EA 98-503 Mr. G. Rainey, President PECO Nuclear Nuclear Group Headquarters Correspondence Control Desk P.O. Box 195 Wayne, Pennsylvania 19087-0195 SUBJECT: EXERCISE OF ENFORCEMENT DISCRETION RELATED TO NRC INTEGRATED INSPECTION REPORT 50-352 & 353/98-08
,
 
==Dear Mr. Rainey:==
,
On October 17,1998, the NRC completed an inspection at the Limerick Generating Station and documented the results in inspection report 50-352 & 353/98-08.
 
In the inspection report, the NRC reviewed a licensee-identified issue involving the potential for bypass of the suppression pool. This issue is a violation of NRC requirements, which could be considered for escalated enforcement and be subject to a civil penalty. However, after consultation with the Director, Office of Enforcement and the Regional Administrator, I have been authorized to exercise discretion to not issue a Notice of Violation and not propose a civil penalty in accordance with the provisions provided in NRC Enforcement Policy, Section Vll.B.3, Violations involving Old Design issues. This decision was made after consideration that: (1) the violation was identified by your staff's good questioning attitude during voluntary initiatives; (2) corrective actions were comprehensive and timely; (3) the conditions were subtle in nature and not likely to be disclosed through routine surveillance or quality assurance activities; and (4) the violation is not reasonably linked to l current performance. The exercise of discretion acknowledges your good effort to identify !
and correct subtle violations, that would not be identified by routine efforts, before the degraded safety systems are called upon.
 
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC Public Document Room (PDR).
 
We appreciate your cooperation. i
 
Sincerely,
,
      '
,    Original Signed by:
!
l Charles W. Hehl, Director  l Division of Reactor Projects
  "
9812020222 981123 PDR ADOCK 05000352    l G  PDR    i
'
0FFICIAL RECORD 00PY  IE:01 l~
 
..  .-. .. . - .~-. - . - . - - _ - . . . . . .-. - - - - _ - -- . - - - -
l t
I    -
?
f Docket Nos.: 50-352,50-353 License Nos.: NPF-39, NPF-85 (  >
l    cc:
 
J. J. Hagan, Vice President, Nuclear Station Support G. Edwards, Chairman, Nuclear Review Board and Director - Licensing
,    J. von Suskil, Vice President - Limerick Generating Station
[    M. P. Gallagher, Plant Manager, Limerick Generating Station l    T. Moore, Manager, Experience Assessment Secretary, Nuclear Committee of the Board Commonwealth of Pennsylvania
          ,
l l
r
_ _,  ._  ,
._ . . _ _ . _ _ _ _ _ . . _ _ _ _ _ _ . . _  _
 
,  . - - .-  _ _ . .-
..
,
G.' Rainey  3
.
Distribution:
Region i Docket Room (with concurrences)
H. Miller, RA/W. Axelson, DRA B. Boger, ADPR, NRR J. Goldberg, OGC J. Lieberman, OE (OEMAIL)
D. Holody, ORA T. Walker, ORA L. Manning, ORA C. Anderson, DRP D. Florek, DRP S. Barr, DRP R. 'Junod, DRP NRC Resident inspector Nuclear Safety Information Center (NSIC)
PUBLIC Distribution w/ encl: (Via E-Mail)
8. McCabe, OEDO R. Capra, PDI-2, NRR inspection Program Branch, NRR (IPAS)
B. Buckley, PD 1-2, NRR M. Thadani, PD 1-2, NRR R. Correia, NRR M. Campion, ORA DOCDESK DOCUMENT NAME: G:\ BRANCH 4\LM\LM-OLD.lSS To receive a copy of tii.'s document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rl/Q Rl/DRP l Rl/ ORA Rl/l)ft,P , l l.
 
