF3-CS-14-00003 Aging Management Review of the Turbine Building and
WF3-CS-14-00003       Aging Management Review of the Turbine Building and     1
Other Structures
Other Structures
WF3-CS-14-00004 Aging Management Review of Bulk Commodities 1 WF3-EP-14-00008 Aging Management Program Evaluation Report
WF3-CS-14-00004       Aging Management Review of Bulk Commodities             1
WF3-EP-14-00008       Aging Management Program Evaluation Report               1
Civil/Structural
Civil/Structural
Procedures
Procedures
Number Title Revision EN-DC-150 Condition Monitoring of Maintenance Rule Structures 6 EN-DC-178 System Walkdowns 7
Number             Title                                                     Revision
EN-MA-145 Maintenance Standard for Torque Applications
EN-DC-150         Condition Monitoring of Maintenance Rule Structures       6
EN-FAP-LR-006 Structural Screening and Aging Management Reviews 7
EN-DC-178         System Walkdowns                                           7
LOU 1564.723 [Specification] Structural Steel Seismic I & II 16
EN-MA-145         Maintenance Standard for Torque Applications               3
UNT-006-032 Coating and Corrosion Program 0 W-CS-2003-001-00 Maintenance Rule Walkdown for Evaluation of Structures 0 WF3-CS-11-00001 Maintenance Rule Walkdown for Evaluation of Structures 0
EN-FAP-LR-006     Structural Screening and Aging Management Reviews         7
WF3-CS-16-00006 Maintenance Rule Walkdown for Evaluation of Structures 0
LOU 1564.723       [Specification] Structural Steel Seismic I & II           16
B-288, Sh 3 Cable and Conduit List Installation Notes Sh.3 8
UNT-006-032       Coating and Corrosion Program                             0
B-288, Sh 4 Cable and Conduit List Installation Notes Sh.4 18
W-CS-2003-001-00   Maintenance Rule Walkdown for Evaluation of Structures     0
Drawings Number Title Revision G-134 General Arrangement Reactor Auxiliary Bldg. Plan+46.00' 35 G-135 General Arrangement Reactor Auxiliary Bldg. Plan+21.00' 30 G-136 General Arrangement Reactor Auxiliary Bldg. Plan -4.00' 35 G-138, Sheet 1 General Arrangement Reactor Auxiliary Bldg. Section 20
WF3-CS-11-00001   Maintenance Rule Walkdown for Evaluation of Structures     0
G-144 General Arrangement Reactor Building Plan El. +21.00 31
WF3-CS-16-00006   Maintenance Rule Walkdown for Evaluation of Structures     0
G-145 General Arrangement Reactor Building Plan El. -4.00 33
B-288, Sh 3       Cable and Conduit List Installation Notes Sh.3             8
G-146, Sheet 1 General Arrangement Reactor Building - Section 18
B-288, Sh 4       Cable and Conduit List Installation Notes Sh.4             18
G-149, Sheet 4 General Arrangement Reactor Auxiliary Bldg. -Plans and Sections
Drawings
G-164 Flow Diagram Containment Spray & Refueling Water
Number             Title                                                     Revision
G-134             General Arrangement Reactor Auxiliary Bldg. Plan+46.00   35
G-135             General Arrangement Reactor Auxiliary Bldg. Plan+21.00   30
G-136             General Arrangement Reactor Auxiliary Bldg. Plan -4.00   35
G-138, Sheet 1     General Arrangement Reactor Auxiliary Bldg. Section       20
G-144             General Arrangement Reactor Building Plan El. +21.00     31
G-145             General Arrangement Reactor Building Plan El. -4.00       33
G-146, Sheet 1     General Arrangement Reactor Building - Section           18
G-149, Sheet 4     General Arrangement Reactor Auxiliary Bldg. -Plans and   25
Sections
G-164             Flow Diagram Containment Spray & Refueling Water         43
Storage Pool
Storage Pool
G-167 Flow Diagram Safety Injection System 20 G-317 S01, Sheet 1 Reactor Aux. Bldg.-EL+ 7.00' Conduit, Trays & Grounding 14 G-554 Reactor Auxiliary Building Floor Slab at El-4.00 Masonry 17 G-560, Sheet 2 Reactor Auxiliary Building Roof Slab at El +60.00 Masonry 11
G-167             Flow Diagram Safety Injection System                     20
G-563, Sheet 2 Reactor Auxiliary Building Structural Layout 4
G-317 S01, Sheet 1 Reactor Aux. Bldg.-EL+ 7.00 Conduit, Trays & Grounding   14
G-599 Turbine Generator Pedestal Mat-Masonry 5
G-554             Reactor Auxiliary Building Floor Slab at El-4.00 Masonry 17
G-763, Sheet 1 Floor Plans 20
G-560, Sheet 2     Reactor Auxiliary Building Roof Slab at El +60.00 Masonry 11
Drawings Number Title Revision G-765, Sheet 3 Floor Plans 23 G-780 Turbine Area Column Schedules 7
G-563, Sheet 2     Reactor Auxiliary Building Structural Layout             4
G-793 Turbine Building Sections & Details 8 G-905 Reactor Auxiliary Building Refuel Pit Liner 2 G-905 Reactor Auxiliary Building Condensate Pool Liner 5
G-599             Turbine Generator Pedestal Mat-Masonry                   5
G-907 Reactor Auxiliary Bldg. Pool Liner Details 9
G-763, Sheet 1     Floor Plans                                               20
License Renewal
Number                Title                                                    Revision
WF3-EP-14-00003      Waterford 3 License Renewal Project Operating            0
Experience Review Results - Aging Management
Program Effectiveness
WF3-EP-14-00007      Waterford 3 License Renewal Project Non Class 1          0
Mechanical
Drawings
Number               Title                                                     Revision
G-765, Sheet 3       Floor Plans                                               23
G-780               Turbine Area Column Schedules                             7
G-793               Turbine Building Sections & Details                       8
G-905               Reactor Auxiliary Building Refuel Pit Liner               2
G-905               Reactor Auxiliary Building Condensate Pool Liner         5
G-907               Reactor Auxiliary Bldg. Pool Liner Details               9
Miscellaneous
Miscellaneous
Number Title Date Video Video Inspection of CSP internals Video Video Inspection of RWSP internals Letter Sandiforth to Booth, Stainless Steel Conduit April 26, 1977
Number                 Title                                         Date
EPRI Report 107933 Aging Assessment Field Guide December 2003
Video                 Video Inspection of CSP internals
Video                 Video Inspection of RWSP internals
Letter                 Sandiforth to Booth, Stainless Steel Conduit   April 26, 1977
EPRI Report 107933     Aging Assessment Field Guide                   December 2003
B.1.40 Water Chemistry Control - Closed Treatment Water System (XI.M21A)
B.1.40 Water Chemistry Control - Closed Treatment Water System (XI.M21A)
Condition Reports
Condition Reports
2007-03514 2011-08166
2007-03514             2011-08166             2013-00724
2013-00724
Procedures
Procedures
Number Title Revision CE-001-004 Periodic Analysis Scheduling Program 315 CE-002-001 Maintaining Steam Generator Chemistry 308 License Renewal
Number         Title                                                           Revision
Number Title  Revision WF3-EP-14-00003 Waterford 3 License Renewal Project Operating Experience Review Results - Aging Management
CE-001-004     Periodic Analysis Scheduling Program                           315
Program Effectiveness
CE-002-001     Maintaining Steam Generator Chemistry                           308
WF3-EP-14-00007 Waterford 3 License Renewal Project Non Class 1
Mechanical
Procedures
Procedures
Number Title Revision CE-002-002 Maintaining Condensate and Feedwater Chemistry 305 CE-002-005 Maintaining Makeup Demineralizer Chemistry 016
Number     Title                                                       Revision
CE-002-006 Maintaining Reactor Coolant Chemistry 314
CE-002-002 Maintaining Condensate and Feedwater Chemistry             305
CE-002-007 Maintaining Component Cooling Water Chemistry 305
CE-002-005 Maintaining Makeup Demineralizer Chemistry                 016
CE-002-008 Maintaining Condensate Storage Pool Chemistry 302
CE-002-006 Maintaining Reactor Coolant Chemistry                       314
CE-002-009 Maintaining Boron Management System Chemistry 301 CE-002-010 Maintaining Safety Injection Tank Chemistry 17 CE-002-011 Maintaining Spent Fuel Pool Chemistry 10
CE-002-007 Maintaining Component Cooling Water Chemistry               305
CE-002-008 Maintaining Condensate Storage Pool Chemistry               302
CE-002-009 Maintaining Boron Management System Chemistry               301
CE-002-010 Maintaining Safety Injection Tank Chemistry                 17
CE-002-011 Maintaining Spent Fuel Pool Chemistry                       10
CE-002-011 Maintaining Diesel Generator Jacket Cooling Water Chemistry 301
CE-002-011 Maintaining Diesel Generator Jacket Cooling Water Chemistry 301
CE-002-013 Maintaining Essential Services Chill Water Chemistry 303
CE-002-013 Maintaining Essential Services Chill Water Chemistry       303
CE-002-020 Maintaining Primary Water Chemistry 13 CE-002-025 Maintaining Refueling Water Storage Pool Chemistry 14 CE-002-027 Maintaining Condensate Storage Tank and Demineralized Water
CE-002-020 Maintaining Primary Water Chemistry                         13
CE-002-025 Maintaining Refueling Water Storage Pool Chemistry         14
Maintaining Condensate Storage Tank and Demineralized Water
CE-002-027                                                            10
Storage Tank
Storage Tank
EN-CY-102 Laboratory Analytical Quality Control 5  
EN-CY-102 Laboratory Analytical Quality Control                       5
 
License Renewal Inspection Document Request
License Renewal Inspection Document Request
Inspection Dates: January 30, 2017, through February 16, 2017
Inspection Dates:         January 30, 2017, through February 16, 2017
Inspection Procedures: IP 71002 "License Renewal InspectionInspectors: Sam Graves, Greg Pick, Wayne Sifre, Jim Melfi, Isaac Anchondo
Inspection Procedures:   IP 71002 License Renewal Inspection
1. License Renewal Application Development Instructions (station blackout, scoping and screening, aging management reviews, operating experience reviews)  
Inspectors:               Sam Graves, Greg Pick, Wayne Sifre, Jim Melfi, Isaac Anchondo
* Program/process documents for performing license renewal activities  
1. License Renewal Application Development Instructions (station blackout, scoping and
* Corrective action program documents for license renewal and site specific  
screening, aging management reviews, operating experience reviews)
* Program/process documents for performing license renewal activities
* Corrective action program documents for license renewal and site specific
* Other specific technical review guidance documents (e.g., operating experience, station
* Other specific technical review guidance documents (e.g., operating experience, station
blackout)  
blackout)
* Assessments and self assessments of the aging management program and scoping
* Assessments and self assessments of the aging management program and scoping
and screening processes
and screening processes
2. License Renewal Process Instructions (developing aging management review report,
2. License Renewal Process Instructions (developing aging management review report,
developing the aging management programs, working with the database)  
developing the aging management programs, working with the database)
 
3. Aging management programs - Currently, the team would like to review the following
3. Aging management programs - Currently, the team would like to review the following
programs:
programs:
XI.M18 Bolting Integrity XI.M41 Buried and Underground Piping
XI.M18 Bolting Integrity
XI.M41 Buried and Underground Piping
XI.M42 Coating Integrity
XI.M42 Coating Integrity
XI.M24 Compressed Air Monitoring XI.M30 Diesel Fuel Monitoring XI.M36 External Services Monitoring
XI.M24 Compressed Air Monitoring
XI.M30 Diesel Fuel Monitoring
XI.M36 External Services Monitoring
X.M1 Fatigue Monitoring
X.M1 Fatigue Monitoring
XI.M26 Fire Protection
XI.M26 Fire Protection
XI.M27 Fire Water System XI.M17 Flow-Accelerated Corrosion (FAC) Program XI.M23 Inspection of Overhead Heavy Load and Light Load (related to refueling)
XI.M27 Fire Water System
XI.M17 Flow-Accelerated Corrosion (FAC) Program
XI.M23 Inspection of Overhead Heavy Load and Light Load (related to refueling)
Handling Systems
Handling Systems
XI.S5 Masonry Wall
XI.S5 Masonry Wall
XI.E4 Metal Enclosed Bus Inspection
XI.E4 Metal Enclosed Bus Inspection
XI.M40 Neutron-Absorbing Material Monitoring XI.E3 Non EQ Inaccessible Power Cables (>400V) XI.E1 Non-EQ Insulated Cables and Connections
XI.M40 Neutron-Absorbing Material Monitoring
XI.E3 Non EQ Inaccessible Power Cables (>400V)
XI.E1 Non-EQ Insulated Cables and Connections
XI.M39 Oil Analysis
XI.M39 Oil Analysis
XI.M32 One-Time Inspection
XI.M32 One-Time Inspection
XI.S8 Protective Coating Monitoring and Maintenance XI.M33 Selective Leaching XI.M20 Service Water Integrity
XI.S8 Protective Coating Monitoring and Maintenance
XI.M33 Selective Leaching
XI.M20 Service Water Integrity
XI.S6 Structure Monitoring
XI.S6 Structure Monitoring
XI.M21A Water Chemistry Control - Closed Treated Water Systems
XI.M21A Water Chemistry Control - Closed Treated Water Systems
For the requested AMPs, please provide: * Relevant 10 element information located in binders  
For the requested AMPs, please provide:
* Documents referred to in the 10 element description  
* Relevant 10 element information located in binders
* Documents referred to in the 10 element description
* Updated OE information since the applicant completed their review
* Updated OE information since the applicant completed their review
M. Chisum A2-2  * Relevant assessments and/or self-assessments completed for the program area being
M. Chisum
reviewed  
* Relevant assessments and/or self-assessments completed for the program area being
* Select corrective action program key words to search and have the list provided so that corrective action documents could be selected for review * Point of contacts and telephone numbers of program owners  
reviewed
* Select corrective action program key words to search and have the list provided so that
corrective action documents could be selected for review
* Point of contacts and telephone numbers of program owners
* Information regarding whether the aging management reviews have been incorporated into
* Information regarding whether the aging management reviews have been incorporated into
plant processes
plant processes
4. References specified in the aging management programs, aging management reviews, and scoping and screening processes
4. References specified in the aging management programs, aging management reviews,
5. Copy of any license amendments subsequent to the original LRA submittal.  
and scoping and screening processes
 
5. Copy of any license amendments subsequent to the original LRA submittal.
6. A minimum of 10 years of operating experience
6. A minimum of 10 years of operating experience
7. Issued or draft procedures related to the aging management programs selected.  
7. Issued or draft procedures related to the aging management programs selected.
 
8. Single set of marked up license renewal drawings (hard copy); size 24 x 36
8. Single set of marked up license renewal drawings (hard copy); size 24 x 36
This e-mail does not contain new or amended information collection requirements subject to
This e-mail does not contain new or amended information collection requirements subject to
Line 1,260: Line 1,586:
collection requirements were approved by the Office of Management and Budget, Control
collection requirements were approved by the Office of Management and Budget, Control
Number 31500011. The NRC may not conduct or sponsor, and a person is not required to
Number 31500011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
respond to, a request for information or an information collection requirement unless the
ML17094A238   SUNSI Review:   ADAMS:   Non-Publicly Available Non-Sensitive Keyword:   By: STG  Yes    No Publicly Available Sensitive NRC-002 OFFICE SRI:EB2 SRI:EB2 SRI:EB1 RI:EB2 PE:PBB C:PBD NAME S. Graves G. Pick W. Sifre I. Anchondo J. Melfi G. Miller SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ DATE 3/26/2017 3/26/2017 3/28/2017 3/24/2017 3/27/2017 3/30/2017 OFFICE C:EB2     NAME G. Werner     SIGNATURE /RA/J. Mateychick
requesting document displays a currently valid Office of Management and Budget control
for     DATE 3/31/2017
number.
 
