ML20205B338: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:_- _ _        .    -      -    -      _    _-            -          .        .      ._
    t
  l
      .        .
                                              SAFEGUARDS INFORMATION-
I
                                                OCT131999
          Docket No. 50-400
          License No. NPF-63
a
          Carolina Power and Light Company
          ATTN: Mr. E. E. Utley
                    Senior Executive Vice Fresident
                    Power Supply and Engineering                                                    !
                      and Construction                                                            !
          P. O. Box 1551                                                                          i
                                                                                                    L
          Raleigh, NC 27602                                        SARGUARDS NORMAD0tl RB'0WD
          Gentlemen:
          SUBJECT: NRC INSPECTION REPORT NO. 50-400/88-37
1          This refers to the Nuclear Regulatory Commission (NRC) inspection conducted
          by J. D. Ennis on September 26-30, 1988. The inspection' included a review of
4
          activities authorized for your Shearon Harris facility. At'the conclusion of
'
          the inspection, the findings were discussed with those members of your staff            f
            identified in the en-losed inspection report.                                          ,
i
                                                                                                    l
:        Areas examined d' iring the inspection are identified in the report. Within
1          these areas, the inspection consisted of selective examinations of procedures          !
:        and representative records, interviews with personnel, and observation of                ,
!        activities in progress.                                                                  r
!                                                                                                  i
i          The inspectic., findings indicate that certain activities appeared to violate            i
;          NRC requirements. The violations described in the enclosed Inspection Report            !
j          are under consideration for escalated enforcement action. Accordingly, no              I
;          Notice of Violation is being issued at this time, and no response to this
!          letter is required. However, please be advised that the number and character-
i          ization of violations described in the enclosed Inspection Report may change as
2
            a result of further NRC review. An Enforcement Conference to discuss these              !
,
            violations has been scheduled for November 3,1988. You will be advised by              {
q          separate correspondence of the results of our deliberations on this matter.            '
1                                                                                                  -
l          In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and          ;
i          security measures are exempt from public disclosure. Therefore, the e.nclosure          !
'
            to this lettir, with the exception of the report cover page, which presents a          ;
            nonexempt summary, will ny be placed in the NRC Public Document Room.                  l
                                                                                                    t
]          Should you have any ques'. ions concerning this letter, please contact us.
                                                        Sincerely,
)                                                                                                    -
!                                                                                                  !
l                                                      Malcolm L. Ernst
                                                        Acting Regional Administrator    /
                                                                                            /g      !
:          Enclosure:    (See page 2)                                                  /I    l  [
        SS10260224        891013                                                  W
                                                                                    % **W
!                                                                                                7
                                                                                              h    i
,
              DR  ADUCK 05000400                                                          sed      !
j                              PDC                                          er' * N 8**ese % '    L
:                                    sm-t. GUARDS INFORMATION-                      "% %          !
 
-
      f5'
  '. . . .                    SAFEGUARDS INFORMATION-
                                                                                          ~          l
                                                                                0071.3 403g
        ..    .
          Carolina Power and Light Company            2
          Enclosuie:
          NRC Inspection Report
              (SafeguardsInfermation)
          cc w/snel:
          R. A. Watson, Vice President
              Harris Nuclear Project
          D. L. Tibbitts, 01 rector of Regulatory
              Compliance
          C. S. Hinnant, Plant General Manager
          cc w/ Inspection Summary:
          State of North Carolina
          bec w/ enc 1:
          NRR/DRIS/SB
          B. Murray, RIV
          bec w/ Inspection Summary:
          C. Barth, OGC
          NRC Resident Inspector
          A. Upchurch, Chairman, Triangle J
              Council of Governments
          ORS. Technical Assistant
          Document Control Desk (RIOS IE 04), 016
                                        f
          R                RI
                                      '
                                        g            .
                                                          RII        RII  .
            Ennis:tj        DMcGuire I      line        dCollins  B arroll
          10/4/88          10/j/88      10///' /88    10// J /88 10////88
                                                                            Dxument kernmeed hereith
                                  4
                                                                            cuwent wstw ure3essfies
          RII              PII          RII            RII        RII    m w e on*d bem
                                g          g ,'                        ;
                                                                                  en.eu cocumeai sim !
          PFr r clsoc      DVer alli    LRey h        GJe    ns JS{ r        '. M
            10/g)/88        10/ p /08    10/((/88      10/ti/88  10/j 2d88        ,,j,y
                            SAFEGUARDS INFORMATION
L
}}
}}

