|
|
Line 1: |
Line 1: |
| {{Adams | | {{Adams |
| | number = ML20206N978 | | | number = ML20216H773 |
| | issue date = 04/10/1987 | | | issue date = 06/25/1987 |
| | title = Insp Rept 50-362/86-37 on 861215,870112-16 & 0316-20. Violations Noted:Failure to Control Licensed Matl to Maintain Exposure within Regulatory Limits,Perform Required Surveys & Provide Immediate Notification of Events to NRC | | | title = Discusses Insp Rept 50-362/86-37 & 50-362/87-13 on 861215- 870514 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000 Based on Failure to Adequately Control Radioactive Matls.Response Required |
| | author name = North H, Russell J, Wenslawski F, Yuhas G | | | author name = Martin J |
| | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) | | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| | addressee name = | | | addressee name = Baskin K |
| | addressee affiliation = | | | addressee affiliation = SOUTHERN CALIFORNIA EDISON CO. |
| | docket = 05000362 | | | docket = 05000362 |
| | license number = | | | license number = |
| | contact person = | | | contact person = |
| | document report number = 50-362-86-37, NUDOCS 8704210068 | | | document report number = EA-87-063, EA-87-63, NUDOCS 8707010566 |
| | package number = ML20206N955 | | | package number = ML20216H778 |
| | document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS | | | document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE |
| | page count = 24 | | | page count = 4 |
| }} | | }} |
|
| |
|
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:. . . . --- . _ . | | {{#Wiki_filter:, 3 ] |
| =~ | | :n |
| . | | [,wam#'o, UNITED STATES ; |
| ,
| | EI ' 3 NUCLEAR REGULATORY COMMISSION ! |
| U. S. NUCLEAR REGULATORY COMMISSION
| | ,t $ ; ,E REGION V ) |
| , | | 0 1450 MARIA LANE, SUITE 210 f W ALNUT CREEK, CALIFoRNI A 94596 |
| | | ,- ,d |
| ==REGION V==
| | **..+ , |
| I Report No. 50-362/86-37 Docket No. 50-362" License No. NPF-15 Licensee: Southern California Edison Company 2244 Walnut Grove Avenue
| | MN 2 51987 f Docket No. 50-362 , |
| 'Rosemead, California 91770 i
| | License No. NPF-15 DrsIctATED ORICINA Southern California Edison Company certified A .,C b- |
| | | . |
| Facility Name: San Onofre Nuclear Generating Station - Unit 3 Inspection At: San Onofre Nuclear Generating Station
| | P. O. Box 800 j 2244 Walnut Grove Avenue Rosemead, California 91770 Attention: Mr. Kenneth P. 8askin, Vice President Nuclear Engineering, Safety and Licensing Department Gentlemen: |
| ' | | Subject: NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTIES (NRC INSPECTION REPORT NOS. 50-362/86-37 AND 87-13 AND LER NO. 86-15, THROUGH REVISION 2) |
| Inspection Conducted: December 15, 1986, January 12-16, 1987, and March 16-2 , 1987 Inspectors: /u v. 9-f7
| | This refers to the inspections conducted from December 15, 1986 through : |
| '
| | May 14, 1987, of activities at the San Onofre Nuclear Generating Station, Unit 3, ' |
| J. gRu sell Date Signed j Radiation Specialist, C. th - An 4hoh7 H. S. NottA )~ C. Senior RaMtion Spe(Malist, Date Signed '
| | San Clemente, Californi The apparent violations of NRC requirements in the enclosed Notice of Violation and Proposed Imposition of Civil Penalties set forth examples involving radiation safety matters that were precipitated by self-revealing events and have been discussed with your representatives during meetings held at the Region V office on April 10 and May 11, 198 The violations described in the enclosed Notice of Violation and Proposed Imposition of Civil Penalties involved significant deficiencies in your l radiation safety program which included: (1) the failure to adequately control radioactive materials, (2) the failure to perform surveys, (3) an ; |
| l ( Y G. P. Nhasj Chief 1'll011W Date Signed
| | occupational overexposure, and (4) the untimely reporting of the events related to a personnel overexposur On December 12, 1986, you reported that a thermoluminescent dosimeter (TLD) |
| | worn on the right hand of a maintenance worker engaged in activities during ' |
| | the Unit 3 outage in October 1986 indicated a potential hand exposure of 511.99 rem. Your management system failed to identify and report this exposure in a timely manner. These failures apparently resulted because of a breakdown in the management oversight and control c,( your personnel dosimetry program. Specifically, computer software used as part of the dosimetry program was not adequately reviewed prior to its use in order to assure that it operated properly. In addition, the error was not identified in a timely manner even after you received a printed copy of the result We recognize that you have dedicated significant effort to a review of the 511.99 rem TLD result and have concluded that you believe the individual probably did not receive the dose indicated by the TLD. Rather, it appears to CERTIFIED MAIL .. 4 RETURN RECEIPT REQUESTED ,4 |
| ' | | ' |
| Faci itie M adiological Protection Section Approved by: .I #7
| | f 2, a |
| : F. A. Wehslawski, Chief Datre S'igned ,
| | * A |
| j Emergency Preparedness and Radiological I i Protection Branch Summary:
| |
| s
| |
| '
| |
| Inspection on December 15, 1986, January 12-16, 1987, and March 16-20, 1987 (Report No. 50-362/86-37)
| |
| Areas Inspected: This was a special inspection in response to the licensee's
| |
| ,
| |
| December 12, 1986, report of a potential exposure to the hand of a worker in
| |
| : excess of the regulatory limit. The inspection included an onsite visit by the Chief, Facilities Radiological Protection Section; subsequent site inspection effort by regionally based Radiation Specialists, NRC Headquarters i Staff and the Resident Inspection Staff; extensive in office review; and independent technical evaluations by NRC consultants. The purpose of the inspections was (1) to determine if the worker received the exposure and (2)
| |
| to establish the adequacy of the radiation protection controls imposed by the l
| |
| licensee to minimize the potential for unplanned exposures to workers from 8704210068 870413 i PDR ADOCK 05000362 <
| |
| '
| |
| O PDR
| |
| )
| |
| | |
| . . . - . . . -.. . . - . . - .- - .- -- . . . . . .
| |
| . . . ,
| |
| S
| |
| -
| |
| ; .
| |
| 1-
| |
| !
| |
| ;
| |
| -2-i.> .
| |
| -
| |
| ! small particulate sources of radioactive materia Inspection procedures
| |
| '
| |
| addressed were 83729, 90712, 92700 and 93702.
| |
| | |
| ! Results: Of the areas inspected, apparent violations involving failure to i control licensed material to maintain exposure within regulatory limits; i failure to perform required surveys; failure to provide immediate~ notification of events-to the NRC; and failure to control licensed material to prevent
| |
| { release to unrestricted areas were identifie t
| |
| | |
| I +
| |
| !
| |
| '
| |
| I i ,
| |
| i
| |
| | |
| ?!
| |
| I
| |
| @
| |
| !
| |
| .
| |
| i
| |
| | |
| ' | | ' |
| | | D D D |
| .
| | * |
| :
| | ~ |
| l -
| |
| ..
| |
| l
| |
| | |
| !
| |
| i 4 i r .
| |
| i ( *
| |
| f
| |
| ' | | ' |
| i
| |
| !
| |
| k i
| |
| }
| |
|
| |
|
| *
| | o |
| ,
| |
| *
| |
| .
| |
| ' | | ' |
| DETAILS Persons Contacted Licensee Personnel
| | i |
| +*H. Ray, Vice President - Site Manager
| | ' ' ' |
| +*H. Morgan, Station Manager r + M. Wharton, Deputy Station Manager
| | Southern California Edison Comprny -2- JUN .2 51987 ll l |
| +*P. Knapp, Health Physics (HP) Manager
| |
| +*R. Warnock, HP Engineering Supervisor
| |
| +*W. Zint1, Compliance Manager
| |
| *C. Couser, Compliance Engineer
| |
| +*D. Schone, Site Quality Assurance (QA) Manager
| |
| +*E. Donnelly, HP Engineer Maintenance Worker A
| |
| ,
| |
| R. Dickey, Dosimetry Supervisor i + J. Reilly, Station Technical Manager
| |
| ,
| |
| + A. Brough, Station Technical Engineer l + S. Stilwagen, Refueling Supervisor Licensee Contractors HP Technician A | |
| + P. Plato, Professor of Radiological Health, University of Michigan NRC Contractor
| |
| ~
| |
| F. Attix, Consulting Physicist, Department of Medical Physics, University of Wisconsin R. Brown, M.D., School of Medicine, University of California M. Moeller, Senior Research Scientist, Health Physics Department, Battelle Pacific Northwest Laboratories NRC Representatives
| |
| + R. Huey, Senior Resident Inspector
| |
| + J. Tatum, Resident Inspector
| |
| ,
| |
| P. Stewart, Resident Inspector
| |
| + R. Paulus, Health Physicist, Operating Reactor Programs Branch, IE A. Johnson, Enforcement Officer S. Block, Region V, Health Physicist, C. * Denotes individuals present at the exit interview on January 16, 198 + Denotes individuals present at the exit interview on March 20, 198 .
| |
| In addition to the individuals identified above, the inspectors met and held discussions with other members of the licensee's and contractor's staff.
| |
| | |
| I
| |
| | |
| _ _ _ _ _ _ _ _ _ _ _
| |
| * | | * |
| .
| | be your position that the persunnel dosimetry device was deiective in some wa Due to the failure to identify the exposure incident in a timely manner, the opportunity was lost to make physical observation of the worker's hand which may have more precisely confirmed the extent of expmure. Nonetheless, j the results of our review indicate that the TLD resp nse was most probably j from radiation exposure. The individual involved was working on plant systems I where. highly radioactive particulate fission products were likely to be l present. Also, the radiation protection controls being implemented were ! |
| I Background On December 12, 1986, at 11:30 a.m. (PST), Southern California Edison Company (SCE) made a report pursuant to 10 CFR 50.72(b) of a potential dose to a worker's right hand of 511,990 mrem. The dose to the worker's left hand and whole body, as read from his other TLD badges, was 160 mrem and 114 mrem, respectively. In response to this notification, the Region V Chief, Facilities Radiological Protection Section conducted an initial, onsite inspection on December 15, 1986, to determine if the licensee was dedicating sufficient resources to evaluate the potential exposure and to verify that the licensee was in the process of implementing additional radiation protection measures to control potential exposures from radiation source In anticipation of the licensee's submittal of a Licensee Event Report (LER), two regionally based radiation specialists reported to the site on January 12, 1987, to perform an independent evaluation of the event. LER 86-015 was issued on January 12, 1987, but indicated that the licensee had not completed their investigation and that a revision to the LER would follo The licensee issued LER 86-015, Revision 1, on February 22, 1987, reporting their conclusion that the overexposure did not occur. The basis for the licensee's conclusion was to be contained in a report to follo On March 3,1987, the licensee issued a final report, Evaluation of the reported high exposure to extremity TLD #80365 in October, 1986, describing the investigation and providing the bases for their conclusion that the overexposure did not occur. After review of the licensee's final report, the Region V Facilities Radiological Protection Section Chief, an headquarters Inspection and Enforcement Health Physicist, the Region V Enforcement Officer and a regionally based Radiation Specialist reported to the site on March 16, 1987, to complete independent onsite investigation of the event. During this same period, the Region V l Emergency Preparedness and Radiological Protection Branch Chief and a NRC l consulting physicist and dosimetry expert visited the facilities of the licensee's dosimetry vendor to review the vendor's processing of the TLD badge in questio As a result of NRC comments made during the exit interview on March 20, 1987, the licensee submitted LER 87-003 on March 24, 1987, pursuant to 10 CFR 20.405(a)(1)(v) in which the licensee provided information regarding three occurrences in which small particles of licensed material had apparently been released from the sit III. Licensee Evaluations Initial Investigation of 512 Rem Exposure In LER 86-015, the licensee described the initial information available to them as follows:
| | . inadequate to ensure that the worker could not have rec.eived a dose to a small part of his right hand on the order of 512 rem. Specifically, the radiological procedures being implemented for the activities that the worker performed did not address the hazard from particulate fission product Further, the radiation prctection technician providing job coverage had not been trained in the necessary survey techniques, and the results of surveys that were performed were not documented. All of these facts contribute to the NRC's conclusion that the overexposure occurre l l |
| __
| | l Our efforts to determine the root cause of this exposure ind?cate that, { |
| | | following your decision to operate Unit 3 during Cycle I with a significant number of fuel pin defects, no special confinement controls were implemented for fuel assembly reconstitution during October and November 1985. Although certain members of your facility management were aware of the hazard, your radiation protection staff was not involved in planning the controls to be , |
| .
| | implemented during fuel reconstitutio Following the dispersal of highly l radioactive particles in the fuel handling building.in October and November ) |
| .
