Report No.:
" '50-206/86-27
,-
,
. <
iDocket No.:
50-206 License No. DPR-13
'
Licensee:
Southern California Edison _ Company
~ P. 0.. Box <800,.2244 Walnut Grove Avenue Rosemead,, California 91770 Facility.Name: San,0nofre Unit 1
'
Location:
San Onofre< Site
- San Clemente, California Conference conducted: May 22, 1986
-
.
Prepared by:
3 86~
P.H./fhnson, Chief Date Signed React 4t Projects Section 3 Approved by:
A 3 !8k P. H ohnson, Chief Date Signed Reac r Projects Section 3 Summary:
Enforcement Conference on May 22, 1986 (Report No. 50-206/86-27)
The following matters were ' discussed:
.i 1.
NRC concerns regarding the loss of power and water hammer event' which e
occurred at San Onofre Unit 1 on November'21, 1985.
2.
Licensee corrective actions.
3.
This conference was' conducted within the scope of Inspection'Prccedure_30702.
i
,
e
"
8606190146 860530
{DR ADOCK 05000206 PDR
.
$
,
!
.
,~
n ENFORCEMENT CONFERENCE-i 1.
Conference Attendees
,
Southern California Edison Company (SCE)'
D. J. Fogarty, Executive Vice President _
,
Dr. L. T. Papay,zSenior Vice President H. B. Ray, Vice President, Site Manager
.
K. P. Baskin, Vice President,. Nuclear Engineering, Safety and Licensing-H. E. Morgan, Station Manager J. M. Curran, Quality Assurance Manager M. A. Wharton, Deputy Station Manager D. E. Nunn, Project Manager J.~L. Reeder,' Unit 1 Operations Superintendent D. E. Schull, Station Maintenance Manager San Diego Gas and Electric Company S. B. Allman, Manager, Nuclear
.
t
'
NRC Region V f
J. B. Martin, Regional Administrator A. E. Chaffee, Deputy Director, Division of Reactor Safety and Projects A. D. Johnson, Enforcement Officer P. H. Johnson, Chief, Reactor Projects Section 3, F. R. Huey, Senior Resident Inspector
'
J. P. Stewart, Resident Inspector A. D'Angelo, Resident Inspector J. E. Tatum, Resident. Inspector
R. C.-Tang,_ Resident Inspector 2.
Conference Summary The enforcement conference convened at 1:00 p.m. in the licensee's conference room at the San Onofre Site.
Mr. Martin made opening remarks-and discussed the~ purpose of the conference.
Mr. Huey then. discussed the' findings of the special inspection, involving the : loss of power'and water hammer event which occurred at San Onofre 1 on November. 21,:1985. Specific, concerns.were discussed, as identified in NRC Inspection Report 50-206/86-07. Three' apparent violations of NRC requirements were identified.
<
With regard to'the apparent violation involving the paralleling of auxiliary transformers, Mr. Baskin.'"sponded that SCE was committed -to the
_
,
improvement = of ' procedures to providt enhanced guidance to plant operators, i
although SCE contends that the exist,ng procedure was appropriate and did not violate NRC requirements. He'added that, from an electrical
'
,
i
'
._
V:
_
'
. "
,,
<
engineering standpoint, SCE believes nothing i-inherently wrong with parallel bus operation, and that operation in parallel did not contribute
- to failure.of the feeder cable.
Mr. Martin then asked and confirmed with licensee representatives that SCE
'would provide, early in the.following week, a written response addressing their evaluation of the paralleling of transformers.
,
In response to a question from Mr. A. Johnson, licensee representatives stated'that they had no questions'regarding the NRC. enforcement policy provided in 10 CFR 2, Appendix C.
Following additional discussion, Mr. Martin presented concluding remarks, and the conference adjourned at 1:20'p.m.
,