ML19308E005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:_>                                  -s-.-,.          -s                                                                                                          '
O
    .i      .: .            .                                          _
UCENSbb EVENI HEPUHI
    ,jk ,'
                    ,    ,          CONTROL DLOCK:l                l          l  l  l  l                                  [pt SE PRINT ALL REZUIREJ INFEM.1 AT*CTJ
: e.                          LCENSEE
      #                                                                                                                              LCENSE                EVENT NAME                                        LCINSE NUMBER
* fvPE-                TYPE o1 l Fl Ll Cl Rl Pl 3l 7 89                                          14 l150l 0l-l 0l 0l 0l 0l 0l-l 0l 0l l4l 25      26 l    l 'l    l    l0l4l 30    31      32 cArtcoRY        "'N NE 1                                OoCKET NUM0ER                              EVENT DATE                      REPORT DATE 7 u 04 CONTl=l b7        LO l      Ltl b9 LtJ l o f si ol-l a l a l o l 21 Iof61of617171 101611141717 60        61                                  60      09                          74    75                        Ut EVENT DESCR4PTION DE l        In Mode 1 operation, in the progress of venting the makeup tank to the waste gas low                                                                          j 7 09 Out BE I        pressure header, an unplanned radioactive nas release to the Auxiliary Building occurred l 7 il D                                                                                                                                                          -
Du h!
7 09 contrary to Environmental Technical Specifications S.6.2.A.                                                      Redundancy N/A. Ventina                        l 80 3E l was ceased and building evacuated immediately. The nunolv air to the Aurf 11 mrv Buildino-l 7 0
        @9 7 89 l      was reestablished And 3RDt41 n rion rounmad uichin chroa minne...(See Additional Factors) l O(*
LD C#"*"
              ' 'SS"                C0OE                  COMPONf NT CODE                    R              M        u R              VIOLATON      (LER 77-49E)
Q ]MlBl @                                                                        W 7 80 10                        11 l Z l 2 l Zl Zl Zl Zl 12                            17      43 l2l9l9l9l 44                    47 W48 CAUSE DESCRIPTION 9
EE l This event was caused by blown loon senin to rho un=co one Inu                                                              nr = auro h. A.,                            l 7 89                                                                                                              -
80 SE I seals were reestablishea and surveritance ne cham 7 09
                                                                                                                  'ncr....a.
4                                                                  I 80 DE I                                                                                                                                                                        I 7 09 fatnny METHOD OF 00 Status                    % POWER                      OTHER STATUS          DISCOVEny                            DISCOVERY DESCMTON 1
7 0          9                  10 l l! ol o! !                          N/A          l                  lHiohAlarmon              RMA2e Rhurrine Off Anv. l
                  ,aay o, 12 i3                            44        45        46                                              -
80 Bldg. Supply Air Fans.
ACrmTY              C04ffNT
* flELE ASE D                                    AMOUNT OF ACTMTY                                                      LOCATON OF AELEASE 30 7 8          9 W                OF  dF'ELEASE 10 l
33 curies      noble nas        l          lReleasetoAux. Bldg.. Vent to Atmos.                                      !
11                                    44          45                                                                      00 SERSONNEL EXPOSURES NUMDEA                TYPE          DESCRIPTICW Q l 0] 0l d 7 89                        11
[_Z_j 12 l__
13-N/A                                                                                                    l GD PERSONNEL. INJuniES NuMcAn                  OESC p TON 3l l nl nl d      ~
l                                  N/A                                                                                                    l 7 09 '                      i1 12                                                                                                                                        uo OFFSITE CONSEQUENCES Ql 7 UD N/A                  -
l 00 LOSS OR DAMAGE TO FACluTY TYPE            DESCR'PTION                                                          ,
hdl 7 89                10 N/A f
I;o PUDUCtTY BE I 7 89 N/A pi j
AODtitONAL FACTORS E l            Surveillance of the header loop seals was increased to preclude re-occurrence.
7 gg                                                                                                                                                          ---....l This was not a repetitive occurrence.
8 0 0 3 20 0 WO NAME:                              k PHONE: (813) 866-4159                        .
l        -              -                        .:-                                                  .
                                                                                                                                                                    ~~
 
