ML20195E800

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-361/99-06 & 50-362/99-06 on 990404- 0515.Violations Identified & Being Treated as Noncited Violations
ML20195E800
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/08/1999
From: Laura Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20195E806 List:
References
50-361-99-06, 50-361-99-6, 50-362-99-06, 50-362-99-6, NUDOCS 9906140104
Download: ML20195E800 (5)


See also: IR 05000361/1999006

Text

.

e

e

ef"* "'4 t UNITED STATES

y $ NUCLEAR REGULATORY COMMISSION

$ f REGloN IV

[ 611 RYAN PLAZA drive, SUITE 400

,,,,, ARLINGTON, TEXAS 760118064

JUN 8 1999

Harold B. Ray, Executive Vice President  !

Southern California Edison Co.

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, California 92674-0128

SUBJECT: NRC INSPECTION REPORT NO. 50-361/99-06; 50-362/99-06

Dear Mr. Ray:

This refers to the inspection conducted on April 4 through May 15,1999, at the San Onofre  !

Nuclear Generating Station, Units 2 and 3, facility. The enclosed report presents the results of

this inspection.

During the 6-week period covered by this inspection, your conduct of activities at the

San Onofre faciiity was gerierally characterized by safety-conscious operation, sound

engineering and maintenance practices, and careful radiological work controls.

Based on the results of this inspection, the NRC has determined that three violations of NRC

reairements occurred. These violations are being treated as noncited violations, consistent

with Appendix C of the Enforcement Policy. These noncited violations are described in the

subject inspection report. If you contest the violation or severity level of these noncited

violations, you should provide a response within 30 days of the date of this inspection report,

with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control

Desk, Washington, DC 20555-0001, with copies to the Senior Resident inspector at the facility

that is the subject of this report, the Regional Administrator, Region IV, and the Diractor, Office

of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.

,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

- $

Linda Joy Smith, Chief

Project Branch E

Division of Reactor Projects

9906140104 99060s

PDR ADOCK 05000361

O pop

... ,

.

Southern California Edison Co. -2-

Docket Nos.: 50-361

50-362

License Nos.: NPF-10

NPF-15

Enclosure:

NRC Inspection Report No.

50-361/99-06;50-362/99-06

cc w/ enclosure:

Chairman, Board of Supervisors

County of San Diego

1600 Pacific Highway, Room 335

San Diego, California 92101

Alan R. Watts, Esq.

Woodruff, Spradlin & Smart

701 S. Parker St. Suite 7000

Orange, California 92868-4720

Sherwin Harris, Resource Project Manager

Public Utilities Department

City of Riverside

3900 Main Street

Riverside, California 92522

i

R. W. Krieger, Vice President

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, Califomia 92674-0128

Stephen A. Woods, Senior Health Physicist

Division of Drinking Water and

Environmental Management

Nuclear Emergency Response Program

California Department of Health Services

P.O. Box 942732, M/S 396

. Sacramento, California 94334-7320

Mr. Michael R. Olson

Sr. Energy Administrator

San Diego Gas & Electric Company

P. O.~ Box 1831

San Diego, California 92112-4150

!'

e

l .

l.

l Southern California Edison Co. -3-

l

l

t

Mr. Steve Hsu

Radiological Health Branch

State Department of Health Serviceo q

.

P.O. Box 942732

Sacramento, California 94234

Mayor

City of San Clemente

100 Avenida Presidio

San Clemente, California 92672

Mr. Truman Burns \Mr. Robert Kinosian

California Public Utilities Commission  !

505 Van Ness, Rm. 4102 l

San Francisco, Ca!ifomia 94102

..

i

i

,

c.

..

JUN 8 1999

.-

Southern California Edison Co. -4

E-Mail report to T. Frye (TJF)

,- E-Mail report to D. Lange (DJL)

l E-Mail report to NRR Evsnt Tracking System (IPAS)

E Mail report to Document Control Desk (DOCDESK)

_

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT) -

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator Resident inspector

l DRP Director- DRS-PSB

'

DRS Director MIS System

Branch Chief (DRP/E) RIV File

Senior Project inspector (DRP/E)

l Branch Chief (DRP/TSS)

l

!

4

1

DOCUMENT NAME: R:\_SO23\SO906RP.JAS

To receive copy of document, indicato in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy

RIV:SRl;DFM/E RI:DRP/En t0 RI:DRP/F, 3 SPE:DFF/En C:DRP/E

JASloan'D% JGKramed JJRusselEM GAPiclM ~

LJSrnith (%3

S V

6/'[ /99 -

S 6/ t /99 6/4 /99 6/ i /99 6/ 3 /99

.

OFFICIAL RECORD COPY.

L

L

e '

i

JUtl 8 1999

4

'

Southern California Edison Co. -4-

E Mail report to T. Frye (TJF)  !

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS) l

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

' E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV: ,

'

Regional Administrator Resident inspector

DRP Director - DRS-PSB

DRS Director MIS System i

Branch Chief (DRP/E) RIV File

Senior Project inspector (DRP/E) ,

!

Branch Chief (DRP/TSS)

I

_

f

DOCUMENT NAME: R:\_SO23\SO906RP.JAS

To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV: SRI @,RR/E Rl:DRP/Ed.0 RI:DRP/F, ,3 SPE:DRP/E/ '

C:DRP/E

JASloanUAh JGKramed JJRussel@ GAPick/TR ~

LJSinith C&S

\, k *

6/ f /99 6/ 4 /99 6/ h /99 6/ 4 /99 6/% /99

OFFICIAL RECORD COPY

i

3 DOI 3!

!

L