ML19345D685: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
        '
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE DECEMBER 10, 1980 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH        NOVEMBER 1980 OAY      AVERAGE DAILY POWER LEVEL                                      DAY      AVERAGE DAILY POWER LEVEL (MWE-NET)                                                                (MWE-NET) 1                  1041                                                  17                366 2                  1066                                                  18                602 3                1054                                                  19                958 4                1071                                                  20                917 5                    854                                                21                1050 6                    446                                                22                987 7                    988                                                23                731 8                  1078                                                  24                927 9                  1052                                                  25                1039 10                  1078                                                  26              1059 11                  1076                                                  27              1060 12                  1077                                                  28              1060 13                  1077                                                  29              1064 14                    121                                                30              1064 15                      0
* AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE DECEMBER 10, 1980 COMPANY PHILADELPHIA ELECTRIC COMPANY
                                                                                        ------        -
W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH        NOVEMBER 1980 OAY      AVERAGE DAILY POWER LEVEL                                      DAY      AVERAGE DAILY POWER LEVEL (MWE-NET)                                                                (MWE-NET) 1                  1041                                                  17                366 2                  1066                                                  18                602 3                1054                                                  19                958 4                1071                                                  20                917 5                    854                                                21                1050 6                    446                                                22                987 7                    988                                                23                731 8                  1078                                                  24                927 9                  1052                                                  25                1039 10                  1078                                                  26              1059 11                  1076                                                  27              1060 12                  1077                                                  28              1060 13                  1077                                                  29              1064 14                    121                                                30              1064 15                      0
                                                                               ~
                                                                               ~
16                    43
16                    43
;    801216 0975 1  .  ._-      ._--        _.      - - - _ - . . - - - - - - . --.. - - -- -- - - .                                .. -
;    801216 0975 1  .  ._-      ._--        _.      - - - _ - . . - - - - - - . --.. - - -- -- - - .                                .. -


                          -      -      -                            _. .
AVERAGE DAILY UNIT POWER' LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE DECEM8ER 10, 1980 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH NOVEMBER 1980 DAY  AVERAGE DAILY POWER LEVEL        DAY      ERAGE DAILY POWER LEVEL (MWE-NET)                                (MWE-NET) 1            857                    17              1056 2          1043                    18              1052 3          1041                    19              1052 4          1034                    20              1054 5          1056                    21              1051 6            998                    22              1044 7          1056                    23              1043 8          1056                    24              1044 9          1031                    25              1044 10          1053                    26              1042 11          1054                    27              1042 12          1054                    28              1038 13          1058                    29                807 14            1052                    30              1021 15            1053 16            1055
.                                                              .--
    *
  .
AVERAGE DAILY UNIT POWER' LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE DECEM8ER 10, 1980 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH NOVEMBER 1980
_ -
DAY  AVERAGE DAILY POWER LEVEL        DAY      ERAGE DAILY POWER LEVEL (MWE-NET)                                (MWE-NET) 1            857                    17              1056 2          1043                    18              1052 3          1041                    19              1052 4          1034                    20              1054 5          1056                    21              1051 6            998                    22              1044 7          1056                    23              1043 8          1056                    24              1044 9          1031                    25              1044 10          1053                    26              1042 11          1054                    27              1042 12          1054                    28              1038 13          1058                    29                807 14            1052                    30              1021 15            1053 16            1055


