Responds to Ltr Which Identified Several Inaccuracies within NRC Insp Repts 50-361/98-18 & 50-362/98-18.Forwards Revised Pages for page-by-page Replacement in Insp Repts
ML20207E652
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/02/1999
From: Laura Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20207E658 List:
References
50-361-98-18, 50-362-98-18, EA-98-563, NUDOCS 9906070096
Download: ML20207E652 (4)


See also: IR 05000361/1998018

Text

e *

,

  1. ""% UNITED STATES

.:' - NUCLEAR REGULATORY COMMISSION

I E

E y REGION IV

l

8 611 RYAN PLAZA drive, sulTE 400

,,,g ARLINGTON, TEXAS 76011-8064

JUN - 21999

EA 98-563

.

Harold B. Ray, Executive Vice President-

Southern California Edison Co.

San Onofre Nuclear Generating Station

P. O. Box 128

San Clemente, California 92674-0128

SUBJECT: CORRECTIONS TO NRC SPECIAL INSPECTION REPORT 50-361; 362/98-18

This letter responds to your letter dated February 16,1999, in which you identified several

inaccuracies within NRC inspection Report 50-361; 362/98-18. Those comments with which we

agree are incorporated into revised pages of NRC Inspection Report 50-361; 362/98-18, which

are enclosed with this letter. Please make a page-by-page replacement of the enclosed pages

with those in the subject inspection report. Those comments with which we disagree are

discussed below.

In the attachment to your letter, in reference to both the Executive Summary and

Section 08.1.b.3, you stated "The September Emergency Chiller inoperability was from

September 4,1998 rather than September 3,1998 as stated. (Please note: Section 08.1.b.1

, states correctly that the inoperability was from September 4,1998)." We disagree with this ,

statement because on September 3,1998, the chiller low temperature cutout switch was

'

inadvertently miswired, which rendered the emergency chiller inoperable. The reference to

September 3,1998, denoted the date of the error. The reference to September 4,1998,

denoted the date that the emergency chiller was declared inoperable by Operations but, in fact,

was already inoperable,

in reference to the second paragraph of Section E8.1.b.1 you stated the following: j

-The first sentence of the paragraph describes the requirements for the use of a

nonconformance report (NCR) to accept a condition "as-is" and justify that the

configuration continues to satisfy design requirements. The paragraph goes on

to say that utilization of an NCR [rather than an Operability Assessment (OA)) in I,'

principle, would have caused increased engineering attention to the design of the ,

chiller and the effect of the degradation on the chiller. SCE does not disagree

with the assertion that an NCR in principle would have received increased ';

attention, however, based on the conditions described in the Action Request i

(AR) and the actions outlined in the initial Field Support assignment of the AR,

SCE believes an OA was the appropriate mechanism to evaluate the condition.

The initial Field Support assignment indicated that there was a need to have the

HVAC group investigate the thermostat setting, chilled water sensor and the

control module. Therefore, there was no intention of accepting the condition

"as-is." SCE concurs, however, that the OA was not accomplished in

accordance with Procedure SO123-XX-1 and the inadequate OA resulted in a

failure to promptly identify and correct a condition adverse to quality.  !

9906070096 990602 ,

PDR ADOCK 05000361  !

O PDR

j

c:

. .

!

L

Southern California Edison Co. -2-

~

, We thank you for the above comment; however, we conclude that no correction to

Section E8.1.b.1 of NRC Inspection Report 50-361; 362/98-18 is necessary. Your comment

provides additional information that is not contradicted by the inspection report.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be

placed in the NRC Public Document Room.

Sincerely,

.

.

L nda Joy S 1, hief

Project Branch E -

Division of Reactor Projects

Docket Nos.: 50-361

50-362

' License Nos.: NPF-10

' NPF-15

Enclosures:

Corrected Pages to NRC inspection Report 50-361; 362/98-18

'cc w/ enclosures:

Chairman, Board of Supervisors

County of San Diego

1600 Pacific Highway, Room 335

San Diego, California 92101

Alan R. Watts, Esq.

-Woodruff, Spradlin & Smart

701 S. Parker St. Suite 7000

Orange, California 92868-4720

~ Sherwin Harris, Resource Project Manager

Public Utilities Department

City of Riverside ~

3900 Main Street

Riverside, Califomia 92522

1 R. W. Krieger, Vice President

Southem Califomia Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, California 92674-0128

N. ,

,

.

[.

!

Southern Califomia Edison Co. '3'

-

,

~

Stephen A Woods, Senior Health Physicist

Division of Drinking Water and

Environmental Management -

. Nuclear Emergency Response Program

California Department of Health Services

P.O. Box 942732, M/S 396 :-

Sacramento, Califomia 94334-7320

Mr. Michael R. Olson

. Sr. Energy Administrator

San Diego Gas,& Electric Company

P. O. Box 1831 -

San Diego, Califomia 92112-4150

Mr. Steve Hsu

Radiological Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,Califomia 94234

. Mayor

City of San Clemente

100 Avenida Presidio

San Clemente, Califomia 92672

4

Mr. Truman Burns \Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

.

' San Francisco, Califomia 94102

e o

Southern California Edison Co. -4-

JLN -21999

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC) -

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE14)

bec distrib. by RIV:

Regional Administrator Resident inspector

DRP Director DRS-PSB

DRS Director MIS System

Branch Chief (DRP/E) RIV File

' Senior Project inspector (DRP/E)

Branch Chief (DRP/TSS)

G. F. Sanborn, EO

W. L Brown, RC

J. Lieberman, OE, MS: 7-H5

OE: EA File, MS: 7-H5

DOCUMENT NAME: R:\_SO23\S0818AK.JJR

To receive copy of document, Indicato in bor: "C" = Copy without enclosures *E* = Copy with enclosures *N* = No copy

RIV:Rl:DRP/E SRI C:DRP/E l

JJRussell JASloan LJSmith tst,

6/1/99 (T) 6/1/99 (T) 6/?., /99

OFFICIAL RECORD COPY

070026