Forwards Insp Repts 50-361/99-12 & 50-362/99-12 on 990808- 0918.One Violation Identified Involving Inoperability of Emergency Diesel Generator in Excess of Allowed Outage Time
ML20217J863
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/15/1999
From: Brockman K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20217J868 List:
References
50-361-99-12, 50-362-99-12, EA-99-242, NUDOCS 9910250195
Download: ML20217J863 (6)


See also: IR 05000361/1999012

Text

1

1

j

g #*% UNITED STATES

.

.p NUCLEAR REGULATORY COMMISSION

!. ,

l REGloN IV i

  • '

g, 611 RYAN PLAZA DRIVE, SUITE 400

b , , , g ARLINGTON, TEXAS 76011-8064

October 15,1999

EA 99-242

Harold B. Ray, Executive Vice President i

Southern California Edison Co.

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, California 92674-0128

SUBJECT: NRC ROUTINE INSPECTION REPORT NO. 50-361/99-12; 50-362/99-12

Dear Mr. Ray:

This refers to the inspection conducted from August 8 ;hrough September 18,1999, at the

San Onofre Nuclear Generating Station, Units 2 and 3, facility. The enclosed report presents

the results of this inspection.

1

During the 6-week period covered by this inspection, your conduct of activities at the

San Onofre facility was generally characterized by safety-conscious operation, sound

engineering and maintenance practices, and careful radiological work controls.

Based on the results of this inspection, one apparent violation was identified and is being

considered for escalated enforcement action in accordance with the " General Statement of

Policy and Procedure for NRC Enforcement Actions"(Enforcement Policy), NUREG-1600 l

(EA 99-242). The apparent violation involves the inoperability of an emergency diesel

generator in excess of its allowed outage time. You reported this information to the NRC in  ;

Licensee Event Report 362/1999-006-00. This issue is discussed in Section 08.1 of the l

enclosed inspection report (EA 99-242). The circumstances surrounding this apparent

violation, the significance of the issues, and the need for lasting and effective corrective action

were discussed with members of your staff at the inspection exit meeting on September 21,

1999 ' As a result, it may not be necessary to conduct a predecisional enforcement conference

in order to enable the NRC to make an enforcement decision.

I

In addition, since you identified the violation, and based on our understanding of your corrective

action, a civil penalty may not be warranted in accordance with Section VI.B.2 of the f

. Enforcement Policy. The final decision will be based on your confirming on the license docket /

that the corrective actions previously described to the staff have been or are being taken.

Before the NRC makes its final enforcement decision, we are providing you an opportunity to

either (1) respond to the apparent violation addressed in this inspection report within 30 days of

the date of this letter or (2) request a predecisional enforcement conference. If a conference is

held, it will be open to public observation. The NRC will also issue a press release to announce

the conference. Please contact Ms. Linda Smith at (817) 86043137 within 7 days of the date of

this letter to notify the NRC of your intended response.

9910250195 991015 "

PDR ADOCK 05000361

G PDR

L

,

.

.

L Southern California Edison Co. -2-

. Your response should be clearly marked as a " Response to An Apparent Violation in inspection

. Report No. 50 361/99-12; 50-362/99-12" and should include for the apparent violation: (1) the

reason for the apparent violation, or, if contested, the basis for disputing the apparent violation,

(2) the corrective steps that have been taken and the results achieved, (3) the corrective steps

that will be taken to avoid further violations, and (4) the date when full compliance will be

achieved. _Your response should be submitted under oath or affirmation and may reference or

include previous docketed correspondence, if the correspondence adequately addresses the

required response. If an adequate response is not received within the time specified or an

extension of time has not been granted by the NRC, the NRC will proceed with its enforcement

decision or schedule a predecisional enforcement conference,

in addition, please be advised that the number and characterization of the apparent violation (s)

described in the enclosed inspection report may change as a result of further NRC review. You

,

will be advised by separate correspondence of the results of our deliberations on this matter.

In addition, the NRC has determined that two Severity Level IV violations of NRC requirements

occurred. These violations are being treated as noncited violations, consistent with Appendix C

of the Enforcement Policy. These noncited violations are described in the subject inspection

report, if you contest the violation or severity level of these noncited violations, you should

provide a response within 30 days of the date of this inspection report, with the basis for your

denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington, DC 20555-0001, with copies to the Regional Administrator, U.S. Nuclear

l Regulatory Commission, Region IV,611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011,

! the Director, Office of Enforcement, United States Nuclear Regulatory Commission,

l Washington, DC 20555-0001; and the'NRC Resident inspector at the San Onofre Nuclear

Generating Station, Units 2 and 3, facility.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response, will be placed in the NRC Public Document Room.