| | 1985, the radiation protection group focused their efforts on mitigating the { |
| | | consequences of the dispersal, but little was done to confirm or clean up affected systems (i.e., reactor coolant, and associated spent fuel pool systems) notwithstanding written requests made by your radiation protection ) |
| "On December 12, 1986, SCE determined that sufficient *
| | group in November 1985 and April 198 This lack of integrated management involvement also greatly contributed to the exposure inciden While your actions to improve radiation protection measures following the identified exposure incident appeared comprehensive during December 1986 and January 1987, three instances in February 1987 indicate that the measures were ] |
| preliminary information existed to believe that an extremity exposure to one individual's right hand in excess of the regulatory limit of 18 3/4 Rem / Quarter may have occurred in October 1986 during maintenance work at Unit 3. Subsequent investigations are not complete and thus have not established whether the extremity exposure actually occurred. The individual was restricted from further exposure for the remainder of the Fall 1986 quarter. He resumed his normal activities on January 1,198 "During October 1986, an SCE Maintenance individual wore two ring TLDs, one on the ring finger of each hand, provided by...(the)... (TLD Service), on five occasions during maintenance work on a Liquid Waste Management System (LWMS)
| | ; |
| Crud Tank Pump...and the Reactor Coolant System (RCS) reactor coolant pump seals... removal and reinsta11ation. The dates of the maintenance work were October 6, 8, 9, 20 and 21, 1986. On October 30, the rings were removed from use and routinely forwarded to the TLD Service for analysi "The TLD Service reported to SCE via electronic data transmission to the SCE computer system, all October TLD results on November 13, 1986. Due to an error in the SCE computer data reformatting program, a reading above 9.999 Rem was truncated, dropping any digits above the first place to the left of the decimal point. As a consequence, the computer program feature to automatically identify excessive exposure data failed and SCE remained unaware of a high reading for one of the Maintenance individual's ring TLD "On or about November 17, 1986, the TLD Service, as is customary, provided the backup printed listing of the electronic data transmission to SCE. On December 11, 1986, SCE dosimetry personnel checked the October dosimetry records and noted a reading above the 18 3/4 Rem / Quarter regulatory limit for extremitie After confirming the data with appropriate vendor personnel on December 12, 1986, NRC notification was made and a comprehensive investigation was initiated."
| | not totally effective in limiting unnecessary exposure to workers and f precluding the release of small particles of licensed radioactive material to unrestricted areas. These examples demonstrated a continued need to improve your training of personnel and to provide sufficient management oversight to ensure that your radiation safety program directions are being carried ou To emphasize the need for continued improvement in the radiological controls l area, in particular the implementation of your dosimetry program, and to ' |
| | | emphasize the need to assure the timely reporting of exposure incidents, I have been authorized, after consultation with the Director, Office of J Enforcement, and the Deputy Executive Director for Regional Operations, to ' |
| The licensee summarized the status of their investigation by stating:
| | issue the enclosed Notice of Violation and Proposed Imposition of Civil . |
| "0ngoing investigations thus far have been unable to establish whether the extremity exposure actually occurred. However, if it did actually occur, the only plausible mechanism would be from a small fission fuel fragment (FFF). At present, it appears equally likely that the TLD reading was anomalous or was caused by tampering. The ongoing investigations should be completed in February "
| | Penalties in the amount of One Hundred Thousand Dollars ($100,000) for the ] |
| !
| | violations described in the enclosed Notice. In accordance with the " General i Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, I Appendix C (1987) (Enforcement Policy), the violations described in the j enclosed Notice have been categorized as three separate Severity Level III l violations or problem u |
| In regard to the problem with fuel fragments, the licensee stated:
| | '- Southern California Edison company -3- M 2 51987 i |
| ,
| | .: The violation involving the 512 rem exposure could have been classified individually at a Severity Level However, because of the limited health I implications of this, most likely, very localized exposure, a Severity Level I I characterization is deemed to be inappropriate. The violation is being categorized at a Severity Level III because the overexposure is of significant regulatory concern. A civil penalty is not being proposed for the exposure violation to focus your attention on the broader area of control of highly radioactive particulate materia The violations associated with the control of radioactive material have been aggregated into a separate Severity Level III I problem for which a civil penalty is proposed. Similarly, to focus your i attention on the management breakdown associated with your dosimetry program, I which resulted in a failure to make a required report to the NRC, this reporting violation was set out as a separate Severity Level III violation for which a civil penalty is propose ! |
| | | The base value of a civil penalty for a Severity Level III violation or problem is $50,000. The escalation and mitigation factors in the Enforcement , |
| - -- . . - . - - -
| | Policy were considered. Your past performance (SALP Category 1 in l radiological controls) and the comprehensive corrective actions being ' |
| -
| | implementee were considered to be sufficient to offset the prior notice of similar problems at your facility involving highly radioactive particles, your initial ineffective corrective action and the multiple examples of failure to control particulate licensed material in February 1987. Accordingly, we have concluded that neither mitigation nor escalation is warrante You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. In your response, you should document the specific actions taken and any additional actions you plan to prevent recurrence. After reviewing your response to this Notice, including your proposed corrective actions and the results of future inspections, the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with NRC regulatory requirement In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Roo The responses directed by tnis letter and the enclosed Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub. L. No. 96-51 |
| l .
| |
| | |
| l
| |
| | |
| l
| |
| "During the first fuel cycle of Unit 3, Fuel degradatio r occurred which resulted in small (size from approximately 0.18 cm down to less than 1 micron) Uranium Dioxide FFFs being liberated to the RCS and spent fuel pool. As a result of
| |
| [
| |
| liquid radwaste processing, FFFs could also be transported to
| |
| '
| |
| the LWM The activity of FFFs ranges from E-3 to E+3 microcuries. Considering the makeup of the radioactive parent / daughter nuclides from an FFF,'these small fragments are characterized as a significant Beta (1.5 Mev average energy) ,
| |
| source and a relatively insignificant gamma component...
| |
| .
| |
| "Due to the presence of FFFs at Unit 3, SCE had previously-instituted a program to minimize personnel contamination and exposure, and spread of the FFFs at the time that FFFs were identified during the initial refueling of Unit This ,
| |
| program was further enhanced in November 1986 to upgrade training and indoctrination of supervision and personnel regarding the hazards, special health physics coverage of ongoing work in areas and systems known, or suspected of being contaminated with FFFs, and frequent beta monitoring. For the January 1987 Unit 3 refueling outage, SCE initiated enhanced monitoring which included a "stop work" requirement if the presence of an FFF is detected in an area which-is not already under special FFF controls."
| |
| | |
| <
| |
| The licensee conducted a medical examination on December 18, 1986, of the individual in question and reported that they did not expect or observe any health effects associated with the extremity exposure. In addition, the licensee reported that the individual stated that he had observed no erythema or epilatio .
| |
| "
| |
| The licensee reported that radiation surveys performed prior to and immediately after the individual's work activities did not indicate radiation or contamination levels which would have resulted in the exposure. Personnel frisking and personnel monitoring booths had ,
| |
| not detected any contamination on the extremities of the individual '
| |
| involved. The licensee reported that, although their investigation was not complete, they were investigating the TLD response, potential tampering and deliberate exposure of the individual ring and that a final report would be submitte *
| |
| During the January 12-16, 1987, visit, the inspectors confirmed that, due to errors in the licensee's computer programming, the initial TLD reading of 511,990 mrem was truncated to 1,990 mre As this figure was below the licensee's administrative limit, it was not flagged by the programming. The inspectors also verified that a hard copy report of the exposure had been received on or about November 17, 1986, but had not been reviewed by the licensee's staff. The hard-copy report was not reviewed until December 11, 1986, when a dosimetry clerk, performing the routine end-of-month comparison of multiple dosimeters, began investigating the ,
| |
| difference between the whole body TLD reading, 114 mrem, and the Pocket Ionization Chamber (PIC) reading, 162 mrem, of the individual in question. The hard-copy report indicated a dose of 511,990 mrem to the right hand. The staff member brought the report to the L--
| |
| | |
| -
| |
| .
| |
| | |
| attention of the Dosimetry Supervisor who informed the HP Engineering Supervisor and he informed the HP Manager at approximately 4:00 p.m., December 11, 1986. The HP Engineering Supervisor contacted the dosimetry vendor at approximately 5:35 and again at approximately 6:25 p.m. and confirmed that the report was valid and had been reviewed by the vendor Health Physicist. The HP Manager notified the Station Manager shortly thereafter. After contacting the vendor Health Physicist the next morning to further verify that the reading was not incorrect, the licensee notified the NRC at 11:30 a.m., December 12, 198 Based on a review of records, the TLD was read on November 10, 198 Although the TLD vendor's procedures would normally require telephone notification of the exposure to the licensee, no notification was made. The licensee representative informed the inspectors that the contract with the TLD Service did not specifically require a telephone notificatio The inspectors were informed by the licensee that the computer software, implemented in February 1984 to expedite the handling of dosimetry data, had not been validated, verified or documented. Specifically, these programs are:
| |
| i i GENCOM - Receives electronic data transmission from the vendor LNDXMIT - Reformats data and creates file in mainframe SRPRCS - Takes information from LNDXMIT created file and updates dosimetry file SCERJE - Updates file on mainframe from lab TLDOSE - Extracts data from SCERJE fcr reports With respect to reporting overexposures, the inspectors brought to the licensee's attention that 10 CFR 20.403(a), Immediate notification, states: "Each licensee shall immediately report any event involving byproduct, source, or special nuclear material possessed by the licensee that may have caused or threatens to cause: (1)... exposure of the feet, ankles, hands or forearms of any individual to 375 rem or more of radiation." Since the licensee had sufficient information available on November 17, 1986, to enable him to recognize and report the potential overexposure yet failed to do so, this is considered a violation of the reporting requiremen Failure to immediately notify the NRC of an event that may have caused or threatens to cause an exposure to the hand of an individual to 375 rem or more is an apparent violation of 10 CFR l 20.403(a). (86-37-01)
| |
| l The dosimetry supervisor informed the inspectors that all written reports from the TLD vendor since implerentation of the defective programs had been reviewed and no other extraordinary exposures were identified. The licensee staff informed the inspectors that they i had instituted action to validate, verify and document the software.
| |
| | |
| I
| |
|
| |
|
| 1
| | Sincerely, f0-Regional Administrat Enclosure: |
| | | Notice of Violation and Proposed Imposition of Civil Penalty cc w/ enclosure: |
| -
| | D. J. Fogarty, SCE H. B. Ray, SCE (San Clemente) |
| . | | . |
| | H. E. Morgan, SCE (San Clemente) |
| | State of CA |
| | . . . . . |
| | . |
| | _--______-_L |
|
| |
|
| 2. Licensee Conclusion Relative to the 512 Rem Exposure With respect to the apparent overexposure of a maintenance worker's right hand, the licensee's final report, Evaluation of the reported high exposure to extremity TLD #80365 in October, 1986, provided the bases for their conclusion-that the exposure report was invali These were: "The residual reading (on the TLD) was unreasonable and unreproducible in the dose range reported; "No sources capable of delivering such a dose were available within a vanishingly small probability; " Extensive radiation and contamination surveys failed to detect any such sources; and "No conclusive medical evidence of such an exposure was found."
| |
|
| |
| The licensee's report documented their investigation and conclusion that it was unreasonable to attribute the TLD reading to tampering or inadvertent exposure, citing the trackable control history of the TLD rings and procedural controls instituted by the licensee and their vendo The licensee's report describes visits by their consultant Health Physicist to the vendor facility and a number of experiments which were performed at the licensee's request. The consultant's report to the licensee documents his investigation into. vendor procedures and the handling of the TLD in question. The consultant's report documents that, when the TLD in question was initially read on a reader designated "AA" by the vendor, it provided a high initial light output, 5.12E6 nanocoulombs; and that, in accordance with vendor procedures, the TLD chip was irradiated to 350 mrem with a Sr/Y-90 source and reread on a reader designated "BB" by the vendor and provided a higher than expected second output, 5.63E5 nanocoulombs. The consultait documented that the vendor performs the irradiation and second reading to determine a unique calibration factor for each chip, that the readers used were recently put into use and that the chips are heated by a laser rather than hot ga The licensee's report centers around the premise that if the exposure is real, the reading on the badge including what the licensee terms the " residual" should be reproducible. The licensee documents numerous experiments involving irradiation of TLD chips with different types of radiation, with dif ferent levels of exposure, and at different exposure rates. The licensee documented experiments involving reading TLDs with different readers, both laser heated and gas heated. The licensee documented experiments involving contaminating TLD chips with physical and chemical agents and chip overheating. The licensee documented experiments that could involve variations in reader calibration over a two-month period, m
| |
|
| |
| _ _ .__ ..