ML17094A238
SUNSI Review:         ADAMS:           Non-Publicly Available       Non-Sensitive   Keyword:
By: STG               Yes No       Publicly Available           Sensitive       NRC-002
OFFICE       SRI:EB2           SRI:EB2         SRI:EB1       RI:EB2           PE:PBB     C:PBD
NAME         S. Graves         G. Pick         W. Sifre     I. Anchondo     J. Melfi   G. Miller
SIGNATURE /RA/                 /RA/           /RA/           /RA/             /RA/       /RA/
DATE         3/26/2017         3/26/2017       3/28/2017     3/24/2017       3/27/2017   3/30/2017
OFFICE       C:EB2
NAME         G. Werner
SIGNATURE /RA/J. Mateychick
for
DATE         3/31/2017
}}
}}

Latest revision as of 07:52, 3 November 2019

NRC License Renewal Inspection Report 05000382/2017007
ML17094A238
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/31/2017
From: Greg Werner
NRC/RGN-IV/DRS/EB-2
To: Chisum M
Entergy Operations
Werner G
References
IR 2017007
Download: ML17094A238 (68)


Text

rch 31, 2017

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC LICENSE RENEWAL INSPECTION REPORT 05000382/2017007

Dear Mr. Chisum:

On February 16, 2017, a U.S. Nuclear Regulatory Commission (NRC) team completed the onsite portion of an inspection of your application for license renewal for the Waterford Steam Electric Station, Unit 3. The team discussed the inspection results with you and other members of your staff.

This inspection examined activities that supported the application for a renewed license for the Waterford Steam Electric Station, Unit 3. The inspection addressed your processes for scoping and screening structures, systems, and components to select equipment subject to an aging management review. Further, the inspection addressed the development and implementation of aging management programs to support continued plant operation into the period of extended operation. As part of the inspection, the NRC examined procedures and representative records, interviewed personnel, and visually examined accessible portions of various structures, systems, and components to verify license renewal boundaries and to observe any effects of equipment aging. These NRC inspection activities constitute one of several inputs into the NRC review process for license renewal applications.

The team concluded that your staff appropriately implemented the scoping and screening of nonsafety-related structures, systems, and components that could affect safety-related structures, systems, and components as required in 10 CFR 54.4(a)(2). The team concluded that your staff conducted an appropriate review of the materials and environments, and established appropriate aging management programs as described in the license renewal application and as supplemented through your responses to requests for additional information from the NRC. The team concluded that your staff maintained the documentation supporting the application in an auditable and retrievable form. Based on the samples reviewed by the team the inspection results support a conclusion of reasonable assurance that actions have been identified and have been or will be taken to manage the effects of aging in the structures, systems, and components identified in your application, and that the intended functions of these structures, systems, and components will be maintained in the period of extended operation.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter, and its enclosure, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA John Mateychick Acting for/

Gregory E. Werner, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-382 License No. NPF-38

Enclosure:

Inspection Report 05000382/2017007 w/Attachments:

1. Supplemental Information 2. License Renewal Inspection Document Request

REGION IV==

Docket: 05000382 License: NPF-38 Report: 05000382/2017007 Applicant: Entergy Operations, Inc.

Facility: Waterford Steam Electric Station, Unit 3 Location: 17265 River Road Killona, LA 70057 Dates: January 30 through February 16, 2017 Team Lead: S. Graves, Senior Reactor Inspector, Engineering Branch 2 Inspectors: G. Pick, Senior Reactor Inspector W. Sifre, Senior Reactor Inspector J. Melfi, Project Engineer I. Anchondo, Reactor Inspector Approved By: Gregory E. Werner Chief, Engineering Branch 2 Division of Reactor Safety Enclosure

SUMMARY

IR 05000382/2017007; 01/30/2017 - 02/16/2017; Waterford Steam Electric Station, Unit 3;

Scoping of Nonsafety-Related Systems Affecting Safety-Related Systems and Review of License Renewal Aging Management Programs.

NRC inspectors from Region IV performed onsite inspections of the applicant's license renewal activities. The team performed the evaluations in accordance with Manual Chapter 2516,

Policy and Guidance for the License Renewal Inspection Programs, and Inspection Procedure 71002, License Renewal Inspection. The team did not identify any findings as defined in NRC Manual Chapter 0612.

The team concluded the applicant adequately performed screening and scoping of nonsafety-related structures, systems, and components as required in 10 CFR 54.4(a)(2). The team concluded that the applicant conducted an appropriate review of the materials and environments and established appropriate aging management programs as described in the license renewal application and as supplemented through responses to requests for additional information from the NRC. The team concluded that the applicant provided the documentation that supported the application and inspection process in an auditable and retrievable form.

Based on the samples reviewed by the team the inspection results support a conclusion of reasonable assurance that actions have been identified and have been or will be taken to manage the effects of aging in the structures, systems, and components identified in your application and that the intended functions of these structures, systems, and components will be maintained in the period of extended operation.

NRC-Identified Findings and Self-Revealing Findings

None

Licensee-Identified Violations

None

REPORT DETAILS

OTHER ACTIVITIES (OA)

4OA5 Other - License Renewal

a. Inspection Scope

(IP 71002)

This inspection was performed to evaluate the thoroughness and accuracy of the applicant's scoping and screening of nonsafety-related structures, systems, and components (SSC), as required in 10 CFR 54.4(a)(2). Also, the team evaluated whether aging management programs will be capable of managing identified aging effects in an appropriate manner.

In order to evaluate scoping activities, the team selected a number of SSCs for review to evaluate whether the methodology used by the applicant appropriately addressed the nonsafety-related systems affecting the safety functions of a structure, system, or component within the scope of license renewal.

The team selected a sample of 23 of the 41 aging management programs developed by the applicant to verify the adequacy of the applicants guidance, implementation activities, and documentation. The team evaluated the programs to determine whether the applicant would appropriately manage the effects of aging and to verify that the applicant would maintain the safety functions of the SSCs during the period of extended operation. The team evaluated the applicants review and consideration of industry and plant-specific operating experience related to aging effects.

The team reviewed supporting documentation and interviewed applicant personnel to confirm the accuracy of the license renewal application conclusions. For a sample of plant structures and systems, the team walked down accessible portions of the systems to observe aging effects. During the plant walkdowns, the team reviewed the material condition of the SSCs.

b.1 Evaluation of Scoping of Nonsafety-Related Structures, Systems, and Components For scoping of nonsafety-related SSCs affecting safety-related SSCs, as required by 10 CFR 54.4(a)(2), the team reviewed the applicants program guidance and scoping results. The team assessed the thoroughness and accuracy of the methods used to identify the SSCs required to be within the scope of the license renewal application.

The team verified that the applicant had established procedures consistent with the NRC-endorsed guidance contained in Nuclear Energy Institute 95-10, Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule, Revision 6, Appendix F, Sections 3, 4, and 5. The team assessed whether the applicant evaluated

(1) nonsafety-related SSCs within the scope of the current licensing basis,
(2) nonsafety-related SSCs directly connected to safety-related SSCs, and
(3) nonsafety-related SSCs not directly connected but spatially near safety-related SSCs.

The team reviewed the license renewal drawings listed in the appendix. The applicant had color coded the drawings to indicate in-scope systems and components required by 10 CFR 54.4(a)(1), (a)(2), and (a)(3). The team interviewed personnel, reviewed program documents, and independently walked down numerous areas within the plant.

The areas walked down included:

  • Reactor auxiliary building
  • Fuel handling building
  • Diesel generator rooms
  • Turbine building and upper deck
  • Diesel generator fuel oil storage tank A area
  • Firewater pump house and tanks
  • Yard fire main
  • Portions of the electrical distribution system associated with station blackout recovery For SSCs selected because of potential spatial interactions, where failure of nonsafety-related components could adversely affect adjacent safety-related components, the team determined that the applicant accurately categorized the in-plant configuration within the license renewal documents. The team determined the personnel involved in the process were knowledgeable and appropriately trained.

For SSCs selected because of potential structural interaction (seismic design of safety-related components potentially affected by nonsafety-related components), the team determined that the applicant accurately identified and categorized the structural boundaries within the program documents. Based on in-plant walkdowns and on independent sampling of the isometric drawings (identified by an asterisk (*) in the appendix) and the seismic boundary determinations, the team determined that the applicant appropriately identified the seismic design boundaries and correctly included the applicable components within the license renewal scope.

On June 27, 2016, the NRC issued a license amendment authorizing the transition of the applicants fire protection program to a risk informed, performance-based program based on the 2001 Edition of National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generation Plants. The applicant had transitioned their fire protection program in accordance with Amendment 248 of the facility operating license. In a response to a request for information letter (W3F1-2017-0002), dated January 16, 2017, the applicant identified they would update their License Renewal Application to reflect this change.

The team reviewed the applicants scoping of systems affected by this change, and reviewed a sample of aging management programs affected by this change.

In summary, the team concluded that the applicant had implemented an acceptable method of scoping nonsafety-related SSCs and that this method resulted in appropriate scoping determinations for the samples reviewed.

b.2 Evaluation of New Aging Management Programs The team reviewed 7 of the 13 new aging management programs to determine whether the applicant had established appropriate actions or had actions planned to manage the effects of aging as specified in NUREG-1801, Generic Aging Lessons Learned (GALL)

Report, Revision 2 (the GALL Report). The team independently reviewed site-specific operating experience to determine whether there were any aging effects for the systems and components within the scope of these programs that had not been identified when considering applicable industry operating experience.

The team selected in-scope SSCs to assess how the applicant maintained plant equipment material conditions under existing programs and to visually observe examples of nonsafety-related equipment determined to be within scope because of the proximity to safety-related equipment and the potential for failure as a result of aging effects.

.1 B.1.3 Buried and Underground Piping and Tanks Inspection (XI.M41)

The applicant established this new aging management program, consistent with the GALL Report, as modified by LR-ISG-2011-03, Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 Aging Management Program XI.M41, Buried and Underground Piping and Tanks, to manage the loss of material, cracking or changes in material properties resulting from general corrosion, and loss of material on external surfaces of buried and underground limited access components. The program specified prevention, mitigation, and inspection activities, including external coatings, quality of backfill, cathodic protection and periodic inspections. The applicant included all in-scope underground piping and components of carbon steel, gray cast iron, polymers, cementitious and concrete materials. This program is credited for plant drains, the emergency generator system, component cooling and auxiliary component cooling water systems, and the fire water system.

The applicant identified that they would manage the effects of aging through visual inspection either during opportunistic excavations for other maintenance or during planned excavations. The inspections will evaluate the condition of the external surfaces, the backfill, and protective coatings and wrappings of steel, stainless steel, and copper alloy on buried and underground components. The applicant will perform one excavation of each material type once every 10 years, beginning in the 10-year period prior to the period of extended operation.

The team reviewed the aging management program evaluation report, implementing procedures, and corrective action documents. The team also reviewed plant specific operating experience, cathodic protection system evaluation reports, and cathodic protection system surveys. The team interviewed engineers responsible for the buried pipe and coating programs and the cathodic protection systems.

The team concluded that the applicant had performed appropriate evaluations of the piping conditions and considered pertinent industry experience and plant operating history to determine the effects of aging on buried piping and tanks. The team concluded that, if implemented as described, the applicant developed guidance that would appropriately identify and address aging effects during the period of extended operation.

.2 B.1.4 Coating Integrity (XI.M42)

The applicant established this new aging management program, consistent with the GALL Report, as modified by LR-ISG-2013-01, Aging Management of Loss of Coating or Lining Integrity for Internal Coatings/Linings on In-Scope Piping, Piping Components, Heat Exchangers and Tanks, with exception, to manage aging effects where loss of coating or lining integrity could impact the components current licensing basis intended functions. The applicant will perform periodic visual inspections of components with coated surfaces in environments of raw water, treated water, lubricating oil or fuel oil.

For coated surfaces that do not meet the acceptance criteria, physical testing will be performed. The training and qualification of individuals must meet the standards endorsed in Regulatory Guide 1.54, Service Level I, II, and III Protective Coatings Applied to Nuclear Power Plants. The applicant will implement this program within the 10-year period prior to entering the period of extended operation.

The applicant requested an exception for this aging management program.

Exception For the Detection of Aging Effects element, the applicant proposed performing a one-time inspection of the internal coating of the 11-foot diameter carbon steel circulating water piping. The piping is in-service while the plant operates and provides the source to fill the wet cooling tower basin. The coal-tar coating, if it detached, would flow to the condenser water box affecting power generation but not any safety functions.

The team identified no concerns with this exception.

The team reviewed the license renewal application and the aging management program evaluation report. The team discussed the program with the responsible staff.

For the Coating Integrity program, the team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience to determine the in-scope components and systems. The team concluded that, if implemented as described, the applicant developed guidance that would appropriately identify and address aging effects during the period of extended operation.

.3 B.1.20 Metal Enclosed Bus Inspection (XI.E4)

The applicant established this new aging management program, consistent with the GALL Report, to manage aging of the electrical bus bar bolted connections, bus bar insulation and insulators, bus enclosure assemblies (internal and external), and elastomers. The program scope included safety-related 4.16kV metal enclosed bus sections between switchgear 3A3-S, 3AB3-S, and 3B3-S and the safety-related 480V metal enclosed bus sections between switchgear 3A31-S, 3AB31-S, and 3B31-S.

The program will inspect a sample of accessible bus bolted connections for increased connection resistance. Bus insulation or insulators will be visually inspected for signs of aging caused by thermal/thermoxidative degradation of organics/thermoplastics, radiation-induced oxidation, moisture/debris intrusion, or ohmic heating, as indicated by embrittlement, cracking, chipping, melting, discoloration, or swelling, which may indicate overheating or aging degradation. A combination of visual inspections and quantitative measurements such as thermography will be performed, as required. Internal bus supports or insulators will be visually inspected for structural integrity and signs of cracking.

assembly external surfaces will be visually inspected for evidence of loss of material caused by general, pitting, and crevice corrosion. Accessible elastomers (e.g., gaskets, boots, and sealants) will be inspected for changes in material properties (elastomer degradation) including surface cracking, crazing, scuffing, dimensional changes (e.g., ballooning and necking), shrinkage, discoloration, hardening, and loss of strength at least once every 10 years. Enclosure assembly internal surfaces will be visually inspected for evidence of loss of material. Internal portions of the enclosure assemblies will also be inspected for cracks, corrosion, foreign debris, excessive dust buildup, and evidence of water intrusion.

The applicant will perform inspections before the period of extended operation, and at least once every 10 years, unless visual inspections are used as the only method to inspect accessible bolted connections. If the applicant uses only visual inspection methods for accessible bolted connection inspection, the inspection will be completed prior to the period of extended operation and at least once every five years thereafter.

This method is consistent with the alternative method described in the GALL Report.

The team reviewed applicable license renewal program basis documents, aging management program evaluation report, existing maintenance procedures, plant specific operating experience, and preventive maintenance requirements. The team interviewed license renewal project personnel and the responsible plant and design engineers. The team walked down all the in-scope metal enclosed buses.

The team concluded that for the Metal Enclosed Bus Inspection program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging for the metal enclosed buses. The team concluded that, if implemented as described, the applicant developed guidance that would appropriately identify and address aging effects during the period of extended operation.

.4 B.1.24 Non-EQ Inaccessible Power Cables ( 400 V) (XI.E3)

The applicant established this new aging management program, consistent with the GALL Report, with exception, to manage the effects of reduced insulation resistance on inaccessible power cables (greater than or equal to 400 V) exposed to adverse localized environments caused by significant moisture. The applicant had no in-scope safety-related cables installed below grade.

The applicant requested an exception for this aging management program.

Exception For the Preventive Actions element, the applicant cannot prevent the 480V electric driven fire pump (FP MPMP0002) and the electric driven jockey fire pump cables from being exposed to significant moisture even with increased inspection frequency.

Periodic manhole inspections will be performed to minimize this exposure, but the inspection frequency cannot be increased to prevent these cables from being exposed to significant moisture.

The applicant took this exception to the Preventive Actions element because of environmental conditions surrounding the in-scope cables. The applicant could not prevent the in-scope 480V electric-driven fire pump cables and the electric-driven jockey fire pump cables from being exposed to significant moisture resulting from site elevation.

