ML20195E800
| ML20195E800 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 06/08/1999 |
| From: | Laura Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Ray H SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20195E806 | List: |
| References | |
| 50-361-99-06, 50-361-99-6, 50-362-99-06, 50-362-99-6, NUDOCS 9906140104 | |
| Download: ML20195E800 (5) | |
See also: IR 05000361/1999006
Text
.
e
e
ef"* "'4t
UNITED STATES
y
$
NUCLEAR REGULATORY COMMISSION
$
f
REGloN IV
[
611 RYAN PLAZA drive, SUITE 400
ARLINGTON, TEXAS 760118064
,,,,,
JUN
8 1999
Harold B. Ray, Executive Vice President
Southern California Edison Co.
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, California 92674-0128
SUBJECT: NRC INSPECTION REPORT NO. 50-361/99-06; 50-362/99-06
Dear Mr. Ray:
This refers to the inspection conducted on April 4 through May 15,1999, at the San Onofre
Nuclear Generating Station, Units 2 and 3, facility. The enclosed report presents the results of
this inspection.
During the 6-week period covered by this inspection, your conduct of activities at the
San Onofre faciiity was gerierally characterized by safety-conscious operation, sound
engineering and maintenance practices, and careful radiological work controls.
Based on the results of this inspection, the NRC has determined that three violations of NRC
reairements occurred. These violations are being treated as noncited violations, consistent
with Appendix C of the Enforcement Policy. These noncited violations are described in the
subject inspection report. If you contest the violation or severity level of these noncited
violations, you should provide a response within 30 days of the date of this inspection report,
with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control
Desk, Washington, DC 20555-0001, with copies to the Senior Resident inspector at the facility
that is the subject of this report, the Regional Administrator, Region IV, and the Diractor, Office
of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.
,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
-
$
Linda Joy Smith, Chief
Project Branch E
Division of Reactor Projects
9906140104 99060s
ADOCK 05000361
O
pop
. . .
,
.
Southern California Edison Co.
-2-
Docket Nos.: 50-361
50-362
License Nos.: NPF-10
NPF-15
Enclosure:
NRC Inspection Report No.
50-361/99-06;50-362/99-06
cc w/ enclosure:
Chairman, Board of Supervisors
County of San Diego
1600 Pacific Highway, Room 335
San Diego, California 92101
Alan R. Watts, Esq.
Woodruff, Spradlin & Smart
701 S. Parker St. Suite 7000
Orange, California 92868-4720
Sherwin Harris, Resource Project Manager
Public Utilities Department
City of Riverside
3900 Main Street
Riverside, California 92522
i
R. W. Krieger, Vice President
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, Califomia 92674-0128
Stephen A. Woods, Senior Health Physicist
Division of Drinking Water and
Environmental Management
Nuclear Emergency Response Program
California Department of Health Services
P.O. Box 942732, M/S 396
. Sacramento, California 94334-7320
Mr. Michael R. Olson
Sr. Energy Administrator
San Diego Gas & Electric Company
P. O.~ Box 1831
San Diego, California 92112-4150
!'
e
l
.
l.
l
Southern California Edison Co.
-3-
l
l
t
Mr. Steve Hsu
Radiological Health Branch
State Department of Health Serviceo
q
.
P.O. Box 942732
Sacramento, California 94234
Mayor
City of San Clemente
100 Avenida Presidio
San Clemente, California 92672
Mr. Truman Burns \\Mr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, Ca!ifomia 94102
..
i
i
,
c.
..
JUN
8 1999
.-
Southern California Edison Co.
-4
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
,-
l
E-Mail report to NRR Evsnt Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
_
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT) -
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
l
DRP Director-
DRS-PSB
'
DRS Director
MIS System
Branch Chief (DRP/E)
RIV File
Senior Project inspector (DRP/E)
l
Branch Chief (DRP/TSS)
l
!
4
1
DOCUMENT NAME: R:\\_SO23\\SO906RP.JAS
To receive copy of document, indicato in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy
RIV:SRl;DFM/E
RI:DRP/En t0
RI:DRP/F, 3
SPE:DFF/En
C:DRP/E
JASloan'D%
JGKramed
JJRusselEM GAPiclM
LJSrnith (%3
6/'[ /99 -
S
6/ t /99
6/4 /99
S
V
6/ i /99
6/ 3 /99
~
.
OFFICIAL RECORD COPY.
L
L
e
'
i
JUtl
8 1999
4
'
Southern California Edison Co.
-4-
E Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
' E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
,
'
Regional Administrator
Resident inspector
DRP Director -
DRS-PSB
DRS Director
MIS System
i
Branch Chief (DRP/E)
RIV File
Senior Project inspector (DRP/E)
,
Branch Chief (DRP/TSS)
_
f
DOCUMENT NAME: R:\\_SO23\\SO906RP.JAS
To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV: SRI @,RR/E
Rl:DRP/Ed.0
RI:DRP/F, ,3
SPE:DRP/E/
C:DRP/E
'
JASloanUAh
JGKramed
JJRussel@
GAPick/TR
LJSinith C&S
6/ 4 /99
6/% /99
~
k
6/ f /99
\\,
6/ 4 /99
6/ h /99
OFFICIAL RECORD COPY
3 DOI 3!
i
!
L