            .- ..                                          . - - - . . - . ~
l'***
:    -          a
: m.                                                              .
                                                                                                -SUPPLEMENTARY INFORMATION
: l.            Report No.:                            50-302/77-49E
: 2.            Facility:                              Crystal River Unit #3
: 3.            Report Date:                          14 June 1977
: 4.            Occurrence Date:                      6 June 1977
: 5.            Identification of occurrence:
!                                                                  Unplanned release of radioactive waste gas contrary to Environ-mental Technical Specifications 5.6.2.A.
: 6.            Conditions Prior to Occurrence:
Normal Mode 1 Operation.
1-
: 7.            Description of occurrence:
:                                                                  At 1400 in the progress of venting the makeup tank to the waste gas low pressure header, an unplanned radioactive gas t
release to the Auxiliary Building occurred. The maximum i                                                                  instantaneous release rate at the peak of the discharge pro-file was 6.47. of the most restrictive limit set forth in Specification 2.4.2A. (1). Supply air to the Auxiliary Building was re-established and ventilation of the building resumed
,                                                                  within three minutes.
: 8.            Designation of Apparent Cause:
Blown loop seal of waste gas decay tank connected to waste gas low pressure header.
: 9.          , Analysis of Occurrence:
The health and safety of the plant and general public were not affected.
1
: 10.              Corrective Action:
i i                                                                  The loop seal was re-established and surveillance of loop seals has been increased to preclude re-occurrenca.
: 11.              Failure Data:
This was the first reportable occurrence of this type.
4 s
    -m e ,      w-+-y      m,,                        .
                                                                    .,        ~e  -ww    ...._,,,e
                                                      -.,.we...,
                                                                                                                      .e,-.. n  .      .,
        , .-- .- -              -y  ----,,_,y            . -      . , , - . ,                  .      . , _ .  . _ - .              . . , ,, ,.
                                                                                                                                                    ,,, - , . _ . _ . . _ , , . . . . , . . , , . . . . , - . . ,.3., -- _ _ _ _ _ . _ . _ --}}

Latest revision as of 22:29, 21 February 2020

RO 77-49E:on 770606,unplanned Radwaste Gas Release Occurred During Makeup Tank Venting.Caused by Waste Gas Decay Tank Blown Loop Seal,Connected to Waste Gas Low Pressure Header. Seals re-established & Their Surveillance Increased
ML19308E005
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/14/1977
From: Stewart W
FLORIDA POWER CORP.
To:
Shared Package
ML19308E002 List:
References
NUDOCS 8003200740
Download: ML19308E005 (2)


Text

_> -s-.-,. -s '

O

.i .: . . _

UCENSbb EVENI HEPUHI

,jk ,'

, , CONTROL DLOCK:l l l l l l [pt SE PRINT ALL REZUIREJ INFEM.1 AT*CTJ

e. LCENSEE
  1. LCENSE EVENT NAME LCINSE NUMBER
  • fvPE- TYPE o1 l Fl Ll Cl Rl Pl 3l 7 89 14 l150l 0l-l 0l 0l 0l 0l 0l-l 0l 0l l4l 25 26 l l 'l l l0l4l 30 31 32 cArtcoRY "'N NE 1 OoCKET NUM0ER EVENT DATE REPORT DATE 7 u 04 CONTl=l b7 LO l Ltl b9 LtJ l o f si ol-l a l a l o l 21 Iof61of617171 101611141717 60 61 60 09 74 75 Ut EVENT DESCR4PTION DE l In Mode 1 operation, in the progress of venting the makeup tank to the waste gas low j 7 09 Out BE I pressure header, an unplanned radioactive nas release to the Auxiliary Building occurred l 7 il D -

Du h!