Sincerely,

I

'

f [ LM -

en E. Br ny Dfrdor

Division of ReactorProjects

! Docket Nos.: 50-361

I

50-362

License Nos.: NPF-10

L NPF-15

Enclosure:

NRC Inspection Report No.

50-361/99-12;50-362/99-12

1

)

' - +

g;

t

' '

yl

,  : Southem California Edison Co. '-3- ,

, :1

( .

'

cc n/enclosurei

j Chairman, Board of Supervis6rs:

,

County of San Diego -

1600 Pacific Highway, Room 335 '

San Diego, California 192101 ,

Alan R. Watts, Esq.

Woodruff, Spradlin & Smart .,

>

"

701 S. Parker St. Suite 7000 .

Orange, California 2 92868-4720  !

' Sherwin. Harris, Resource Project Manager f

' Public Utilities Department -

.

' City of Riverside'

3900 Main Street i

- '

Riverside, California 925?2 -

]

-

--

, 4

j. R. W. Krieger, Vice President ]

Southern California Edison Company -

, . San Onofre' Nuclear Generating Station

' ' P.O. Box 128 -

? San Clemente, California 192674-0128 '

-i

Stephen A. Woods, Senior Health Physicist

Division of Drinking Water and

- Environmental Management ;

Nuclear Emergency Response Program

California Department of Health Services

P.O. Box 942732, fNS 3961

/ Sacramento, California 94234-7320 '!

!

Michael R. Olson _ l

Sr. Energy Administratur

-

San Diego Gas & Electric Company

P.O. Box 1831'

' San Diego, CaliforniaL 92112 4150

Steve' Hsu'

~ Radiological Health _ Braach

!J ,

State Department of Health Services

L ,

-

l P.O. Box 942732'-

.

Sacramento, Califomia 94234

'

,

l- i

i

't

.f -

,

'

.

!

, I

~

u_

R

m.

',

-.&.*

!;

~

l. ,. - Southern California dison Co. -4-

W -

,

b Mayor

'

, ' City of San Clemente.

'

l ..f" 100 Avenida Presidio.

San Clemente,' California 92672 '

r

iTruman Burns / Robert Kinosian-

. California' Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco,' California 94102

l'

i

l

[

.

'l

I I

'

L,

,

,. I

l I

! I

i

!

~ ,

d

.o

'

.. cci15lM

Southern California Edison Co. 5-

' E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC) .

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE14)'

bec distrib. by RIV: .

' Regional Administrator Resident inspector

DRP Director RIV File {

DRS Director RITS Coordinator

' Bianch Chief (DRP/E) j

Senior Project inspector (DRP/E) i

Branch Chief (DRP/TSS)

G. F. Sanborn, D: ACES -

K. D. Smith, RC j

R. W. Borchardt, OE, MS: 014E1 l

OE:EA File, MS: 014E1

J

DOCUMENT NAME: R:\_SO23\SO912RP.JAS .

To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Co w with enclosures "N" = No copy

RIV: SRI:DRP/E Rl:DRP/E ' RI:DRP/E D: ACES C:DRP/E i

JAStoan (T-GAP) JGKramer (T-GAP) - JJRussell (T-GAP) GFSanborn LJSmith

10/05/99* 10/05/99* 10/05/99* 10/08/99* 10/14/99*

D:DRP _ M 7

'

KEBrockman O' ,

10/\'V99 l

  • Previously Concurred OFFICIAL RECORD COPY

a

2 '0 's t 5 :-

i

.

7: ,

,

  1. .

"

OCT 151999

'

Southern California Edison Co. -5 .

'

E-Mail report to D. Lange (DJL)_

. E-Mail report to NRR Event Tracking System (IPAS) '

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia ('APC)

' E-Mail report to Frank Talbot (FXT)

<

_ bec to DCD (IE14)

bec distrib. by RIV:

Regional Administrator Resident inspector

, DRP Director RIV File l

DRS Director RITS Coordinator

l

Branch Chief (DRP/E)

Senior Project inspector (DRP/E)

Branch Chief (DRP/TSS)

'

G. F. Sanborn, D: ACES 1

K. D. Smith, RC .

.,

R. W. Borchardt, OE, MS:' 014F.1 -

OE:EA File, MS: 014E1

DOCUMENT NAME: R:\_SO23\SO912RP.JAS

To receive copy of document, indicate in box: "c" = Copy without enclosures "E" = Co)y with enclosures "N" = No copy

RIV: SRI:DRP/E RI:DRP/E RI:DRP/E D: ACES l IC:DRP/E

JASloan (T-GAP) - JGKramer (T-GAP) ..JJRussell (T-GAP) GFSanborn LJSmith

10/05/99* 10/05/99* 10/05/99* 10/08/99* 10/14/99*

D:DRP . c1

KEBrockman 9/

10/\'V99 -

  • Previously Concurred OFFICIAL RECORD COPY

r

I'

-