| |
| -
| |
| .
| |
|
| |
| The licensee's experiments were unable to produce an initial light output equivalent to a 500 rad dose by any means other than irradiation of a TLD. Of the experiments conducted, the licensee reported that only very high exposures, those greater than 65,000 rem, duplicated the large " residual" seen when the badge in question was read. The licensee conducted no experiments to investigate the effect of inadequate heating of the TLD chip as a method of producing a similarly high " residual" reading. The licensee's inability to reproduce the exposure by the undertaken experiments precipitated their conclusion that the TLD reading was invali In addition, the licensee concluded that no sources of radiation ,
| |
| capable of delivering such a dose were available within a vanishingly small probability by analyzing the distribution of irradiated fuel fragments and Co-60 particles found outside the fuel handling building, the majority of which had been found after i January 2, 198 The analysis failed to consider numerous higher activity particles found within the fuel handling building and other particles found before January 2, 198 ,
| |
| The licensee's report stated that extensive radiation and contamination surveys did not detect any sources capable of i delivering such a large dose. No records were made of any radiation
| |
| < or contamination surveys performed during actual work activities while the ring was being worn. The licensee documented two air samples taken during the work activities and also documented the
| |
| ; radiation and contamination levels as recalled by the involved workers and technicians two months subsequent to the time the ring was wor The licensee's report documents that no conclusive medical evidence of such an exposure could be found based on examination of the
| |
| '
| |
| worker's hands and blood samples two months after the potential occurrenc j 3. Investigation of Released Particles Following the January 12-16, 1987, inspection, two events involving i control of fuel fragments were brought to the NRC's attention by the licensee by telephone. LER 87-003, submitted on March 24, 1987,
| |
| -
| |
| describes these occurrences as well as an additional occurrence not
| |
| ! previously brought to the NRC's attention. The two events,
| |
| : previously brought to NRC's attention, were reviewed during the March 16-20, 1987, inspection. In addition, the Senior Resident Inspector documented his observations regarding implementation of the fuel fragment control program in Inspection Report N /86-3 The licensee reported that the first event involved a contract worker on February 2, 1987. The worker's protective clothing became contaminated and, after removing them and while wearing only modesty
| |
| ! garments, the worker was surveyed by a whole body contamination monitor, a PBM-200. The worker repeatedly alarmed the monitor but hand frisking of only the suspect area with a E-140 detected no
| |
| :
| |
|
| |
| _ _ .
| |
| -
| |
| j .
| |
|
| |
| '
| |
| ?
| |
| i i
| |
| contamination. A whole body frisk was not performed. The worker was eventually released from the restricted area and upon his retu n on February 3, 1987, he again alarmed the PBM-200. On this occasian .
| |
| a HP technician conducted a full body frisk of the individual and located a particle on the sleeve of his jacket. The particle was four,d to be a 0.08 microcurie irradiated fuel fragment which produced a calculated contact dose rate of approximately 400 mrem /hr. The licensee surveyed the worker's residence and automobile and found no further contamination. The licensee concluded that they had recovered all the radioactive material t1at could have left the site on the worker's body. The licensee estimated that the dose to the worker was 1.77 rem to the skin cf the whole body and 1.20 rem to the extremity and that the worket's family received no appreciable exposure. This was based on th conclusion that the particle was transferred from the individua''s upper arm, where it was initially located when the PBM-200 alarned, to the worker's jacket during his drive home, that the particle was removed from contact with the worker's body when he removed his jacket at his residence, that the other members of the worker's family did not contact the jacket and that the particle was again put in contact with the workers lower arm when he donned his jteket the next da The licensee reported that the second event involved a site HP technician on February 19, 1987. The HP technician found that his shoe was contaminated on the outside as he was entering the fa:ility restricted area at the beginning of his shift. The shoe was discarded, so the activity of the particle and its composition could not be determined. The licensee determined that a radioactive particle may have been embedded in the technician's shoe and might have been previously removed from the site. The licensee is continuing the investigatio The licensee reported that the third event involved a site HP technician on February 21, 198 The technician discovered what was later determined to be 0.2 microcurie irradiated fuel fragment in the carpet of his residence during a self-initiated survey of his home with an E-140. The technician stated that he had been concerned that irradiated fuel fragments might have gotten offsite as these fragments had been found outside restricted areas and that the sensitive instrumentation used to detect these particles, the PBM-200 personnel monitoring booths, had only recently been put into use. The contact dose rate produced by the particle at the time it was found was calculated to be approximately 1200 mrem /h The licensee determined by isotopic distribution that the particle was approximately one year old. The licensee has not yet assigned a dose to the technician or estimated the dose to which the technician's family was exposed as a result of this occurrenc CFR 20.301 and 10 CFR 30.41 require that no licensee shall dispose or transfer licensed material, except as authorized. In addition, 10 CFR 20.105(b) requires that, except as authorized by the NRC, no licensee shall possess, use or transfer licensed material in such a manner as to create, in any unrestricted area, l
| |
| l
| |
| ,
| |
|
| |
| _ .
| |
|
| |
| radiation levels which, if an individual were continuously present, could result in his receiving a dose in excess of two millirem in any one hour or 100 millirem in any seven consecutive day ..
| |
| The inspectors noted that-the 0.2 pCi source could result in a dose of 1200 mrem /hr to the skin of an individual or 27 mrem /hr to the limiting organ if it were continuously present on the individua For example, if the speck were to become embedded in an individual's clothing (as previously observed in SCE modesty garments) a member of the public could receive a localized dose well in excess of acceptable limits within a few hour The release of licensed material from the licensee's restricted area to offsite areas is an apparent violation of 10 CFR 20.105(b),
| |
| 20.301 and 30.4 (86-37-02) ,
| |
| i 10 CFR 20 states, under Precautionary Procedures in 20.201, Surveys, that:
| |
| "As used in the regulations in this part, " survey" means an evaluation of the radiation hazards incident to the production,
| |
| . use, release, disposal, or presence of radioactive materials or other sources of radiation under a specific set of condition >
| |
| When appropriate, such evaluation includes a physical survey of the location of materials and equipment, and measurements of levels of radiation or concentrations of radioactive material' '
| |
| presen "(b) Each licensee shall make or cause to be made such surveys as (1) may be necessary for the licensee to comply with the regulations in this part, and (2) are reasonable under the circumstances to evaluate the extent of radiation hazards that may be present."
| |
|
| |
| During the inspection of March 16-20, 1987, the inspectors reviewed the licensee's investigation of the February 2, 1987, and February 21, 1987, events. This review included discussions with the individuals involve The licensee's staff determined that, in regard to the February 2 event, the individual had been working immediately adjacent to a fuel fragment control area established in accordance with licensee health physics procedure 50123-VII-7.12. The individual's protective clothin0 became physically dirty and the individual
| |
| -
| |
| suspected he had become contaminate The worker went to the control point and requested the assistance of the llP technicia The licensee representative stated that the HP technician determined that the protective clothing was contaminated without determining the extent, level or type of contamination. The technician surveyed '
| |
| .
| |
| i the individual and observed that the instrument was pegged. The
| |
| ! individual was directed to remove the contaminated clothing without ,
| |
| special precautions. Specifically, in order to assess the dose to j
| |
| ,
| |
| the worker and to minimize the potential for personnel contamination ,
| |
| during removal of the protective clothing and to prevent j i
| |
| I
| |
| - - _ - - - _ - . _ . _ _ _ _ . . _ _ _ _ - - _ - - _ _ _ _ . - - . _ _ - _ - _ . _ _ - - - _ . . - _ - _ . . _
| |
|
| |
| ,
| |
| '
| |
| '
| |
|
| |
| distribution into the laundry pool, a survey to identify the extent, location and type of contamination would have been appropriat Failure to make such surveys as are reasonable to evaluate the extent of radiation hazard that may be present is an apparent violation of 10 CFR 20.201(b)(2). (86-37-03)
| |
| After the individual removed his protective clothing, he performed whole body monitoring in the PBM-200 beta booth and repeatedly alarmed the monitor. The HP technicians responding to the alarms, performed frisking type measurements of the individual but failed to identify the radioactive material present. The HP technician allowed the individual to leave the site in spite of the fact that the worker continued to alarm the PBM-200. Failure to make such surveys as are reasonable to evaluate the extent of radiation hazard that may be present is an apparent violation of 10 CFR 20.201(b)(2).
| |
|
| |
| (86-37-04)
| |
| In response to this event, the licensee terminated the HP technician's employment, discussed the event with the staff and instituted a policy that requires management approval for release of any individual that continues to alarm a PBM-200 monito The licensee evaluated the dose to the skin of the whole body of the individual to be 1.77 rem and to the skin of the extremity of-the individual to be 1.20 rem by postulating that the only contamination present on the individual during the event was the particle found the next day on the individual's jacket and that that particle had been removed from the workers upper arm and attached to the cuff of his jacket when the jacket was removed af ter the individual arrived at his residenc The inspectors, employing a conservative scenario that the particle remained on the worker's skin until it was located on February 3, 1987, calculated that a dose to the skin of the whole body of the individual on the order of 7 rem could have occurred. This dose together with the individual's cumulative whole body exposure for the first quarter of 1987, would not have been in excess of the rem limi IV. NRC Evaluation of 512 Rem Exposure (Note: The following paragraph designations A., B., C., and D. are intended to coincide with the paragraph designations 2.A., B., C., and D. on page 6 of this report.) Dosimetric Indications The Emergency Preparedness and Radiological Protection Branch Chief and a Conruiting Physicist, export in the field of thermoluminescent dosimetry, visited the vendor's facility to review the processing of the TLD badg The team reviewad the vendor's TLD handling procedures from the time the TL0s are obtained from the supplier J
| |
| until the time they are discarded, specific information relative to ,
| |
| '
| |
| the TLD in question, and the hardware used by the vendo i . _ _ _ _ _, . .. .
| |
| <
| |
| l
| |
| '
| |
| -
| |
|
| |
| 'The team found that the TLD chip in question was composed of lithium i fluoride (LiF), commonly termed TLD-100, obtained from the vendor's supplier. They found that after receipt from the supplier the i
| |
| chipsareannealedandresponsecheckedbyexposingthechIpstoa l known dose of radiation. The chips must respond within a certain i range or they are discarded. The chips are then cleaned and sealed l in plastic rings under a welded polyethylene cover. The rings are
| |
| ! individually labelled and sent to the users with appropriate controls. When the rings are returned they are surveyed for contamination and then processe The processing involves removing the label, noting any damage to the ring, cutting the ring in half to release the chip, loading the chip into a carousel with other returned chips and controls, noting any damage to the chip, reading the chip on the vendor's laser heating system, reirradiating each chip to 350 mrem from Sr/Y-90, rereading the chip to determine a unique calibration factor, annealing and cleaning the chips and reloading them into rings. The vendor's procedures require that the chip be read several times if the chip indicates a high dose and that the chip then be discarded. The vendor's procedures also j require that the vendor contact the user to report a high dose. The team found that the vendor had not performed any rereadings of the 512 rem chip after the second read and that the vendor had not contacted the licensee by telephone when the exposure was discovere The use of lithium fluoride, TLD systems is a standard dosimetric technique widely used throughout the industry. (See: Personnel Thermoluminescence Dosimetry Systems - Performance, ANSI N13.15 1985). Lif systems respond primarily to ionizing radiation but can provide a false indication if the chips are contaminated with a substance which could burn or luminesce or if the chip is heated to too high a temperature and it incandesce <
| |
| The team observed, relative to the possibility of incandescence causing the high initial light output, that none of the other 45 user chips in the carousel during the first reading of the chip in question produced a high light output and that the chip in question produced a high output during the second read on a different reade The NRC consultant dosimetry expert observed that it was not reasonable to attribute he large light output of the TLD to overheating as this woub have had to occur only for the chip in question and sequentially on two different machine The team observed the vendor's records of the chip in question, relative to the possibility of contamination having caused the high initial light output, and noted there was no record of any
| |
| '
| |
| contaminant being observed on the badge by the technician, that no l foreign or charred material was observed in the carousel af ter the l read, and that the laser heating is done in a nitrogen atmosphere
| |
| : which would not be conducive to burning. The team also noted that i the licensee performed experiments in which they contaminated TLD I chips with various chemicals and agents and that these failed to produce any responso greater than that equivalent to a dose of 50 mre The team also noted that, after a search of available
| |
| ___________________________ _ ___
| |
|
| |
| _
| |
| -
| |
| ,
| |
| :
| |
| *
| |
| *
| |
| 12 [
| |
| 'l literature, such false-light outputs had been observed but that their magnitude was a factor of 100 less than the light output noted in this event. (See: Hoots, S. S. and Landrum, V., Glow Curve
| |
| ,
| |
| Analysis for Verification of Dose in LiF Chips, Health Physics 43, ,
| |
| '
| |
| 905-912).
