March 2, 2007
SUBJECT:
ANNUAL ASSESSMENT LETTER - SAN ONOFRE NUCLEAR GENERATING STATION - (NRC INSPECTION REPORT 05000361 /2007001, 05000362/2007001)
Dear Mr. Rosenblum:
On February 7, 2007, the NRC staff completed its performance review of the San Onofre Nuclear Generating Station, Units 2 and 3. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the physical protection review and resultant inspection plan.
Overall, San Onofre Nuclear Generating Station, Units 2 and 3, operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green).
Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. In addition to baseline inspections, we plan to conduct Temporary Instruction 251 511 66, Pressurized Water Reactor Containment Blockage, in Unit 2.
The enclosed inspection plan details the inspections, except those related to physical protection, scheduled through September 30, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review.
Southern California Edison Company
- 2 -
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/reading-rm/adams. html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8250 with any questions you may have regarding this letter or the inspection plan.
Since re 1 y,
Rebecca Nease, Chief Project Branch D Division of Reactor Projects Dockets: 50-361 Licenses: NPF-I 0 50-362 NPF-15 Enclosure:
San Onofre Inspection/Activity Plan cc w/enclosure:
Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, CA 92101 Gary L. Nolff Assistant Director-Resources City of Riverside 3900 Main Street Riverside, CA 92522 Mark L. Parsons Deputy City Attorney City of Riverside 3900 Main Street Riverside, CA 92522 Ray W. Waldo Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-01 28 David Spath, Chief Division of Drinking Water and Environmental Management California Department of Health Services P.O. Box 942732 Sacramento, CA 94234-7320 Michael R. Olson San Onofre Liaison San Diego Gas & Electric Company 8315 Century Park Ct. CP21G San Diego, CA 921 23-1 548
Southern California Edison Company
- 3 -
Director, Radiological Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-741 4 Mayor City of San Clemente 100 Avenida Presidio San Clemente, CA 92672 James D. Boyd, Commissioner California Energy Commission 151 6 Ninth Street (MS 34)
Sacramento, CA 9581 4 Douglas K. Porter, Esq.
Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 James T. Reilly Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-01 28 Daniel P. Breig Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-01 28 A. Edward Scherer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-01 28 Brian Katz Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-01 28 Chief, Radiological Emergency Oakland Field Office Chemical and Nuclear Preparedness Department of Homeland Security 11 11 Broadway, Suite 1200 Oakland, CA 94607-4052 Preparedness Section and Protection Division Walter F. Ekard Chief Administrative Officer San Diego County 1600 Pacific Coast Highway, Suite 209 San Diego, CA 92101 The Honorable David M. Swerdlin, Mayor City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 David Adams, City Manager City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 The Honorable Wayne Eggleston, Mayor City of San Clemente 100 Avenida Presidio San Clemente, CA 92672 George Scarbrough, City Manager City of San Clemente 100 Avenida Presidio San Clemente, CA 92672 The Honorable Lara Anderson, Mayor City of Dana Point 33282 Golden Lantern, Suite 203 Dana Point, CA 92629 Doug Chotkevys, City Manager City of Dana Point 33282 Golden Lantern, Suite 203 Dana Point, CA 92629
Southern California Edison Company
- 4 -
Mike Rose, Emergency Services Coordinator City of Dana Point 33282 Golden Lantern, Suite 203 Dana Point, CA 92629 Karen E. Armes, Acting Regional Director Federal Emergency Management 11 11 Broadway, Suite 1200 Oakland, CA 94607-4052 Agency, Region IX Penny Leinwander, Senior Health Physicist Department of Health Services Environmental Management Branch 161 6 Capitol Avenue, MS 7405 Sacramento, CA 95899-741 3 Benjamin Tong, Manager Radiological Preparedness Unit Governors Office of Emergency Services 3650 Schriever Avenue Mather, CA 95655 Michele Skiermont Radiological Coordinator Governors Office of Emergency Services Radiological Preparedness Unit 3650 Schriever Avenue Mather, CA 95655 Susan Asturias, Sr. Emergency Services Coordinator San Diego County Off ice of Emergency Services 5555 Overland Avenue San Diego, CA 92123 Denise Bundy Senior Program Coordinator Orange County Sheriffs Department/
Emergency Management Bureau 2644 Santiago Canyon Road Silverado, CA 92676-971 9 Jim Russell, Emergency Planning Officer City of San Clemente 91 0 Calle Negocio, Suite 100 San Clemente, CA 92673 Ziad Mazboudi, Senior Civil Engineer City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675-3679 Richard Rozzelle, District Superindent Orange Coast District California Department of Parks & Recreation 3030 Avenida Del Presidente San Clemente, CA 92672 Steve Long, Chief Ranger Orange Coast District California Department of Parks & Recreation 3030 Avenida Del Presidente San Clemente, CA 92672 Terre Duensing, Emergency Manager Orange County Sheriffs Department Emergency Management Bureau 2644 Santiago Canyon Road Silverado, CA 92676 Lynne Seabloom Emergency Preparedness Coordinator Oceanside Fire Department 300 N. Coast Highway Oceanside, CA 92054 Joe Cramer Deputy Assistant Chief of Staff Operations and Training Marine Corps Base P.O. Box 555021 Camp Pendleton, CA 92055-5021 Patricia Gentry, REHS Program Manager Environmental Health County of Orange 1241 E. Dyer Road, Suite 120 Santa Ana, CA 92705
Southern California Edison Company
- 5 -
Jan Sener Crime Prevention Orange County Sheriffs Department 100 Avenida Presidio San Clemente, CA 92672 Institute of Nuclear Power Operations (INPO)
Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339
~
m C
0 a,
a m
C a,
C a,
m m
._
c
-
.- -
m b
0 N
m m
b
0 0)
m
.
