ML19308D433: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 20: Line 20:
   .            L/
   .            L/
* i CONIDOL OLOCK:l                  l    l    l  l    l      l                              [pLCASE PRINT ALL REQUIRED INFCW.1 AT*C.
* i CONIDOL OLOCK:l                  l    l    l  l    l      l                              [pLCASE PRINT ALL REQUIRED INFCW.1 AT*C.
  ,,
                         .                            1                              6 e                        LCf N$t t t
                         .                            1                              6 e                        LCf N$t t t
NAME                                                                        *
NAME                                                                        *
* LCENSE                EVENT LCEN5g NUMutn                                          TYPE                  l'!8't lFlticl nl rl 3l
* LCENSE                EVENT LCEN5g NUMutn                                          TYPE                  l'!8't lFlticl nl rl 3l 7    DU                                  14 l 0 l 0-l-l 0 l 0 l 0 l 0 l 0 l-l 0 l 0 l 15                                                      26 l4 2G l 1l1l1l1l      30 l0l3l 31        32 cattconY        "N nan t                                DOCr.tf NUMotn                              tvtNT OATE                        ACPont OAft h CON'T l - l - l                            l Ll        l0l5l0l-10l3l0l2l                              l0 l 4l 2l 4 l 7 l 7 l            l0 l5 l1 l7 l 7l1 7 0              57    bu          59        6C        G1                                      68    09                          74    75                        t EVENT DESCDiPTION o    l      In Mode 1 operation with Reactor Building purge in progress, the primary containment' 7 09 t
                                                                                                                        ,
     @l average temperature $xceeded                        130 0 F. contrary to Technical Specificati)n 3.6.1.5.                                    Re-7 0U
7    DU                                  14 l 0 l 0-l-l 0 l 0 l 0 l 0 l 0 l-l 0 l 0 l 15                                                      26 l4 2G l 1l1l1l1l      30 l0l3l 31        32
                                                                                                                                                                                  '
cattconY        "N nan t                                DOCr.tf NUMotn                              tvtNT OATE                        ACPont OAft h CON'T l - l - l                            l Ll        l0l5l0l-10l3l0l2l                              l0 l 4l 2l 4 l 7 l 7 l            l0 l5 l1 l7 l 7l1 7 0              57    bu          59        6C        G1                                      68    09                          74    75                        t EVENT DESCDiPTION o    l      In Mode 1 operation with Reactor Building purge in progress, the primary containment' 7 09 t
     @l
                                                          *
* average temperature $xceeded                        130 0 F. contrary to Technical Specificati)n 3.6.1.5.                                    Re-7 0U
* U EE l          dun dan cy N/A.            Non-repetitive occurrence.                        SWV-151 was opened to allow cooling water to 7 09                                                                                                                                                                  t!
* U EE l          dun dan cy N/A.            Non-repetitive occurrence.                        SWV-151 was opened to allow cooling water to 7 09                                                                                                                                                                  t!
bl 7 U9 re t u rn en      Industrial cooline System and Reactor Buildin'c averace temoerature decreased a
bl 7 U9 re t u rn en      Industrial cooline System and Reactor Buildin'c averace temoerature decreased a
35 I          to less than 130                F.                                                                                        (LER 77-41) 7 09                                                                              m,g                                                                                  L SYSTIM      CAULt                                                Ct,ur'ONt NT              COMPONENT CODE        CODL                  COMPONENT COct                  auPRA6s                MANufAC1unisa          v106,At oN O      l Sl Bl        {              l Vl Al Ll Vl Ej X]                      lNl              [Zl9l9l9l                    l Nl
35 I          to less than 130                F.                                                                                        (LER 77-41) 7 09                                                                              m,g                                                                                  L SYSTIM      CAULt                                                Ct,ur'ONt NT              COMPONENT CODE        CODL                  COMPONENT COct                  auPRA6s                MANufAC1unisa          v106,At oN O      l Sl Bl        {              l Vl Al Ll Vl Ej X]                      lNl              [Zl9l9l9l                    l Nl 7 09 to                    11          12                            17          43            44                  47        48 CAUSE DESCRIPTION                                                    0 hl 7 00 Nuclear services closed evcle cooling valve SWV-151 was closed. SWV-151 was opened 6.
* 7 09 to                    11          12                            17          43            44                  47        48
                                                                                                                                                                  *
                                                                                                                                                                                .
CAUSE DESCRIPTION                                                    0 hl 7 00 Nuclear services closed evcle cooling valve SWV-151 was closed. SWV-151 was opened 6.
30 l          and systetr restored operable 24 April 1977; 7 JL9 g                                                                                                                                                                      L.
30 l          and systetr restored operable 24 April 1977; 7 JL9 g                                                                                                                                                                      L.
7
7 f 4CILrty METHOO OF STATUS              % POWER                      OTHER STAILS              DISCOVLnY                          OrSCovtnY OttCAPTON 70 1
        -
f 4CILrty METHOO OF STATUS              % POWER                      OTHER STAILS              DISCOVLnY                          OrSCovtnY OttCAPTON 70 1
b 9            10 l 0_ l 6 l 4 l 12 13 l          N/A                l 44 W
b 9            10 l 0_ l 6 l 4 l 12 13 l          N/A                l 44 W
45 l                            N/A 46                                                            Ut ACIM17        C04 TENT
45 l                            N/A 46                                                            Ut ACIM17        C04 TENT
Line 51: Line 38:
PERSONNEL INJunlES NUM0tR              OCSCR4PfiON 3 l 0l 0l 0]
PERSONNEL INJunlES NUM0tR              OCSCR4PfiON 3 l 0l 0l 0]
7 09 l                                N/A                                                                                                        l 11 12 6$
7 09 l                                N/A                                                                                                        l 11 12 6$
OFFSITE CONSEQUENCES IE l                                                          N/A                         *
OFFSITE CONSEQUENCES IE l                                                          N/A
* l 7 0U DO LOSS OR OAMAGE TO FACILITY 1 YI't      CC SCR:PTCP.
* l 7 0U DO LOSS OR OAMAGE TO FACILITY 1 YI't      CC SCR:PTCP.
bdl 7 89              10 N/A
bdl 7 89              10 N/A l
                                                                                                .
bD PUDLtCITY 7
l bD PUDLtCITY 7
b !..                                                          i/A l
b !..                                                          i/A l
                                                                                                                                                                         ,;t ,
                                                                                                                                                                         ,;t ,
Line 64: Line 50:
I4 f0NI . (81M 866-4159
I4 f0NI . (81M 866-4159