  .
                                                                                                                                                  .
  &
                                                                                                                                                    .
S 0                                      UNIT SHUTOOWNS AND POWER REDUCTIONS                    00CRET NO. 50 - 277 UNIT NAME PE ACH SOTTON UNIT 2 0                                                                                                            --        --      -------------
S 0                                      UNIT SHUTOOWNS AND POWER REDUCTIONS                    00CRET NO. 50 - 277 UNIT NAME PE ACH SOTTON UNIT 2 0                                                                                                            --        --      -------------
DATE DECEMBER 10, 1980 O                                            REPORT MONTH NOVEM8ER, 1980                    COMPLETED BY PHILaOELPHI A ELECTRIC COMPANY
DATE DECEMBER 10, 1980 O                                            REPORT MONTH NOVEM8ER, 1980                    COMPLETED BY PHILaOELPHI A ELECTRIC COMPANY W.M.ALDEN O
_    _
W.M.ALDEN O
ENGINEER-IN-CHARGE
ENGINEER-IN-CHARGE
                                                                                                       .        NUCLEAR SECTION GENERATION DIVISION-NUCLEAR 3                                                                                                TELEPHONE (2158 841-5022
                                                                                                       .        NUCLEAR SECTION GENERATION DIVISION-NUCLEAR 3                                                                                                TELEPHONE (2158 841-5022 D        l      l      l        l        l METH00 0F l LICENSEE 15YSTENICONPONENTI CAUSE AND CORRECTIVE l      (TYPE 100RATIONIREA50N15 HUTTING 00WNI            EVENT  l CODE I    CODE I        ACTION 10 No.1 OATE I (111 (H004511 (2) l REACTOR (3) l REPORT f l                  (4) l    (5) l PREVENT RECURRENCE I      1      i        !          l        .      I          i        1          1 30 l 801105 l F l 012.6 l A l        1        1 NA      l HA l VALVEX l ELECTRO-HYORAULIC CONTROL LEAR ON fl 3      1      l      1          l        l                l          l        l          l CONTROL VALVE I      l      l        l          l                l          1        1          1 33 l 801114 I F l 048.3        l    A l        3        I NA      I 50 l VALVEX l FEE 0 WATER LE AK AT HIGH PRES 5URE COOL ANT
                                    .                      -
_
_......... .... . .............. ..
D        l      l      l        l        l METH00 0F l LICENSEE 15YSTENICONPONENTI CAUSE AND CORRECTIVE l      (TYPE 100RATIONIREA50N15 HUTTING 00WNI            EVENT  l CODE I    CODE I        ACTION 10 No.1 OATE I (111 (H004511 (2) l REACTOR (3) l REPORT f l                  (4) l    (5) l PREVENT RECURRENCE I      1      i        !          l        .      I          i        1          1 30 l 801105 l F l 012.6 l
              '
A l        1        1 NA      l HA l VALVEX l ELECTRO-HYORAULIC CONTROL LEAR ON fl 3      1      l      1          l        l                l          l        l          l CONTROL VALVE I      l      l        l          l                l          1        1          1 33 l 801114 I F l 048.3        l    A l        3        I NA      I 50 l VALVEX l FEE 0 WATER LE AK AT HIGH PRES 5URE COOL ANT
[]        l      l      1        l          l                l          l        l          l INJECTION TESTABLE CHECA VALVE I      i      i        I          I                i          1        l          l                                                .
[]        l      l      1        l          l                l          l        l          l INJECTION TESTABLE CHECA VALVE I      i      i        I          I                i          1        l          l                                                .
R$ $ 801117 l F i 026.4 i            A I        3        l NA      l IA I INSTRU l APRM HI-FLOX AUTOMATIC SCRAM 00E TD '2A' D      I      l      t        l          l                l          l        l          l R.1 CIRC. FLOW CONTROL SYSTEN FAILURE I      l      1        1          I                I          I        I          i 15 1 801122 1 5 1 000.0 i            H l      4          l NA      I RC l ZZZZZZ l LL A0 DROP FOR CONTROL A00 SEQUENCE EXCHANGE C)      l      I      I        I          i                1          I        I          I I      I      I    e7.3 I          I                I          I        i          l
R$ $ 801117 l F i 026.4 i            A I        3        l NA      l IA I INSTRU l APRM HI-FLOX AUTOMATIC SCRAM 00E TD '2A' D      I      l      t        l          l                l          l        l          l R.1 CIRC. FLOW CONTROL SYSTEN FAILURE I      l      1        1          I                I          I        I          i 15 1 801122 1 5 1 000.0 i            H l      4          l NA      I RC l ZZZZZZ l LL A0 DROP FOR CONTROL A00 SEQUENCE EXCHANGE C)      l      I      I        I          i                1          I        I          I I      I      I    e7.3 I          I                I          I        i          l i            til                      (2)                                              (33                          (4)
>
i            til                      (2)                                              (33                          (4)
F - FORCEO        REASON                                                METHOD                        EXHIBIT G - INSTRUCTIONS l    5 - SCHEDULED      A - EQUIPMENT FAILURE (EXPLAIN)                        1 - MANUAL                    FOR PREPARATION OF OATA l
F - FORCEO        REASON                                                METHOD                        EXHIBIT G - INSTRUCTIONS l    5 - SCHEDULED      A - EQUIPMENT FAILURE (EXPLAIN)                        1 - MANUAL                    FOR PREPARATION OF OATA l
8 - MAINTENANCE OR TEST                                2 - MANUAL SCRAM.            ENTRY SHEETS FOR LICENSEE P                      C - REFUELING                                          3 - AUTOMATIC SCRAM.          EVENT REPORT (LER) i                      0 - REGULATORY RESTRICTION                            4 - DTHER (EXPLAIN)              FILE (NUREG-01613 b                      E - OPERATOR TRAINING + LICENSE EXAMINATION
8 - MAINTENANCE OR TEST                                2 - MANUAL SCRAM.            ENTRY SHEETS FOR LICENSEE P                      C - REFUELING                                          3 - AUTOMATIC SCRAM.          EVENT REPORT (LER) i                      0 - REGULATORY RESTRICTION                            4 - DTHER (EXPLAIN)              FILE (NUREG-01613 b                      E - OPERATOR TRAINING + LICENSE EXAMINATION
Line 60: Line 37:
i
i


