Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3
ML20217E322
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/13/1999
From: Scherer A
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217E325 List:
References
NUDOCS 9910190168
Download: ML20217E322 (2)


Text

!

pyhmitmMim A. Mmd Sdar

.e j EDISON  : b mm l An mimv nnumnaur~ c-cony l

October 13,1999 U. S. Nuclear Regulatory Commission -

Document Control Desk Washington, D C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for September 1999 San Onofre Nuclear Generating Station, Units 2 and 3 N

Gentlemen:

Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires '

Southern California Edison to provide.a Monthly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for each unit. Attachments 1 and 2 provide the subject Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to pressurizer safety valves for either Unit 2 or 3.

If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.

Sincerely, i f7 t

Attachments 1 & 2 -

[

cc: E. W. Merschoff, Regional Administrator, NRC Region IV L. Raghavan, NRC Project Manager, San Onofre Units 2 & 3 J. A. Sloan, NRC Senior Resident inspector, San Onofre Unit 2 & 3 <

9910190168 991013 '

PDR ADOCK 05000361 R PDR P. O. Ika 128 San Clemate. CA 92674 0128 9494 68-7501 Fax 949 368-7575

i t

l l

.i Attachment 1 NRC Monthly Operating Report, September 1999 San Onofre Nuclear Generating Station, Unit 2

..