| |
|
| |
| The team investigated the question presented by the licensee of the second large light output, or " residual," observed during the
| |
| '
| |
| l calibration cycle of the chip in question. The NRC consultant noted that there are varying opinions as to what the second light output
| |
| ; might and might not indicate and the magnitude of which might be
| |
| ; expected in certain situations. The vendor provided data to the l team from a two chip badge recently processed by the vendor which provided an initial reading of about 10,000 rad, a second reading of 60% of the first reading, a third reading of 10% of the first reading and fourth through seventh readings of from 1% to 5% of the first reading. The vendor also performed an experiment at the l request of the team in which they varied the heating time with the laser, thereby inadequately heating the chip. The vendor informed the team that the heating time of the chip in question was 1 second and that the experiments demonstrated that a reduction of th heating time to 0.95 second resulted in light output, during the second reading, of from 10% to 30% of the initial reading when the l
| |
| chips had been exposed to about 500 rem.
| |
|
| |
| l This finding cicarly indicates that the " residual" effect was reproducible and process parameters seem to indicate it was the most likely source of the observed response of the SCE chip in questio The vendor representative, after having reviewed their records and after having performed numerous experiments stated:
| |
| ! "I believe in light of these tests, we will continue our l position, which is that we have not seen any data that would cause us to qualify our original dose reported to Southern California Edison."
| |
|
| |
| The N9C's consultant and dosimetry expert stated:
| |
| "It is not only possible, but seems probable that TLD #80365 l
| |
| received a dose of ionizing radiation approximating that which
| |
| ' | | ' |
| was reported."
| | Southern California Edison Company -4- |
| | | ! |
| In view of the findings presented above, it appears that the licensee's conclusion that: "The residual reading was unreasonable and unreproducible in the dose rango reported" is invali . Sources of Exposure During the December 15, 1986, initial NRC inspection, the Section Chief examined the licensee's investigation plan; contacted the
| | bec w/ enclosure: |
| ! involved HP Engineering and Plant Maintenance personnel; and reviewed available records. The Section Chief determined that the potential exposure could not easily be attributed to a particular
| | RSB/ Document Control Desk (RIDS) (IE06) |
| | | ' PDR I.POR SECY CA JTaylor, DEDO JLieberman, OE PRobinson, OE a Enforcement Coordinators ' |
| - . . - - | | RI, RII, RIII, RIV, RV |
| ! .
| | - FIngram, PA BHayes, 01 |
| -
| |
| -
| |
| .
| |
|
| |
|
| P l job or event. However, the most likely source of exposure that could have resulted in a dose of this magnitude would have involved
| | SConnelly, OIA EJordan, AE00 ; |
| '
| | OE File Project Inspector Resident Inspector R. Huey (2) |
| .
| | G. Cook B. Faulkenberry J. Martin Docket File LFMB M. Smith i |
| direct contact of the worker's hand with a small particle of irradiated fuel. Particles of this type were known to exist at Unit l 3 following operation during cycle one with 105 defective fuel pin ,
| | ! |
| The Section Chief suggested to the licensee that their evaluation !
| | j OE RV OG: OE:D DE00 PRobinson JMartin JGoldberg JLieberman JTaylor 6/ /87 6/ /87 6/ /e/ 6/ /87 6/ /87 JRussell GYuha RScara AJo on JMar, tin 7 87 6/p/87 6/,9 87 6/th/87 Quf-ST COPY ]^/REQQEST COPY ] EST COPY ] pfQUEST COPY ] JtEQl)EST COPY ] ) |
| carefully consider those systems which could contain fuel fragments and involved maintenance performed by the worke ,
| | EV / N0 1 YES T/ NO E / NO ] WES/ / N0 ]/YEV / NO j ' |
| l On March 18, 1987, the licensee's staff informed the inspectors that t the site Health Physics organization had not been involved in the planning phase of the fuel reconstitution effort following cycle 1 and that the Health Physics input was provided as a supplement to the reconstitution plan. -The reconstitution / refueling supervisor stated that highly radioactive particles were found early during the reconstitution effort, in late 1985, and that this problem was greatly exacerbated w'un, during reconstitution of the final fuel bundle, a fuel pin was pulled apart. The supervisor recalled that this necessitated greatly increased radiological control requirements, isolation of the Fuel Handling Building from normal access and the training of a special team of HP technicians in order to locate these fuel fragments and decontaminate the building, further details are contained in Inspection Report No. 50-362/86-0 The Refueling Supervisor further informed the inspectors that all the damaged fuel pins were grouped into one bundle and stored in the ,
| | V \/ / " |
| Spent Fuel Pool without further containmen '
| | ..TO PDR ] j |
| The Refueling Supervisor informed the inspectors that the Fuel Pool Cleanup System, which draws suction from below the racks in which t the reconstitution was performed, was run both during and after reconstitution. Based on a review of the FSAR and plant system diagrams, the inspectors noted that the Fuel Pool Cleanup System ,
| |
| contains a backflushable filter, designed to remove particles greater than 5 micrometers in size, and that these filters are routinely backflushed into the Crud Tank systen. The inspectors also noted that the Crud Tank liquid is circulated through shielded disposable filters which, as indicated by a review of licensee survey records, produced external gamma dose rates as measured with a teletector of up to 120 R/hr. The inspectors also noted that ;
| |
| similar backflushable filters of other primary systems are routinely backflushed into the Crud Tank. The inspectors also reviewed the design of the Reactor Coolant Pump Seals and Heat Exchangers and noted that these provide areas which could trap circulating ;
| |
| particles. A review of licensee surveys revnaled that the seal ,
| |
| areas have elevated dose rates due to accumulation of particulate ,
| |
| material on the seals, t The inspectors reviewed a memorandum issued by the HP Manager on November 15, 1985, requesting the assistance of the Station I Technical organization to identify probable pathways for system !
| |
| and !
| |
| contamination, actionsproduct Indications of fission neededcontamination to ameliorate future problems,id in various liqu :
| |
| samples. The inspectors noted the response from a licensee Senior i i
| |
| : | | : |
| | | ES J / NO ] |
| I
| |
| '
| |
| | |
| Engineer on February 4, 1986, which identified numerous systems potentially contaminated with fuel fragments, specifically:
| |
| " Spent Fuel Pool Cleanup System
| |
| " Spent Fuel Pool Cooling System
| |
| " Fuel Handling Building Sumps and Drains and Contaminant Sump
| |
| *
| |
| ' Reactor Coolant Radwaste System
| |
| *
| |
| " Reactor Coolant Chemical Volume and Control System
| |
| " Containment Spray
| |
| *
| |
| " Nuclear Plant Sampling System" The inspectors also noted a memorandum from the Unit 2/3 HP Supervisor to the HP Manager dated April 24, 1986, which observed that an extensive number of plant systems might contain fuel fragments, that no controls specific for dealing with fuel fragments were being implemented for work on these systems, and called for a task force to address and eliminate the fuel fragment proble The inspectors were informed by the licensee's staff that a task force to address the fuel fragment problem was not instituted until December 1986, that a formalized program to control fuel fragments during work on potentially contaminated systems was not instituted until January 5, 1987, and that the majority of HP technicians did not receive training in the specialized techniques needed for detecting fuel fragments until December 1986 and January 198 The inspectors reviewed shipping documents which recorded the transfer of ten fuel fragments from the licensee to a contract laboratory on March 25, 1986. The ten fuel fragments, ranging in size from 220 microcuries to 6800 microcuries, were recovered from the fuel handling building. A fuel fragment of 100 microcuries will produce a contact dose rate of about 300-900 rad /hr depending upon the beta energy, age of the particle a,1d calculational techniqu Discussions with the licensee's staf f also revealed that 20 to 25 other large fuel frag'nents, whose activities were not determined, were removed from the floor of the fuel Handling Building (FHB)
| |
| during the cleanup after fuel reconstitutio The insptctors were also informed by the licensee's staff that perhaps hundreds of smaller fragments whose activities were not determined were also found at this time in the FH8. The inspectors noted that the statistical analysis, presented by the licensee to support their conclusion that no fuel fragment sufficient 1/ large to produce the exposure in question was present in the areas which the worker entered, neglected to include the largo particles removed from the FHB and to consider the communication between the Reactor Coolant System and the Reactor Coolant Pumps and the Spent Fuel Pool and the Crud Tank Syste The inspectors also noted that a formal tracking
| |
| | |
| *
| |
| .-
| |
| | |
| system to document the number and size of fuel fragments was not established until January 2, 198 In view of the findings presented above, it appears that the licensee's conclusion that: "No source capable of delivering such a -
| |
| dose were available within a vanishingly small probability" is invalid.
| |
| | |
| l C. Work Activities and Surveys
| |
| ; The inspectors reviewed the Radiation Exposure Permits (REPS),
| |
| '
| |
| numbers 76234, 90253 and 90254 which controlled entry of the workers
| |
| | |
| to the restricted area while wearing the TLD in question. The REPS were found to be routine in nature, they contained no instructions which would alert the worker or technician to the potential for fuel
| |
| ! fragments within the systems being worked and they provided no special instructions which would ameliorate the hazard from fuel
| |
| .
| |
| fragments.
| |
| | |
| .
| |
| '
| |
| . When questioned by the inspectors, technician "A," who had been the responsible technician on October 6, 20 and 21 covering the jobs of
| |
| | |
| the worker in question, stated that he had not received, at the time
| |
| ; of the potential event or subsequently, the specialized
| |
| ; instructions, which had been provided to others, needed to detect 1 fuel fragments; that no specialized controls had been inn. ployed i during the jobs which recognized the hazard from fuel fragments and that the special survey techniques, needed to distinguish a fuel fragment from activation product contamination, were not employe Although the licensee's staff could locate records of radiation and j contamination surveys taken before and after the jobs in question,
| |
| :
| |
| they could produce no records of surveys taken of the areas or
| |
| '
| |
| components on which the mechanic worked during the period he was wearing the TLD. The licensee's staff located the records of two
| |
| .
| |
| air samples taken during the period at the jobs in question. Based
| |
| ! on their recollections, the workers and technicians invalved Gated that only teletector measurements were taken during actual work on the Reactor Coolant Pump seal and heat-exchanger / gasket replacement
| |
| : and that these indicated maximum gamma levels between 5 and 10 rem /hr. They also stated that open and closed window R0-2 measurements were taken during the Crud Tank Pump repair and that, as best the technician could recall, the meter never went off scale on the 0-500 mR/hr range when components were surveyed and that the meter never went off scale on the 0-50 mR/hr range when the workers'
| |
| ;
| |
| gloved hands were surveyed.
| |
| | |
| The inspectors note that a teletector is a rugged, high range geiger-muller survey instrument with a telescoping probe used for measuring high gamma radiation fields and that it is insensitive to beta radiation on the higher ranges. The R0-2 is a general use ionization chamber survey instrument with a thin window which allows detection of beta radiation and is equipped with a sliding metal shield which can be used to eliminate the low energy beta contribution from the response. The R0-2 can thus be used to 1 estimato the beta or surface dose rate as opposed to the deep dose
| |
| ,
| |
| | |
| . - .
| |
| '
| |
| ,-
| |
| 16 +
| |
| a t
| |
| .
| |
| j rate by taking a window opened and a window closed reading and applying a correction factor. The correction factor is dependent on '
| |
| .
| |
| the energy of the beta particles being measured the distance from the source to the detector and the physical size of the radiation
| |
| *
| |
| sourc At NRC's request, a consultant laboratory made a series of measurements of a fuel fragment, identified as No. 7, provided by the licensee on March 25, 198 This approximately 80 micrometer -'
| |
| speck of irradiated fuel was found to contain about 153 microcuries of mixed fission products on April 6, 1987. The major isotopes included Ce-144, Pr-144, Ru-106, Rh-106, Sr-90, Y-90, Cs-137, ,.
| |
| Ba-133, Pm-147 and Nb-9 The laboratory calculated the dose rate to one square centimeter of skin through 7 mg/cm2 to be 432 rem /hr if the speck were in contact with the skin. The dose rate measured by an exo-electron technique was 215 rad /hr as close to the speck as possibl Using a large volume ion chamber (Eberline Mooel R0-2A), the following measurements were made and the instrument response recorded:
| |
| Shielded through Two Pairs of Unshielded Rubber Gloves and One Cotton Distance Window Open Window Closed Window Open Window Closed Contact 6.0 R/hr 1.2 R/hr 2.8 R/hr 0.56 R/hr 10 cm 500 mR/hr 130 mR/hr 420 mR/hr 94 mR/hr 30 cm 61 mR/hr 15 mR/hr 56 mR/hr 11.7 mR/hr The diameter of the R0-2A and R0-2 is about 7.6 centimeter Measurements were made as the instrument was moved in 0.5 centimeter increments from directly over the speck, at contact, to one sid The results are shown below:
| |
| Displacement of Source from the Center of the Window Open Window Closed Detector in Centimeters R/hr R/hr
| |
| ,
| |
| 0 .0 .2 .0 .98 .9 0.95 2. 0 .88 .5 0.80 .5 0.67 .0 .0 .08 This experimental data indicates the extreme position and distance dependence to be expected when using a hand held ion chamber to survey for irradiated fuel speck .