?!
?!
T-.
~
C
0 a,
a m
C m
C a,
m m
._
c
-
.- -
m b
0 N.
T-b
0 W
?!
?!
T-T-
m C
0 a,
a m
C m
C a,
m m
.-
c
-
._
_
m m
?!
0 m
N In 0.
m
0 cu.
?!.
In
m m
m
C C
C
0
C u c U m a a a m
m m
C C
C
.P.P.P c
c c
-
-
_
.
( o m C
C
0
a l a,
a n m
m
C C
m a,
C C
a, a,
.P.o c
c
- -
.-.-
_ _
3 3 m m b
b
0
0
3 %
3 s
$!$
$ S
0
b b
0
0
0
m m
C C
0
a l a,
a n m
m
C C
m a,
m a,
( o m a
m
.P.o
+
e
- -
.E.E
- -
m m
b b
0
0
?!?!
P P
& &
0
b b
0
0
?!?!
z z 5 %
0
m m
m m
C C
C C
.o e 2.g.g
0
0
c u m m a,
a a a a m
m m
m
C C
C C
a, a, a, a,
m a c u a,
m m
m m
m m
m m
- - - -
.r.E.r.E m m m m
_ _ _ _
m a
a
,
.-
C C
C
.-.-
m o
a
,
m m
m
m m
m
- - -
m m
m
b b
b
0
0
$ $ $
8 0 0 m
h h
0
m m m c n w a a a
0
0
0
0
e N C U C U m
m m
m
0
0
0
0
s p s T - T -
a a z a
0
0
r cu W
d r J c9 c
c u
r
c c
L m
m m
C m-c
C m
h
C m
a
m a,
C a,
>
.-
c E
s W -
I?
c C
3 m
a
m c
._
c F
._
B c
E m
C
.-
c c
z c
+
C a,
W E
C
m
c
.-
c
._
& >
L c
._
B U
C -
z m _
I?
e C S U
C m
ln-4-
(0 F-1 4:
t-z-1 4:
t-z I-z Q
J n.
I-
=
m C
C a,
.-
.-
L t
C
0 a,
._
c c
I?
n
.-
u.
cri m
a, C
m 6 L
L
e m C
C C
m
._
h N
_
I?
c C
t z
_ 2
0 m a
0
.-
c a,
C m
E a,
CL W
U J
2 I-a
w a-0 C
m m
m a,
2 d
a P
ii i=
d I-
0
0 d
n.
W I
T-In T-K 5 a s I
0 $ 6 8 a x ?
n.
IT N z 2 a
T-b
P a
T-T-
b N
T-T-
T-T-
b a
N z 2 a
T-b T-
N b
T-T-
T-a N
N b
T-T-
T-a N
P a
T-T-
b T-T-O
a T-b -
T-
P a
T-T-
b (51-3 m
N 2 (51-3 m
N 2 T-z a
T-b N
N N
N N
N
N N
N
N N
N N
N N
N
N N
N
N N
N N
N
m m
C C
0
m a,
a a o
m
C C
a a,
.o.P c
c
_ -
.E.r
_ -
$ X m m m
m
a m
0
0
2 %
c 9 m
o
O T -
m m
0
0
-
N
0
$ 2 5 5 m
m m
m
C K
C C
0
0
m a, a, a,
R a
Q Q
m m
m m
C C
C C
C u c u c u a,
C C
C C
m a, a, a,
m m
m m
m m
m m
.P.e.g.g c
c
- - - -
.-.-.-
t-
- - - -
m m m m m
m m
m
0
0
0
0
8 0 0 0 m a & &
m m
m m
9 3 3 2 8 0 0 0 m a & &
0
0
0
0
0 0 0 0 2 N N N
0
0
m m
m m
m m
m m
C C
C C
C C
C C
0
0
0
0
a, a, a, a l a, a,
m a,
R Q Q Q a a Q Q
m m
K C
m m
m m
m m
C C
C C
C C
_ _
a, a, a, a, a, a,
o a r
.g.g.g.g.g.g
.g.g
- - - - - -
.E.E.E.c.E.r
.r - -
.r c
D c
U t
u
5
O a,
m m m m m m m m m
m m
m m
m
m m
_ _ _
m m
m m
m m
o m
m m
m c
d m
m
a m
0
0
0
0
0
0
0
0
0
0
0
0
m m
m m
m m
m m
0
0
0
0
0
0
0
0
Y Y
T--
N O
0
0
0
0
.
