1
j
g
- %
UNITED STATES
.p
NUCLEAR REGULATORY COMMISSION
.
!.
l
REGloN IV
,
i
- '
, , , g
b
g,
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON, TEXAS 76011-8064
October 15,1999
EA 99-242
Harold B. Ray, Executive Vice President
i
Southern California Edison Co.
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, California 92674-0128
SUBJECT: NRC ROUTINE INSPECTION REPORT NO. 50-361/99-12; 50-362/99-12
Dear Mr. Ray:
This refers to the inspection conducted from August 8 ;hrough September 18,1999, at the
San Onofre Nuclear Generating Station, Units 2 and 3, facility. The enclosed report presents
the results of this inspection.
During the 6-week period covered by this inspection, your conduct of activities at the
San Onofre facility was generally characterized by safety-conscious operation, sound
engineering and maintenance practices, and careful radiological work controls.
Based on the results of this inspection, one apparent violation was identified and is being
considered for escalated enforcement action in accordance with the " General Statement of
Policy and Procedure for NRC Enforcement Actions"(Enforcement Policy), NUREG-1600
(EA 99-242). The apparent violation involves the inoperability of an emergency diesel
generator in excess of its allowed outage time. You reported this information to the NRC in
Licensee Event Report 362/1999-006-00. This issue is discussed in Section 08.1 of the
enclosed inspection report (EA 99-242). The circumstances surrounding this apparent
violation, the significance of the issues, and the need for lasting and effective corrective action
were discussed with members of your staff at the inspection exit meeting on September 21,
1999 ' As a result, it may not be necessary to conduct a predecisional enforcement conference
in order to enable the NRC to make an enforcement decision.
In addition, since you identified the violation, and based on our understanding of your corrective
action, a civil penalty may not be warranted in accordance with Section VI.B.2 of the
f
. Enforcement Policy. The final decision will be based on your confirming on the license docket
/
that the corrective actions previously described to the staff have been or are being taken.
Before the NRC makes its final enforcement decision, we are providing you an opportunity to
either (1) respond to the apparent violation addressed in this inspection report within 30 days of
the date of this letter or (2) request a predecisional enforcement conference. If a conference is
held, it will be open to public observation. The NRC will also issue a press release to announce
the conference. Please contact Ms. Linda Smith at (817) 86043137 within 7 days of the date of
this letter to notify the NRC of your intended response.
9910250195 991015
"
ADOCK 05000361
G
L
,
.
.
L Southern California Edison Co.
-2-
. Your response should be clearly marked as a " Response to An Apparent Violation in inspection
. Report No. 50 361/99-12; 50-362/99-12" and should include for the apparent violation: (1) the
reason for the apparent violation, or, if contested, the basis for disputing the apparent violation,
(2) the corrective steps that have been taken and the results achieved, (3) the corrective steps
that will be taken to avoid further violations, and (4) the date when full compliance will be
achieved. _Your response should be submitted under oath or affirmation and may reference or
include previous docketed correspondence, if the correspondence adequately addresses the
required response. If an adequate response is not received within the time specified or an
extension of time has not been granted by the NRC, the NRC will proceed with its enforcement
decision or schedule a predecisional enforcement conference,
in addition, please be advised that the number and characterization of the apparent violation (s)
described in the enclosed inspection report may change as a result of further NRC review. You
will be advised by separate correspondence of the results of our deliberations on this matter.
,
In addition, the NRC has determined that two Severity Level IV violations of NRC requirements
occurred. These violations are being treated as noncited violations, consistent with Appendix C
of the Enforcement Policy. These noncited violations are described in the subject inspection
report, if you contest the violation or severity level of these noncited violations, you should
provide a response within 30 days of the date of this inspection report, with the basis for your
denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, DC 20555-0001, with copies to the Regional Administrator, U.S. Nuclear
l
Regulatory Commission, Region IV,611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011,
!
the Director, Office of Enforcement, United States Nuclear Regulatory Commission,
l
Washington, DC 20555-0001; and the'NRC Resident inspector at the San Onofre Nuclear
Generating Station, Units 2 and 3, facility.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response, will be placed in the NRC Public Document Room.
Sincerely,
f
[
LM
-
I
'
en E. Br
n Dfrdor
y
Division of ReactorProjects
!
Docket Nos.: 50-361
I
50-362
License Nos.: NPF-10
L
Enclosure:
NRC Inspection Report No.
50-361/99-12;50-362/99-12
1
)
'
+
-
g;
t
yl
'
'
- Southem California Edison Co.
'-3-
,
,
, :1
(
.