                          '
    .
      .
SUPPLEMENTARY INFORMATION
SUPPLEMENTARY INFORMATION
                                                                      .
: 1. Report No:            50-302/77-41
: 1. Report No:            50-302/77-41
: 2. Facility:            Crystal River Unit #3
: 2. Facility:            Crystal River Unit #3
: 3. Report Date:          17 May 1977
: 3. Report Date:          17 May 1977
: 4. Occurrence Date:      24 April 1977
: 4. Occurrence Date:      24 April 1977
'
: 5. Identification of occurrence:
: 5. Identification of occurrence:
Primary containment average air temperature exceeded 130        F. contrary to Technical Specification 3.6.1.5.
Primary containment average air temperature exceeded 130        F. contrary to Technical Specification 3.6.1.5.
: 6. Conditions Prior to occurrence:
: 6. Conditions Prior to occurrence:
Normal Mode 1 operation.                                                            ~
Normal Mode 1 operation.                                                            ~
:"
: 7. Description of occurrence:
: 7. Description of occurrence:
At 1945 with Reactor Building purge in progress, the primary containment average air temperature was 1410 F. Entered action statement of T.S.3.6.1.5.
At 1945 with Reactor Building purge in progress, the primary containment average air temperature was 1410 F. Entered action statement of T.S.3.6.1.5.
Nuclear services closed cycle cooling valve SWV-151 was found closed.        SWV-151 was opened allowing cooling water to return to Industrial Cooling Sys-
Nuclear services closed cycle cooling valve SWV-151 was found closed.        SWV-151 was opened allowing cooling water to return to Industrial Cooling Sys-tem, and the containment averago temperature decreased to less than 1300 F.
  -
tem, and the containment averago temperature decreased to less than 1300 F.
at 2029.
at 2029.
: 8. Designation of Apparent Cause of Occurrence:
: 8. Designation of Apparent Cause of Occurrence:
Line 94: Line 72:
: 11. Failure Data
: 11. Failure Data
             .                                                                                    I Fir s t. occurrence of this event.
             .                                                                                    I Fir s t. occurrence of this event.
.
                                                                  -
                                                                         -.}}
                                                                         -.}}

Latest revision as of 12:41, 1 February 2020

RO-77-41:on 770424,primary Containment Average Air Temp Exceeded 130 F.Caused by Closure of Nuclear Svcs Closed Cycle Cooling Valve SWV-151.Personnel Cautioned Re Unauthorized Manipulation of Valves
ML19308D433
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/17/1977
From: Stewart W
FLORIDA POWER CORP.
To:
Shared Package
ML19308D405 List:
References
NUDOCS 8002280737
Download: ML19308D433 (2)


Text

L.it.,we w w4 L. V 4.s w a e iL.I LJ 840

. L/

  • i CONIDOL OLOCK:l l l l l l l [pLCASE PRINT ALL REQUIRED INFCW.1 AT*C.