  - ______              _ _ _ _ _ - . _ - _ _ _                _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                              . - - _ -_
e O
e
<                                                                                                                                                                                                                                                .
O
             =                                                                                                                                                                                                                                    .
             =                                                                                                                                                                                                                                    .
,
UNIT SHUTDOWNS AND POWER REDUCTIONS                                                    DOCKET NO. 50 - 278 UNIT NAME PE ACH BOTTOM UNIT 3
UNIT SHUTDOWNS AND POWER REDUCTIONS                                                    DOCKET NO. 50 - 278
:                                                                                                                                                                                                  DATE DECEMSER 10 1980 REPDRT NONTH NOVEMSER, 1980 COMPLETED SY PHILADELPHIA ELECTRIC COMPANY
!,
UNIT NAME PE ACH BOTTOM UNIT 3
                                                                                                                                                                                                                                      .____..
:                                                                                                                                                                                                  DATE DECEMSER 10 1980
! &                                                                                                                                                                                                      ..                .........._....
REPDRT NONTH NOVEMSER, 1980 COMPLETED SY PHILADELPHIA ELECTRIC COMPANY
             $                                                                                                                                                                                          W.M.ALDEN
             $                                                                                                                                                                                          W.M.ALDEN
:                                                                                                                                                                                                        ENGINE E R-IN-C HAR GE NUCLEAR SECTIDN b                                                                                                                                                                                          GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022
:                                                                                                                                                                                                        ENGINE E R-IN-C HAR GE NUCLEAR SECTIDN b                                                                                                                                                                                          GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022
_____________ .--                                                                    _.              .._.        _____                    ___              _      __--
  'l                  l                                                                                                                                                                                          ..__
  'l                  l                                                                                                                                                                                          ..__
                                                                                                                                                                                                            -
___
'                                                l      l                  l                                                                                                                                                                  ..
'                                                l      l                  l                                                                                                                                                                  ..
'                    l                          ITYPElDURATIDNIRE ASONISHUTTING OOWNI l METHOD OF l LICENSEE 15YSTEMICDNPONENTI CAUSE AND CORRECTIVE EVENT            4 CODE i      CODE l          ACTIDN 10 3  NO.1_ DATE
'                    l                          ITYPElDURATIDNIRE ASONISHUTTING OOWNI l METHOD OF l LICENSEE 15YSTEMICDNPONENTI CAUSE AND CORRECTIVE EVENT            4 CODE i      CODE l          ACTIDN 10 3  NO.1_ DATE
Line 91: Line 56:
F - FORCED                            REASDN                                                                                                          METHDD                        EXHISIT G - INSTRUCT!DNS 5 - SCHEDULED                          A - EQUIPMENT F AILURE (EXPL AIN) e 1 - NANUAL                    FDR PREPARATIDN OF DATA 8 - MAINTENANCE OR TEST                                                                                          2 - MANUAL SCRAM.
F - FORCED                            REASDN                                                                                                          METHDD                        EXHISIT G - INSTRUCT!DNS 5 - SCHEDULED                          A - EQUIPMENT F AILURE (EXPL AIN) e 1 - NANUAL                    FDR PREPARATIDN OF DATA 8 - MAINTENANCE OR TEST                                                                                          2 - MANUAL SCRAM.
C - REFUELING                                                                                                                                  ENTRY SHEETS FDR LICENSEE
C - REFUELING                                                                                                                                  ENTRY SHEETS FDR LICENSEE
                                                                                                                                                                   ' 3 - AUTDMATIC SCRAM.              EVENT REPORT (LERI
                                                                                                                                                                   ' 3 - AUTDMATIC SCRAM.              EVENT REPORT (LERI 0 - REGULATORY RESTRICTION                                                                                      4 - DTHER (EXPLAIN)
,
0 - REGULATORY RESTRICTION                                                                                      4 - DTHER (EXPLAIN)
'
          ,
E - OPERATDR TRAINING + LICENSE EXAMINATION                                                                                                        FILE INUREG-0161)
E - OPERATDR TRAINING + LICENSE EXAMINATION                                                                                                        FILE INUREG-0161)
F - ADMINJ5YRATIVE (5) p G - OPERATIONAL ERROR (EXPLAINI H - OTHER(EtPLAINI d
F - ADMINJ5YRATIVE (5) p G - OPERATIONAL ERROR (EXPLAINI H - OTHER(EtPLAINI d
EXHIBIT I - SAME SOURCE i
EXHIBIT I - SAME SOURCE i
<
I.
* I.
O t
O t
                                                                                                                                                                                                                    -  .-      -      .
 