7 09 contrary to Environmental Technical Specifications S.6.2.A. Redundancy N/A. Ventina l 80 3E l was ceased and building evacuated immediately. The nunolv air to the Aurf 11 mrv Buildino-l 7 0

@9 7 89 l was reestablished And 3RDt41 n rion rounmad uichin chroa minne...(See Additional Factors) l O(*

LD C#"*"

' 'SS" C0OE COMPONf NT CODE R M u R VIOLATON (LER 77-49E)

Q ]MlBl @ W 7 80 10 11 l Z l 2 l Zl Zl Zl Zl 12 17 43 l2l9l9l9l 44 47 W48 CAUSE DESCRIPTION 9

EE l This event was caused by blown loon senin to rho un=co one Inu nr = auro h. A., l 7 89 -

80 SE I seals were reestablishea and surveritance ne cham 7 09

'ncr....a.

4 I 80 DE I I 7 09 fatnny METHOD OF 00 Status  % POWER OTHER STATUS DISCOVEny DISCOVERY DESCMTON 1

7 0 9 10 l l! ol o! ! N/A l lHiohAlarmon RMA2e Rhurrine Off Anv. l

,aay o, 12 i3 44 45 46 -

80 Bldg. Supply Air Fans.

ACrmTY C04ffNT

  • flELE ASE D AMOUNT OF ACTMTY LOCATON OF AELEASE 30 7 8 9 W OF dF'ELEASE 10 l

33 curies noble nas l lReleasetoAux. Bldg.. Vent to Atmos.  !

11 44 45 00 SERSONNEL EXPOSURES NUMDEA TYPE DESCRIPTICW Q l 0] 0l d 7 89 11

[_Z_j 12 l__

13-N/A l GD PERSONNEL. INJuniES NuMcAn OESC p TON 3l l nl nl d ~

l N/A l 7 09 ' i1 12 uo OFFSITE CONSEQUENCES Ql 7 UD N/A -

l 00 LOSS OR DAMAGE TO FACluTY TYPE DESCR'PTION ,

hdl 7 89 10 N/A f

I;o PUDUCtTY BE I 7 89 N/A pi j

AODtitONAL FACTORS E l Surveillance of the header loop seals was increased to preclude re-occurrence.

7 gg ---....l This was not a repetitive occurrence.

8 0 0 3 20 0 WO NAME: k PHONE: (813) 866-4159 .

l - - .:- .

~~

.- .. . - - - . . - . ~

l'***

- a
m. .

-SUPPLEMENTARY INFORMATION

l. Report No.: 50-302/77-49E
2. Facility: Crystal River Unit #3
3. Report Date: 14 June 1977
4. Occurrence Date: 6 June 1977
5. Identification of occurrence:

! Unplanned release of radioactive waste gas contrary to Environ-mental Technical Specifications 5.6.2.A.

6. Conditions Prior to Occurrence:

Normal Mode 1 Operation.

1-

7. Description of occurrence:
At 1400 in the progress of venting the makeup tank to the waste gas low pressure header, an unplanned radioactive gas t

release to the Auxiliary Building occurred. The maximum i instantaneous release rate at the peak of the discharge pro-file was 6.47. of the most restrictive limit set forth in Specification 2.4.2A. (1). Supply air to the Auxiliary Building was re-established and ventilation of the building resumed

, within three minutes.

8. Designation of Apparent Cause:

Blown loop seal of waste gas decay tank connected to waste gas low pressure header.

9. , Analysis of Occurrence:

The health and safety of the plant and general public were not affected.

1

10. Corrective Action:

i i The loop seal was re-established and surveillance of loop seals has been increased to preclude re-occurrenca.

11. Failure Data:

This was the first reportable occurrence of this type.

4 s

-m e , w-+-y m,, .

., ~e -ww ...._,,,e

-.,.we...,

.e,-.. n . .,

, .-- .- - -y ----,,_,y . - . , , - . , . . , _ . . _ - . . . , ,, ,.

,,, - , . _ . _ . . _ , , . . . . , . . , , . . . . , - . . ,.3., -- _ _ _ _ _ . _ . _ --