Forwards Insp Repts 50-361/99-01 & 50-362/99-01 on 990103- 0220.Three non-cited Violations Were Identified
ML20205E544
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/30/1999
From: Laura Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20205E547 List:
References
50-361-99-01, 50-361-99-1, 50-362-99-01, 50-362-99-1, NUDOCS 9904050220
Download: ML20205E544 (5)


See also: IR 05000361/1999001

Text

.

4" "4e

UNITED STATES

1

NUCLEAR REGULATORY COMMISSION

..

a

o

,

i.

j

REG!oN IV

j

611 RYAN PLAZA DRIVE, CUlTE 400

ARLINGTON, TEXAS 76011-8064

,,,g

MAR 3 0 999

Harold B. Ray, Executive Vice President

Southern California Edison Co.

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, California 92674-0128

SUBJECT: NRC INSPECTION REPORT NO. 50-361/99-01; 50-362/99-01

Dear Mr. Ray:

This refers to the inspection conducted on January 3 through February 20,1999, at the

San Onofre Nuclear Generating Station, Units 2 and 3, facility. The enclosed report presents

the results of this inspection.

l

During the 7-week period covered by this inspection, your conduct of activities at 1:ie

l

San Onofre facility was genemlly characterized by safety-conscious operation, sound

'

l

engineering and maintenance practices, and careful radiological work controls.

!

!

Based on the results of this inspection, the NRC has determined that three violations of NRC

(

requirements occurred. These violations are being treated as noncited violations (NCVs),

consistent with Appendix C of the NRC Enforcement Policy. These NCVs are described in the

subject inspection report. If you contest the violation or severity level of these NCVs, you

should provide a response within 30 days of the date of this inspection report, with the basis for

your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,

i

Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV, the

Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,

DC 20555-0001, and the resident inspector at the facility.

!

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

l

enclosure will be placed in the NRC Public Documer t Room.

l

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

o

r

VI

-

a Joy Smith, Ac g Chief

Project Branch

,

1

Division of Reactor Projects

9904050220 990330

&

PDR

ADOCK 05000361

G

PDR

.

.

Southern California Edison Co.

-2-

Docket Nos.: 50-361

50-362

License Nos.; NPF-10

NPF-15

Enclosure:

NRC Inspection Report No.

50-361/99-01;50-362/99-01

cc w/ enclosure:

Chairman, Board of Supervisors

County of San Diego

1600 Pacific Highway, Room 335

San Diego, California 92101

Alan R. Watts, Esq.

Woodruff, Spradlin & Smart

701 S. Parker St. Suite 7000

Orange, California 92868-4720

Sherwin Harris, Resource Project Manager

Public Utilities Department

City of Riverside

3900 Main Street

Riverside, California 92522

R. W. Krieger, Vice President

Southern California Edson Company

j

San Onofre Nuclear Generating Station

j

P.O. Box 128

i

San Clemente, California 92674-0128

l

l

Stephen A. Woods, Senior Health Physicist

{

Division of Drinking Water and

j

Environmental Management

Nuclear Emergency Response Program

j

California Department of Health Services

i

P.O. Box 942732, M/S 396

Sacramento, California 94334-7320

!

'

l

Mr. Michael R. Olson

Sr. Energy Administrator

San Diego Gas & Electric Company

P. O. Box 1831

San Diego, California 92112-4150

I

i

i

l

'

.

Southern California Edison Co.

-3-

Mr. Steve Hsu

Radiological Health Branch

State Department of Health Services

P.O. Box 942732

z

Sacramento, California 94234

'

Mayor

City of San Clemente

100 Avenida Presidio

San Clemente, California 92672

Mr. Truman Burn.e\\Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

l

!

l

l

1

l

l

l

!

i

l

1

l

1

MAR 3 01999

Southern California Edison Co.

-4

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)'

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

. E-Mail report to Frank Talbot (FXT)

l

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

DRS-PSB

'

l

DRS Director

MIS System

Branch Chief (DRP/E)

RIV File

. Senior Project inspector (DRP/E)

Branch Chief (DRP/TSS)

,

l'

l

DOCUMENT NAME: R:\\_SO901RP.JAS

To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:DRP/E

RI:DRP/E

SRI:DRP/E

LC:DRS:PSB

C:DRP/E

-

JGKramer %eewI DECorporandy b4

JASloan b%er*' GMGood 6htVLJSmith

'l03g99

M

03/a499

FJs 03/2299

%

03(3h9

03M99

OFFICIAL RECORD COPY

.

y__

q

.-

J

"

MG 3 0 m

l

Southern California Edison Co.

-4-

l'

'

' E-Mail report to T. Frye (TJF)

1

E-Mail report to D. Lange (DJL)

'

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

l

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

i'

'

bec distrib. by RIV:

,

i

.

Regional Administrator -

Resident inspector

!

DRP Director

DRS-PSB

l

DRS Director.

MIS System

L-

Branch Chief (DRP/E)

RIV File

Senior Project inspector (DRP/E)

Branch Chief (DRP/TSS) -

/

050030

DOCUMENT NAME: R:\\_SO901RP.JAS

To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:DRP/E

RI:DRP/E

SRI:DRP/E l

C:DRS:PSB

C:DRP/E

JGKramer D ,cima I DECorporandy ow

JASloan et c" GMGood (MVLJSmith

03%299

'J

03/W99

FIO 03/2299

A

03/1/99

03/W99

OFFICIAL RECORD COPY