| |
| | |
| -
| |
| ~
| |
| !- 17 o If specks are located in areas of high background radiation, only f deliberate and careful survey techniques could be expected to l identify irradiated fuel fragments of this siz The inspectors observed that the licensee's final report contains an analysis of the maximum size of fuel fragments that could be present during the work in question based on survey record data taken before and after the work and the radiation levels as remembered by the technician involved. The licensee's evaluation fails to take into account that beta radiation from fuel fragments can be easily shielded by small thicknesses of metal from piping or by a worker's hand and that the presence of fuel fragments within a system or on a
| |
| ,
| |
| worker's hand would not be observable, as noted above, unless
| |
| !
| |
| extraordinary surveys were made during the work and the technician l involved had the knowledge and skill to detect the In view of the findings presented above, it appears that the licensee's conclusion that: " Extensive radiation and contamination surveys failed to detect any such sources" is not a valid basis for concluding that sources of radiation sufficient to cause the exposure were not presen CFR 20.201(b)(1), Surveys, requires that each licensee shall make j or cause to be made such surveys as may be necessary to comply with the regulations in this par During the work on October 6,'8, 20 and 21, 1986, involving the
| |
| , reactor ccolant and crud tank pumps performed by worker "A" while wearing the TLD in question, the licensee failed to make such surveys as were necessary to comply with the dose limit expressed in 20.201(a), in that worker "A" received a dose to the right hand on the order of 512 rem.
| |
| | |
| ,
| |
| Failure to make such surveys as are necessary to comply with the l regulations is an apparent violation of 20.201(b)(1). (86-37-05)
| |
| D. Medical Evaluation of the Worker When the licensee first brought this event to the attention of the NRC, the NRC's medical consultant contacted the licensee's physician to confer on what physiological effects might be observable from large radiation exposures to the hand of an individual. As the worker involved was not examined until more than eight weeks after the potential event, the window of opportunity had passed for observation of physical effects such as erythema, which can occur due to dotes to the skin of 200-600 rem between 1 and 2 weeks after exposure and dry desquamation (flaking) which can occur due to doses between 800-1100 rem, see: Extremity Monitoring: Considerations for Use, 00simetry Placement and Evaluation, NUEEG/CR-4297 PNL-550 The licensee's examining physician observed no physiological effect, that would have been indicative of an exposure greater than 1300 rem.
| |
| | |
| l such as moist desquamation or ulceration. When questioned by the I inspectors, worker "A" stated that he did not recall any reddening of his hand but that he did recall an episode of dry scaling on his l
| |
| | |
| *
| |
| | |
| hand in about November 1986 but that he does occasionally experience periods of dry scaling and took little notice of i The licensee's final report documents that the licensee's physician I obtained a blood sample from worker "A" which was analyzed by a nationally recognized authority for anomalies that might be observed as a result of a large radiation exposure. The blood sample report stated:
| |
| "We observed only two cells with dicentric chromosomes in our cytogenetic analyses of 500 metaphases from lymphocyte cultures from...(worker "A")....The distribution of dicentrics was
| |
| "overdispersed" in that one of these two damaged cells contained two dicentric chromosomes. Such findings'could be observed if the majority of...(worker "A"s)... circulating
| |
| .
| |
| lymphocytes had not been exposed to radiation, while a small
| |
| ! proportion had received an excessive radiation dose. Thus our cytogenetic findings corroborate exposure data from his physical dosimeters which indicate that he may have received a localized over-exposure of one hand, but that he did not receive a clinically significant whole body dose."
| |
| | |
| l When a noted authority on the hematological effects of radiation was l contacted by a Region V health physicist, the authority stated that the noted dicentrics were not inconsistent with a large i
| |
| localized exposure but such anomalies would have had an extremely I
| |
| small chance of being observed due to the small volume of blood in the han In view of the findings presented above, it appears that the licensee's conclusion that: "No conclusive medical evidence of such l
| |
| an exposure was found" fails to recognize that the window of opportunity for physiological observations was missed and that the
| |
| '
| |
| cytogenetic findings, although inconclusive, are consistent with a partial body exposure of this magnitud E. Dose to the Worker 10 CFR 20.101(a) limits the total occupational radiation exposure to the hands of an individual in a restricted area to 18.75 rem per calendar quarte The Branch Chief and the consultant dosimetry expert determined, from their visit to the dosimetry vendor, that there was no reason to conclude the TLD in question did not function properly and that the light output observed was consistent with a large dose of ionizing radiatio The inspectors determined that small intense sources of radiation, fuel fragments, were present at the licensee's facilities; that some of these particles exhibited sufficient activity to produce a dose of the magnitude observed in a very short period of time; and that the components on which worker "A" labored could have been contaminated with such particle _
| |
| '
| |
| -
| |
| 19 .
| |
| .
| |
| Lacking radiation or contamination survey records, the inspectors determined, from extensive discussion with the workers and technicians involved, that the surveys taken, as recalled, do not provide conclusive evidence that a fuel fragment was not present during the reactor coolant and crud tank pump work. In addition, the technicians involved had not received the training needed to detect such particles and the technicians did not have sufficient '
| |
| understanding of the properties of fuel fragments to determine if they were present and to take action to protect the workers from the Therefore, it appears that a maintenance worker received during the fourth calendar quarter of 1986 a cumulative dose to the right hand on the order of 512 rem while performing maintenance activities in the restricted are Failure to comply with dose limits is an apparent violation of 20.101(a). (86-37-06)
| |
| V. Licensee Actions in Response to the Fuel Fragment Problem As previously noted in this report, as a result of the Unit 3 Cycle 1 refueling outage, the licensee had, prior to identification of the 512 rem exposure, begun to establish a formal radiation protection control program specifically to address the fuel fragment issue for the Unit 3 outage scheduled to begin in January 198 ,
| |
| On December 22, 1986, the Health Physics Manager issued a memorandum to site management titled: A Station-wide Program for Irradiated Fuel Particle Control. This memorandum identified specific points to be addressed by the Technical, Operations and Maintenance Support, Maintenance, Operations, Planning and Control, Training and Health Physics Divisions. The key points included: identification of all systems containing fuel particles; determination of actions to prevent further addition of fuel particles, transfer of existing particles to other systems and cleanup strategy; improved fuel performance and reconstitution programs; specialized maintenance planning; specialized training; and additional radiation protection control A general employee education handout titled: Facts About Irradiated Fuel Fragments and How to Protect Against Them, was issued to all workers on December 26, 1986, and incorporated into the formal General Employee Training program performed as a requirement for restricted area acces During the first week of January 1987, the specific radiation protection procedures establishing a three-zone control approach were issue In the licensee's February 22, 1987, revision of LER No. 86-015, the licensee stated in part:
| |
| "Notwithstanding that we conclude that the overexposura did not . i occur, action has been taken as if it did occu This action -
| |
| includes the following measures:
| |
| .
| |
| _
| |
| ., ,c_ . _ . , .r --,. _ _ _ _ _ - - , - . _ _ _ _ . - - - . - - _ _ . , . . -
| |
| - - . , _ ~
| |
| '
| |
| | |
| "1. The 512 rad extremity exposure report will be included in the l individual's record as a special entry. In order to avoid I
| |
| penalizing the worker in his future employment, the record will also reflect the existence of the referenced repor "2. The SCE program for detecting small radioactive particles and for controlling exposure to them, already considered by SCE to l be one of the strongest in the industry, was further enhanced.
| |
| | |
| l This program includes:
| |
| " Extensive, mandatory use of exceedingly sensitive fixed instrumentation (frisking booths) for the detection of ,
| |
| - personnel contamination;
| |
| "Special training (including hands-on laboratory exercises) in radioactive ) article characteristics and survey techniques for all lealth Physics Technicians;
| |
| " Oral and written indoctrination of all managers, first line supervisors and workers in the special problems associated with radioactive particles, including the methods each person must employ to protect himself; L
| |
| "Special procedures to assure detection and control of radioactive particles which feature the establishment of clearly identifiable zones, to demark and contain such particles, surrounded by clearly identified buffer zones (or solid physical barriers) which are surveyed frequently to verify that control is being maintained; :
| |
| " Maintenance and wide publication of a radioactive .
| |
| particle census during outages to maintain Station !
| |
| awareness; l
| |
| ! "The establishment of a Task Force to recommend and l implement action to minimize the future production and j movement of radioactive particle "3. Action has been taken to eliminate deficiencies in the vendor's system for reporting anomalous exposures and in the Station's t procedures for receiving and verifying routine electronic data transmissions from the vendor. A change to our contract with ,
| |
| the vendor now mandates vendor compliance with previously existing reporting procedures and that TLD chips which exhibit anomalous high readings be promptly isolated, identified and ,
| |
| delivered to SCE with a full report of the results obtained." ~
| |
| During the NRC March 16-20, 1987, visit, the inspector confirmed that the <
| |
| General Employee Training includes a handout and video presentation on fuel fragment issues. The inspector observed that two PBM-200 frisking booths were being put into operation just outside the main restricted area access point and all individuals were being provided a handout titled: Information About Personnel Contamination and Friskina. The handout explained actions workers should take to ensure they are free of
| |
| | |
| ,
| |
| _ _
| |
| *
| |
| *
| |
| | |
| -
| |
| contamination; why the voluntary PBM-200s had been made available outside f the restricted area; the establishment of a " Radiological Concerns i
| |
| Phoneline;" and the safety significance of personnel exposure to l irradiated fuel fragment The inspectors met with the Irradiated Fuel Particle Task Force Chairperson and reviewed the action item status report of the March 10, '
| |
| 1987, meeting. The task force is composed of first line supervision and engineer level personnel from the various divisions. The chairperson stated that he spends about one half of his time on task force activities. Twelve action items were considered closed and eighteen open at the time of this inspection. The closed items included six directly related to training and the radiation protection procedures as described abov The remaining involved use of a spent fuel pool skimmer during refueling; increasing availability of the spent fuel pool cleanup system; participation in the Combustion Engineering Fuel Users Group; and consideration of irradiated fuel fragments in planning work activitie Several key open items include: identification of systems containing fragments; preparation for future fuel reconstitution; and identification of systems to be cleane Review of the licensee's fragment inventory and tracking report for the period from January 2, 1987, through February 26, 1987, indicated 92 new fuel fragments (composed of isotopes indicating recent exposure in the core), 155 old fuel fragments, 51 ruthenium particles, 84 crud and 42 cobalt particles had been found and analyzed. One hundred and forty of the specks were found on personnel or their clothing. The activity of these 140 specks ranged from 0.001 microcuries to 1.249 microcurie Nineteen of the specks were detected with hand held friskers and ranged from 0.002 to 1.249 microcuries, the remaining 121 were detected by the PBM-200 Sixty-two specks ranging from 0.199 to 21.53 microcuries were detected from non personnel source The inspectors discussed the irradlated fuel particle control program with several workers including six llealth Physics Technicians. All the
| |
| ; workers seemed familiar with the program. Several workers were concerned ( with the consistent discovery of specks outside the zone controlled
| |
| : areas. The workers felt that discovery of specks on personnel at the PBM-200s indicated that the control program is not fully effective, j Basad on the discussions with the six llealth Physics Technicians, the
| |
| '
| |
| inspector advised licensee management that one technician exhibited excellent knowledge of the program and techniques to identify and control l specks. Three technicians demonstrated an acceptable level of knowledge
| |
| ; and two technicians appeared to require additional training on survey l
| |
| procedure The inspectors requested to review the dosimetry record for the individual with the 512 rem hand exposure. The computer record did not reference the 512 rem dose. The licensee representative stated that they l plan to footnote the file indicating a copy of the evaluation is available for review but not to show a dose of 512 rem for the fourth quarter 1986 hand exposure.
| |
| | |
| l
| |
| | |
| '
| |
| *
| |
| | |
| l l
| |
| l Based on the above observation, the inspectors found the licensee's program to be adequat Three areas were presented for the licensee to consider:
| |
| l
| |
| '
| |
| There appears to be a significant' mismatch in resources allocated to l the problem. It appears a great deal of effort is being spent providing radiation protection measures while far less effort is
| |
| !
| |
| going into the task force effort to remove the source of activity.
| |
| | |
| ,
| |
| More comprehensive radiation surveys need to be considered in work l
| |
| areas and for people leaving work zones when they believe they are
| |
| '
| |
| contaminate * The licensee should evaluate the effectiveness of training provided to the radiation protection technician These points were discussed at the exit interview on March 20, 198 No violations or deviations were identified in this are VI. Exit Interview
| |
| !