Latest revision as of 06:28, 30 December 2020

Forwards Insp Rept 50-400/88-37 on 880926-30.Violations Noted Under Consideration for Escalated Enforcement Action
ML20205B338
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/13/1988
From: Ernst M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20205B345 List:
References
NUDOCS 8810260224
Download: ML20205B338 (2)


See also: IR 05000400/1988037

Text

_- _ _ . - - - _ _- - . . ._

t

l

. .

SAFEGUARDS INFORMATION-

I

OCT131999

Docket No. 50-400

License No. NPF-63

a

Carolina Power and Light Company

ATTN: Mr. E. E. Utley

Senior Executive Vice Fresident

Power Supply and Engineering  !

and Construction  !

P. O. Box 1551 i

L

Raleigh, NC 27602 SARGUARDS NORMAD0tl RB'0WD

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-400/88-37

1 This refers to the Nuclear Regulatory Commission (NRC) inspection conducted

by J. D. Ennis on September 26-30, 1988. The inspection' included a review of

4

activities authorized for your Shearon Harris facility. At'the conclusion of

'

the inspection, the findings were discussed with those members of your staff f

identified in the en-losed inspection report. ,

i

l

Areas examined d' iring the inspection are identified in the report. Within

1 these areas, the inspection consisted of selective examinations of procedures  !

and representative records, interviews with personnel, and observation of ,

! activities in progress. r

! i

i The inspectic., findings indicate that certain activities appeared to violate i

NRC requirements. The violations described in the enclosed Inspection Report  !

j are under consideration for escalated enforcement action. Accordingly, no I

Notice of Violation is being issued at this time, and no response to this

! letter is required. However, please be advised that the number and character-

i ization of violations described in the enclosed Inspection Report may change as

2

a result of further NRC review. An Enforcement Conference to discuss these  !

,

violations has been scheduled for November 3,1988. You will be advised by {

q separate correspondence of the results of our deliberations on this matter. '

1 -

l In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and  ;

i security measures are exempt from public disclosure. Therefore, the e.nclosure  !

'

to this lettir, with the exception of the report cover page, which presents a  ;

nonexempt summary, will ny be placed in the NRC Public Document Room. l

t

] Should you have any ques'. ions concerning this letter, please contact us.

Sincerely,

) -

!  !

l Malcolm L. Ernst

Acting Regional Administrator /

/g  !

Enclosure: (See page 2) /I l [

SS10260224 891013 W

% **W

! 7

h i

,

DR ADUCK 05000400 sed  !

j PDC er' * N 8**ese % ' L

sm-t. GUARDS INFORMATION- "% %  !

-

f5'

'. . . . SAFEGUARDS INFORMATION-

~ l

0071.3 403g

.. .

Carolina Power and Light Company 2

Enclosuie:

NRC Inspection Report

(SafeguardsInfermation)

cc w/snel:

R. A. Watson, Vice President

Harris Nuclear Project

D. L. Tibbitts, 01 rector of Regulatory

Compliance

C. S. Hinnant, Plant General Manager

cc w/ Inspection Summary:

State of North Carolina

bec w/ enc 1:

NRR/DRIS/SB

B. Murray, RIV

bec w/ Inspection Summary:

C. Barth, OGC

NRC Resident Inspector

A. Upchurch, Chairman, Triangle J

Council of Governments

ORS. Technical Assistant

Document Control Desk (RIOS IE 04), 016

f

R RI

'

g .

RII RII .

Ennis:tj DMcGuire I line dCollins B arroll

10/4/88 10/j/88 10///' /88 10// J /88 10////88

Dxument kernmeed hereith

4

cuwent wstw ure3essfies

RII PII RII RII RII m w e on*d bem

g g ,'  ;

en.eu cocumeai sim !

PFr r clsoc DVer alli LRey h GJe ns JS{ r '. M

10/g)/88 10/ p /08 10/((/88 10/ti/88 10/j 2d88 ,,j,y

SAFEGUARDS INFORMATION

L