______
UPtROlihG DASO MtPUM8 DOCKET No. 50 - 277 DATE DECEM8ER 10, 1980 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M. A L DE N ENGINEER-IN-CHAAGE NUCLEAR SECTIDN GENERATIDN DIV!530N-NUCLEAR TELEPHONE (215) 641-5022
* UPtROlihG DASO MtPUM8 DOCKET No. 50 - 277
                                                                              .                  . ..............
DATE DECEM8ER 10, 1980 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY
                                                                                                                    ......
W.M. A L DE N ENGINEER-IN-CHAAGE NUCLEAR SECTIDN GENERATIDN DIV!530N-NUCLEAR TELEPHONE (215) 641-5022
                                                                                                     ~ ~ ~'~~~~~~~~~
                                                                                                     ~ ~ ~'~~~~~~~~~
OPERATING STATUS
OPERATING STATUS
: 1. UNIT NAME: PEACH SOTTOM UNIT 2                        1 NOTES: THIS UNIT EXPERIENCED                                l
: 1. UNIT NAME: PEACH SOTTOM UNIT 2                        1 NOTES: THIS UNIT EXPERIENCED                                l 1                                                              I
                                                    --
1                                                              I
: 2. REPORTING PERIOD: NOVEM8ER, 1980                        1            THREE MAJOR QUTAGES AND                          I l                                                              ;
: 2. REPORTING PERIOD: NOVEM8ER, 1980                        1            THREE MAJOR QUTAGES AND                          I l                                                              ;
: 3. LICENSED THERMAL POWER (MWTis                3293      I            ONE MAJOR POWER REDUCTION                        l l                                                              1 4 NAMEPLATE R ATING (GROSS MWEl a                1152      l                                                            1
: 3. LICENSED THERMAL POWER (MWTis                3293      I            ONE MAJOR POWER REDUCTION                        l l                                                              1 4 NAMEPLATE R ATING (GROSS MWEl a                1152      l                                                            1 1                                                              I
                                                          -
: 5. DESIGN ELECTRICAL RATING (NET MWEl s          1065      1                                                            1 1                                                            i
1                                                              I
: 5. DESIGN ELECTRICAL RATING (NET MWEl s          1065      1                                                            1
                                                        --
1                                                            i
: 6. MAXIMUM DEPENDA4LE CAPACITY (GROSS MWEl f 1098          l                                                            l l                              .                              I
: 6. MAXIMUM DEPENDA4LE CAPACITY (GROSS MWEl f 1098          l                                                            l l                              .                              I
: 7. MAXIMUM DEPENDA8LE CAPACITY (NET MWEls        1051      l                                                            l
: 7. MAXIMUM DEPENDA8LE CAPACITY (NET MWEls        1051      l                                                            l
Line 128: Line 77:
: 11. HOURS IN REPORTING PERIOD                                    T20                4,040                    56,184
: 11. HOURS IN REPORTING PERIOD                                    T20                4,040                    56,184
: 12. NUMBER OF HOURS RE ACTOR WAS CRITICAL                      669.9              4,09 3.3                41,848.7
: 12. NUMBER OF HOURS RE ACTOR WAS CRITICAL                      669.9              4,09 3.3                41,848.7
: 13. RE ACTOR RESERVE SHUTDOWN HOURS                              0.0                    0.0                        0.3
: 13. RE ACTOR RESERVE SHUTDOWN HOURS                              0.0                    0.0                        0.3 14 Houas GENERATOR ON-LINE                                      632.7              3,839 0                  40,821.8
                                                                              .                .      -
                                                                                                              .          ..
14 Houas GENERATOR ON-LINE                                      632.7              3,839 0                  40,821.8
_
: 15. UNIT RESERVE 5NUTDOWN HOURS                                    0.0                    0.0                        0.0 l 16. GROSS THERMAL ENERGY GENERATED (MWHi                  1,935,647          11,457,326              118,222,970 1
: 15. UNIT RESERVE 5NUTDOWN HOURS                                    0.0                    0.0                        0.0 l 16. GROSS THERMAL ENERGY GENERATED (MWHi                  1,935,647          11,457,326              118,222,970 1
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                  649,400          3,815,220                38,873,450
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                  649,400          3,815,220                38,873,450
Line 140: Line 85:
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                          82.4                  43.0                      63.1
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                          82.4                  43.0                      63.1
: 22. UNIT CAPACITY FACTOR (USING DER NET)                          81.4                  42.4                      62.3
: 22. UNIT CAPACITY FACTOR (USING DER NET)                          81.4                  42.4                      62.3
                                                        .                                    .                            .
: 23. UNIT FORCED OUTAGE RATE                                      12.1                  3.6                        6.1 24 SnuTDOWNS SCHEDULED OVER NEXT 4 MONTHS (TYPE, DATE, AND DURATIDN OF E ACHi s
: 23. UNIT FORCED OUTAGE RATE                                      12.1                  3.6                        6.1
                                                                                                              ..
24 SnuTDOWNS SCHEDULED OVER NEXT 4 MONTHS (TYPE, DATE, AND DURATIDN OF E ACHi s
: 25. IF 5HUTDOWN AT END OF REPORT PERIDO, ESTIMATED DATE OF STARTUP
: 25. IF 5HUTDOWN AT END OF REPORT PERIDO, ESTIMATED DATE OF STARTUP
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATIOMI:              PDRECAST          ACHIE VE D
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATIOMI:              PDRECAST          ACHIE VE D INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
                                                                "
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION


           .                                H P t R 41 [ N(, D A l a P f Prp t DOCKET NO. 50 - 278 OATE DECEM8ER 10, 1980 COMPLETED BY PHILADELPHI A ELECTRIC COMFANY
           .                                H P t R 41 [ N(, D A l a P f Prp t DOCKET NO. 50 - 278 OATE DECEM8ER 10, 1980 COMPLETED BY PHILADELPHI A ELECTRIC COMFANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLE AR TELEPHONE (215) 841-5022 OPERATTNG STATUS
                                                                                                                                                  ..
W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLE AR TELEPHONE (215) 841-5022
                  ,,                                                                                                                  _.........
OPERATTNG STATUS
                                                                                                                                                        ...
: 1. UNIT N AME PE ACH BOTTOM UNIT 3                                      l NOTEst THIS UNIT EXPERIENCED NO                                          l
: 1. UNIT N AME PE ACH BOTTOM UNIT 3                                      l NOTEst THIS UNIT EXPERIENCED NO                                          l
                                          -
                                                                             -_.                                                                              l l
                                                                             -_.                                                                              l l
: 2. REPORTING PERIDOS NOVEMBER, 1980                                    l                  MAJOR DUTAGES AND ONE                                  I I                                                                          l
: 2. REPORTING PERIDOS NOVEMBER, 1980                                    l                  MAJOR DUTAGES AND ONE                                  I I                                                                          l
Line 164: Line 98:
l        S. DESIGN ELECTRICAL RATING INET MWEls                        1065    I                                                                          I
l        S. DESIGN ELECTRICAL RATING INET MWEls                        1065    I                                                                          I
:                                                                                1                                                                          1
:                                                                                1                                                                          1
: 6. MAXIMUM DEPENDA8LE CAPACITY (GROS $ MWEls 1098                        l                                                                        l
: 6. MAXIMUM DEPENDA8LE CAPACITY (GROS $ MWEls 1098                        l                                                                        l l                                                                          1
                                                                        --
l                                                                          1
: 7. MAXIMUM DEPENDA8LE CAPACITY INET MWE l s                    1035    l                                                                          1
: 7. MAXIMUM DEPENDA8LE CAPACITY INET MWE l s                    1035    l                                                                          1
: 8. IF CHANGES DCCUR IN CAP ACITY RATINGS IITEMS NUMSER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
: 8. IF CHANGES DCCUR IN CAP ACITY RATINGS IITEMS NUMSER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
Line 174: Line 106:
: 11. HDURS IN RE PORTING PERIOD                                                    720                  8,D40                      52,080
: 11. HDURS IN RE PORTING PERIOD                                                    720                  8,D40                      52,080
: 12. NUMBER OF HOURS RE ACTOR WAS CRITICAL                                      .720.0                  6,e64.4                  41,512.5
: 12. NUMBER OF HOURS RE ACTOR WAS CRITICAL                                      .720.0                  6,e64.4                  41,512.5
                                                                                                                                  -
: 13. REACTOR RESERVE SHUTDOWN HOURS                                                0.0                          0.0                      0.0 14 HOUR S GENE R ATOR OM-LINE                                                  720.0                  6,461.8                  40,393 6 IS. UNIT RESERVE SHUTDOWN HOUR $                                                  0.0                          0.0                      0.0
: 13. REACTOR RESERVE SHUTDOWN HOURS                                                0.0                          0.0                      0.0 14 HOUR S GENE R ATOR OM-LINE                                                  720.0                  6,461.8                  40,393 6 IS. UNIT RESERVE SHUTDOWN HOUR $                                                  0.0                          0.0                      0.0
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                                2,320 694                20,592,130                114,811,284 l
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                                2,320 694                20,592,130                114,811,284 l
_
: 17. GROSS ELECTRIC AL ENERGY GENERATED IMWHI                                771,490                6,837,400                37,423,260
: 17. GROSS ELECTRIC AL ENERGY GENERATED IMWHI                                771,490                6,837,400                37,423,260
: 18. NET ELECTRICAL ENERGY GENERATED (MWM)                                    742,603                6,581,544                35,926,384
: 18. NET ELECTRICAL ENERGY GENERATED (MWM)                                    742,603                6,581,544                35,926,384
(      19 UNIT SERVICE FACTOR
(      19 UNIT SERVICE FACTOR 100.0                      80.4                        77.6 l
                                                                                        --
100.0                      80.4                        77.6 l
i      20. UNIT AVAILA8ILITY FACTDR                                                    100.0                      80.4                        77.6 1
i      20. UNIT AVAILA8ILITY FACTDR                                                    100.0                      80.4                        77.6 1
'
: 21. UNIT C APACITY FACTOR (USING MOC NET) 99.7                    79.1                        66.7
: 21. UNIT C APACITY FACTOR (USING MOC NET)
                                .
99.7                    79.1                        66.7
                                                                                                                                              .....
: 22. UNIT CAPACITY FACTOR (USING DER NET)                                          96.8                    .76.9                        64.8
: 22. UNIT CAPACITY FACTOR (USING DER NET)                                          96.8                    .76.9                        64.8
: 23. UNIT FDRCED OUT AGE RATE                                                      0.0                      10.5                          7.4
: 23. UNIT FDRCED OUT AGE RATE                                                      0.0                      10.5                          7.4
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND OURATION OF EACHis REFUELING / MAINTENANCE, 3/7/81, SIXTEEN WEEKS
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND OURATION OF EACHis REFUELING / MAINTENANCE, 3/7/81, SIXTEEN WEEKS
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTup
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTup
: 26. UNIT S IN TEST STATUS (PRIDR TO COMMERCI AL OPERATION):                                FORECAST                ACHIEVED INITIAL CRITICALITY
: 26. UNIT S IN TEST STATUS (PRIDR TO COMMERCI AL OPERATION):                                FORECAST                ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATIOM                                                          -
* INITIAL ELECTRICITY COMMERCIAL OPERATIOM                                                          -
                                                                                                                                    .
   ~-- -    --        - - , -        -- o            ,              , .        -w.        ,  ---n.  ,,a.        -w, - , , . -        --        ~ --
   ~-- -    --        - - , -        -- o            ,              , .        -w.        ,  ---n.  ,,a.        -w, - , , . -        --        ~ --