| |
| '
| |
| The inspectors met with the licensee representatives denoted in Paragraph 1 at the conclusion of the site visit on March 20, 198 The scope and findings of the inspection were summarized. The licensee representatives were informed of the apparent violations of NRC requirements discussed in this repor In regard to the apparent violations noted, the Vice President and Site Manager stated that the Commission bears the responsibility to reasonably enforce their Regulations and that the good faith efforts of SCE should
| |
| . be recognized. The Vice President and Site Manager continued that SCE's l evaluation of the 512 rem exposure represents a large allocation of l resources and that their conclusion is the most reasonable that could be
| |
| ! reached based on the extensive research performed. Additionally, he
| |
| ; stated his belief that the SCE fuel fragment control program represents i the state-of-the-art in the industry today and that their extraordinary
| |
| !
| |
| I efforts should not be rewarded with Notices of Violations when other programs, which probably have similar problems, are not being cited
| |
| ,
| |
| because they are not as diligent as SCE.
| |
| | |
| l l
| |
| l 1 l l
| |
| l l
| |
| }} | | }} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P7111999-10-26026 October 1999 Informs That Licensee 990330 Response to GL 97-06 Provides Reasonable Assurance That Condition of Licensee Steam Generator Internals Is in Compliance with Current Licensing Bases for Plant ML20217K3571999-10-21021 October 1999 Discusses Use of SONGS as Generic Safety Issue 191 Ref Plant.Future Requests for Info & Addl Coordination Activities Be Handled Through D Evans of Organization.With Diskette ML20217K8541999-10-21021 October 1999 Forwards Revised Pages to ERDS Data Point Library,Per Requirements of 10CFR50,App E,Section VI.3.a.Described Unit 2 & 3 Changes for 2/3R7813 Were Completed on 990924 ML20217L9491999-10-21021 October 1999 Forwards SONGS Emergency Response Telephone Directory, for Oct-Dec 1999 ML20217J8631999-10-15015 October 1999 Forwards Insp Repts 50-361/99-12 & 50-362/99-12 on 990808- 0918.One Violation Identified Involving Inoperability of Emergency Diesel Generator in Excess of Allowed Outage Time ML20217E3221999-10-13013 October 1999 Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3 ML20217E7671999-10-12012 October 1999 Forwards Rev 62 to NRC Approved Aug 1983, Physical Security Plan,Songs,Units 1,2 & 3, IAW 10CFR50.54(p).Changes,as Described in Encls 1 & 2,do Not Reduce Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20217B5981999-10-0606 October 1999 Informs That Staff Concluded That All Requested Info for GL 98-01, Year 2000 Readiness in Us Nuclear Power Plants, Provided for San Onofre Nuclear Generating Station,Units 2 & 3 ML20216H8741999-09-29029 September 1999 Provides Requested Written Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Lab Testing of Charcoal Adsorber Samples for Creacus & Pacu Satisfies Listed Requirements ML20216H8541999-09-29029 September 1999 Submits Encl Request for Relief from ASME Code,Section III Requirements in 10CFR50.55(a)(3) to Use Mechanical Nozzle Seal Assembly as Alternate ASME Code Replacement at SONGS, Units 2 & 3 for Period of Operation Beginning with Cycle 11 ML20216J2631999-09-28028 September 1999 Forwards Copy of Final Accident Sequence Precursor (ASP) Analysis of Operational Event at Songs,Unit 2,reported in LER 361/98-003 ML20212H4461999-09-28028 September 1999 Forwards Suppl Info,As Discussed with NRC During 990812 Telcon,To Support Risk Informed Inservice Testing & GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20212G5611999-09-24024 September 1999 Informs NRC That SCE Remains Committed to Performing Eddy Current Examinations of 100% of Reactor Vessel Head Penetrations at Songs,Unit 3.Exams Will Not Be Performed During Cycle 11 RFO 05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments1999-09-23023 September 1999 Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments ML20212D9921999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of San Onofre.Nrc Plan to Conduct Core Insps & One Safety Issues Evaluation of MOVs at Facility Over Next 7 Months. Details of Insp Plan Through March 2000 Encl ML20212A4061999-09-14014 September 1999 Forwards Revised Pages to ERDS Data Point Library.Described Unit 2 Changes for 2R7817 & 2R7828 Were Completed on 990818 & Unit 3 Change for 3R7828 Was Completed on 990903 ML20216E6031999-09-10010 September 1999 Provides Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Dtd 990820.Schedule Shown on Attachment 1, Operator Licensing Exam Data, Provides Util Best Estimate Through Cy 2003 ML20217B9011999-09-10010 September 1999 Responds to Which Addressed Concerns Re Y2K Issue & Stockpiling of Potassium Iodide (Ki) Tablets by Informing That San Onofre Nuclear Station Already Completed All Work Required to Be Ready for Y2K Transition ML20211K4191999-09-0303 September 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20211N0261999-09-0303 September 1999 Forwards Exemption from Certain Requirements of 10CFR50.44 & 10CFR50,app A,General Design Criterion 41 in Response to Util Request of 980910,as Supplemented 990719 & SER 05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 31999-08-31031 August 1999 Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 ML20211H3321999-08-30030 August 1999 Discusses 1999 Emergency Preparedness Exercise Extent of Play & Objectives.Based on Review,Nrc Has Determined That Exercise Extent of Play & Objectives Are Appropriate to Meet Emergency Plan Requirements ML20211J7151999-08-27027 August 1999 Forwards Insp Repts 50-361/99-09 & 50-362/99-09 on 990627- 0807.Two Violations Being Treated as non-cited Violations ML20211H8561999-08-23023 August 1999 Forwards SE Accepting Licensee 970625 Requests for Relief RR-E-2-03 - RR-E-2-04 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval ML20211J5821999-08-23023 August 1999 Corrected Copy of ,Changing Application Date from 970625 to 990625.Ltr Forwarded SE Accepting Licensee 990625 Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section XI as Listed ML20210V4271999-08-16016 August 1999 Forwards Proprietary Certified Renewal Applications for SROs a Harkness,R Grabo & T Vogt & RO D Carter,Submitted on Facsimile Form NRC-398 & Certified NRC Form 396.Encls Withheld ML20210R6681999-08-13013 August 1999 Forwards Response to NRC RAI Re SCE License Amend Applications 173 & 159 for Songs,Units 2 & 3,proposed Change Number 485,which Requests Addition of SR to TS 3.3.9, CR Isolation Signal ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210Q6451999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for SONGS, Units 2 & 3,per TS 5.7.1.4.There Were No Challenges to Pressurizer Safety Valves for Either Units ML20210P5711999-08-11011 August 1999 Forwards Amend Application Number 189 for License NPF-10 & Amend Application Number 174 to License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Encl Calculation E4C-098 ML20210P4681999-08-11011 August 1999 Forwards COLR for Cycle 10 for Songs,Units 2 & 3,IAW TS Section 5.7.1.5.d, Colr. Changes to COLR Parameters Have Been Conducted IAW Approved COLR Methodologies & All Applicable Limits of Safety Analysis Were Met ML20210P6221999-08-10010 August 1999 Forwards Replacement Pages for Attachments E & F of Amend Application Numbers 168 & 154 for Songs,Units 2 & 3.Pages Are Provided to Correct Errors to Pagination & Headings in 970618 Submittal ML20210N9721999-08-10010 August 1999 Responds to Appeal of FOIA Request for Documents Re Osre Issue.No Osre Visit Scheduled for Sept 1996 at Plant,Per 990722 Telcon.V Dricks,In Ofc of Public Affairs Should Be Contacted Re Osre Issue ML20210N0901999-08-0909 August 1999 Informs That 990312 Application Requested Amends to Licenses DPR-13,NPF-10 & NPF-15,respectively,being Treated as Withdrawn.Proposed Change Would Have Modified Facility TSs Pertaining to SONGS Physical Security Plan ML20210N5051999-08-0909 August 1999 Forwards Cycle 10 Update to TS Bases,Which Have Been Revised Between 980101-990630,per 10CFR50.71(e) 05000361/LER-1999-004, Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl1999-08-0606 August 1999 Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl ML20210L2311999-08-0505 August 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements,For Songs,Unit 3.Rept Covers 970916 Through 990509,date Unit 3 Returned to Service Following Cycle 10 Refueling Outage ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20216D9671999-07-29029 July 1999 Provides Response to RAI to Support Proposed TS Change 460 Re Containment Isolation Valve Completion Time for SONGS, Units 2 & 3.Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak, Encl ML20210C1821999-07-22022 July 1999 Forwards Rept Providing Results of Insp of Eggcrate Tube Supports Done on Secondary Side of Sgs,Using Remote Controlled Visual Equipment ML20210B2451999-07-21021 July 1999 Forwards Response to NRC 990615 RAI Re GL 95-07, Pressure Locking & Thermal Bldg of SR Power-Operated Gate Valves, for Songs,Units 2 & 3 ML20210B9891999-07-20020 July 1999 Ack Receipt of Transmitting Plant Emergency Plan Implementing Procedure SO123-VIII-1, Recognition & Classification of Emergencies ML20209J5241999-07-19019 July 1999 Provides Clarification of Util Intentions Re Disposition of Systems for Which Exemption & TS Changes Were Requested in Licensee .Deferment of Action Re Hydrogen Monitors,Encl ML20210N2881999-07-19019 July 1999 Forwards Rev 61 to Physical Security Plan,Rev 21 to Safeguards Contingency Plan & Rev 20 to Security Force Training & Qualification Plan,Per 10CFR50.54(p),for Plant. Screening Criteria Forms Encl.Plans Withheld ML20210A2911999-07-19019 July 1999 Submits Withdrawal Request Submitted by Ltr Dtd 990312, Requesting NRC Approval of Revs to Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan ML20209G3421999-07-15015 July 1999 Forwards Table of 16 Affected Tube Locations in SG E089, Discovered During Cycle 10 Outage Insp,Which Were Probably Not Examined by Bobbin During Cycle Outage Insp ML20209D8051999-07-12012 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rc Structural Integrity, Issue on 950519 to Plant. NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20209F5681999-07-0909 July 1999 Forwards Insp Repts 50-361/99-08 & 50-362/99-08 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy ML20209C1571999-07-0202 July 1999 Forwards Response to NRC RAI Re SCE Submittal Dtd 980710,re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20196K6721999-07-0202 July 1999 Discusses 990628 Meeting Conducted in Region IV Office Re Status of San Onofre Nuclear Generating Station Emergency Preparedness Program.List of Attendees & Licensee Presentation Encl 1999-09-03
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062F9441990-11-0909 November 1990 Forwards Insp Repts 50-206/90-35,50-361/90-35 & 50-362/90-35 on 901009-12.No Violations Noted ML20058G5571990-11-0505 November 1990 Provides Corrections to Insp Repts 50-206/90-33,50-361/90-33 & 50-362/90-33,per ML20058B9291990-10-22022 October 1990 Forwards Ref Matl Requirements for Requalification Program Evaluation at Units 2 & 3 During Wk of 910122-0201 ML20059N9351990-10-0303 October 1990 Forwards Insp Repts 50-206/90-33,50-361/90-33 & 50-362/90-33 on 900904-07.No Violations Noted ML20059L1611990-09-18018 September 1990 Provides Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exam to Be Administered on 901010.W/o Encls ML20059G9751990-08-21021 August 1990 Forwards Insp Repts 50-206/90-31,50-361/90-31 & 50-362/90-31 on 900731-0803.No Violations Noted ML20059A4621990-08-16016 August 1990 Advises That 900717 Response to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount, Served as Basis for Closing Issue on Unit 1.Results of Evaluation of Units 2 & 3 Will Be Subj of Future Ltr ML20058P2911990-08-0101 August 1990 Forwards Initial Licensing Exam Rept 50-361/OL-90-02 on 900618-29 for Units 2 & 3.Fifteen of 19 Candidates Passed Exam IR 05000206/19900101990-07-26026 July 1990 Ack Receipt of Advising of Steps Taken to Correct Violations Noted in Insp Repts 50-206/90-10,50-361/90-10 & 50-362/90-10.Identification of New Info Provided Addl Useful Info on Recent Check Valve Activities at Facility ML20055H7451990-07-24024 July 1990 Requests Util Provide Listed Ref Matls for Reactor & Senior Reactor Operator Licensing Exams on 901023-25 ML20058L8981990-07-23023 July 1990 Forwards Insp Repts 50-206/90-26,50-361/90-26 & 50-362/90-26 on 900625-29.No Violations Noted.Weaknesses Re Implementation of Internal Exposure Control Program Noted ML20055G5771990-07-17017 July 1990 Advises That New Storage Facility Meets Requirements of 10CFR73.21(d)(2) & Acceptable for Storage of Safeguards Info,Per 900403 Request ML20055D5201990-07-0202 