ML20206H765

From kanterella
Jump to navigation Jump to search
Forwards Exam Repts 50-361/99-301 & 50-362/99-301 on 990416. Two Operators & Two Senior Operators Were Evaluated.Four Applicants Satisfied Requirements of 10CFR55 & Appropriate Licenses Issued
ML20206H765
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/06/1999
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20206H769 List:
References
50-361-99-301, 50-362-99-301, NUDOCS 9905120010
Download: ML20206H765 (5)


See also: IR 05000361/1999301

Text

-

,

  1. " "* % ,

t UNITED STATES

t NUCLEAR REGULATORY COMMISSION

  1. 0

7. 1 j REGION IV

k,s

l jM 611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON, TEXAS 76011-8064

,,,,,

WAY - 61999

Harold B. Ray, Executive Vice President

Southern California Edison Co. .

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, California 92674-0128

SUBJECT: NRC INSPECTION REPORT 50-361;50-362/99-301

l

Dear Mr. Ray:

On April 16,1999, an operator licensing certification inspection was conducted at your San

Onofre Nuclear Generating Station. The enclosed report presents the scope and results of that

inspection. )

1

The inspection included an evaluation of four applicants for an operator license (two operators

and two senior operators). This was a licensee-authored retake written examination only and

did not involve an NRC site visit. We determined that the four applicants satisfied the

requirements of 10 CFR Part 55, and the appropriate licenses have been issued.

The written examination was adequate for administration as submitted, Minor enhancement

comments to a number of questions were adequately addressed by your staff.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sin ely, i

l

t

t

Arthur T. Howel*lli, Director

\

j'

Division of Reactor Safety

Docket Nos.: 50-361; 50-362

License Nos.: NPF-10; NPF 15 //

%

9905120010 990506

PDR ADOCK 05000361

V PDR

u

w

Southern California Edison Co. -2--

Enclosure:

NRC Inspection Report

' 50-361; 50-362/99-301-

cc w/ enclosure and Attachments 1-2:

R. Sandstrom, Training Manager

Southern California Edison Co.

San Onofre Nuclear Generating Station

P.O. Box 128 :

'

. San Clemente', California 92674-0128

cc w/ enclosure and Attachment 1:

Chairman, Board of Supervisorc -

County of San Diego

1600 Pacific Highway, Room 335

- San Diego, California 92101 -

Alan R. Watts, Esq.

Woodruff, Spradlin & Smart

701 S. Parker St. Suite 7000'

. Orange, California 92868-4720-

Sherwin Harris, Resource Project Manager

- Public Utilities Department j

City of Riverside

3900 Main Street

Riverside, California 92522

R. W. Krieger, Vice President

Southem California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, California 92674-0128

Stephen A. Woods, Senior Health Physicist

Division of Drinking Water and

Environmental Management .

Nuclear Emergency Response Program

California Department of Health Services

' P.O. Box 942732, M/S 396 l

Sacramento, California' 94334-7320

]

)

i

J

~

Southern California Edison Co. ' 3-

-

Mr. Michael R. Oison

Sr. Energy Administrator

' San Diego Gas & Electric Company

P. O. Box 1831

San Diego, California 92112-4150

Mr. Steve Hsu

Radiological Health Branch

. State Department of Health Services

'

P.O. Box 942732 -

Sacramento, California 94234

Mayor

City of_ San Clemente

100 Avenida Presidio

l

San Clemente, California 92672 -

Mr. Truman Burns \Mr. Robert Kinosian

- California Public Utilities Commission .

505 Van Ness, Rm. 4102

San Francisco, California 94102

.

l

<  ;=

-,

" h.: Jouthern Calif @ E$on Co.' -4--

- E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

. E-Mail report to Document Control Desk (DOCDESK)

bec to DCD k)(IE42)

bec distrib.'by RIV:

bec w/ enclosure and Attachment 1:

Regional Administrato

Resident inspector

DRP Director-

DRS Director .

MIS System

Branch Chief (DRP/E)

RIV File

- Senior Project inspector (DRP/E)

Branch Chief (DRP/TSS)

bec w/ enclosure and Attachments 1-2:

R. Gallo (HOHB/NRR)(MS:9D4)

L. Hurley

i 1 i I) /t *

DOCUMENT NAME: S:\DRS\ REPORTS \SO9301rp.jlp.wpd

To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

C:OB:DRS C:PBC D:DRV

JLPellet/imb* LSmith* ATHdrpil

05/ /99 05/ /99 0545'@s

  • previously concurred OFFICIAL RECORD COPY

l

!

i

j

m

-

1

,

'

{ Southern California Edison Co. -4-

, E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

.

'

E-Mail report to NRR Event Tracidng' System (IPAS) '

E-Mail report to Document Control Desk _(DOCDESK)

bec to DCD (IE01)(IE42)

' bcc distrib. by RIV:

bec w/ enclosure and Attachment 1:

Regional Administrato i

Resident inspector-

' DRP Director-

DRS Director

MIS System

Branch Chief (DRP/E)

RIV File

-Senior Project inspector (DRP/E)

Branch Chief (DRP/TSS)

bec w/ enclosure and Attachments 1-2: j

R. Gallo (HOHB/NRR)(MS:9D4) ]

L. Hurley. '

DOCUMENT NAME: S:\DRS\ REPORTS \SO9301rp.jlp.wpd

' To receive copy of document, indicate in box: "C" = Copy without enclosures *E" - Copy with enclosures "N" = No copy

-lC:OB:DRS C:PBC D:DRV

. lJLPellet/imb* LSmith* ATHell

l05/ /99 05/ /99 05d@s

' *previously concurred. OFFICIAL RECORD COPY

.