The manholes and duct banks housing these cables are continuously submerged above the cable support assemblies from ground water penetration since the site elevation is below river elevation. As a result the applicant had chosen to perform annual inspections of the cables and cable support assemblies. A review of site historical operating experience identified only one medium-voltage cable failure and that failure was not attributable to moisture intrusion.

The team held numerous discussions with the applicant about their efforts to mitigate the in-scope cables exposure to submergence and their current and proposed process for inspections. The applicant opened and dewatered an in-scope manhole for the team to inspect and observe the as-found conditions of the cables, cable support assemblies and the structural condition of the cable vault and ducting. The applicant had planned to use the sites maintenance program and existing model work orders to perform visual inspections of the in-scope cables and cable support assemblies. After reviewing existing work orders and the open manhole conditions, the applicant identified that enhancements to their work orders and inspection process for the cables and manholes would be appropriate. As part of their aging management program, the applicant was developing a cable reliability program using Procedure EN-DC-346, Cable Reliability Program, Revision 6, and guidance from several industry guidance documents, including Electric Power Research Institute (EPRI) TR-1020804, Aging Management Development Guidance AC and DC Low-Voltage Power Cable Systems for Nuclear Power Plants, to improve their cable management process. The in-scope cabling had ethylene propylene rubber (EPR) insulation with jacketing of black heavy-duty chlorosulphonated polyethylene for low moisture absorption. The cables were designed for underground and aboveground applications in wet or dry locations and direct burial.

The applicant stated the in-scope cables did not have splices.

The program specified annual manhole inspections to assess whether cables and cable support assemblies are intact. The applicant discussed the enhancements to the work order process for the in-scope cables that will significantly improve the visual inspection process. In addition, the applicant will electrically test the inaccessible power cabling prior to entering the period of extended operation and once every six years thereafter.

The program stated the testing will be a proven test for detecting deterioration of the insulation system caused by wetting or submergence, such as Dielectric Loss (Dissipation Factor/Power Factor), AC Voltage Withstand, Partial Discharge, Step Voltage, Time Domain Reflectometry, Insulation Resistance and Polarization Index, Line Resonance Analysis, or other state-of-the-art testing at the time the test is performed.

The program will trend and track the results for condition monitoring, and the applicant will use the Structures Monitoring program for inspection and management of the cable vault structures. After discussions and review, the team had no significant concerns with the exception and concluded the licensee could provide reasonable assurance that the aging effects for the in-scope cables would be appropriately managed through the enhanced inspection and testing program.

The team reviewed applicable license renewal program basis documents, aging management program evaluation report, program procedures, and records for completed maintenance activities. In addition, the team reviewed condition records from the corrective action database for relevant plant operating experience documents. The team interviewed plant personnel and reviewed maintenance work orders, manhole inspection results, and records regarding water removed from manholes.

The team concluded that for the Non-EQ Inaccessible Power Cables program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging for inaccessible cables. The team concluded that, if implemented as described, the applicant developed guidance that would appropriately identify and address aging effects during the period of extended operation.

.5 B.1.26 Non-EQ Insulated Cables and Connections (XI.E1)

The applicant established this new aging management program, consistent with the GALL Report, to manage the aging of insulated cables and connections exposed to adverse localized environments caused by heat, radiation, or moisture. The monitored aging effects included cable and connection jacket surface anomalies, such as embrittlement, discoloration, cracking, melting, swelling, or surface contamination. The program population will consist of all accessible cables and connections such that the program sample will represent, with reasonable assurance, all cables (accessible and inaccessible) and connections in adverse localized environments.

The applicant planned to monitor the aging effects through periodic visual inspections.

The program acceptance criteria established that accessible cables and connections were to be free from unacceptable visual indications of surface anomalies. The applicant defined an unacceptable indication as a noted condition or situation that, if left unmanaged, could lead to a loss of intended function. The applicant will complete the first inspection sample of these components prior to entering the period of extended operation and once every 10 years thereafter.

The team reviewed relevant license renewal program basis documents, aging management review documents, procedures, plant specific operating experience, and preventive maintenance requirements. The team interviewed the license renewal project personnel and walked down a sample of accessible areas within the plant where cable trays and exposed cables were installed in adverse localized environments. The applicant identified that EPRI TR 109619, Guideline for Management of Adverse Localized Environments, dated June 1999 will be used as guidance in performing the inspections.

The team concluded that for the Non-EQ Insulated Cables and Connections program, the applicant performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging for cables and connections exposed to adverse localized environments. The team concluded that, if implemented as described, the applicant developed guidance that would appropriately identify and address aging effects during the period of extended operation.

.6 B.1.28 One-Time Inspection (XI.M32)

The applicant established this new aging management program, consistent with the GALL Report, to manage the aging of components for loss of material, cracking, and reduction of heat transfer internal to plant systems. The applicant will conduct these one-time inspections to identify and characterize the material conditions in representative low-flow and stagnant areas of plant piping and components addressed by the Water Chemistry Control - Primary and Secondary program, the Diesel Fuel Monitoring the Oil Analysis programs, the circulating water concrete intake piping internals, and the reactor vessel flange leak detection line. The planned visual and volumetric inspections would provide direct evidence that no loss of material resulting from corrosion in treated liquid environments was present. The applicant will implement this program within the 10 year period prior to entering the period of extended operation.

The team reviewed the license renewal application and the aging management program evaluation report. The applicant proposed an acceptable method to select their sample population (20 percent of the sample population up to a maximum of 25 components)and specified that the sampling would occur for each set of common material and environment combinations.

For the One Time Inspection program, the team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described, the applicant developed guidance that would appropriately identify and address aging effects during the period of extended operation.

.7 B.1.35 Selective Leaching (XI.M33)

The applicant established this new aging management program, consistent with the GALL Report, to manage the aging of components subject to selective leaching of materials. The affected components included material made of gray cast iron and copper alloy with greater than 15 percent nickel (i.e., bronze or brass) exposed to raw water, treated water, and ground water that may lead to selective leaching. The program will include a one-time visual inspection and mechanical testing of a sample of components with metallurgical properties susceptible to selective leaching to demonstrate the absence of this aging effect, or to implement an aging management program if a loss of material has occurred.

The team reviewed the license renewal application, the aging management program evaluation report, and the list of components subject to selective leaching. The majority of the components consisted of gray cast iron piping and valves in the fire protection system. The team discussed the program evaluations and planned activities with the responsible staff.

For the Selective Leaching program the team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effect of aging in components and systems subject to this mechanism. The team concluded that, if implemented as described, the applicant developed guidance would appropriately identify and address aging effects during the period of extended operation.

b.3 Evaluation of Existing Aging Management Programs The team reviewed 16 of the 28 existing programs credited with aging management to determine whether the applicant had taken or planned to take appropriate actions to manage the effects of aging as described in the GALL Report and any related License Renewal Interim Staff Guidance (LR-ISG).

The team reviewed site-specific operating experience to determine whether there were any aging effects for the systems and components within the scope of these programs that had not been identified from the applicants review of industry operating experience.

The team evaluated whether the applicant implemented or planned to implement appropriate actions to manage the effects of aging. These programs had established procedures, records of past corrective actions, and previous operating experience related to applicable components. Some programs required enhancements and took exceptions (i.e., changes to program aspects that will be implemented prior to the period of extended operation) to be consistent with the GALL Report.

The team walked down selected in-scope SSCs to assess how the applicant maintained plant equipment under the current operating license; to observe examples of nonsafety- related equipment determined to be in-scope because of the proximity to safety-related equipment; and, to assess the potential for failures as a result of aging effects.

.1 B.1.1 Bolting Integrity (XI.M18)

This was an existing program, consistent with the GALL Report, after one exception and three enhancements, credited with managing aging of safety-related and nonsafety-related closure bolting for pressure retaining components. The program included the selection of bolting materials and use of lubricants and sealants consistent with guidance in EPRI NP-5769, Degradation and Failure of Bolting in Nuclear Power Plants, and recommendations provided in NUREG-1339, Resolution of Generic Safety Issue 29:

Bolting Degradation or Failure in Nuclear Power Plants, to prevent or mitigate degradation and failure of safety-related bolting. The applicant selected bolting materials, lubricants, and sealants in accordance with industry guidance. In addition, the applicant established torque values and restricted the use of molybdenum disulfide as specified in industry guidelines and manufacturer recommendations. Maintenance practices and bolting replacement activities included proper gasket activation, preload, torqueing, and fit-up of bolting in accordance with manufacturer, vendor, or industry recommendations.

The applicant requested an exception for this aging management program.

Exception For the Detection of Aging Effects element, identify that the applicant does not perform inspections of buried fire water system bolting as part of this program. Inspection of buried fire water system bolting is performed in accordance with the Buried and Underground Piping and Tanks Inspection Program.

The team had no significant concerns with the exception. The applicant identified that enhancements were necessary to ensure consistency with the GALL Report.

Enhancements For the Scope of the Program element, revise procedures to include submerged pressure-retaining bolting.

For the Parameters Monitored or Inspected element, revise procedures to monitor high-strength bolting locations for cracking.

For the Detection of Aging Effects element, revise procedures to include volumetric examinations per ASME Code Section XI for high-strength bolting.

The team had no significant concerns with the enhancements.

The team reviewed license renewal program documents, the aging management program evaluation report, plant operating experience, implementing procedures, and corrective action documents.

The team concluded that for the Bolting Integrity program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging for pressure retaining bolting. The team concluded that, if implemented as described, including the enhancements and exception, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.

.2 B.1.5 Compressed Air Monitoring (XI.M24)

This was an existing program, consistent with the GALL Report after enhancement, credited with managing the loss of material in compressed air systems by periodically monitoring the system air for moisture and contaminants and by inspecting system internal surfaces. The applicants air system quality was being maintained in accordance with manufacturer recommendations, EPRI guidelines, and ASME and ANSI specifications.

The applicant identified that enhancements were necessary to ensure consistency with the GALL Report.

Enhancements For the Scope of the Program element, revise procedures to include the EDG starting air system.

Enhancements For the Preventive Actions element, revise procedures to apply consideration of the guidance of ASME OM-S/G-1998 (Part 17); EPRI NP-7079; and EPRI TR-108147 to the limits specified for the air system contaminants.

For Parameters Monitored or Inspected, Detection of Aging Effects, and Monitoring and Trending elements, revise procedures to include periodic and opportunistic visual inspections of accessible internal surfaces of system components including accumulators, flex hoses, and tubing of compressed air systems. Specify inspections at frequencies recommended in ASME OM-S/G-1998 (Part 17).

The team had no significant concerns with the enhancements.

The team reviewed the license renewal application, the NRC aging management program audit results, and the aging management program evaluation report. The team also reviewed the site strategic compressed air monitoring plans, operating experience evaluations, procedures, condition reports, and system health reports.

For the Compressed Air Monitoring program, the team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging. The team concluded that, if implemented as described, including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.

.3 B.1.8 Diesel Fuel Monitoring (XI.M30)

This was an existing program, consistent with the GALL Report after enhancement, credited with managing aging effects resulting from general, pitting, crevice, and microbiological influenced corrosion on internal surfaces of the diesel fuel oil system tanks. The program managed aging effects by minimizing exposure to fuel oil contaminated with water and microbes. The components monitored by this program included the diesel generator fuel oil storage tanks, diesel generator fuel oil feed tanks, diesel-driven fire pump fuel tanks, and the auxiliary diesel generator fuel oil tank.

The applicant identified that enhancements were necessary to ensure consistency with the GALL Report.

Enhancements For the Scope of the Program element, revise procedures to add the auxiliary diesel generator fuel oil tank and the diesel generator fuel oil feed tanks to the program.

For both Parameters Monitored or Inspected and Monitoring and Trending elements, revise procedures to monitor and trend water content, sediment, particulates, and microbiological activity in the emergency diesel generator feed tanks, and auxiliary diesel generator fuel oil tank, and particulate and microbiological activity in high pressure fire pump (HPFP) fuel oil storage tank at least quarterly.

For the Detection of Aging Effects element, revise procedures to:

  • Include periodic multi-level sampling of in-scope tanks, and if the tank design features do not allow for multi-level sampling, the sampling methodology that includes a representative sample from the lowest point in the tank shall be used;
  • Include a ten-year periodic cleaning and internal visual inspection of in-scope tanks. In the areas of any degradation identified during the internal inspection a volumetric inspection shall be performed. In the event an internal inspection cannot be performed due to design limitations, a volumetric examination shall be performed. These cleanings and internal inspections will be performed at least once during the 10-year period prior to the period of extended operation and at succeeding 10-year intervals.

The team had no significant concerns with the enhancements.

The team reviewed the aging management program evaluation report, relevant condition reports, chemical analysis reports, and implementing procedures, 10-year data summaries and performance graphs for each of the in-scope tanks to determine the quality and history of fuel conditions and the most recent 10-year cleaning and inspection activities for the diesel generator fuel oil storage tanks. The team interviewed plant personnel and walked down the train A diesel generator fuel oil feed tank and fuel oil storage tank, the diesel-driven fire pump fuel tanks, and the auxiliary diesel generator fuel oil tank. Because of the low sulfur content in diesel fuel oil and the corresponding lower energy content, the applicant was implementing a modification that added an additional diesel generator fuel oil storage tank for each safety-related train. The team confirmed that the design ensured that the new tanks would also be sampled when taking routine samples required by technical specifications. The design of the new tanks allowed personnel to take fuel oil samples at different elevations within the tanks.

The team concluded that for the Diesel Fuel Monitoring program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging on internal surfaces of the diesel fuel oil tanks. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.

.4 B.1.10 External Surfaces Monitoring (XI.M36)

This was an existing program, consistent with the GALL Report as modified by LR-ISG-2011-03, Changes to the Generic Lessons Learned (GALL) Report Revision 2 Aging Management Program XI.M41, Buried and Underground Piping and Tanks, and LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion under Insulation, after enhancement, credited with managing aging effects of loss of material, cracking, and change in material properties to external plant surfaces. The program used periodic inspections and walkdowns to monitor for material degradation and leakage, including coatings and insulation degradation, and loss of material. The program included confirmation of the integrity of coated surfaces as a means to effectively manage the effects of corrosion on metallic surfaces. Accessible mechanical components are inspected at least once per refueling cycle; inaccessible mechanical components or areas that have limited access caused by safety, security, or other considerations will be inspected when plant conditions permit, but at a frequency that will ensure the components intended function is maintained. When required by the ASME Code, inspections are conducted in accordance with the code requirements. In the absence of such requirements, plant-specific visual inspections are performed of metallic surfaces using procedures implemented by inspectors qualified through plant programs. Component surfaces that are insulated and in an environment of condensation and insulated outdoor components are periodically inspected at such intervals that would ensure the components intended function.

The applicant identified that several enhancements were necessary to ensure consistency with the GALL Report as modified by LR-ISG-2011-03.

Enhancements For the Detection of Aging Effects element, revise procedures to:

  • Include instructions to perform a 100 percent visual inspection of accessible polymeric component surfaces. The visual inspection should identify indicators of loss of material caused by wear to include dimensional change, surface cracking, crazing, scuffing, and for flexible polymeric materials with internal reinforcement, the exposure of reinforcing fibers, mesh, or underlying metal. In addition, 10 percent of the available flexible polymeric surface area should be physically manipulated to augment the visual inspection to confirm the absence of hardening and loss of strength;
  • Conduct representative inspections during each 10-year period of insulated surfaces of each material type (e.g., steel, stainless steel, copper alloy, aluminum)in an air-outdoor or condensation environments;
  • Remove insulation in order to perform a visual inspection of a representative sample of insulated indoor component surfaces in an environment of condensation and outdoor component surfaces. The inspections shall include a minimum of 20 percent of the in-scope piping length for each material type (e.g., steel, stainless steel, copper alloy, aluminum), or for components with a configuration which does not conform to a 1- foot axial length determination, 20 percent of the surface area.