'
cc n/enclosurei
j Chairman, Board of Supervis6rs:
County of San Diego -
,
1600 Pacific Highway, Room 335 '
San Diego, California 192101
,
Alan R. Watts, Esq.
- Woodruff, Spradlin & Smart
>
.,
"
701 S. Parker St. Suite 7000
.
Orange, California 2 92868-4720
!
' Sherwin. Harris, Resource Project Manager
f
' Public Utilities Department -
.
' City of Riverside'
3900 Main Street
i
-
Riverside, California 925?2 -
]
- '
,
--
4
j. R. W. Krieger, Vice President
]
Southern California Edison Company -
. San Onofre' Nuclear Generating Station
,
' P.O. Box 128 -
'
? San Clemente, California 192674-0128 '
-i
- Stephen A. Woods, Senior Health Physicist
Division of Drinking Water and
- Environmental Management ;
Nuclear Emergency Response Program
- California Department of Health Services
P.O. Box 942732, fNS 3961
/ Sacramento, California 94234-7320
'!
Michael R. Olson
_
- Sr. Energy Administratur
-
San Diego Gas & Electric Company
P.O. Box 1831'
' San Diego, CaliforniaL 92112 4150
Steve' Hsu'
~ Radiological Health _ Braach
!J
State Department of Health Services
,
L
l P.O. Box 942732'-
-
,
.
l-
'
Sacramento, Califomia 94234
i
,
i
't .f -
,
.
'
,
~
u_
Rm.
',
-.&.*
!;
l.
- Southern California dison Co.
-4-
~
,.
W
-
,
b
Mayor
'
' City of San Clemente.
,
l
..f
100 Avenida Presidio.
'
"
San Clemente,' California 92672 '
r
iTruman Burns / Robert Kinosian-
. California' Public Utilities Commission
- 505 Van Ness, Rm. 4102
San Francisco,' California 94102
l '
i
l
[
.
'l
I
I
'
L,
,
I
,.
l
I
!
I
i
!
,
~
d
.o
..
cci15lM
'
Southern California Edison Co.
5-
' E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC) .
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE14)'
bec distrib. by RIV:
.
' Regional Administrator
Resident inspector
DRP Director
RIV File
{
DRS Director
RITS Coordinator
' Bianch Chief (DRP/E)
j
Senior Project inspector (DRP/E)
i
Branch Chief (DRP/TSS)
G. F. Sanborn, D: ACES -
K. D. Smith, RC
j
R. W. Borchardt, OE, MS: 014E1
OE:EA File, MS: 014E1
J
DOCUMENT NAME: R:\\_SO23\\SO912RP.JAS
.
To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Co w with enclosures "N" = No copy
'
RIV: SRI:DRP/E
Rl:DRP/E
RI:DRP/E
D: ACES
C:DRP/E i
JAStoan (T-GAP)
JGKramer (T-GAP) -
JJRussell (T-GAP) GFSanborn
LJSmith
10/05/99*
10/05/99*
10/05/99*
10/08/99*
10/14/99*
7
D:DRP _
M
KEBrockman
O'
,
10/\\'V99
l
'
- Previously Concurred
OFFICIAL RECORD COPY
a
2 '0 's t 5 :-
i
.
7:
,
,
.
OCT 151999
"
'
Southern California Edison Co.
-5 .
'
E-Mail report to D. Lange (DJL)_
. E-Mail report to NRR Event Tracking System (IPAS)
'
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia ('APC)
' E-Mail report to Frank Talbot (FXT)
_ bec to DCD (IE14)
<
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
RIV File
l
,
l
DRS Director
RITS Coordinator
Branch Chief (DRP/E)
Senior Project inspector (DRP/E)
Branch Chief (DRP/TSS)
G. F. Sanborn, D: ACES
1
'
K. D. Smith, RC
.
.,
R. W. Borchardt, OE, MS:' 014F.1 -
OE:EA File, MS: 014E1
DOCUMENT NAME: R:\\_SO23\\SO912RP.JAS
To receive copy of document, indicate in box: "c" = Copy without enclosures "E" = Co)y with enclosures "N" = No copy
RIV: SRI:DRP/E
RI:DRP/E
RI:DRP/E
D: ACES l
IC:DRP/E
JASloan (T-GAP) -
JGKramer (T-GAP)
..JJRussell (T-GAP) GFSanborn
LJSmith
10/05/99*
10/05/99*
10/05/99*
10/08/99*
10/14/99*
D:DRP
. c1
KEBrockman
9/
10/\\'V99 -
- Previously Concurred
OFFICIAL RECORD COPY
r
I'
-