                                                -                    .                        -  --    .                    . _ .                  -          .
locact 240. >u-ar, Attachment to Monthly Operating Report hr November 1080 REFUEING INFORMATION                                                  s
            .
locact 240. >u-ar,
* Attachment to Monthly Operating Report hr November 1080
                          -
REFUEING INFORMATION                                                  s
: 1.        Name of facility:
: 1.        Name of facility:
Peach Bottonit! nit 2
Peach Bottonit! nit 2
Line 214: Line 131:
Yes.
Yes.
If answer is yes, what,'in general, will there be?
If answer is yes, what,'in general, will there be?
                                                                                                      .
Toohnical Specifications to sooommodate reload fusel.
Toohnical Specifications to sooommodate reload fusel.
Modifloations to reactor oore operating limits are earpooted.
Modifloations to reactor oore operating limits are earpooted.
Line 220: Line 136:
                                                 %gting information:
                                                 %gting information:
November 13, 1981
November 13, 1981
,
'
: 6.          I + gt t licensing ocasiderations assooisted with refueling, e.g.,
: 6.          I + gt t licensing ocasiderations assooisted with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant abanges in feel design, new operating procedures Bone earpooted.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant abanges in feel design, new operating procedures Bone earpooted.
Line 229: Line 143:
l                                    8.        The present 14a==w spent ftsel pool storage espeoity and the size l                                                cf any increase la licensed storage espacity that has been requested
l                                    8.        The present 14a==w spent ftsel pool storage espeoity and the size l                                                cf any increase la licensed storage espacity that has been requested
;                                                or is p1mem*4, in number of final assemblies:
;                                                or is p1mem*4, in number of final assemblies:
,
The spent ftaal pool eterego capacity has been relicensed for 2816 final assemblies.
The spent ftaal pool eterego capacity has been relicensed for 2816 final assemblies.
9          The projected date of tt.e last refueling that een be disaharged to the opent ftsel pool assuming the present liosamed empemity.
9          The projected date of tt.e last refueling that een be disaharged to the opent ftsel pool assuming the present liosamed empemity.
                                                                                                                                         *              'T' September,1990                                          D""Dr                                          B
                                                                                                                                         *              'T' September,1990                                          D""Dr                                          B
                                                                                                             ,ccJ                        c              .W.. .3
                                                                                                             ,ccJ                        c              .W.. .3
_ _ _ . - . _ - . . - - , - . , _ _ - - . . - . . . . - . - , . . , - - - - - - - - -                    - - -  - - - - - - - - - - - - - - - -


          .. __-        .  . _.    -_  - - _ - _  __          _  __  _      _    -  - -.
    .
      - -
JA>cks t, No. S0-2IO
JA>cks t, No. S0-2IO
  ,
                     ,                                                Attachment to Monthly Operating Report For November 1980 1
                     ,                                                Attachment to Monthly Operating Report For November 1980 1
          *
          .
1
1
: 1. Mene of facility:
: 1. Mene of facility:
Line 250: Line 156:
June 27, 1961
June 27, 1961
                                                                                                     ;
                                                                                                     ;
                                                                  "
: 4. Will refueling or resumption of operstioa. thereafter require a technical specification oberge or other license assedmont?
: 4. Will refueling or resumption of operstioa. thereafter require a technical specification oberge or other license assedmont?
                                                      .
Yes.                          .
Yes.                          .
If onewer le yes, idiate in general, will Abese be?
If onewer le yes, idiate in general, will Abese be?
Line 267: Line 171:
September,1991
September,1991