Alternatively, insulation can be removed and a minimum of 25 inspections performed that can be a combination of 1-foot axial length sections and individual components for each material type;

  • Include inspection locations based on the likelihood of corrosion under insulation;
  • Allow subsequent inspections to consist of an examination of the exterior surface of the insulation for indications of damage to the jacketing or protective outer layer of the insulation, if no loss of material caused by general, pitting or crevice corrosion, beyond that which could have been present during initial construction and no evidence of cracking is identified after the initial inspection;
  • Ensure that if the external visual inspections of the insulation reveal damage to the exterior surface of the insulation or there is evidence of water intrusion through the insulation, periodic inspections under the insulation will continue at such intervals that would ensure the components intended function; Enhancements
  • Provide guidance that removal of tightly adhering insulation that is impermeable to moisture is not required unless there is evidence of damage to the moisture barrier.

However, the entire population of in-scope accessible piping component surfaces that have tightly adhering insulation will be visually inspected for damage to the moisture barrier with the same frequency as for other types of insulation inspections. These inspections will not be credited towards the inspection quantities for other types of insulation.

For the Acceptance Criteria element, include the following criteria:

  • Stainless steel should have a clean and shiny surface with no discoloration;
  • Other metals should not have any abnormal surface indications;
  • Flexible polymeric materials should have a uniform surface texture and color with no cracks and no unanticipated dimensional change, no abnormal surface with the material in an as new condition with respect to hardness, flexibility, physical dimensions, and color;
  • Rigid polymeric materials should have no erosion, cracking, checking or chalking.

The team had no significant concerns with the enhancements.

The team reviewed the license renewal application, the NRC aging management program audit results, aging management program evaluation report, and program procedures. The team also reviewed site strategic external surfaces monitoring plans; operating experience evaluations, procedures, and external surfaces related condition reports. The team interviewed personnel and walked down areas of the plant containing in-scope external surfaces.

For the External Surface Monitoring program, the team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.

.5 B.1.11 Fatigue Monitoring (X.M1)

This was identified as an existing program, consistent with the GALL Report after enhancement, credited with ensuring that fatigue usage remains within allowable limits for those components identified as having a fatigue Time-Limited Aging Analysis (TLAA).

The applicant implemented the program consistent with NUREG/CR-6260, Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components, and NUREG/CR-6909, Effects of LWR Coolant Environments on the Fatigue Life of Reactor Materials.

The applicant implemented the objectives of the program by:

(1) tracking the number of critical thermal and pressure transients for selected components;
(2) verifying that the severity of monitored transients are bounded by the design transient definitions for which they are classified; and
(3) assessing the impact of the reactor coolant environment on a sample set of critical components including those from NUREG/CR-6260 and those components identified to be more limiting than the components specified in NUREG/CR- 6260. The applicants program provided for trending to ensure that the fatigue usage factor remains below the design limit during the period of extended operation.

The applicant identified that enhancements were necessary to ensure consistency with the GALL Report.

Enhancements For the Scope of the Program element, revise procedures to:

  • Monitor and track additional critical thermal and pressure transients for components that have been identified to have a TLAA including those high-energy line break locations with a cumulative usage factor (CUF) of greater than 0.1;
  • Develop a set of fatigue usage calculations that consider the effects of the reactor water environment on a sample of reactor coolant system components. This sample shall include the locations identified in NUREG/CR-6260 and additional plant-specific component locations in the reactor coolant pressure boundary if they are found to be more limiting than those considered in NUREG/CR-6260; For the Detection of Aging Effects element, revise procedures to provide updates of the fatigue usage calculations on an as-needed basis if an allowable cycle limit is approached or in a case where a transient definition has been changed, unanticipated new thermal events are discovered, or the geometry of components have been modified.

The team had no significant concerns with the enhancements.

The team reviewed the aging management program evaluation report, plant fatigue transient reviews, condition reports, and summaries of associated plant and industry operating experience. The team also reviewed the Procedure PE-002-003, Fatigue Monitoring Program, Revision 5, which established a thermal and pressure transient and fatigue monitoring program. In addition, the team reviewed calculation 1400394.302, Waterford-3 Plant Fatigue Transient Review, Revision 0, which established the set of plant transient events that needed to be tracked from plant start-up through April 5, 2014, and interviewed plant personnel.

The team concluded that for the Fatigue Monitoring program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the plant transient events that are required to be tracked under this program. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.

.6 B.1.12 Fire Protection (XI.M26)

This was an existing program, consistent with the GALL Report after enhancement, credited with managing aging effects for penetration seals, fire barrier walls, ceilings, floors, other fire resistance materials that serve an intended fire barrier function, and all fire-rated doors that perform a fire barrier function. The applicant planned to manage the effects of aging through visual inspections and functional testing. The applicant visually inspected 10 percent of each type of fire-rated penetration seal every 18 months, and visually inspected fire barrier walls, ceilings, and floors, including coatings and wraps at least once every refueling cycle examining for any signs of aging such as cracking, spalling, and loss of material. Fire doors are visually inspected and are functionally tested every 18 months in accordance with surveillance requirements. Where fire damper housings were in duct work, they are included in the HVAC systems program.

In-wall fire damper housings are included in structural aging management reviews.

The applicant does not have Halon or CO2 fire suppression systems. Freeze-thaw is not significant as the station is located in a temperate weather area, identified by ASTM C 33-90, Standard Specification for Concrete Aggregates, and concrete structures and components are designed and constructed in accordance with ACI-318, Building Code Requirements for Structural Concrete requirements.

The applicant identified that enhancements were necessary to ensure consistency with the GALL Report.

Enhancements For the Detection of Aging Effects element, revise procedures to:

  • Include an inspection of fire barrier walls, ceilings, and floors for any signs of degradation such as spalling or loss of material caused by chemical attack, or reaction with aggregates at least once every refueling cycle;
  • Inspect fire-rated doors for any degradation of door surfaces at least once per refueling cycle;
  • Ensure fire barrier seals are inspected by personnel qualified in accordance with appropriate NFPA standards; For the Acceptance Criteria element, revise procedures to provide the following acceptance criteria:
  • No significant indications of concrete spalling, and loss of material of fire barrier walls, ceilings, and floors and in other fire barrier materials;
  • No surface degradation of fire doors.

The team identified no significant concerns with the enhancements.

On June 27, 2016, the NRC issued a license amendment authorizing the transition of the applicants fire protection program to a risk informed, performance-based program based on the 2001 Edition of National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generation Plants. The applicant had transitioned their fire protection program in accordance with Amendment 248 of the facility operating license. The team reviewed program documents associated with the approved fire protection program.

The team reviewed the scoping drawings, implementing procedures, program enhancements including procedure markups to implement the enhancements, completed surveillance tests, work orders, plant operating experience, and corrective action documents. The team interviewed fire protection personnel, and walked down a sample of fire barriers and equipment to observe the material condition of the barriers and to assess the effectiveness of the existing program.

The team concluded that for the Fire Protection program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.

.7 B.1.13 Fire Water System (XI.M27)

This was an existing program, consistent with the GALL Report as modified by LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion under Insulation, after enhancement and exception, credited with managing loss of material, flow blockage caused by fouling, and loss of coating integrity for in-scope long-lived, passive, water-based fire suppression system components using periodic flow testing and visual inspections in accordance with the 2011 edition of NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems. The program is credited with managing loss of material in systems including dry-pipe systems downstream of manual isolation valves or deluge valves which may not drain correctly or allow water to collect in piping sections.

System flow testing, including that of underground headers, hose stations, main drains, and selected inspector test valves are performed to ensure the system maintains its intended function. Fire suppression water system parameters monitored during periodic flow testing are fire pump discharge pressure, pressure at fire hydrants and local areas being tested (e.g., local static and flow pressure at main drain valves being opened for testing). Fire water system pressure is continuously monitored such that a loss of pressure is immediately detected and corrective action is initiated. When visual inspections are used to detect loss of material and fouling, the inspection technique used will be capable of detecting surface irregularities that could indicate wall loss caused by corrosion, corrosion product deposition, and flow blockage caused by fouling.

The applicant requested exceptions for this aging management program. The applicant modified several previously identified exceptions in a subsequent responses to NRC Request for Information correspondence.

Exceptions For the Detection of Aging Effects element:

  • NFPA 25, Section 5.2.1 specifies annual sprinkler inspections. The applicant performs the sprinkler inspections every refueling cycle;
  • NFPA 25, Section 6.3.1 specifies flow testing every five years at the hydraulically most remote hose connections of each zone of an automatic standpipe system to verify the water supply still provides the design pressure at the required flow. The applicant performs main header flow testing in the main headers that supply the standpipe system to verify the water supply provides the design pressure and required flow;
  • NFPA 25, Section 13.2.5 specifies annual main drain tests at each water based system riser to determine if there is a change in the condition of the water piping and control valves. The applicant performs the main drain tests every refueling cycle;
  • NFPA 25, Section 14.2 specifies performing an internal inspection of the wet and dry fire water piping at least every five years. The applicant performs full flow testing of the piping downstream of the deluge valves for transformers, but does not perform an internal inspection on the dry piping downstream of the deluge valves for the transformers;
  • NFPA 25, Section 9.2.7.1 specifies an evaluation of interior tank coatings in accordance with the adhesion test of ASTM D 3359, Standard Test Methods for Measuring Adhesion by Tape Test, generally referred to as the cross-hatch test.

The applicant inspects the tank interior coating for damage, chips, blisters, peeling, pinholes, rust, or any local or general failure of the coating every five years. In addition, the applicant performs ultrasonic thickness checks or mechanical measurements of any identified corroded areas. The applicant does not apply the cross-hatch test;

  • NFPA 25, Section 13.4.3.2.3 requires preaction valves to be trip tested every three years with the control valve fully open. The applicant trip tests the preaction valves with the manual isolation valve closed.

The team noted that several exceptions were taken to the annual testing periodicity recommendations in Table 4a of LR-ISG-2012-02, because access for some inspections is feasible only during refueling outages. This exception is allowed by LR-ISG-2012-02.

The team had no significant concerns with the exceptions.

The applicant identified that several enhancements were necessary to ensure consistency with the GALL Report as modified by LR-ISG-2012-02.

Enhancements For the Detection of Aging Effects element, revise procedures to:

Enhancements

  • Inspect for loss of fluid in the glass bulb heat responsive elements;
  • Perform an inspection of each buildings wet pipe fire water system every five years by opening a flushing connection at the end of one main and by removing a sprinkler toward the end of one branch line to allow for inspection of the interior for evidence of loss of material and the presence of foreign organic or inorganic material that could result in flow obstructions or blockage of a sprinkler head. The inspection method used shall be capable of detecting surface irregularities that could indicate wall loss below nominal pipe wall thickness caused by corrosion, corrosion product deposition, and flow blockage caused by fouling. Ensure procedures require a follow-up volumetric wall thickness evaluation where irregularities are detected;
  • Perform an internal inspection every five years for evidence of loss of material and the presence of foreign organic or inorganic material that could result in flow obstructions or blockage of a sprinkler head of the dry piping downstream of preaction valves. The inspection shall be performed by opening a flushing connection, removing the most remote sprinkler head, and using a method capable of detecting surface irregularities that could indicate wall loss below nominal pipe wall thickness caused by corrosion, corrosion product deposition, and flow blockage caused by fouling;
  • Perform preaction valve trip testing every three years with the manual isolation valve closed;
  • Perform an inspection of the nozzles associated with the charcoal filters for loss of material and foreign or organic material when the charcoal is replaced;
  • Inspect the interior of the fire water tanks in accordance with NFPA 25 (2011 Edition) Sections 9.2.6 and 9.2.7 including sub-steps;
  • Remove strainers every 5 years and after each actuation to clean and inspect for damage and corroded parts;
  • Specify that sprinkler heads are tested or replaced in accordance with NFPA-25 (2011 Edition), Section 5.3.1;
  • Conduct a flow test or flush sufficient to detect potential flow blockage, or conduct a visual inspection of 100 percent of the internal surface of piping segments that cannot be drained or piping segments that allow water to collect in each 5-year interval, beginning 5 years prior to the period of extended operation;
  • Perform volumetric wall thickness inspections of 20 percent of the length of piping segments that cannot be drained or piping segments that allow water to collect each 5-year interval of the period of extended operation. Measurement points shall be obtained to the extent that each potential degraded condition can be identified (e.g., general corrosion, microbiologically-induced corrosion). The 20 percent of piping that is inspected in each 5-year interval is in different locations than previously inspected piping; Enhancements
  • Perform a blockage evaluation if the flowing pressure decreases by more than 10 percent from the original main drain test or previous main drain tests;
  • Trip test with flow the deluge valve systems for the main turbine lube oil tank and main feedwater pumps at least once every 18 months. If obstructions are found the system shall be cleaned and retested;
  • Open and close hydrant valves slowly while performing flow tests to prevent surges in the system. The program shall also require full opening of the hydrant valve;
  • Verify the hydrants drain within 60 minutes after flushing or flow testing;
  • Perform vacuum box testing on the bottom of the tank to identify leaks, or in the event the bottom of the fire water tank is uneven, the station will perform a suitable NDE technique rather than vacuum box testing to identify leaks;
  • Ensure training and qualification of individuals performing the evaluation of fire water storage tank coating degradation is in accordance with ASTM International standards endorsed in Regulatory Guide 1.54, including limitations, if any, identified in Regulatory Guide 1.54 on a particular standard;
  • Perform wet sponge and dry film testing on the coating applied to the interior of the fire water tanks;
  • Ensure a fire water tank is not returned to service after identifying interior coating blistering, delamination or peeling unless there are only a few small intact blisters surrounded by coating bonded to the substrate as determined by a qualified coating specialist, or the following actions are performed:
(1) any blistering in excess of a few small intact blisters that are not growing in size or number, or blistering not completely surrounded by coating bonded to the substrate is removed;
(2) any delaminated or peeled coating is removed;
(3) the exposed underlying coating is verified to be securely bonded to the substrate as determined by an adhesion test endorsed by Regulatory Guide 1.54 at a minimum of three locations;
(4) the outermost coating is feathered and the remaining outermost coating is determined to be securely bonded to the coating below via an adhesion test endorsed by Regulatory Guide 1.54 at a minimum of three locations adjacent to the defective area;
(5) ultrasonic testing is performed where there is evidence of pitting or corrosion to ensure the tank meets minimum wall thickness requirements;
(6) an evaluation is performed to ensure downstream flow blockage is not a concern; and
(7) a follow-up inspection is scheduled to be performed within two years and every two years after that until the coating is repaired, replaced, or removed;
  • Determine the extent of coating defects on the interior of the fire water tanks by using one or more of the following methods when conditions such as cracking, peeling, blistering, delamination, rust, or flaking are identified during visual examination:
(1) lightly tapping and scraping the coating to determine the coating integrity;
(2) dry film thickness measurements at random locations to determine Enhancements overall thickness of the coating;
(3) wet-sponge testing or dry film testing to identify holidays in the coating;
(4) adhesion testing in accordance with ASTM D3359, ASTM D4541, or equivalent testing endorsed by Regulatory Guide 1.54 at a minimum of three locations;
(5) ultrasonic testing where there is evidence of pitting or corrosion to determine if the tank thickness meets the minimum thickness criteria; For the Acceptance Criteria element, include criteria for:
  • Fire water tanks interior coating that include:
(1) indications of peeling and delamination are not acceptable;
(2) blisters are evaluated by a coatings specialist qualified in accordance with an ASTM International standard endorsed in RG 1.54 including staff limitations associated with use of a particular standard;
(3) blisters should be limited to a few intact small blisters that are completely surrounded by sound coating/lining bonded to the substrate. Blister size and frequency should not be increasing between inspections (e.g., reference ASTM D714-02, Standard Test Method for Evaluating Degree of Blistering of Paints);
(4) indications such as cracking, flaking, and rusting are to be evaluated by a coatings specialist qualified in accordance with an ASTM International standard endorsed in RG 1.54 including staff limitations associated with use of a particular standard; As applicable, wall thickness measurements, projected to the next inspection, meet design minimum wall requirements;
(5) when conducting adhesion testing, results meet or exceed the degree of adhesion recommended in plant-specific design requirements specific to the coating/lining and substrate;
  • No abnormal debris (i.e., no corrosion products that could impede flow or cause downstream components to become clogged). Any signs of abnormal corrosion or blockage will be removed, its source and extent of condition determined and corrected, and entered into the corrective action program.