July 1990 Requests Util Provide Ref Matls Listed in Encl for Requalification Program Evaluation & Exams During Wk of 901001,by 900801.Failure to Supply Ref Matl as Required May Result in Postponement of Exam ML20055F3871990-06-29029 June 1990 Forwards Insp Repts 50-206/90-22,50-361/90-22 & 50-362/90-22 on 900422-0602 & Notice of Deviation.Several Staff Members May Have Misunderstanding Re Licensee Ability to Make Repeated Entries Into & Exits from Tech Spec Statements ML20055D5361990-06-29029 June 1990 Discusses Electrical Safety Sys Functional Insp Conducted on 891030-1130 & Forwards Notice of Violation ML20055E1641990-06-28028 June 1990 Authorizes Use of Alloy 690 as Alternative to Alloy 600 in Steam Generator Tube Plugs,Per 900627 Request.Nrc Endorsed Use of Alloy 690 for Fabrication of Plugs in NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube.. ML20059M9701990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20248E0851989-09-29029 September 1989 Forwards Amend 18 to Indemnity Agreement B-31 Re Changes to 10CFR140, Financial Protection Requirements & Indemnity Agreements, Effective 890701 ML20248J0561989-09-22022 September 1989 Forwards Insp Repts 50-206/89-26,50-361/89-26 & 50-362/89-26 on 890828-0901 & Acceptance Criteria.No Violations or Deviations Noted ML20248H9271989-09-20020 September 1989 Forwards Insp Repts 50-206/89-23,50-361/89-23 & 50-362/89-23 on 890814-18.No Violations Noted ML20248B5261989-09-19019 September 1989 Provides Info Re Generic Fundamentals Exam Section of Licensing Written Exam to Be Administered on 891004 ML20248B7841989-09-16016 September 1989 Advises That Portions of 880624 & 0825 Revs 19,19A & 20 to Physical Security Plan Consistent w/10CFR50.54(p) & Acceptable.Unacceptable Portion Withheld (Ref 10CFR73.21) ML20247B1181989-08-25025 August 1989 Forwards Insp Repts 50-206/89-18,50-361/89-18 & 50-362/89-18 on 890618-0729 & Notice of Violation ML20248A9121989-07-28028 July 1989 Advises of Reactor Operator Written Exams Scheduled for 891031 & Operating Exams Scheduled for 891101-03.Ref Matl Requirements for Reactor/Senior Reactor Operator Licensing Exams Encl ML20245G7031989-07-26026 July 1989 Forwards Insp Repts 50-206/89-14,50-361/89-14 & 50-362/89-14 on 890430-0617.No Violations Noted.Addl Example of LER Failing to Properly Address All Applicable Root Causes & Corrective Actions for Event Identified in Rept IR 05000206/19890171989-07-0606 July 1989 Forwards Safeguards Insp Repts 50-206/89-17,50-361/89-17 & 50-362/89-17 on 890619-23.No Violations Noted.Repts Withheld (Ref 10CFR73.21) ML20246B5701989-06-22022 June 1989 Forwards Enforcement Conference Repts 50-361/89-19 & 50-362/89-19 on 890602 & Notice of Violation.Importance of Prompt Corrective Actions for Identified Engineering Program Deficiencies Addressed During Conference ML20246L6911989-06-22022 June 1989 Forwards Exam Rept 50-361/OL-89-01 for Units 2 & 3 Administered on 890512.Candidate Failed to Meet Min Qualification Requirements for Licensing ML20245K3571989-06-16016 June 1989 Forwards Insp Repts 50-206/89-15,50-361/89-15 & 50-362/89-15 on 890508-26.No Violations Noted IR 05000361/19880351989-05-31031 May 1989 Confirms 890602 Enforcement Conference in Region V to Discuss Concerns Re Inoperability of Emergency Chillers Noted in Insp Repts 50-361/88-35 & 50-362/88-37,per 890524 & 31 Telcons.Agenda & Notice of Meeting Encl ML20246N6641989-05-15015 May 1989 Responds to Request to Revise Physical Security Plan,Section 5.1.1 Re Granting Unescorted Access to Protected Areas. Advises of Issuance of Rule Requiring All Power Reactor Licensees to Have Access Authorization Program ML20247G1391989-05-12012 May 1989 Advises That Evaluation of Requalification Program & Licensed Personnel Scheduled for Wks of 890814 & 28.Ref Matl Listed on Encl Should Be Furnished by 890616 ML20246P8861989-05-0202 May 1989 Forwards Insp Repts 50-206/89-08,50-361/89-08 & 50-362/89-08 on 890313-23 & Notice of Violation.Rept Describes Too Many Examples Involving Inadequate Control of Radioactive Matl ML20246C2441989-04-19019 April 1989 Forwards Insp Repts 50-206/89-12,50-361/89-12 & 50-362/89-12 on 890320-24.No Violations or Deficiencies Noted ML20236B8601989-03-13013 March 1989 Advises That 880204 & 890216 Revs 17 & 17A to Physical Security Plan,Respectively,Consistent W/Provisions of 10CFR50.54(p) & Acceptable for Inclusion in Plan IR 05000206/19890051989-02-28028 February 1989 Forwards Safeguards Insp Repts 50-206/89-05,50-361/89-05 & 50-362/89-05 on 890206-10.No Violations Noted.Rept Withheld (Ref 10CFR2.790(d)) ML20235T7991989-02-27027 February 1989 Advises That 871229,880204 & 890216 Revs 4A,5 & 5A, Respectively,To Safeguards Contingency Plan Acceptable ML20235Q6011989-02-10010 February 1989 Forwards Notice of Issuance of Amends to Licenses NPF-10 & NPF-15 & Opportunity for Hearing on 881024 Request Re Change to Tech Spec 3/4.8.1.1, AC Sources ML20235L0941989-02-0909 February 1989 Requests Encl Ref Matl Be Submitted by 890227 for Reactor Operator Licensing Exams Scheduled for 890505.Inadequate or Incomplete Ref Matl May Result in Exam Rescheduled ML20245C0771989-02-0808 February 1989 Identifies Addl Technical Issues Which NRC Must Resolve Before Restart from Current Refueling Outage ML20206M4061988-11-28028 November 1988 Denies 881112 Request for Commission to Extend Public Comment Period on Proposed Fitness for Duty Program ML20195H6681988-11-28028 November 1988 Responds to 881112 Request for Commission to Extend Public Comment Period on Proposed Fitness for Duty Rule.Comments Received After 881121 Will Be Considered If Practical ML20206L7571988-11-22022 November 1988 Informs That Review of Change Notice 29 to Topical Rept SCE-1-A, QA Program, Amend 11 Will Require More than 60 Days to Complete Review & Evaluation ML20206J5201988-11-16016 November 1988 Informs That 881108 Request for Extension of Public Comment Period on Proposed Fitness for Duty Rule Denied.Ample Response Time Provided IR 05000361/19880101988-11-0707 November 1988 Ack Receipt of 880902 & 1003 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-361/88-10 & 50-362/88-10 ML20206D0331988-10-31031 October 1988 Forwards Exam Rept 50-361/OL-88-02 Administered on 880726-0811.Rept for Both Units ML20205R6931988-10-26026 October 1988 Documents Change in Schedule for Administration of Reactor Operator & Senior Reactor Operator Licensing Exams.Written Exams Scheduled for 881213 & Plant Oral Exams on 881214-16 IR 05000361/19880151988-10-0404 October 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-361/88-15 & 50-362/88-16 ML20154N9121988-09-0909 September 1988 Forwards Emergency Operating Procedures Insp Repts 50-361/88-13 & 50-362/88-14 on 880601-14.No Violations or Deviations Identified.Emphasizes Staff Commitment to Eliminate Deficiencies in Procedures & Training Program ML20154N9301988-09-0909 September 1988 Forwards Insp Rept 50-362/88-22 on 880718-0805 & Notice of Violation 1990-09-18
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217P7111999-10-26026 October 1999 Informs That Licensee 990330 Response to GL 97-06 Provides Reasonable Assurance That Condition of Licensee Steam Generator Internals Is in Compliance with Current Licensing Bases for Plant ML20217J8631999-10-15015 October 1999 Forwards Insp Repts 50-361/99-12 & 50-362/99-12 on 990808- 0918.One Violation Identified Involving Inoperability of Emergency Diesel Generator in Excess of Allowed Outage Time ML20217B5981999-10-0606 October 1999 Informs That Staff Concluded That All Requested Info for GL 98-01, Year 2000 Readiness in Us Nuclear Power Plants, Provided for San Onofre Nuclear Generating Station,Units 2 & 3 ML20216J2631999-09-28028 September 1999 Forwards Copy of Final Accident Sequence Precursor (ASP) Analysis of Operational Event at Songs,Unit 2,reported in LER 361/98-003 ML20212D9921999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of San Onofre.Nrc Plan to Conduct Core Insps & One Safety Issues Evaluation of MOVs at Facility Over Next 7 Months. Details of Insp Plan Through March 2000 Encl ML20217B9011999-09-10010 September 1999 Responds to Which Addressed Concerns Re Y2K Issue & Stockpiling of Potassium Iodide (Ki) Tablets by Informing That San Onofre Nuclear Station Already Completed All Work Required to Be Ready for Y2K Transition ML20211K4191999-09-0303 September 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20211N0261999-09-0303 September 1999 Forwards Exemption from Certain Requirements of 10CFR50.44 & 10CFR50,app A,General Design Criterion 41 in Response to Util Request of 980910,as Supplemented 990719 & SER ML20211H3321999-08-30030 August 1999 Discusses 1999 Emergency Preparedness Exercise Extent of Play & Objectives.Based on Review,Nrc Has Determined That Exercise Extent of Play & Objectives Are Appropriate to Meet Emergency Plan Requirements ML20211J7151999-08-27027 August 1999 Forwards Insp Repts 50-361/99-09 & 50-362/99-09 on 990627- 0807.Two Violations Being Treated as non-cited Violations ML20211H8561999-08-23023 August 1999 Forwards SE Accepting Licensee 970625 Requests for Relief RR-E-2-03 - RR-E-2-04 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval ML20211J5821999-08-23023 August 1999 Corrected Copy of ,Changing Application Date from 970625 to 990625.Ltr Forwarded SE Accepting Licensee 990625 Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section XI as Listed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210N9721999-08-10010 August 1999 Responds to Appeal of FOIA Request for Documents Re Osre Issue.No Osre Visit Scheduled for Sept 1996 at Plant,Per 990722 Telcon.V Dricks,In Ofc of Public Affairs Should Be Contacted Re Osre Issue ML20210N0901999-08-0909 August 1999 Informs That 990312 Application Requested Amends to Licenses DPR-13,NPF-10 & NPF-15,respectively,being Treated as Withdrawn.Proposed Change Would Have Modified Facility TSs Pertaining to SONGS Physical Security Plan ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210B9891999-07-20020 July 1999 Ack Receipt of Transmitting Plant Emergency Plan Implementing Procedure SO123-VIII-1, Recognition & Classification of Emergencies ML20209D8051999-07-12012 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rc Structural Integrity, Issue on 950519 to Plant. NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20209F5681999-07-0909 July 1999 Forwards Insp Repts 50-361/99-08 & 50-362/99-08 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy ML20196K6721999-07-0202 July 1999 Discusses 990628 Meeting Conducted in Region IV Office Re Status of San Onofre Nuclear Generating Station Emergency Preparedness Program.List of Attendees & Licensee Presentation Encl ML20196K3351999-06-30030 June 1999 Informs That Effective 990703,NRC Project Management Responsibility for San Onofre Unit 1 Will Be Transferred to Wc Huffman ML20212J3581999-06-24024 June 1999 Final Respons to FOIA Request for Records.App a Records Withheld in Part (Ref Exemptions 1 & 3) ML20209D7851999-06-16016 June 1999 Requests That San Onofre Nuclear Generating Station Be Included as One of Several Reference Plants in GSI-191 Study ML20195J6441999-06-15015 June 1999 Forwards Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Response Requested within 30 Days of Receipt of Ltr ML20196A7351999-06-15015 June 1999 Requests That Cover Page to NRC Insp Repts 50-361/98-14 & 50-362/98-14 Be Replaced with Encl Page.Originally Issued Page,Signed by T Steka,Was Dated Incorrectly ML20207H4021999-06-14014 June 1999 Requests Addl Info Re Completion of Time for Containment Isolation Valves,Same as for Engineered Safeguards Features ML20196A8001999-06-0909 June 1999 Requests That Pages 14-17 of NRC Insp Repts 50-361/99-04 & 50-362/99-04 Be Replaced with Encl Pages.Initial Issued Rept Contained Some Duplicated Info ML20195E8001999-06-0808 June 1999 Forwards Insp Repts 50-361/99-06 & 50-362/99-06 on 990404- 0515.Violations Identified & Being Treated as Noncited Violations ML20195E8091999-06-0707 June 1999 Ack Receipt of Transmitting Licensee Emergency Plan,Rev 7 Under Provisions of 10CFR50.54(q) ML20195E8281999-06-0707 June 1999 Ack Receipt of Transmitting Licensee Emergency Plan Implementing Proceedure SO123-VIII-1,rev 11 Under Provisions of 10CFR50.54(q) ML20207E6521999-06-0202 June 1999 Responds to Ltr Which Identified Several Inaccuracies within NRC Insp Repts 50-361/98-18 & 50-362/98-18.Forwards Revised Pages for page-by-page Replacement in Insp Repts ML20195D2771999-06-0202 June 1999 Forwards Se,Concluding That Util Has Capability to Perform Reload Design & non-LOCA Analyses for Songs,Units 2 & 3, Based on Review of TR SCE-9801-P & Onsite Audit of Implementation of Reload Technology Transfer Program ML20207A8981999-05-25025 May 1999 Advises That Versions of SCE-9801-P,Rev 0 & CEN-635(S)-P, Rev 00,submitted in 981130 & s & Affidavits & 