_          _  _
                ''.                                        -
PEACH BOTTOM ATOMIC POWER STATION NARRATIVE  
PEACH BOTTOM ATOMIC POWER STATION NARRATIVE  


Line 275: Line 177:
UNIT 2 OPER ATI0ilS On November 1, adjustments to the jet compressor steam pressure caused a brief load reduction to 67% due to a decrease in condenser vacuum. Between November 2 and November 3, load was reduced 100 MWe for approximately four hours due to river temperatures difference. On November 5, the unit was removed from service to correct an EHC oil leak on #4 turbine control valve. Coincident with the EHC oil leak HPCI was declared inoperable for approximately 24 hours to correct a failed resistor in its EGM ricvcenor. The unit was returned to service on November 6. On November 14, the unit was removed from service due to a HPCI testable check valve leak. During reactor shutdown a low steam pressure scram occurred due to the mode switch not being taken out of "RUN". The unit was returned to service on November 16. Failure of a recirculation pump speed controller caused a high APRM flux scram the next day.      The unit was returned to service on November 18 and reached full power on November 21. Load was reduced between November 22 & 23 to accommodate a control rod pattern adjustment.
UNIT 2 OPER ATI0ilS On November 1, adjustments to the jet compressor steam pressure caused a brief load reduction to 67% due to a decrease in condenser vacuum. Between November 2 and November 3, load was reduced 100 MWe for approximately four hours due to river temperatures difference. On November 5, the unit was removed from service to correct an EHC oil leak on #4 turbine control valve. Coincident with the EHC oil leak HPCI was declared inoperable for approximately 24 hours to correct a failed resistor in its EGM ricvcenor. The unit was returned to service on November 6. On November 14, the unit was removed from service due to a HPCI testable check valve leak. During reactor shutdown a low steam pressure scram occurred due to the mode switch not being taken out of "RUN". The unit was returned to service on November 16. Failure of a recirculation pump speed controller caused a high APRM flux scram the next day.      The unit was returned to service on November 18 and reached full power on November 21. Load was reduced between November 22 & 23 to accommodate a control rod pattern adjustment.
UNIT 3 OPERATIONS Power recovery from the late October outage was completed by November 2, when the A-1 water box was removed from service due to tube leaks. On November 3, a load reduction of 150 MWe was necessary to accommodate a control rod pattern adjustment. On November 6, power was reduced to approximately 560 MWe due to a brief loss of the 'B' recirculation pump caused by the failure of a reactor level switch. On November 23, it was necessary to l                  manually isolate the reactor' water clean-up system because of a minor pipe leak between the inlet isolation valves. Repairs are in progress. Between November 29 & 30, a  power reduction was taken to adjust the control rod pattern.
UNIT 3 OPERATIONS Power recovery from the late October outage was completed by November 2, when the A-1 water box was removed from service due to tube leaks. On November 3, a load reduction of 150 MWe was necessary to accommodate a control rod pattern adjustment. On November 6, power was reduced to approximately 560 MWe due to a brief loss of the 'B' recirculation pump caused by the failure of a reactor level switch. On November 23, it was necessary to l                  manually isolate the reactor' water clean-up system because of a minor pipe leak between the inlet isolation valves. Repairs are in progress. Between November 29 & 30, a  power reduction was taken to adjust the control rod pattern.
                                                                                        '
l i
l i
l _ . _ , . - -        -        -    ,-.}}
l _ . _ , . - -        -        -    ,-.}}

Revision as of 05:22, 31 January 2020

Monthly Operating Repts for Nov 1980
ML19345D685
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/10/1980
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML19345D684 List:
References
NUDOCS 8012160475
Download: ML19345D685 (9)


Text

.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE DECEMBER 10, 1980 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH NOVEMBER 1980 OAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 1041 17 366 2 1066 18 602 3 1054 19 958 4 1071 20 917 5 854 21 1050 6 446 22 987 7 988 23 731 8 1078 24 927 9 1052 25 1039 10 1078 26 1059 11 1076 27 1060 12 1077 28 1060 13 1077 29 1064 14 121 30 1064 15 0

~

16 43

801216 0975 1 . ._- ._-- _. - - - _ - . . - - - - - - . --.. - - -- -- - - . .. -

AVERAGE DAILY UNIT POWER' LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE DECEM8ER 10, 1980 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH NOVEMBER 1980 DAY AVERAGE DAILY POWER LEVEL DAY ERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 857 17 1056 2 1043 18 1052 3 1041 19 1052 4 1034 20 1054 5 1056 21 1051 6 998 22 1044 7 1056 23 1043 8 1056 24 1044 9 1031 25 1044 10 1053 26 1042 11 1054 27 1042 12 1054 28 1038 13 1058 29 807 14 1052 30 1021 15 1053 16 1055

