ML20206B492
| ML20206B492 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 04/20/1999 |
| From: | Laura Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Ray H SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20206B494 | List: |
| References | |
| 50-361-99-04, 50-361-99-4, 50-362-99-04, 50-362-99-4, NUDOCS 9904290261 | |
| Download: ML20206B492 (5) | |
See also: IR 05000361/1999004
Text
1
n
.
- "%,k
UNITED STATES
NUCLEAR REGULATORY COMMISSION
g
5
REGION IV
611 RYAN PLAZA DRIVE, suite 400
q,g
ARUNGTON, texas 76011-8064
APR 201999
Harold B. Ray, Executive Vice President
,
Southern Califomia Edison Co.
I
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, California 92674-0128
,
SUBJECT: NRC INSPECTION REPORT NO. 50-361/99-04; 50-362/99-04
Dear Mr. Ray:
This refers to the routine inspection conducted on February 21 through April 3,1999, at the
San Onofre Nuclear Generating Station, Units 2 and 3, facility. The enclosed report presents
the results of this inspection.
During the 6-week period covered by this inspection, your conduct of activities at the
San Onofre facility was generally characterized by safety-conscious operation, sound
engineering and maintenance practices, and careful radiological work controis.
Based on the results of this inspection, the NRC has determined that three violations of NRC
requirements occurred. These violations are being treated as noncited violations (NCVs),
consistent with Appendix C of the Enforcement Policy. These NCVs are described in the
subject inspection report. If you contest the violation or severity level of these NCVs, you
should provide a response within 30 days of the date of this inspection report, with the basis for
your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV, and the
Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
DC, 20555-0001, and the resident inspector at the facility.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
.
.
Linda Joy Smith, Chief
Project Branch E
Division of Reactor Projects
,
Docket Nos.: 50-361
50-362
License Nos.: NPF-10
NPF-15
9904290261 990420
~
ADOCK 05000361
0
-
-
- -
'
,
p =-
. -
L,..
Southem Califomia Edison Co.
-2-
i
Enclosure:
.,
NRC Inspection Report No. 50-361/99-04; 50-362/99-04
cc w/ enclosure:
Chairman, Board of Supervisors
'
County of San Diego
1600 Pacific Highway, Room 335
San Diego, Califomia ' 92101
Alan R. Watts, Esq.
Woodruff, Spradlin & Smart
~ 701 S. Parker St. Suite 7000
Orange, California 92868-4720
Sherwin Harris, Resource Project Manager
Public Utilities Department
City of Riverside
3900 Main Street -
Riverside, California 92522
R. W. Krieger, Vice President
Southem Califomia Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, Califomia 92674-0128
Stephen A. Woods, Senior Health Physicist
Division of Drinking Water and
Environmental Management
Nuclear Emergency Response Program
Califomia Department of Health Services
P.O. Box 942732, M/S 396
Sacramento, Califomia 94334-7320
Mr. Michael R. Olson
Sr. Energy Administrator
San Diego Gas & Electric Company
P. O. Box 1831
- San Diego, California 92112-4150
- Mr. Steve Hsu
Radiological Health Branch
State Department of Health Services
j-
P.O. Box 942732
Sacramento, California 94234
,
L
, . . . .
.
,
.
.
Southern California Edison Co.
-3-
Mayor
. City of San Clemente
100 Avenida Presidio
San Clemente, Califomia 92672
' Mr. Truman Bums \\Mr. Robert Kinosian
Califomia Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, Califomia 94102
.
I
______.________._j
. . . . . . . .
.
.
!
..
- -
APR 201999
Southem Califomia Edison Co.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-mail report to Richard Correia (RPC)
E-mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
DRS Director
MIS System
Branch Chief (DRP/E)
RIV File
Senior Project inspector (DRP/E)
Branch Chief (DRP/TSS)
DOCUMENT NAME: R:\\_SO23\\SO904RP.JAS
To rooshe copy of f::- -
f. Indioste in box: *C" = Copy without enclosures *E" = Copy with enclosures "N" = No cop f
FhV:Rl:DRP/E
SRl:DRP/E
PE:DRP/E
SRI:DRP/E
C:DRP/E
,
JGKramore% JASloan #
JFMolfi w
DLProulx Gl* LJSmith CE
046e@9
0
04/p/99
1p'
04/f 99 U
04W99 M 04#799
W
OFFICIAL RECORD COPY
,
' ' ' . _ _ _ . _ . _ _
__
_ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
________
9
,
1
..
APR 2 0 299
'
Southern California Edison Co.
-4-
E-Mail report to T. Frye (TJF)
E Mail report to D. Lange (DJL)
E Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-mail report to Richard Correia (RPC)
E mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
DRS Director
MIS System
Branch Chief (DRP/E)
RIV File
Senior Project inspector (DRP/E)
Branch Chief (DRP/TSS)
E
200000
DOCUMENT NAME: R:\\_SO23\\SO904RP.JAS
To receive copy of document, Indicate in box: 'C" = Copy without enclosures *E" = Copy with enclosures "N" = No cop r
RIV:RI:DRP/E
SRl:DRP/E
PE:DRP/E
SRI:DRP/E
C:DRP/E
_,
JGKramer.r 6 JASloan .,#
JFMelfi
w
DLProulx G W LJSmith LE
'
04/9/99
04/;/99
9-
04/d99
04/M/99 W'ai 04/>Y99
OFFICIAL RECORD COPY
. . .
_
i