For the Corrective Action element, revise procedures to:

  • Specify replacement of any sprinkler heads that show signs of leakage, excessive loading, corrosion, or loss of fluid in the glass bulb heat responsive element;
  • Perform an obstruction evaluation if any of the following conditions exist:
(1) there is an obstructive discharge of material during routine flow tests;
(2) an inspectors test valve is clogged during routine testing;
(3) foreign materials are identified during internal inspections;
(4) sprinkler heads are found clogged during removal or testing;
(5) pin hole leaks are identified in fire water piping;
(6) after an extended fire water system shutdown (greater than one year);
(7) there is a 50 percent increase in time it takes for water to flow out the inspector test valve after the associated dry valve is tripped when compared to the original acceptance criteria or last test.
  • Evaluate for microbiologically-induced corrosion if tubercles or slime are identified during any internal inspections of fire water piping.

The enhancements included revisions to program procedures to ensure compliance with applicable sections of Table 4a of LR-ISG-2012-02, Fire Water System Inspection and Testing Recommendations. The applicant revised several of the originally identified enhancements in subsequent responses to NRC Request for Information correspondence. The team identified no significant concerns related to the enhancements.

The team verified that the applicant performed the following types of specific activities, as required by their Technical Requirements Manual in accordance with applicable NFPA codes:

(1) fire water supply piping flush tests, including cycling testable valves in the flow path;
(2) hydrostatic testing, flushing to remove debris, and visually inspecting yard fire hydrants and associated hoses; and
(3) visually inspecting spray and sprinkler headers for signs of degradation and blockage.

The team reviewed license renewal documents, the aging management program evaluation report, implementing procedures, program enhancements including recent procedure revisions, plant operating experience, corrective action documents, completed work orders, and surveillance tests. The team interviewed plant personnel and walked down fire water system equipment, including the fire pumps, fire water storage tanks, and associated piping. On June 27, 2016, the NRC issued a license amendment authorizing the transition of the applicants fire protection program to a risk informed, performance-based program based on the 2001 Edition of NFPA Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generation Plants. The applicant had transitioned their fire protection program in accordance with Amendment 248 of the facility operating license. The team reviewed program documents associated with the approved fire protection program.

The team concluded that for the Fire Water System program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described including the enhancements and exceptions, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.

.8 B.1.14 Flow-Accelerated Corrosion (XI.M17)

This was an existing program, consistent with the GALL Report after enhancement, credited with maintaining the structural integrity of carbon steel piping and valve bodies containing two-phase and single-phase fluids. The applicant implemented the program consistent with EPRI NSAC-202L, Recommendations for an Effective Flow Accelerated Corrosion Program, Revisions 2 and 3.

The applicant implemented the objectives of the program by:

(1) performing an analysis to determine systems susceptible to flow accelerated corrosion;
(2) conducting appropriate analysis to predict wall thinning;
(3) performing wall thickness measurements based on wall thinning predictions and operating experience; and
(4) evaluating measurement results to determine the remaining service life and the need for replacement or repair of components. The team determined the applicant used procedures and methods in the flow accelerated corrosion program consistent with their commitments to Bulletin 87-01, Thinning of Pipe Wall in Nuclear Power Plants, and Generic Letter 89-08, Erosion/Corrosion Induced Pipe Wall Thinning.

The applicant identified that enhancements were necessary to ensure consistency with the GALL Report.

Enhancements For the Scope of Program, Detection of Aging Effects, and Monitoring and Trending elements, revise procedures to:

  • Manage wall thinning caused by erosion mechanisms from cavitation, flashing, liquid droplet impingement, and solid particle impingement;
  • Include susceptible locations based on the extent of condition reviews in response to plant specific and/or industry guidance and operating experience;
  • Ensure piping and components replaced with flow accelerated corrosion resistant material and subject to erosive conditions are not excluded from inspections;
  • Include the need for continued wall thickness measurements of replaced piping until the effectiveness of the corrective action is assured.

For the Corrective Action element, revise procedures to evaluate wall thinning caused by erosion from cavitation, flashing, liquid droplet impingement, and solid particle impingement when determining a replacement type of material.

The team had no significant concerns with the enhancements.

The team reviewed the aging management program evaluation report, implementing procedures, program health reports, condition reports, and summaries of associated plant and industry operating experience. In addition, the team discussed program development in response to NRC generic communications, program implementation, and self-assessment results with engineers and license renewal staff.

The team concluded that for the Flow-Accelerated Corrosion program, the applicant had performed appropriate evaluations and had considered pertinent industry experience and plant operating history to determine the effects of aging on carbon steel piping and valves. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.

.9 B.1.17 Inspection of Overhead Heavy Load and Light Load (Related to Refueling)

Handling Systems (XI.M23)

This was an existing program, consistent with the GALL Report after enhancement, credited with managing the loss of material resulting from corrosion and rail wear for all cranes, trolley, and hoist structural components, fuel handling equipment, and rails. The cranes and hoists in the scope of the program are:

  • Reactor containment building polar crane
  • Reactor containment building auxiliary (pedestal) crane
  • Fuel handling building bridge crane
  • Nonsafety-related jib cranes
  • Boom crane and monorails located in the reactor building, turbine building, auxiliary facilities, and yard structures.

The team determined the applicant established inspection requirements consistent with the guidance contained in NUREG 0612, Control of Heavy Loads at Nuclear Power Plants, for heavy load handling systems that can directly or indirectly cause a release of radioactive material, applicable industry standards (i.e., Crane Manufacturers Association of America Specification 70) for other cranes within the scope of license renewal, and applicable OSHA regulations (29 CFR Volume XVII, Section 1910.179).

The team determined that the applicant included the specific inspection requirements in preventative maintenance basis documents.

The applicant identified enhancements were necessary to ensure consistency with the GALL Report.

Enhancements For the Parameters Monitored element, revise procedures to specify monitoring of crane rails for loss of material caused by wear, monitoring structural components of the bridge, trolley and hoists for deformation, cracking and loss of material caused by corrosion and monitor structural connections for loose or missing bolts, nuts, pins, or rivets and any other conditions indicative of loss of bolting integrity.

For the Detection of Aging Effects element, revise procedures to specify inspection frequency in accordance with ASME B30.2 or other appropriate standard in the ASME B30 series. Infrequently used cranes and hoists will be inspected prior to use.

Bolted connections will be visually inspected for loose or missing bolts, nuts, pins, or rivets at the same frequency as crane rails and structural components.

For the Acceptance Criteria element, revise procedures to require that significant loss of material caused by wear of crane rails and any sign of loss of bolting integrity will be evaluated in accordance with ASME B30.2 or other appropriate standard in the ASME B30 series; For the Corrective Action element, revise procedures to specify that maintenance and repair activities will utilize the guidance provided in ASME B30.2 or other appropriate standard in the ASME B30 series.

The team had no significant concerns with the enhancements.

The team reviewed license renewal program basis documents, aging management review documents, existing procedures and surveillances, and surveillance results. In addition, the team searched the applicants corrective action database for relevant condition reports. The team walked down accessible cranes and trolleys, interviewed maintenance personnel and engineers, and reviewed completed crane maintenance work orders.

For the Inspection of Overhead Heavy Load and Light Load (Related to Refueling)

Handling Systems program, the team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging on crane rails, trolleys and hoist structural components. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.

.10 B.1.19 Masonry Wall (XI.S5)

This was an existing program, consistent with the GALL Report after enhancement, credited with managing cracking of masonry walls, as well as degradation of the structural steel restraint systems of the masonry walls. This program contained inspection guidelines and listed attributes that caused aging of masonry walls, which were monitored during structural inspections, as well as established examination criteria, evaluation requirements, and acceptance criteria. The applicant included reinforced masonry walls in proximity to safety-related components within the scope of the program if the wall could collapse and damage the components or removable walls stacked to allow equipment removal. The team discussed the program with cognizant engineers and walked down and examined accessible masonry block walls including structural steel supports to assess their condition.

The applicant identified enhancements were necessary to ensure consistency with the GALL Report.

Enhancements For the Scope of Program element, revise procedures to ensure masonry walls located within in-scope structures are included in the scope of the Masonry Wall Program.

For the Parameters Monitored or Inspected element, revise procedures to include monitoring gaps between the structural steel supports and masonry walls that could potentially affect wall qualification.

For the Detection of Aging Effects element, revise procedures to specify that masonry walls will be inspected at least once every five years, with provisions for more frequent inspections in areas where significant aging effects are observed to ensure there is no loss of intended function between inspections.

For the Acceptance Criteria element, revise procedures to include acceptance criteria for masonry wall inspections that ensure observed aging effects (cracking, loss of material or gaps between the structural steel supports and masonry walls) do not invalidate the wall's evaluation basis or impact its intended function.

The team had no significant concerns with the enhancements.

The team reviewed license renewal documents, the aging management program evaluation report, plant procedures, corrective action documents, and prior inspection results. The team searched the corrective action database for relevant corrective action program documents. The team walked down in-scope masonry walls, and interviewed plant personnel.

The team concluded that for the Masonry Wall program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging for the masonry walls and their structural supports. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.

.11 B.1.21 Neutron-Absorbing Material Monitoring (XI.M40)

This was an existing program, consistent with the GALL Report after enhancement, credited with ensuring that degradation of neutron absorbing material used in the spent fuel pool that could compromise the criticality analysis will be detected. The applicant implemented the program consistent with the provisions established by 10 CFR 50.68(b)(4).

The applicant implemented the objectives of the program by performing periodic coupon inspection and testing to assure that the effects of aging do not cause degradation that impacts the required five-percent sub-criticality margin. The program monitors for loss of material, reduction in neutron absorbing capacity, and changes in dimension such as blisters, pits, and bulges that could result in a loss of neutron absorbing capability.

The applicant identified an enhancement was necessary to ensure consistency with the GALL Report.

Enhancement For the Monitoring and Trending element, revise procedures to compare measurement results from periodic inspections to prior measurement results, and relate coupon measurement to the performance of the spent fuel neutron-absorber materials considering differences in exposure conditions, vented/non-vented test samples, spent fuel racks, etc. The enhancement also ensures the predicted Boron-10 areal density will be sufficient to maintain the subcritical conditions required by technical specifications until the next coupon test.

The team had no significant concerns with the enhancement.

The team reviewed the aging management program evaluation report, condition reports, and summaries of associated plant and industry operating experience. The team also reviewed Procedure NE-001-106, SFSR Boral Surveillance Program, Revision 5, which monitors the integrity and performance of Boral on a continuing basis.

The team concluded that for the Neutron-Absorbing Material Monitoring program, the applicant had performed appropriate inspections and testing, as well as considered pertinent industry experience and plant operating history to satisfy the provisions under 10 CFR 50.68(b)(4). The team concluded that, if implemented as described including the enhancement, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.

.12 B.1.27 Oil Analysis (XI.M39)

The Oil Analysis program was an existing program, consistent with the GALL Report, credited with maintaining oil systems free of contaminants (primarily water and particulates), thereby preserving an environment that was not conducive to loss of material and reduction of heat transfer. The applicant performed sampling, analysis, and trending of results on the systems listed in the aging management program to provide an early indication of adverse equipment condition in the lube and hydraulic oil environments. The affected materials include aluminum, carbon and stainless steels, copper alloy, and gray cast iron.

During review of the components included in the oil analysis aging management program evaluation report, the team questioned what specific nonsafety-related components could impact safety-related systems. The applicant determined that they had mischaracterized nonsafety-related components identified during the teams review.

Specifically, a tank had been included in the list of components, but the applicant subsequently determined the tank was abandoned-in-place and a section of tubing that contained air instead of lubricating oil was identified. The applicant documented this error in Condition Report 2017-00655, initiated actions to revise the aging management program evaluation report, and began processing a revision to their license renewal application.

The team reviewed the aging management program evaluation report, license renewal application, plant operating experience, implementing procedures, condition reports, and 10-year trend graphs of the parameter monitored by the oil analysis for the in-scope components. The team interviewed plant personnel responsible who implemented the lubrication oil analysis program.

For the Oil Analysis program, the team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging on aluminum, carbon and stainless steels, copper alloy, and gray cast iron internal pipe and component surfaces. The team concluded that, if implemented as described, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.

.13 B.1.31 Protective Coating Monitoring and Maintenance (XI.S8)

This was an existing program, consistent with the GALL Report after enhancement, credited with managing loss of coating integrity of Service Level I coatings inside containment. The program included visual inspections of accessible coatings that covered steel and concrete surfaces inside containment (e.g., steel liner, steel shell, supports, concrete surfaces, and penetrations).

The applicant identified an enhancement was necessary to ensure consistency with the GALL Report.

Enhancement For the Detection of Aging Effects element, revise plant procedures to specify visual inspections of coatings near sumps or screens associated with the Emergency Core Cooling System.

The team had no significant concerns with the enhancement.

The team reviewed license renewal documents, the aging management program evaluation report, implementing procedures, corrective action documents, plant operating experience, and inspection results. The team also searched the corrective action program database for relevant corrective action requests. The team interviewed the program owner and license renewal project personnel.

The team concluded that for the Protective Coating Monitoring and Maintenance program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described with the enhancement, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.

.14 B.1.36 Service Water Integrity (X1.M20)

This was an existing program, consistent with the GALL Report after enhancement, credited with managing aging effects resulting from material loss and reduction of heat transfer for components in, or cooled by, the Auxiliary Component Cooling Water systems. The applicant planned to manage the aging effects through surveillance tests and chemistry control techniques addressed by applicant commitments to Generic Letter 89-13, Service Water System Problems Affecting Safety-Related Equipment, dated July 18, 1989.

The applicant identified that enhancements were necessary to ensure consistency with the GALL Report.

Enhancements For the Preventive Actions element, revise procedures to:

(1) flush redundant, infrequently flowed sections, and stagnant lines to ensure there is no blockage, and
(2) inspect selected low flow or stagnant areas, and system low points such as drains.

For the Parameters Monitored or Inspected and Detection of Aging Effects elements, revise procedures to monitor the auxiliary component cooling water basins for biological fouling by visual inspection as well as analysis of water for biological activity.

The team had no significant concerns with the enhancements.

The team reviewed the implementing procedures, self-assessments, chemistry data, heat exchanger heat transfer test trending data, pressure and flow data, and selected corrective actions. In addition, the team interviewed the program manager and walked down accessible portions of the auxiliary component cooling water system.

For the Service Water Integrity program, the team concluded that the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in components cooled by the auxiliary component cooling water. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.

.15 B.1.38 Structures Monitoring (XI.S6)

This was an existing program, consistent with the GALL Report after enhancement, credited with managing aging effects associated with cracking, loss of bond, loss of material (spalling, scaling), cracking resulting from expansion, increase in porosity and permeability, loss of strength, and loss of form for concrete structures, steel, and structural supports, including the exterior of electrical duct manholes and vaults, masonry walls, and roofs. The current program was implemented consistent with the guidance of NUMARC 93-01, Industry Guidelines for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, Revision 2, and Regulatory Guide 1.160, Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, Revision 2.

The structures and structural components in the program are inspected by qualified personnel. Concrete structures are inspected for indications of deterioration and distress, using guidelines in ACI 201.1R, Guide for Making a Condition Survey of Existing Buildings and ACI 349.3R, Evaluation of Existing Nuclear Safety-Related Concrete Structures. Elastomers are monitored for hardening, shrinkage and a loss of sealing. Component supports will be inspected for loss of material, and reduction in anchor capacity caused by local concrete degradation. Exposed surfaces of bolting are monitored for loss of material, loose or missing nuts, missing bolts, or other indications of loss of preload. Implementing plant procedures are written to ensure that the selection of bolting material, installation torque or tension, and the use of lubricants and sealants is appropriate. The program includes preventive actions described in NUREG-1339, Resolution of Generic Issue 29: Bolting Degradation or Failure in Nuclear Power Plants, and other industry standards to ensure structural bolting integrity includes proper specification of bolting material, lubricant, and installation torque.

Exposed surfaces of bolting are monitored for loss of material, loose or missing nuts, and/or bolts.

Thread lubricants containing molybdenum disulfide are not used by the applicant so stress corrosion cracking of structural bolting associated with the use of this lubricant is not an aging mechanism concern in this program. In addition, the applicant had no operating history of bolting failures caused by stress corrosion cracking.

The program contains provisions for increased inspection frequency and trending of structures and components in accordance with 10 CFR 50.65 (a)(1), if the extent of degradation indicates that the structure or component may not meet its design basis.

The applicant identified that enhancements were necessary to ensure consistency with the GALL Report.

Enhancements For the Scope of Program element, revise procedures to:

  • Add the following structures to the program:

o Battery house 230kV switchyard o Control house 230kV switchyard o Fire pump house o Fire water storage tank foundations o Fuel oil storage tank foundation Enhancements o Manholes, handholes, and duct banks o Plant stack o Transformer and switchyard support structures and foundations

  • Include a list of structural components and commodities within the scope of license renewal to be monitored in the program;
  • Include periodic sampling and chemical analysis of ground water; For the Preventive Actions element, revise procedures to include the preventive actions for storage of ASTM A325, ASTM F1852, and/or ASTM A490 bolting from Section 2 of Research Council on Structural Connections publication Specification for Structural Joints Using ASTM A325 or A490 Bolts.

For the Parameters Monitored or Inspected element, revise procedures to include the following parameters:

  • For concrete structures, base inspections on quantitative requirements of industry codes, standards, and guidelines and consideration of industry and plant-specific operating experience.
  • For concrete structures and components include:
(1) loss of material;
(2) loss of bond;
(3) increase in porosity and permeability;
(4) loss of strength; and
(5) reduction in concrete anchor capacity caused by local concrete degradation.
  • For chemical analysis of ground water, monitor pH, chlorides, and sulfates.
  • Include the following components to be monitored for the associated parameters:
(1) Anchor bolts (nuts and bolts) for loss of material; and
(2) loose or missing nuts and/or bolts;
  • Elastomeric vibration isolators and structural sealants for cracking, loss of material, loss of sealing and change in material properties (e.g., hardening);

For the Detection of Aging Effects element, revise procedures to include the following:

  • Visual inspection of elastomeric material should be supplemented by feel or touch to detect hardening if performance of intended function of the elastomeric material is suspect. Include instructions to augment the visual examination of elastomeric material with physical manipulation of at least ten percent of available surface area.
  • Structures will be inspected at least once every five years with provisions for more frequent inspections of structures and components categorized as (a)(1) in accordance with 10 CFR 50.65.
  • Submerged structures will be inspected at least once every five years.

Enhancements

  • Sampling and chemical analysis of ground water at least once every five years.

The program owner will review the results and evaluate any anomalies and perform trending of the results.

The team had no significant concerns with the enhancements.

The team reviewed license renewal documents, the aging management program evaluation report, existing procedures, and corrective action program documents. The team searched the corrective action database for relevant condition records. The team interviewed cognizant engineers who conducted the structural inspections and walked down the structures.

The team concluded that for the Structures Monitoring program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.

.16 B.1.40 Water Chemistry Control - Closed Treated Water Systems (XI.M21A)

This was an existing program, consistent with the GALL Report as modified by LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion under Insulation, after enhancement, credited with managing aging effects of loss of material, cracking, and reduction in heat transfer for components in closed-cycle cooling water systems.

The systems within the scope of this program included the diesel generator jacket water, component cooling water, auxiliary component cooling water, and chilled water heating, ventilation and air conditioning subsystems that serviced the switchgear ventilation and the mechanical auxiliary building. The program included monitoring and control of corrosion inhibitor and chemistry parameters consistent with the guidance of EPRI 1007820, Closed Cooling Water Chemistry Guideline, April 2004. The applicant maintained water chemistry by adding a molybdate corrosion inhibitor, biocides and pH chemicals.

The applicant identified that enhancements were necessary to ensure consistency with the GALL Report as modified by LR-ISG-2012-02.

Enhancements For the Scope of Program element, revise procedures to include high pressure fire water diesel pump jacket water system.

For the Parameters Monitored or Inspected element, revise procedures to specify specific water chemistry parameters monitored and the acceptable range of values for these parameters are in accordance with EPRI 1007820, industry guidance, or vendor recommendations.

Enhancements For the Detection of Aging Effects element, revise procedures to:

  • Inspect accessible components whenever a closed treated water system boundary is opened. Ensure that a representative sample of piping and components is inspected at a frequency of at least every ten years. These inspections will be conducted in accordance with applicable ASME Code requirements, industry standards, or other plant-specific inspection guidance by qualified personnel using procedures that are capable of detecting corrosion, fouling, or cracking. If visual examination identifies adverse conditions, additional examinations, including ultrasonic testing, are conducted;
  • Define a representative sample as 20 percent of the population (defined as components having the same material, environment, and aging effect combination)with a maximum of 25 components. Components inspected will be those with the highest likelihood of corrosion, fouling, or cracking;
  • Perform treated water sampling and analysis of the closed treated water systems per industry standards and in no case greater than quarterly unless justified with an additional analysis.

For the Acceptance Criteria element, revise procedures to:

  • Specify specific water chemistry parameters monitored and the acceptable range of values for these parameters are in accordance with EPRI 1007820, industry guidance, or vendor recommendations;
  • Provide acceptance criteria for inspections. Ensure system components meet system design requirements, such as minimum wall thickness.

The team had no significant concerns with the enhancements.

The team reviewed the implementing procedures and chemistry data for the monitored systems. The team walked down a sample of heat exchangers and pumps cooled by closed cooling water systems and interviewed a system engineer. From a review of the data, the team determined that the applicant appropriately monitored for both loss of heat transfer and loss of material for the in-scope systems.

The team concluded that for the Water Chemistry Control - Closed Treated Water Systems program, the applicant had performed appropriate evaluations and considered pertinent industry experience and plant operating history to determine the effects of aging in the affected systems. The team concluded that, if implemented as described including the enhancements, the applicant provided guidance that would appropriately identify and address aging effects during the period of extended operation.

b.4 System Reviews The team performed an in-depth review of structures that were identified as potentially susceptible to Alkali-Silica reaction. The team made this selection based on the location of Waterford Steam Electric Station, surrounding industrial facilities, and the proximity of the Mississippi river. The team did not identify any significant indications of alkali-silica reaction in the sample of structures reviewed by the team.

c.

Overall Conclusion Overall, based on the samples reviewed by the team, the inspection results supported a conclusion that there is reasonable assurance that actions have been identified and have been taken or will be taken to manage the effects of aging in the SSCs identified in the license renewal application and that the intended functions of these SSCs will be maintained in the period of extended operation.

4OA6 Meetings, Including Exit

Exit Meeting Summary

The team presented the inspection results to Mr. M. Chisum, Site Vice President, and other members of the licensee staff during an exit meeting conducted on February 16, 2017. The applicant acknowledged the NRC inspection observations. The team returned all proprietary information reviewed during this inspection.

SUPPLEMENTAL INFORMATION

Applicant Personnel

A. Harris Regulatory Assurance

B. Briner System Engineer

C. Pickering Engineering Supervisor

C. Tara System Engineer

C. Zenon System Engineer

D. Garretson System Engineer

D. Marse Senior Chemistry Specialist

D. Viener Design Engineer

D. Williams System Engineer

E. Begley Predictive Maintenance Engineer

J. Hoss Design Engineer

J. Jung System Engineer

J. Lanci System Engineer

L. Milster License Renewal Coordinator

L. Murray License Renewal Project Manager

M. Besse Design Engineer

M. Chisum Site Vice President

M. Groome System Engineer

M. Provensal Mechanical Design Engineer

M. Sandusky Project Coordinator

P. Linger System Engineer

P. Prejean Senior Chemistry Specialist

R. Porter Supervisor, Design Engineer

R. Tran Design Engineer

S. Brown Project Coordinator

S. Nelson Fire Marshall

S. Picard Civil Design Engineer

T. House System Engineer

Entergy Services, Inc. License Renewal Corporate Team

A. Cox Consultant

D. Lach Project Manager

D. Wootten Consultant

H. Rideout Senior License Renewal Engineer

K. Ehren Consultant

M. Spinelli Senior License Renewal Engineer

R. Rucker Consultant

NRC Personnel

F. Ramirez Senior Resident Inspector

C. Speer Resident Inspector

TABLES OF DOCUMENTS REVIEWED

General

Fleet Administrative Procedures

Number Title Revision

EN-FAP-LR-001 License Renewal Project Overview 9

EN-FAP-LR-003 System and Structure Scoping for License Renewal 3

EN-FAP-LR-004 Mechanical System Screening and Aging Management 8

Reviews

EN-FAP-LR-005 Electrical System Scoping, Screening and Aging 6

Management Reviews

EN-FAP-LR-006 Structural Screening and Aging Management Reviews 7

EN-FAP-LR-012 Operating Experience Review for License Renewal 5

EN-FAP-LR-012 OE-AMP Effectiveness Review Process 5

7.5

Letters/Correspondence

Number Title Date

W3F1-2016-0063 Responses to Request for Additional Information October 13, 2016

Set 1 Regarding the License Renewal Application

for Waterford Steam Electric Station, Unit 3

W3F1-2016-0069 Responses to Request for Additional Information November 10, 2016

Set 2 Regarding the License Renewal Application

for Waterford Steam Electric Station, Unit 3

W3F1-2016-0070 Responses to Request for Additional Information December 12, 2016

Set 3 Regarding the License Renewal Application

for Waterford Steam Electric Station, Unit 3

W3F1-2016-0071 Responses to Request for Additional Information January 9, 2017

Set 4 Regarding the License Renewal Application

for Waterford Steam Electric Station, Unit 3

Letters/Correspondence

Number Title Date

W3F1-2016-0074 Responses to Request for Additional Information December 7, 2016

Set 5 Regarding the License Renewal Application

for Waterford Steam Electric Station, Unit 3

W3F1-2016-0075 Responses to Request for Additional Information December 7, 2016

Set 6 Regarding the License Renewal Application

for Waterford Steam Electric Station, Unit 3

W3F1-2016-0077 Responses to Request for Additional Information December 15, 2016

Set 7 Regarding the License Renewal Application

for Waterford Steam Electric Station, Unit 3

W3F1-2017-0002 Responses to Request for Additional Information January 16, 2017

Sets 8 and 9 Regarding the License Renewal

Application for Waterford Steam Electric Station,

Unit 3

W3F1-2017-0003 Responses to Request for Additional Information January 19, 2017

Set 10 Regarding the License Renewal Application

for Waterford Steam Electric Station, Unit 3

W3F1-2017-0005 Responses to Request for Additional Information February 1,2017

Set 11 Regarding the License Renewal Application

for Waterford Steam Electric Station, Unit 3

ML020920464 NRC letter to NEI, Staff guidance on scoping of April 1, 2002

equipment relied on to meet the requirements of

the Station Blackout (SBO) Rule (10 CFR 50.63)

for license renewal (10 CFR 54.4(a)(3)), (ISG-02)

License Renewal

Number Title Revision/Date

W3F1-2016-0012 License Renewal Application, Waterford Steam March 23, 2016

Electric Station, Unit 3

NUREG-1801 Generic Aging Lessons Learned (GALL) 2

NEI 95-10 Industry Guideline for Implementing the 6

Requirements of 10 CFR Part 54 - The license

Renewal Rule

Miscellaneous

Number Title Date

Nuclear Plant Operating Agreement for January 29, 2016

Waterford III Nuclear Power Plant - Amended

and Restated

Miscellaneous

Number Title Date

WLP-ESPC- Issue Resolution Walkdowns July 28, 2015

ENG_WALKDOWNS

LO-WLO-2016-0055 License Renewal Pre-NRC Inspection December 12, 2016

Operating Experience

Number Title Revision

WF3-EP-14-00002 Operating Experience Review Results - AERM 0

WF3-EP-14-00003 Operating Experience Review Results - Aging 0

Management Program Effectiveness

Project Documents

Number Title Date

WF3-EE-14-00001 Electrical Screening and Aging Management February 1, 2016

Review

WF3-EE-14-00001 Electrical Screening and Aging Management February 14, 2017

Review

WF3-EP-14-00009 Aging Management Program Evaluation Results - February 1, 2016

Electrical

Procedures

Number Title Revision

EN-LI-102 Corrective Action Program 28

EN-LI-121 Trending and Performance Review Process 17

Scoping

Calculation

Number Title Revision

Safety-Related Design Calculation C-CE-4 5

IAA48 Foot Print Loads Safety-Related Hanger

Calculation

Condition Report

2017-00241

Drawings

Number Title Revision

LRA-G285 Main One Line Diagram 0

Drawings

Number Title Revision

G285 Main One Line Diagram 19

L006S01 Waterford 3 230kV SW Station One line Diagram In-Service 9

B430-V24.1 Instrument Installation Details 8

G152, sheet 4* Flow Diagram - Instrument Air System, Reactor Auxiliary 0

Building EL. 4.00 & 7.00

G152, sheet 9* Flow Diagram - Instrument Air System, Miscellaneous 0

Building

G153, sheet 4* Flow Diagram - Feedwater, Condensate & Air Evacuation 0

Systems

G160, sheet 1 Flow Diagram - Component Closed Cooling Water Systems 0

G160, sheet 2 Flow Diagram - Component Closed Cooling Water Systems 0

G160, sheet 3 Flow Diagram - Component Closed Cooling Water Systems 0

G160, sheet 4 Flow Diagram - Component Closed Cooling Water Systems 0

G160, sheet 5 Flow Diagram - Component Closed Cooling Water Systems 0

G160, sheet 6* Flow Diagram - Component Closed Cooling Water Systems 0

G161, sheet 1 Flow Diagram - Fire, Make-up & Domestic Water Systems 0

G161, sheet 2* Flow Diagram - Fire, Make-up & Domestic Water Systems 0

G161, sheet 3* Flow Diagram - Fire, Make-up & Domestic Water Systems 0

G161, sheet 5 Flow Diagram - Fire, Make-up & Domestic Water Systems 0

G164, sheet 1* Flow Diagram - Miscellaneous Reactor Auxiliary Systems 0

G166, sheet 1* Flow Diagram - N2, H2, and CO2 Systems 0

G166, sheet 2* Flow Diagram - N2, H2, and CO2 Systems 0

G167, sheet 1 Flow Diagram - Safety Injection Systems 0

G167, sheet 2 Flow Diagram - Safety Injection Systems 0

G167, sheet 3 Flow Diagram - Safety Injection Systems 0

G167, sheet 4 Flow Diagram - Safety Injection Systems 0

G168, sheet 1 Flow Diagram - Chemical and Volume Control Systems 0

G168, sheet 2 Flow Diagram - Chemical and Volume Control Systems 0

Drawings

Number Title Revision

G168, sheet 3 Flow Diagram - Chemical and Volume Control Systems 0

G169, sheet 1 Flow Diagram - Fuel Pool Systems 0

G172, sheet 1 Flow Diagram - Reactor Coolant System 0

G179, sheet 1 Flow Diagram - Reactor Coolant Pump Seals 0

ISO-4305-8643 CW-ISO-IC-892 2

ISO E3029LW3IA7 Instrument Air 10

ISO V8.20-1001-2 Chemical Feed 3

ISO V8.20-1001-4 Chemical Feed 3

License Renewal

Number Title Revision

WF3-EP-14-00001 System and Structural Scoping Results 0

WF3-ME-14-00026 Aging Management Review of Nonsafety-Related 1

Systems and Components Affecting Safety-Related

Systems

Miscellaneous

Title Date

Photographs - Waterford-3 230-kV Switchyard Station Blackout Recovery August, 2014

Components

Procedures

Number Title Revision

OP-902-005 Emergency Operating Procedure - Station 020

Blackout Recovery Procedure

OP-902-009, Electrical Restoration: Energize 1A(B) and 315

2-A 2A(B) from Off-Site Power

NEW PROGRAMS

B.1.3 Buried and Underground Piping and Tanks (XI.M41)