m z 3 z z z 5 2 0)
c E
R
m (0 a,
.- I!
m E
E P
a C
0 a,
a m
C
a,
m
.-
c
-
m
.I-O K
3
m a,
a:
.-
c
-
.I-
c
3
fJ3 a,
a:
.-
Y -
c E
R
a,
c m
.E?
a a,
C
m a 0 r m
.-
c
.-._
a c
0,
a, C
a, c
0.
.-
n c
s
C
.-
e
._ 8 c
z c
U C
m c
.-
c
.- 8 c
C a,
c
2 W
(\\I
a w
m
a w
0 a
w I
I m
m
0
P P P
.
.
.
-
K K Z 2 a a a W
N N C U C U N N N
N
N N
N N
N N
m m
m
C C
C
0
a m
a
,
Q Q R m
m m
C C
C
.g.g.g
- - -
a, a, a,
a a a,
m m
m
m m
m
.E.E.E m
m m
_ _ _
m m
m
r c u c u m a 3
0
0
$ $ ! $
0
m m
C C
0
a, a,
m m
C C
m a,
C C
a, a,
m m
m m
.g g n a
- -
.-.-
- -
m m
m m
0
0
c u c u S $
$ 2 2:
$ S
0
m m
0
0
0
(D m
I I
m m
m
C C
C
0
m c u a,
R R
Q
m m
m
K C
C
.e.P.o c
c c
- - -
a, a, ( L I C u a l a,
m m
m
m m
m
.E.E.E
_ - -
m m
m
m m
m
0
0
$!$!$!
0
0
2 2 2 0)
C
0 a,
m C
a, C
a, m
m
._
c n
-
.- -
m m
c!
0
m cn
m
0 cu *.
Q m
F c-
C m
m C
m m
a,
._
e a
[II
.- 8 s
-
._
a, c
cr
U m
oc
.-
m a,
E z j nZ.
.-.:
-
a n
0
z z m
m
0
0
c ! c !
? a a a c
c r
2 %
0
m m
0
0
AI S &
0
i I
m m
C C
0
a l a,
m m
C C
m a,
a l a,
m m
m m
.P.o n n 4 - 4 -
- -
.E-
.E m
m
m m
- -
0
0
$ 2 2 s
$ 2 5 %
-
m m
0
0
0
m
-
E II)
a c
C
0
0 oc U
C m
C m
c C
a,
.-
c -
._
c
.-
e
m -
E a
e a
L
C
3
.-
c
-
s:
d U
K m
K
.-
c
._
c C
a, e
m m
m
m m
m m
m m
m m
m m
Southern California Edison Company
- 6 -
Electronic distribution by RIV:
Regional Administrator (BSMI)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJCI)
Senior Resident Inspector (CCOI)
Branch Chief, DRPID (RLNI)
Senior Project Engineer, DRP/D (GEW)
Team Leader, DRPlTSS (FLB2)
RlTS Coordinator (MSH3)
V. Dricks, PA0 (VLD)
W. Maier, RSLO (WAM)
L. Owen, RA Secretary (LAO)
DRS Branch Chiefs (WBJ, ATG, LJS, MPSI)
C. Miller, Chief, TRPS, OED0 (CGM)
S. Richards, Deputy Director, DIRS, NRR (SAR)
J. Lubinski, Deputy Director, DORL, NRR (JWL)
C. Haney, Director, DORL, NRR (CXH)
D. Terao, Chief, PLB IV, DORL, NRR (DXT)
N. Kalyanam, NRR Project Manager (NXK)
RidsNrrDirslpab@,nrc.aov ROPreports@nrc.gov SUNS Review Completed: -RLN-ADAMS: yes Cl No initials: -RLN ix Publicly Available 0 Non-Publicly Available 0 Sensitive ix Non-Sensitive 11 RLNease:df I DDChamberlain I ATHowell Iii ~
I RLNease 11 2/23/07 12/26/07 12/24/07 13/2/07 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax