Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements,For Songs,Unit 3.Rept Covers 970916 Through 990509,date Unit 3 Returned to Service Following Cycle 10 Refueling Outage
ML20210L231
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 08/05/1999
From: Scherer A
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20210L236 List:
References
NUDOCS 9908090069
Download: ML20210L231 (2)


Text

_ . ___

.,[ftft=d 500iHERN CALIFORNIA A. Edward Scherer EDISON An i.DISON IYlfRNATIONAL* Company ,

ML-m P

August 05,1999 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Docket No. 50-361 Owner's Report of Inservice Inspection, Form NIS-1 San Onofre Nuclear Generating Station, Unit 3

Reference:

American Society of Mechanical Engineers (ASME)

Boiler and Pressure Vessel Code (ASME B&PVC), Section XI: 1989 Edition: no Addenda; second inspection interval Gentlemen:

In accordance with 10CFR50.55(a)(g) and ASME B&PVC,Section XI, Article IWA-6000, this letter submits the Inservice inspection (ISI) Summary Report, including the Owner's Reports of Repairs and Replacements, for San Onofre Nuclear Generating Station, Unit 3.

This report covers the period from September 16,1997, through May 09,1999, the date Unit 3 retumed to service following its cycle 10 refueling outage. If you have any questions or require additional information, please advise.

Sincerely, 9900090069 990005 e PDR ADOCK 05000361 0 PDR l

Attachment /

cc: (see attached list)

Oh o9ooki P. O. Box 128 San Clemente. CA 92674-0128 949-368-7501 Fax 949-368-75'75

F p

Document Control Desk . August 05,1999 ;

! ~ Owner's Report of Inservice Inspection, Form NIS-1 '

l cc: E. W. Merschoff, Regional Administrator, NRC Region IV A. T. Howell, Ill, Director, Division of Reactor Safety, NRC Region IV J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 3 l L. Raghavan, NRC Project Manager, San Onofre Units 2 and 3 '

Gerald Quinn, Senior Safety Engineer Division of Occupational Safety and Health, Pressure Vessel Unit 2100 E. Katella Ave.

Anaheim, CA 92806-6040 w/o Attachment J. LeMire, Principal Safety Engineer, Division of Occupational Safety and Health, Pressure Vessel Unit 1515 Clay St. Suite 1302 Oakland, CA 94612 i

l l

l

F

, #373- ..

r SOUTHERN CALIFORNIA

EDISO%

An EDISONINTERNA770N4L Company SAN ONOFRE NUCLEAR GENERATING STATION UNIT-3 INSERVICEINSPECTION

SUMMARY

REPORT 2nd INTERVAL, 2"d PERIOD CYCLE-10 REFUELING OUTAGE U3C10 SITE TECHNICAL SERVICES