990225,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20206U3681999-05-18018 May 1999 Forwards Partially Withheld Insp Repts 50-361/99-07 & 50-362/99-07 on 990426-29.Matl Encl Contains Safeguards Info & Will Not Be Placed in PDR (Ref 10CFR2.790) ML20207A2131999-05-14014 May 1999 Submits Summary of 990422 Meeting in San Clemente,Ca Re PPR Results Completed 990211.Informal Discussions Held with Public Following Meeting Re Recent Changes Used to Assess Licensee Performance ML20206P1521999-05-13013 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328. Reorganization Chart Encl ML20206P4051999-05-12012 May 1999 Responds to Re Request of TS Interpretation. Instrumentation with Battery Backup,But Lacking DG Backup Cannot Be Excluded from Provisions of Action B.2 ML20206Q2481999-05-10010 May 1999 Forwards Insp Repts 50-361/99-05 & 50-362/99-05 on 990426-30.No Violations Noted ML20206H4881999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Aswer Key,Encl for Info.Without Encl ML20206H7651999-05-0606 May 1999 Forwards Exam Repts 50-361/99-301 & 50-362/99-301 on 990416. Two Operators & Two Senior Operators Were Evaluated.Four Applicants Satisfied Requirements of 10CFR55 & Appropriate Licenses Issued IR 05000361/19983021999-05-0303 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-361/98-302 & 50-362/98-302 Issued on 990104.Review Found Reply Responsive to Concerns Raised ML20206K5061999-04-30030 April 1999 Discusses Closure of OI Investigation 4-1998-04 Re Southern California Edison Led Joint Util Audit of Inst of Nuclear Power Operations Fitness for Duty & Access Authorization Programs.Synopsis from Subj Rept Encl ML20206B4921999-04-20020 April 1999 Forwards Insp Repts 50-361/99-04 & 50-362/99-04 on 990221-0403.Three Violations Occurred & Being Treated as non-cited Violations ML20205S2941999-04-20020 April 1999 Forwards RAI Re Licensee 981230 Request to Implement risk-informed IST Program During Remainder of Second 10-year Interval for SONGS & to 970313 Response to GL 96-05 ML20206B4241999-04-20020 April 1999 Forwards Insp Repts 50-361/99-03 & 50-362/99-03 on 990205-0312.One Violation Occurred & Being Treated as non-cited Violation,Consistent with App C of NRC Enforcement Policy ML20205Q6171999-04-19019 April 1999 Forwards SE Authorizing Licensee 980826 Request for Relief from ASME B&PV Code,Section XI Requirements for Certain ISIs at Plant,Units 2 & 3 ML20205R0101999-04-16016 April 1999 Discusses Request for Approval of Deviation from Approved Fire Protection Program.Forwards SE Related to Request for Approval Incorporating Certain Requirements of App R to 10CFR50 ML20205M9421999-04-13013 April 1999 Forwards Emergency Response Data System Implementation Documents.Data Point Library Updates for Kewaunee (271), San Onofre (272) & Clinton (273) Encl.Also Encl Plant Attribute Library Update for Grand Gulf (274).Without Encls ML20205M9891999-04-0707 April 1999 Informs That L Raghavan Assumed Project Manager Responsibilities Effective 990329 & Dembek Assumed Responsibilities as Section Chief for SONGS ML20205E5441999-03-30030 March 1999 Forwards Insp Repts 50-361/99-01 & 50-362/99-01 on 990103- 0220.Three non-cited Violations Were Identified 1999-09-03
[Table view] |
Text
, 3 ]
- n
[,wam#'o, UNITED STATES ;
EI ' 3 NUCLEAR REGULATORY COMMISSION !
,t $ ; ,E REGION V )
0 1450 MARIA LANE, SUITE 210 f W ALNUT CREEK, CALIFoRNI A 94596
,- ,d
MN 2 51987 f Docket No. 50-362 ,
License No. NPF-15 DrsIctATED ORICINA Southern California Edison Company certified A .,C b-
.
P. O. Box 800 j 2244 Walnut Grove Avenue Rosemead, California 91770 Attention: Mr. Kenneth P. 8askin, Vice President Nuclear Engineering, Safety and Licensing Department Gentlemen:
Subject: NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTIES (NRC INSPECTION REPORT NOS. 50-362/86-37 AND 87-13 AND LER NO. 86-15, THROUGH REVISION 2)
This refers to the inspections conducted from December 15, 1986 through :
May 14, 1987, of activities at the San Onofre Nuclear Generating Station, Unit 3, '
San Clemente, Californi The apparent violations of NRC requirements in the enclosed Notice of Violation and Proposed Imposition of Civil Penalties set forth examples involving radiation safety matters that were precipitated by self-revealing events and have been discussed with your representatives during meetings held at the Region V office on April 10 and May 11, 198 The violations described in the enclosed Notice of Violation and Proposed Imposition of Civil Penalties involved significant deficiencies in your l radiation safety program which included: (1) the failure to adequately control radioactive materials, (2) the failure to perform surveys, (3) an ;
occupational overexposure, and (4) the untimely reporting of the events related to a personnel overexposur On December 12, 1986, you reported that a thermoluminescent dosimeter (TLD)
worn on the right hand of a maintenance worker engaged in activities during '
the Unit 3 outage in October 1986 indicated a potential hand exposure of 511.99 rem. Your management system failed to identify and report this exposure in a timely manner. These failures apparently resulted because of a breakdown in the management oversight and control c,( your personnel dosimetry program. Specifically, computer software used as part of the dosimetry program was not adequately reviewed prior to its use in order to assure that it operated properly. In addition, the error was not identified in a timely manner even after you received a printed copy of the result We recognize that you have dedicated significant effort to a review of the 511.99 rem TLD result and have concluded that you believe the individual probably did not receive the dose indicated by the TLD. Rather, it appears to CERTIFIED MAIL .. 4 RETURN RECEIPT REQUESTED ,4
'
f 2, a
'
D D D
~
'
o
'
i
' ' '
Southern California Edison Comprny -2- JUN .2 51987 ll l
be your position that the persunnel dosimetry device was deiective in some wa Due to the failure to identify the exposure incident in a timely manner, the opportunity was lost to make physical observation of the worker's hand which may have more precisely confirmed the extent of expmure. Nonetheless, j the results of our review indicate that the TLD resp nse was most probably j from radiation exposure. The individual involved was working on plant systems I where. highly radioactive particulate fission products were likely to be l present. Also, the radiation protection controls being implemented were !
. inadequate to ensure that the worker could not have rec.eived a dose to a small part of his right hand on the order of 512 rem. Specifically, the radiological procedures being implemented for the activities that the worker performed did not address the hazard from particulate fission product Further, the radiation prctection technician providing job coverage had not been trained in the necessary survey techniques, and the results of surveys that were performed were not documented. All of these facts contribute to the NRC's conclusion that the overexposure occurre l l
l Our efforts to determine the root cause of this exposure ind?cate that, {
following your decision to operate Unit 3 during Cycle I with a significant number of fuel pin defects, no special confinement controls were implemented for fuel assembly reconstitution during October and November 1985. Although certain members of your facility management were aware of the hazard, your radiation protection staff was not involved in planning the controls to be ,
implemented during fuel reconstitutio Following the dispersal of highly l radioactive particles in the fuel handling building.in October and November )
1985, the radiation protection group focused their efforts on mitigating the {
consequences of the dispersal, but little was done to confirm or clean up affected systems (i.e., reactor coolant, and associated spent fuel pool systems) notwithstanding written requests made by your radiation protection )
group in November 1985 and April 198 This lack of integrated management involvement also greatly contributed to the exposure inciden While your actions to improve radiation protection measures following the identified exposure incident appeared comprehensive during December 1986 and January 1987, three instances in February 1987 indicate that the measures were ]
not totally effective in limiting unnecessary exposure to workers and f precluding the release of small particles of licensed radioactive material to unrestricted areas. These examples demonstrated a continued need to improve your training of personnel and to provide sufficient management oversight to ensure that your radiation safety program directions are being carried ou To emphasize the need for continued improvement in the radiological controls l area, in particular the implementation of your dosimetry program, and to '
emphasize the need to assure the timely reporting of exposure incidents, I have been authorized, after consultation with the Director, Office of J Enforcement, and the Deputy Executive Director for Regional Operations, to '
issue the enclosed Notice of Violation and Proposed Imposition of Civil .
Penalties in the amount of One Hundred Thousand Dollars ($100,000) for the ]
violations described in the enclosed Notice. In accordance with the " General i Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, I Appendix C (1987) (Enforcement Policy), the violations described in the j enclosed Notice have been categorized as three separate Severity Level III l violations or problem u
'- Southern California Edison company -3- M 2 51987 i
.: The violation involving the 512 rem exposure could have been classified individually at a Severity Level However, because of the limited health I implications of this, most likely, very localized exposure, a Severity Level I I characterization is deemed to be inappropriate. The violation is being categorized at a Severity Level III because the overexposure is of significant regulatory concern. A civil penalty is not being proposed for the exposure violation to focus your attention on the broader area of control of highly radioactive particulate materia The violations associated with the control of radioactive material have been aggregated into a separate Severity Level III I problem for which a civil penalty is proposed. Similarly, to focus your i attention on the management breakdown associated with your dosimetry program, I which resulted in a failure to make a required report to the NRC, this reporting violation was set out as a separate Severity Level III violation for which a civil penalty is propose !
The base value of a civil penalty for a Severity Level III violation or problem is $50,000. The escalation and mitigation factors in the Enforcement ,
Policy were considered. Your past performance (SALP Category 1 in l radiological controls) and the comprehensive corrective actions being '
implementee were considered to be sufficient to offset the prior notice of similar problems at your facility involving highly radioactive particles, your initial ineffective corrective action and the multiple examples of failure to control particulate licensed material in February 1987. Accordingly, we have concluded that neither mitigation nor escalation is warrante You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. In your response, you should document the specific actions taken and any additional actions you plan to prevent recurrence. After reviewing your response to this Notice, including your proposed corrective actions and the results of future inspections, the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with NRC regulatory requirement In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Roo The responses directed by tnis letter and the enclosed Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub. L. No. 96-51
Sincerely, f0-Regional Administrat Enclosure:
Notice of Violation and Proposed Imposition of Civil Penalty cc w/ enclosure:
D. J. Fogarty, SCE H. B. Ray, SCE (San Clemente)
.
H. E. Morgan, SCE (San Clemente)
State of CA
. . . . .
.
_--______-_L
'
Southern California Edison Company -4-
!
bec w/ enclosure:
RSB/ Document Control Desk (RIDS) (IE06)
' PDR I.POR SECY CA JTaylor, DEDO JLieberman, OE PRobinson, OE a Enforcement Coordinators '
RI, RII, RIII, RIV, RV
- FIngram, PA BHayes, 01
SConnelly, OIA EJordan, AE00 ;
OE File Project Inspector Resident Inspector R. Huey (2)
G. Cook B. Faulkenberry J. Martin Docket File LFMB M. Smith i
!
j OE RV OG: OE:D DE00 PRobinson JMartin JGoldberg JLieberman JTaylor 6/ /87 6/ /87 6/ /e/ 6/ /87 6/ /87 JRussell GYuha RScara AJo on JMar, tin 7 87 6/p/87 6/,9 87 6/th/87 Quf-ST COPY ]^/REQQEST COPY ] EST COPY ] pfQUEST COPY ] JtEQl)EST COPY ] )
EV / N0 1 YES T/ NO E / NO ] WES/ / N0 ]/YEV / NO j '
V \/ / "
..TO PDR ] j
ES J / NO ]