License Renewal

Number Title Revision

WF3-EP-14-00003 Operating Experience Review Results - Aging 0

Management Program Effectiveness

License Renewal

Number Title Revision

WF3-EP-14-00007 Aging Management Program Evaluation Results - 0

Non-Class 1 Mechanical

Miscellaneous

Number Title Revision/Date

LR-ISG-2011-03 Changes to the Generic Aging Lessons Learned 2

(GALL) Report Revision 2 Aging Management

Program XI.M41, Buried and Underground Piping

and Tanks

NACE SP0169-2007 Control of External Corrosion on Underground or March 15, 2007

Submerged Metallic Piping Systems

Report No. APEC Native Survey and CP Testing Waterford 0

1000002.400 Steam Electric Station - WSES Entergy

Corporation Inspection Dates: October 2010 &

June 2012

Operating Experience

Title

Buried Piping 2nd QTR 2013 Semi-Annual Health Report

B.1.4 Coating Integrity (XI.M42)

License Renewal

Number Title Revision

LR-ISG-2013-01 Aging Management of Loss of Coating or Lining

Integrity for Internal Coatings/Linings on In-Scope

Piping, Piping Components, Heat Exchangers, and

Tanks

WF3-ME-14-00030 License Renewal Topical Report on Coating 0

Integrity

WF3-EP-14-00003 Operating Experience Review Results - Aging 0

Management Program Effectiveness

WF3-EP-14-00007 Aging Management Program Evaluation Results 1

Non-Class 1 - Coating Integrity

B.1.20 Metal Enclosed Bus Inspection (XI.E4)

Drawings

Number Title Revision

1564-8891 Armor-Clad Busway, 1600A 4

Drawings

Number Title Revision

1564-8892 Metal-Enclosed Bus Duct, 5kV 1200A

Procedure

Number Title Revision

EN-DC-349 Metal Enclosed Bus Inspection Procedure 3

Project Document

Number Title Date

WF3-EP-14-00009, Aging Management Program Evaluation Results - February 1, 2016

Section 3.1 Electrical

Vendor Documents

Number Title Revision

TD-G080.0735 General Electric Important Instructions for Armor-Clad 0

Indoor Feeder Busway, GEH-2636

TD-C012.0035 Calvert Switch and Bus Support, Class A, Indoor 0

TD-C012.0025 Calvert Field Service Manual 0

TD-C012.0045 Calvert Minimum Air Clearance Phase Rigid Bus 0

Work Orders

00120374 52195668 00121064 00183173

B.1.24 Non-EQ Inaccessible Power Cables ( 400V) Program (XI.E3)

Condition Report

2017-00961*

  • Written as a result of this inspection

Drawing

Number Title Revision

G349 Yard Duct Runs and Outdoor Lighting 20

Letters

Number Title Date

W3F1-2007-0065 Response to NRC RAI on GL 2007-01, "Inaccessible December 18, 2007

or Underground Power Cable Failures that Disable

Accident Mitigation Systems or Cause Plant

Transients."

Letters

Number Title Date

W3F1-2007-0017 Response to Generic Letter 2007-01 Waterford May 3, 2007

Steam Electric Station, Unit 3 (Waterford 3)

License Renewal

Number Title Revision

WF3-EE-14-00001, Electrical Screening and Aging Management Review 1

Section 4.1

WF3-EE-14-00001, WF3 Technical Evaluation of Aging Management Activities 2

11 for the Non-EQ Underground Power Cable (400V) Circuits

Subject to Aging Management Review

WF3-EP-14-00009, Aging Management Program Evaluation Results - Electrical 1

Section 3.3

Miscellaneous

Number Title Date

Photographs - dewatered manhole MH-M329 February 2017

EPRI TR-1020804 Plant Support Engineering: Aging Management June 2010

Program Development Guidance for AC and DC

Low-Voltage Power Cable Systems for Nuclear

Power Plants

Procedure

Number Title Revision

EN-DC-346 Cable Reliability Program 6

Work Orders

00352718 00466126 52605139

B.1.26 Non-EQ Insulated Cables and Connections (XI.E1)

Condition Report

2008-01841

License Renewal

Number Title Revision

WF3-EP-14-00009, Aging Management Program Evaluation Results - 1

Section 3.5 Electrical - Non-EQ Insulated Cables and Connections

Program

Miscellaneous

Number Title Date

EPRI TR-109619 Guideline for the Management of Adverse Localized June 1999

Equipment Environments

Procedure

Number Title Revision

EN-DC-348 Non-EQ Insulated Cables and Connections Inspection 5

B.1.28 One-Time Inspection (XI.M32)

License Renewal

Number Title Revision

WF3-EP14-00007 Aging Management Program Evaluation Results 0

Non-Class 1 - Selective Leaching

B.1.35 Selective Leaching (XI.M33)

License Renewal

Number Title Revision

License Renewal Information System Selective Leaching

Program Component List

WF3-EP14-00007 Aging Management Program Evaluation Results 0

Non-Class 1 - Selective Leaching

EXISTING PROGRAMS

B.1.1 Bolting Integrity (XI.M18)

Condition Reports

2014-05715 2015-07280 2015-09258 2015-09262 2015-09264

2015-9278 2016-00168 2016-00277 2016-03103 2016-04690

2016-04694 2016-04843 2016-04844 2016-06651 2016-06655

License Renewal

Number Title Revision

WF3-EP-14-00006 Bolting Integrity (Section 4.1) 0

Miscellaneous

Number Title Revision

CEP-UPT-0100 Underground Piping and Tanks Inspection and Monitoring 4

SEP-UIP-WF3 Underground Components Inspection Plan 3

Miscellaneous

Number Title Revision

NP-5769 Degradation and Failure of Bolting in Nuclear Power 1

Plants (Research Project 2520-7)

UNT-005-007 Plant Lubrication Program 304

Procedure

Number Title Revision

EN-MA-145 Maintenance Standard for Torque Application 8

B.1.5 Compressed Air Monitoring (XI.M24)

Condition Reports

2013-02290 2014-00021 2014-02354 2014-01061

License Renewal

Number Title Revision

WF3-EP-14-00007 Aging Management Program Evaluation Results - Non- 0

Class 1 Mechanical - Compressed Air Monitoring

Procedures

Number Title Revision

CE-002-032 Maintaining Instrument Air System 305

CE-001-004 Periodic Analysis Scheduling Program 315

B.1.8 Diesel Fuel Monitoring (XI.M30)

Drawings

Number Title Revision/Date

5817-446-R2 Auxiliary Diesel Generator Day Oil Tank Outline September 5,

1978

1564-2525 12-6 Diesel Oil Storage Tank - A & B General 4

Plan

1564-2526 12-6 Diesel Oil Storage Tank - Shell Details 5

1564-2527 12-6 Diesel Oil Storage Tank - Bottom and 2

Anchor Ring Layout

1564-2528 12-6 Diesel Oil Storage Tank - Roof Details 1

1564-4559 48 O.D. * 6-6 Tangential Line Diesel Oil Storage 3

Feed Tanks

License Renewal

Number Title Revision

License Renewal Information System Diesel Fuel

Monitoring Program Component List

WF3-EP14-00003 Operating Experience Review Results - Aging 0

Management Program Effectiveness

WF3-EP14-00007 Aging Management Program Evaluation Results 1

Non-Class 1 - Diesel Fuel Monitoring

Miscellaneous

Title

10-year graphs of water/sediment and particulates for diesel Fuel Oil

Storage Tank A and Tank B, diesel Day Tank A and diesel Day Tank B

Fuel Oil Storage Tanks A and B Diesel Fuel Oil Analysis Reports dated

April 22 and July 6, 2016

Procedures

Number Title Revision

CE-001-004 Periodic Analysis Scheduling Program 315

CE-002-030 Maintaining Diesel Fuel Oil 27

CE-003-608 Determination of Biologicals in Diesel Fuel 3

EN-LI-121 Trending and Performance Review Process 17

MM-003-019 Diesel Generator Fuel Oil Storage Tank Inspection 10

Work Orders

244684 52648830 00400699 00293713 52651825 00401851

B.1.10 External Surfaces Monitoring (XI.M36)

Calculations

Number Title Revision/Date

ECM06-002 Insulation Removal Limits - Piping Inspections in 1

Safeguards Pump Room, SDC HX Room and Wing

Area

LOU 1564.101 Heat, Antisweat and Process Heating Insulation for January 15, 1985

Nuclear and Non-Nuclear Piping and Equipment

SEP-ISI-104 Program Section for ASME Section XI, Division 1 2

Inservice Inspection Program

Condition Reports

2011-07651 2014-05520 2014-04930 2013-05270

2005-04705 2013-01420 2005-03983 2015-00463

License Renewal:

Number Title Revision

WF3-EP-14-00007 Aging Management Program Evaluation Results - 0

Non-Class 1 Mechanical - External Surface

Monitoring

Procedures

Number Title Revision

EN-DC-178 System Walkdowns 7

EN-LI-121 Trending and Performance Review Process 17

PMC-004-004 Maintenance / Installation of Thermal Insulation 5

B.1.11 Fatigue Monitoring (XI.M1)

Calculation

Number Title Revision

CN-RIDA-09-38 Design Reconciliation of Waterford 3 Reactor Vessel 0

Internals for Operation at 3716 MWt with Replacement

Steam Generator

Condition Reports

2004-01751 2015-00044

License Renewal

Number Title Revision

WF3-EP-14-00006 Fatigue Monitoring Program (Section 4.2) 0

WF3-EP-14-00004 TLAA and Exemption Evaluation Results 0

WF3-EP-14-00005 TLAA - Mechanical Fatigue 0

WF3-ME-15-00001 Survey of Design Transients for Thermal Cycle 0

Counting - 1300394.301

WF3-ME-15-00002 Plant Transient Analysis for Waterford - Plant 0

Startup through 4/5/2014 - 1400394.302

Procedures

Number Title Revision

PE-002-003 Fatigue Monitoring Program Coordinator 5

B.1.12 Fire Protection (XI.M26)

Condition Report

2015-00405

License Renewal

Number Title Revision

WF3-EP-14-00007, Aging Management Program Evaluation Results 1

Section 4.6 Non-Class 1 Mechanical - Fire Protection

Miscellaneous

Number Title Date

Q4-2016 Program Health Report - Fire Protection 2016

Q3-2016 Program Health Report - Fire Protection 2016

NFPA 25 Standard for the Inspection, Testing, and Maintenance of 2011

Water-Based Fire Protection Systems

Procedures

Number Title Revision

ME-003-006 Fire Barrier Penetration Seals 306

ME-003-006 Fire Barrier Penetration Seals 310

ME-003-007 Fire Wrap Barriers 15

ME-003-007 Fire Wrap Barriers 17

ME-003-009 Fire Rated Walls, Floors, and Ceilings 302

ME-003-009 Fire Rated Walls, Floors, and Ceilings 306

PS-015 111 Fire Door Surveillance 301

(PMC-003-006)

UNT-005-013 Fire Protection Program 13

UNT-005-013 Fire Protection Program 14

Work Orders

00324922 00324921

B.1.13 Fire Water System (XI.M27)

Condition Reports

2011-00224 2012-00509 2014-00521 2016-06184 2017-00935* CR-HQN-

2017-00241*

  • Written as a result of this inspection

Drawings

Number Title Revision

G161, Sheet 1 Flow Diagram Fire, Make Up & Domestic Water Systems 0

G161, Sheet 2 Flow Diagram Fire, Make Up and Domestic Water Systems 0

G161, Sheet 3 Flow Diagram Fire, Make Up & Domestic Water Systems 0

G161, Sheet 5 Flow Diagram Fire, Make Up & Domestic Water Systems 0

G161, Sheet 6 Flow Diagram Fire, Make Up & Domestic Water Systems 0

G164, Sheet 3 Flow Diagram, Miscellaneous Reactor Auxiliary Systems 0

15641660 Fire Water Storage Tank A 2

License Renewal

Number Title Revision

WF3-EP-14-00007, Aging Management Program Evaluation Results Non- 1

Section 4.7 Class 1 Mechanical - Fire Water System

WF3-ME-14-00010 Aging Management Review of the Fire Protection: Water 1

System

LR-ISG-2012-02 Aging Management of Internal Surfaces, Fire Water

Systems, Atmospheric Storage Tanks, and Corrosion

under Insulation

Miscellaneous

Number Title Date

NFPA 25 Standard for the Inspection, Testing, and Maintenance of 2011

Water-Based Fire Protection Systems

Technical Fire Suppression Water Systems

Requirements

Manual 3/4.7.10

Q4-2016 Program Health Report - Fire Protection

Q3-2016 Program Health Report - Fire Protection

NRC Regulatory Service Level I, II, AND III Protective Coatings Applied to October 2010

Guide 1.54 Nuclear Power Plants

Procedures

Number Title Revision

MM-003-021 Sprinkler System Inspection (Safety Areas) 10

MM-003-021 Sprinkler System Inspection (Safety Areas) 12

MM-003-032 Maintenance Surveillance Procedure Diesel Fire Pump Engine 14

Inspection

Procedures

Number Title Revision

MM-004-422 Sprinkler System Inspection (Nonsafety Areas) 8

MM-004-422 Sprinkler System Inspection (Nonsafety Areas) 10

MM-004-423 Yard Fire Hydrant Hose House Inspection and House 14

Replacement

MM-004-423 Yard Fire Hydrant Hose House Inspection and House 17

Replacement

MM-004-424 Building Fire Hose Station Inspection and Hose Replacement 304

MM-004-424 Building Fire Hose Station Inspection and Hose Replacement 307

MM-007-008 Fire Hose Hydrostatic Test 301

MM-007-008 Fire Hose Hydrostatic Test 308

OP-903-055 Fire Main Flush and Hydrant Inspection 11

OP-903-057 Fire Protection System Flow Test 18

OP-903-057 Fire Protection System Flow Test 21

OP-903-058 Fire Hose Station Valve Cycling Check 14

OP-903-059 Sprinkler System Functional Test 12

UNT-005-013 Fire Protection Program 13

UNT-005-013 Fire Protection Program 14

Work Orders

232209 52681255 52517633 52283342 52487901 52732060 52610650

232586 52727119 52606298 52321112 52489432 52508563 52603247

B.1.14 Flow Accelerated Corrosion (XI.M17)

Condition Reports

2013-01360 2014-02147 2014-04226

Calculation

Number Title Revision

030709-02 Flow Accelerated Corrosion CHECWORKS FAC Model 0

Engineering Change

Number Title Revision

35912 RF-18 Flow Accelerated Corrosion (FAC) project Tcrit 0

Values

46350 RF-19 Flow Accelerated Corrosion (FAC) project Tcrit 0

Values

License Renewal

Number Title Revision

WF3-EP-14-00006 Flow-Accelerated Corrosion (Section 4.8) 0

Miscellaneous

Number Title Revision/Date

RFO-19 Flow Accelerated Corrosion Summary 0

Report

RFO-18 Flow Accelerated Corrosion Summary 0

Report

Program Health Report - Q2-2012 June 30, 2012

Program Health Report - Q2-2013 June 30, 2013

Program Health Report - Q2-2014 June 30, 2014

Program Health Report - Q2-2015 June 30, 2015

LR-ISG-2012-01 Wall Thinning Due to Erosion Mechanisms

Waterford 3 FAC program System Susceptibility October 26, 2014

Evaluation (SSE)

Procedures

Number Title Revision

EN-DC-315 Flow Accelerated Corrosion Program 12

EN-LI-121 Trending and Performance Review Process 22

NSAC-202L Recommendations for an Effective Flow-Accelerated 3

Corrosion Program

EN-DC-315 Flow Accelerated Corrosion Program 12

B.1.17 Inspection of Overhead Heavy Load and Light Load (related to refueling) Handling

Systems (XI.M23)

Condition Reports

2009-02108 2007-01250 2014-03161

2014-01628 2011-00215 2007-03574

2011-02935 2014-05435 LO-WLO-2004-00033

License Renewal

Number Title Revision

WF3-EP-14-00008 Waterford 3 License Renewal Project - Aging 1

Management Program Evaluation Report

Civil/Structural - Inspection of Overhead Heavy Load

and Light Load (Related to Refueling) Handling

Systems

WF3-CS-14-00001 WF3 License Renewal Project - Aging Management 1

Review of the Reactor Building

WF3-CS-14-00003 WF3 License Renewal Project - Aging Management 1

Review of the Turbine Building and Other Structures

WF3-EP-14-00003 WF3 License Renewal Project - Operating Experience 0

Review Results - Aging Management Effectiveness

Program

Miscellaneous

Title Revision

Quality Assurance Program Manual 29

Procedures

Number Title Revision

MM-002-201 Containment Building Polar Crane PM 303

MM-004-401 Fuel Handling Building Crane PM 7

MM-004-870 Kranco Overhead Cranes PM 301

MM-004-877 Containment Building Auxiliary Pedestal Crane PM 302

MM-006-018 Miscellaneous Hoist Maintenance 7

MM-007-002 Crane and Hoist Inspection and Testing 9

B.1.19 Masonry Wall (XI.S5)

