ML20209F568
| ML20209F568 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 07/09/1999 |
| From: | Laura Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Ray H SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20209F572 | List: |
| References | |
| 50-361-99-08, 50-361-99-8, 50-362-99-08, 50-362-99-8, NUDOCS 9907160066 | |
| Download: ML20209F568 (5) | |
See also: IR 05000361/1999008
Text
i
t
.
'
- "'%g .
UNITED STATES
p
g
NUCLEAR REGULATORY COMMISSION
.
$
l
l
REGloN IV
r
611 RYAN PLAZA DRIVE, sulTE 400
ARLINGTON, TEXAS 76011-8064
,,g
JUL - 9 "
Harold B. Ray, Executive Vice President
Southern California Edison Co.
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, California 92674-0128
SUBJECT: NRC ROUTINE INSPECTION REPORT 50-361/99-08; 50-362/99-08
Dear Mr. Ray:
This refers to the inspection conducted on May 16 through June 26,1999, at the San Onofre
Nuclear Generating Station, Units 2 and 3, facility. The enclosed report presents the results of
this inspection,
During the 6-week peried covered by this it.spection, your conduct of activities at the
San Onofre facilities was generally characterized by safety-conscious operation, sound
engineering and maintenance practices, and careful radiological work controls.
Based on the results of this inspection, the NRC has determined that one violation of NRC
requirements occurred. This violation is being treated as a noncited violation, consistent with
Appendix C of the Enforcement Policy. This noncited violation is described in the subject
inspection report. If you contest the violation or severity level of this noncited violation, you
should provide a response within 30 days of the date of this inspection report, with the basis for
j
your denial, to the Nuclear Regulatory Commission, ATTN Document Control Desk,
Washington, DC 20555-0001, with copies to the Regional Administrator, U.S. Nuclear
Regulatory Commission, Region IV,611 Ryan Plaza Drive, Suite 400, Arlington, TX 76011, the
Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001; and the NRC Resident inspector at the San Onofre facility.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response, if requested, will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
h-
'
,
Linda Joy Smit , Chief
Project Branch E
Division of Reactor Projects
9907160066 990709
gDR
ADOCK 05000361
p
- ...
. :-
< Southern California Edison Co.
-2-
L
Docket Nos.: 50-361
50-362-
License Nos.: NPF-10
NPF-15
j
Enclosure:
NRC Inspection Report No.
50-361/99-08; 50-362/99-08'
cc w/ enclosure:
R. W. Krieger, Vice President
Southern California Edison Company
San Onofre Nuclear Generating Station
- P. O. Box 128
San Clemente, California 92674-0128
Mr. Michael R. Olson
Sr. Energy Administrator
San Diego Gas & Electric Company
P. O. Box 1831
1
San Diego, California 92112-4150
)
Mayor
. City of San Clemente
100 Avenida Presidio
San Clemente, California 92672
Chairman, Board of Supervisors
County of San Diego
1600 Pacific Highway, Room 335
San Diego, California 92101
i
Mr. Steve Hsu
Radiological Health Branch
State Department of Health Services
P. O. Box 942732
Sacramento, California 94234
j
Stephen A. Woods, Senior Health Physicist
Division oi Drinking Water and
'
Environmental Management
Nuclear Emergency Response Program
California Department of Health Servicec
j
l
P.O. Box 942732, M/S 396
l
Sacramento, California 94334-7320
l.
i
'
F.:.
g-
!
'
.
Southern California Edison Co.
-3-
l
Mr. Truman Burns \\Mr. Robert Kinoslan
l
California Public Utilities Commission
!
l
505 Van Ness, Rm. 4102
I
San Francisco, California 94102
i
,
l
1
l
l
i
L
- .
I
l
l
-
i
r
\\
-
JUL - 91999
.
Southern California Edison Co.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
!
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
DRS Director
MIS System
Branch Chief (DRP/E)
RIV File
Senior Project inspector (DRP/E)
Branch Chief (DRP/TSS)
l
!
DOCUMENT NAME: R:\\_SO23\\00908RP.JAS
i
To receive copy of document, Indicate in box: 'C' = Copy without enclosures *E' = Copy with enclosures 'N' = No cop'r
RIV:SRl:DRP/E
RI:DRP/E, n
Rl:DRP/E
PE:DRP/E
C:DRP/E
n
JASloanM fQ
JG.Kram@R JJRusseM GAPickW
LJSmith d3
PAGoldberh
I
7/7/99
'
74/99 LC
7A,/99 fM 7$99
7/f/99
7499
V 'i
f-
OFFICIAL RECORD COPY
I y
Southern California Edison Co.
-4-
l
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
l
E-Mail report to NRR Event Tracking System (IPAS)
l
E-Mail report to Document Control Desk (DOCDESK)
,
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
.
I
'
bec to DCD (IE01)
.
bec distrib. by RIV:
Regional Administrator
Resident inspector
i
DRP Director
DRS-PSB
j
DRS Director
MIS System
'
Branch Chief (DRP/E)
RIV File
Senior Project inspector (DRP/E)
]
Branch Chief (DRP/TSS)
'
!
'
j
,
i
i
/
I
l
?
i
i
DOCUMENT NAME: R:\\_SO23\\SO908RP.JAS
i-
To receive e,opy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:SRl:DRP/E
RI:DRP/E, n
RI:DRP/E
PE:DRP/E
C:DRP/E l
n
JASloanM fM
JG_Kramd% JJRusseM GAPickW
LJSmith 63
PAGoldberkt i
!
7/7/99
74/99 1 '
74/99 e,li 7$99
7/ f/99
7/ff99
V
~
'
OFFICIAL RECORD COPY
.G000.9
l
!