. 1 6 e LCf N$t t t

NAME *

  • LCENSE EVENT LCEN5g NUMutn TYPE l'!8't lFlticl nl rl 3l 7 DU 14 l 0 l 0-l-l 0 l 0 l 0 l 0 l 0 l-l 0 l 0 l 15 26 l4 2G l 1l1l1l1l 30 l0l3l 31 32 cattconY "N nan t DOCr.tf NUMotn tvtNT OATE ACPont OAft h CON'T l - l - l l Ll l0l5l0l-10l3l0l2l l0 l 4l 2l 4 l 7 l 7 l l0 l5 l1 l7 l 7l1 7 0 57 bu 59 6C G1 68 09 74 75 t EVENT DESCDiPTION o l In Mode 1 operation with Reactor Building purge in progress, the primary containment' 7 09 t

@l average temperature $xceeded 130 0 F. contrary to Technical Specificati)n 3.6.1.5. Re-7 0U

  • U EE l dun dan cy N/A. Non-repetitive occurrence. SWV-151 was opened to allow cooling water to 7 09 t!

bl 7 U9 re t u rn en Industrial cooline System and Reactor Buildin'c averace temoerature decreased a

35 I to less than 130 F. (LER 77-41) 7 09 m,g L SYSTIM CAULt Ct,ur'ONt NT COMPONENT CODE CODL COMPONENT COct auPRA6s MANufAC1unisa v106,At oN O l Sl Bl { l Vl Al Ll Vl Ej X] lNl [Zl9l9l9l l Nl 7 09 to 11 12 17 43 44 47 48 CAUSE DESCRIPTION 0 hl 7 00 Nuclear services closed evcle cooling valve SWV-151 was closed. SWV-151 was opened 6.

30 l and systetr restored operable 24 April 1977; 7 JL9 g L.

7 f 4CILrty METHOO OF STATUS  % POWER OTHER STAILS DISCOVLnY OrSCovtnY OttCAPTON 70 1

b 9 10 l 0_ l 6 l 4 l 12 13 l N/A l 44 W

45 l N/A 46 Ut ACIM17 C04 TENT

  • R'LI ASt o AMOUNT f'F ACIMTV

] Oryf:lLI ASE l LOCAf TON OF ACLEASt 7 8

{

9 10 11 N/A l 44 l N/A l 45 Ot PERSONNEL EXPOSUAES NUMDin TYPt OtSOAiPTON H l 0l 0l 0l Wl N/A l

7 09 11 12 13 St.

PERSONNEL INJunlES NUM0tR OCSCR4PfiON 3 l 0l 0l 0]

7 09 l N/A l 11 12 6$

OFFSITE CONSEQUENCES IE l N/A

  • l 7 0U DO LOSS OR OAMAGE TO FACILITY 1 YI't CC SCR:PTCP.

bdl 7 89 10 N/A l

bD PUDLtCITY 7

b !.. i/A l

,;t ,

l OITIONAL FACTOnS

/

b 00-See a t tached Supplomont arv In forma tion 8002280 23 7 *l tus 7 UU b

\ ane N AMI - 'W. P .J L CH;t l' t '

I4 f0NI . (81M 866-4159

SUPPLEMENTARY INFORMATION

1. Report No: 50-302/77-41
2. Facility: Crystal River Unit #3
3. Report Date: 17 May 1977
4. Occurrence Date: 24 April 1977
5. Identification of occurrence:

Primary containment average air temperature exceeded 130 F. contrary to Technical Specification 3.6.1.5.

6. Conditions Prior to occurrence:

Normal Mode 1 operation. ~

7. Description of occurrence:

At 1945 with Reactor Building purge in progress, the primary containment average air temperature was 1410 F. Entered action statement of T.S.3.6.1.5.

Nuclear services closed cycle cooling valve SWV-151 was found closed. SWV-151 was opened allowing cooling water to return to Industrial Cooling Sys-tem, and the containment averago temperature decreased to less than 1300 F.

at 2029.

8. Designation of Apparent Cause of Occurrence:

Nuclear services closed cycle cooling valve SWV-151 was closed. The reason for this is unknown.

9. Analysis of Occurrence:

The initial temperature condition as assumed in LOCA Accident Analysis was exceeded, however, no hazard to plant or public was presented by this occur '

rence.

10. Corrective Action:

Normal shi ft surve'i llance (SP-300) checks Reactor Building temperature once per shift. Since this occurrence, plant personnel have been cautioned re-garding unauthorized manipulation of valves.

11. Failure Data

. I Fir s t. occurrence of this event.

-.