Condition Reports

2002-01613 2004-01281 2004-01293

Drawings

Number Title Revision

G-554 Reactor Auxiliary Building Floor Slab at El-4.00 Masonry 17

G-560, Reactor Auxiliary Building Roof Slab at El +60.00 Masonry 11

Sheet 2

G-599 Turbine Generator Pedestal Mat-Masonry 5

License Renewal

Number Title Revision

WF3-CS-14-00002 Aging Management Review of the Nuclear Plant Island 1

Structure

WF3-CS-14-00003 Aging Management Review of the Turbine Building and 1

Other Structures

WF3-EP-14-00003 Operating Experience Review Results - Aging 0

Management Program Effectiveness

WF3-EP-14-00008 Operating Experience Review Results - Aging 1

Management Program Evaluation Report

Civil/Structural

Miscellaneous

Number Title Date

Information Notice No. Lessons Learned from Regional Inspections of December 31,

87-67 Licensee Actions in Response to IE Bulletin 80-1 1987

IE Bulletin No. 80-11 Masonry Wall Design May 8, 1980

Letter

D. W. Herrin to Files, W3P83-3187, IE Bulletin 80-11 September 19,

Masonry Wall Design 1983

EPRI Report 107933 Aging Assessment Field Guide December

2003

Procedure

Number Title Revision

EN-DC-150 Condition Monitoring of Maintenance Rule Structures 6

B.1.21 Neutron-Absorbing Material Monitoring (XI.M40)

Drawing

Number Title Revision

G141 General Arrangement Fuel Handling Plans 23

License Renewal

Number Title Revision

WF3-EP-14-00006 Neutron-Absorbing Material Monitoring (Section 4.9) 0

Miscellaneous

Number Title Revision

NET-28083-001-01 Inspection and Testing of Waterford BORAL Surveillance 0

Coupons

Miscellaneous

Number Title Revision

LR-ISG-2009-01 Aging Management of Spent Fuel Pool Neutron-Absorbing

Materials Other Than Boraflex

SNM-SFP-C21 Spent Fuel Pool Inventory Map Cycles 21 4

Procedure

Number Title Revision

NE-001-106 SFSR Boral Surveillance Program 5

B.1.27 Oil Analysis (XI.M39)

Drawings

Number Title Revision

G164, sheet 1 Flow Diagram - Miscellaneous Reactor Auxiliary Systems 0

1564-2044 Emergency Diesel Generator B, Oil Schematic and Notes 0

License Renewal

Number Title Revision

Table 3.3.2-15-17 Emergency Diesel Generator System Nonsafey-Related

Components Affecting Safety-Related Systems Summary

of Aging Management Evaluation

WF3-EP14-00003 Operating Experience Review Results - Aging 0

Management Program Effectiveness

WF3-EP14-00007 Aging Management Program Evaluation Results 0

Non-Class 1 - Oil Analysis

Miscellaneous

Number Title Revision

Condition Report 2017-00655

Information related to ISO cleanliness codes for lubricating

oils

Lubrication Manual specification sheets for auxiliary

feedwater pump, auxiliary component cooling water pump,

and diesel generator

Lubrication oil laboratory test results for auxiliary

feedwater pump and diesel generator

SEP-LUB-WF3-001 Waterford 3 Lubrication Analysis & Monitoring Program 0

Implementation

EPRI 1019518 Lubrication Guide 4

Procedures

Number Title Revision

EN-DC-310 Predictive Maintenance Program 7

EN-LI-121 Trending and Performance Review Process 17

UNT-005-007 Plant Lubrication Procedure 304

B.1.31 Protective Coating Monitoring and Maintenance (XI.S8)

Condition Reports

2003-03425 2006-04317 2011-02987 2013-01020 2014-02804

License Renewal

Number Title Revision

WF3-EP-14-00003 Waterford 3 License Renewal Project Aging Management 0

Program Effectiveness

WF3-EP-14-00008 Waterford 3 License Renewal Project Aging Management 1

Program Evaluation Report Civil/Structural

WF3-CS-14-00001 Waterford 3 License Renewal Project Aging Management 1

Review of the Reactor Building

Miscellaneous

Number Title Revision/Date

EPRI Topical Report Guideline on Nuclear Safety-Related Coatings, 2

No. 1019157 (Formerly TR-109937 and 1003102)

NRC IN 2011-20 Concrete Degradation by Alkali-Silica Reaction November 18,

2011

GL 98-04 Potential for Degradation of the Emergency Core

Cooling System and the Containment Spray System

after a Loss-of-Coolant Accident because of

Construction and Protective Coating Deficiencies and

Foreign Material in Containment

GL 2004-02 Potential Impact of Debris Blockage on Emergency July 14, 1998

Recirculation during Design Basis Accidents at

Pressurized Water Reactors

GL 2004-02 Potential Impact of Debris Blockage on Emergency September 13,

Recirculation during Design Basis Accidents at 2004

Pressurized Water Reactors

NRC Bulletin 96-03: Potential Plugging of Emergency Core Cooling Suction May 6, 1996

Strainers by Debris in Boiling Water Reactors

Procedures

Number Title Revision

EN-DC-220 Safety-Related Coatings Program 2

EN-FAP-LR-006 Structural Screening and Aging Management Reviews 7

WF3-CS-14-00001 Aging Management Review of the Reactor Building 1

WF3-EP-14-00003 Operating Experience Review Results - Aging Management 0

Program Effectiveness

NOECP-451 Conducting Engineering Inspection of Reactor Containment 1

Building Protective Coatings

B.1.36 Service Water Integrity (XI.M20)

Calculation

Number Title Revision

SEP-HX-WF3-001 Generic Letter 89-13 Heat Exchanger Test Basis 0

Condition Reports

LO-WLO-2008-00043 2006-03340 2008-00669 2010-07206

LO-WLO-2006-0048 2008-04488 2008-04996

CR-HQN-2007-0893 2007-02364 2011-15424

License Renewal

Number Title Revision

WF3-EP-14-00007 WF3 License Renewal Project - Aging Management 0

Program Evaluation Results - Non-Class 1 Mechanical -

Service Water Integrity

Miscellaneous

Number Title Revision/Date

W3-DBD-4 Waterford SES Unit No.3 Design Basis Document - 303

Component Cooling Water, Auxiliary Component

Cooling Water

CTI Code ATC-105 Cooling Technology Institute - CTI Code Tower February 2000

Standard Specifications - Acceptance Test Code for

Water Cooling Towers

Procedures

Number Title Revision

CE-002-003 Maintaining Auxiliary Component Cooling Water Chemistry 302

EN-DC-184 NRC Generic Letter 89-13 Service Water Program 3

Procedures

Number Title Revision

EN-DC-340 Microbiologically Induced Corrosion (MIC) Monitoring 3

Program

EN-LI-121 Trending and Performance Review Process 17

PE-004-021 CCW Heat Exchanger Performance Test 4

UNT-006-032 Coating and Corrosion Program 1

PE-004-003 Wet Cooling Tower A(B) Thermal Performance Test 306

Work Orders

2514794 00451255-32

B.1.38 Structures Monitoring (XI.S6)

Condition Reports

2006-00755 2009-06945 2010-05582 2012-04684 2016-04481 2016-04484

2012-07645 2014-05375 2015-00947 2016-04480 2016-04482

License Renewal

Number Title Revision

WF3-EP-14-00001 Waterford 3 License Renewal Project System and 0

Structure Scoping Results Civil/Structural

WF3-EP-14-00003 Waterford 3 License Renewal Project Operating 0

Experience Review Results - Aging Management

Program Effectiveness

WF3-EP-14-00008 Waterford 3 License Renewal Project Aging Management 1

Program Evaluation Report Civil/Structural

Operating Experiences

Number Title Revision

WF3-CS-14-00002 Aging Management Review of the Nuclear Plant Island 1

Structure

WF3-CS-14-00003 Aging Management Review of the Turbine Building and 1

Other Structures

WF3-CS-14-00004 Aging Management Review of Bulk Commodities 1

WF3-EP-14-00008 Aging Management Program Evaluation Report 1

Civil/Structural

Procedures

Number Title Revision

EN-DC-150 Condition Monitoring of Maintenance Rule Structures 6

EN-DC-178 System Walkdowns 7

EN-MA-145 Maintenance Standard for Torque Applications 3

EN-FAP-LR-006 Structural Screening and Aging Management Reviews 7

LOU 1564.723 [Specification] Structural Steel Seismic I & II 16

UNT-006-032 Coating and Corrosion Program 0

W-CS-2003-001-00 Maintenance Rule Walkdown for Evaluation of Structures 0

WF3-CS-11-00001 Maintenance Rule Walkdown for Evaluation of Structures 0

WF3-CS-16-00006 Maintenance Rule Walkdown for Evaluation of Structures 0

B-288, Sh 3 Cable and Conduit List Installation Notes Sh.3 8

B-288, Sh 4 Cable and Conduit List Installation Notes Sh.4 18

Drawings

Number Title Revision

G-134 General Arrangement Reactor Auxiliary Bldg. Plan+46.00 35

G-135 General Arrangement Reactor Auxiliary Bldg. Plan+21.00 30

G-136 General Arrangement Reactor Auxiliary Bldg. Plan -4.00 35

G-138, Sheet 1 General Arrangement Reactor Auxiliary Bldg. Section 20

G-144 General Arrangement Reactor Building Plan El. +21.00 31

G-145 General Arrangement Reactor Building Plan El. -4.00 33

G-146, Sheet 1 General Arrangement Reactor Building - Section 18

G-149, Sheet 4 General Arrangement Reactor Auxiliary Bldg. -Plans and 25

Sections

G-164 Flow Diagram Containment Spray & Refueling Water 43

Storage Pool

G-167 Flow Diagram Safety Injection System 20

G-317 S01, Sheet 1 Reactor Aux. Bldg.-EL+ 7.00 Conduit, Trays & Grounding 14

G-554 Reactor Auxiliary Building Floor Slab at El-4.00 Masonry 17

G-560, Sheet 2 Reactor Auxiliary Building Roof Slab at El +60.00 Masonry 11

G-563, Sheet 2 Reactor Auxiliary Building Structural Layout 4

G-599 Turbine Generator Pedestal Mat-Masonry 5

G-763, Sheet 1 Floor Plans 20

License Renewal

Number Title Revision

WF3-EP-14-00003 Waterford 3 License Renewal Project Operating 0

Experience Review Results - Aging Management

Program Effectiveness

WF3-EP-14-00007 Waterford 3 License Renewal Project Non Class 1 0

Mechanical

Drawings

Number Title Revision

G-765, Sheet 3 Floor Plans 23

G-780 Turbine Area Column Schedules 7

G-793 Turbine Building Sections & Details 8

G-905 Reactor Auxiliary Building Refuel Pit Liner 2

G-905 Reactor Auxiliary Building Condensate Pool Liner 5

G-907 Reactor Auxiliary Bldg. Pool Liner Details 9

Miscellaneous

Number Title Date

Video Video Inspection of CSP internals

Video Video Inspection of RWSP internals

Letter Sandiforth to Booth, Stainless Steel Conduit April 26, 1977

EPRI Report 107933 Aging Assessment Field Guide December 2003

B.1.40 Water Chemistry Control - Closed Treatment Water System (XI.M21A)

Condition Reports

2007-03514 2011-08166 2013-00724

Procedures

Number Title Revision

CE-001-004 Periodic Analysis Scheduling Program 315

CE-002-001 Maintaining Steam Generator Chemistry 308

Procedures

Number Title Revision

CE-002-002 Maintaining Condensate and Feedwater Chemistry 305

CE-002-005 Maintaining Makeup Demineralizer Chemistry 016

CE-002-006 Maintaining Reactor Coolant Chemistry 314

CE-002-007 Maintaining Component Cooling Water Chemistry 305

CE-002-008 Maintaining Condensate Storage Pool Chemistry 302

CE-002-009 Maintaining Boron Management System Chemistry 301

CE-002-010 Maintaining Safety Injection Tank Chemistry 17

CE-002-011 Maintaining Spent Fuel Pool Chemistry 10

CE-002-011 Maintaining Diesel Generator Jacket Cooling Water Chemistry 301

CE-002-013 Maintaining Essential Services Chill Water Chemistry 303

CE-002-020 Maintaining Primary Water Chemistry 13

CE-002-025 Maintaining Refueling Water Storage Pool Chemistry 14

Maintaining Condensate Storage Tank and Demineralized Water

CE-002-027 10

Storage Tank

EN-CY-102 Laboratory Analytical Quality Control 5

License Renewal Inspection Document Request

Inspection Dates: January 30, 2017, through February 16, 2017

Inspection Procedures: IP 71002 License Renewal Inspection

Inspectors: Sam Graves, Greg Pick, Wayne Sifre, Jim Melfi, Isaac Anchondo

1. License Renewal Application Development Instructions (station blackout, scoping and

screening, aging management reviews, operating experience reviews)

  • Other specific technical review guidance documents (e.g., operating experience, station

blackout)

and screening processes

2. License Renewal Process Instructions (developing aging management review report,

developing the aging management programs, working with the database)

3. Aging management programs - Currently, the team would like to review the following

programs:

XI.M18 Bolting Integrity

XI.M41 Buried and Underground Piping

XI.M42 Coating Integrity

XI.M24 Compressed Air Monitoring

XI.M30 Diesel Fuel Monitoring

XI.M36 External Services Monitoring

X.M1 Fatigue Monitoring

XI.M26 Fire Protection

XI.M27 Fire Water System

XI.M17 Flow-Accelerated Corrosion (FAC) Program

XI.M23 Inspection of Overhead Heavy Load and Light Load (related to refueling)

Handling Systems

XI.S5 Masonry Wall

XI.E4 Metal Enclosed Bus Inspection

XI.M40 Neutron-Absorbing Material Monitoring

XI.E3 Non EQ Inaccessible Power Cables (>400V)

XI.E1 Non-EQ Insulated Cables and Connections

XI.M39 Oil Analysis

XI.M32 One-Time Inspection

XI.S8 Protective Coating Monitoring and Maintenance

XI.M33 Selective Leaching

XI.M20 Service Water Integrity

XI.S6 Structure Monitoring

XI.M21A Water Chemistry Control - Closed Treated Water Systems

For the requested AMPs, please provide:

  • Relevant 10 element information located in binders
  • Documents referred to in the 10 element description
  • Updated OE information since the applicant completed their review

M. Chisum

  • Relevant assessments and/or self-assessments completed for the program area being

reviewed

  • Select corrective action program key words to search and have the list provided so that

corrective action documents could be selected for review

  • Point of contacts and telephone numbers of program owners
  • Information regarding whether the aging management reviews have been incorporated into

plant processes

4. References specified in the aging management programs, aging management reviews,

and scoping and screening processes

5. Copy of any license amendments subsequent to the original LRA submittal.

6. A minimum of 10 years of operating experience

7. Issued or draft procedures related to the aging management programs selected.

8. Single set of marked up license renewal drawings (hard copy); size 24 x 36

This e-mail does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 31500011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

ML17094A238

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: STG Yes No Publicly Available Sensitive NRC-002

OFFICE SRI:EB2 SRI:EB2 SRI:EB1 RI:EB2 PE:PBB C:PBD

NAME S. Graves G. Pick W. Sifre I. Anchondo J. Melfi G. Miller

SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/

DATE 3/26/2017 3/26/2017 3/28/2017 3/24/2017 3/27/2017 3/30/2017

OFFICE C:EB2

NAME G. Werner

SIGNATURE /RA/J. Mateychick

for

DATE 3/31/2017