I NAME DFKeV CAnderson cfa DHol,ody f)/// CW DATE 119/98 110y98 11(7/98 '' 11/d/98 L    OFFICIAL RECORD COPY Oh IN] @,
i$h
}}
}}

Latest revision as of 04:47, 13 November 2020

Discusses licensee-identified Issue Involving Potential for Bypass of Suppression Pool as Documented in Insp Repts 50-352/98-08 & 50-353/98-08.NOV Will Not Be Issued & Civil Penalty Will Not Be Proposed
ML20196D401
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/23/1998
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
50-352-98-08, 50-352-98-8, 50-353-98-08, 50-353-98-8, EA-98-503, NUDOCS 9812020222
Download: ML20196D401 (3)


Text

-

,

' - November,23, 1998

!

EA 98-503 Mr. G. Rainey, President PECO Nuclear Nuclear Group Headquarters Correspondence Control Desk P.O. Box 195 Wayne, Pennsylvania 19087-0195 SUBJECT: EXERCISE OF ENFORCEMENT DISCRETION RELATED TO NRC INTEGRATED INSPECTION REPORT 50-352 & 353/98-08

,

Dear Mr. Rainey:

,

On October 17,1998, the NRC completed an inspection at the Limerick Generating Station and documented the results in inspection report 50-352 & 353/98-08.

In the inspection report, the NRC reviewed a licensee-identified issue involving the potential for bypass of the suppression pool. This issue is a violation of NRC requirements, which could be considered for escalated enforcement and be subject to a civil penalty. However, after consultation with the Director, Office of Enforcement and the Regional Administrator, I have been authorized to exercise discretion to not issue a Notice of Violation and not propose a civil penalty in accordance with the provisions provided in NRC Enforcement Policy, Section Vll.B.3, Violations involving Old Design issues. This decision was made after consideration that: (1) the violation was identified by your staff's good questioning attitude during voluntary initiatives; (2) corrective actions were comprehensive and timely; (3) the conditions were subtle in nature and not likely to be disclosed through routine surveillance or quality assurance activities; and (4) the violation is not reasonably linked to l current performance. The exercise of discretion acknowledges your good effort to identify !

and correct subtle violations, that would not be identified by routine efforts, before the degraded safety systems are called upon.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC Public Document Room (PDR).

We appreciate your cooperation. i

Sincerely,

,

'

, Original Signed by:

!

l Charles W. Hehl, Director l Division of Reactor Projects

"

9812020222 981123 PDR ADOCK 05000352 l G PDR i

'

0FFICIAL RECORD 00PY IE:01 l~

.. .-. .. . - .~-. - . - . - - _ - . . . . . .-. - - - - _ - -- . - - - -

l t

I -

?

f Docket Nos.: 50-352,50-353 License Nos.: NPF-39, NPF-85 ( >

l cc:

J. J. Hagan, Vice President, Nuclear Station Support G. Edwards, Chairman, Nuclear Review Board and Director - Licensing

, J. von Suskil, Vice President - Limerick Generating Station

[ M. P. Gallagher, Plant Manager, Limerick Generating Station l T. Moore, Manager, Experience Assessment Secretary, Nuclear Committee of the Board Commonwealth of Pennsylvania

,

l l

r

_ _, ._ ,

._ . . _ _ . _ _ _ _ _ . . _ _ _ _ _ _ . . _ _

, . - - .- _ _ . .-

..

,

G.' Rainey 3

.

Distribution:

Region i Docket Room (with concurrences)

H. Miller, RA/W. Axelson, DRA B. Boger, ADPR, NRR J. Goldberg, OGC J. Lieberman, OE (OEMAIL)

D. Holody, ORA T. Walker, ORA L. Manning, ORA C. Anderson, DRP D. Florek, DRP S. Barr, DRP R. 'Junod, DRP NRC Resident inspector Nuclear Safety Information Center (NSIC)

PUBLIC Distribution w/ encl: (Via E-Mail)

8. McCabe, OEDO R. Capra, PDI-2, NRR inspection Program Branch, NRR (IPAS)

B. Buckley, PD 1-2, NRR M. Thadani, PD 1-2, NRR R. Correia, NRR M. Campion, ORA DOCDESK DOCUMENT NAME: G:\ BRANCH 4\LM\LM-OLD.lSS To receive a copy of tii.'s document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rl/Q Rl/DRP l Rl/ ORA Rl/l)ft,P , l l.