S 0 UNIT SHUTOOWNS AND POWER REDUCTIONS 00CRET NO. 50 - 277 UNIT NAME PE ACH SOTTON UNIT 2 0 -- -- -------------

DATE DECEMBER 10, 1980 O REPORT MONTH NOVEM8ER, 1980 COMPLETED BY PHILaOELPHI A ELECTRIC COMPANY W.M.ALDEN O

ENGINEER-IN-CHARGE

. NUCLEAR SECTION GENERATION DIVISION-NUCLEAR 3 TELEPHONE (2158 841-5022 D l l l l l METH00 0F l LICENSEE 15YSTENICONPONENTI CAUSE AND CORRECTIVE l (TYPE 100RATIONIREA50N15 HUTTING 00WNI EVENT l CODE I CODE I ACTION 10 No.1 OATE I (111 (H004511 (2) l REACTOR (3) l REPORT f l (4) l (5) l PREVENT RECURRENCE I 1 i  ! l . I i 1 1 30 l 801105 l F l 012.6 l A l 1 1 NA l HA l VALVEX l ELECTRO-HYORAULIC CONTROL LEAR ON fl 3 1 l 1 l l l l l l CONTROL VALVE I l l l l l 1 1 1 33 l 801114 I F l 048.3 l A l 3 I NA I 50 l VALVEX l FEE 0 WATER LE AK AT HIGH PRES 5URE COOL ANT

[] l l 1 l l l l l l INJECTION TESTABLE CHECA VALVE I i i I I i 1 l l .

R$ $ 801117 l F i 026.4 i A I 3 l NA l IA I INSTRU l APRM HI-FLOX AUTOMATIC SCRAM 00E TD '2A' D I l t l l l l l l R.1 CIRC. FLOW CONTROL SYSTEN FAILURE I l 1 1 I I I I i 15 1 801122 1 5 1 000.0 i H l 4 l NA I RC l ZZZZZZ l LL A0 DROP FOR CONTROL A00 SEQUENCE EXCHANGE C) l I I I i 1 I I I I I I e7.3 I I I I i l i til (2) (33 (4)

F - FORCEO REASON METHOD EXHIBIT G - INSTRUCTIONS l 5 - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF OATA l

8 - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE P C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER) i 0 - REGULATORY RESTRICTION 4 - DTHER (EXPLAIN) FILE (NUREG-01613 b E - OPERATOR TRAINING + LICENSE EXAMINATION

" - ADMINISTRATIVE ($1

, - OPERATIDNAL ERROR (EXPLAIN) h H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE y

i

e O

= .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PE ACH BOTTOM UNIT 3

DATE DECEMSER 10 1980 REPDRT NONTH NOVEMSER, 1980 COMPLETED SY PHILADELPHIA ELECTRIC COMPANY

$ W.M.ALDEN

ENGINE E R-IN-C HAR GE NUCLEAR SECTIDN b GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022

'l l ..__

' l l l ..

' l ITYPElDURATIDNIRE ASONISHUTTING OOWNI l METHOD OF l LICENSEE 15YSTEMICDNPONENTI CAUSE AND CORRECTIVE EVENT 4 CODE i CODE l ACTIDN 10 3 NO.1_ DATE

_ _ . _ I_(131 _ _ _(HDUR$ll

_ _ _ (23 I REACTOR 431 1 REPDRT e 1 (48 l (5) l PREVENT RECURRENCE 1 1 I l i I i l 19 1 801129 l 5 l 000.0 i H l 4 1 NA 1

!I I I I= 1 II RC l 2ZZZZZ l LOAD DROP FOR CDNTROL RDO PATTERN ADJUSTMENT I i 1 -

1 I

1 l i 1 I I I i

'i i

l' l (1) (2) (3)

I (45 i

F - FORCED REASDN METHDD EXHISIT G - INSTRUCT!DNS 5 - SCHEDULED A - EQUIPMENT F AILURE (EXPL AIN) e 1 - NANUAL FDR PREPARATIDN OF DATA 8 - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

C - REFUELING ENTRY SHEETS FDR LICENSEE

' 3 - AUTDMATIC SCRAM. EVENT REPORT (LERI 0 - REGULATORY RESTRICTION 4 - DTHER (EXPLAIN)

E - OPERATDR TRAINING + LICENSE EXAMINATION FILE INUREG-0161)

F - ADMINJ5YRATIVE (5) p G - OPERATIONAL ERROR (EXPLAINI H - OTHER(EtPLAINI d

EXHIBIT I - SAME SOURCE i

I.

O t

UPtROlihG DASO MtPUM8 DOCKET No. 50 - 277 DATE DECEM8ER 10, 1980 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M. A L DE N ENGINEER-IN-CHAAGE NUCLEAR SECTIDN GENERATIDN DIV!530N-NUCLEAR TELEPHONE (215) 641-5022

~ ~ ~'~~~~~~~~~

OPERATING STATUS

1. UNIT NAME: PEACH SOTTOM UNIT 2 1 NOTES: THIS UNIT EXPERIENCED l 1 I
2. REPORTING PERIOD: NOVEM8ER, 1980 1 THREE MAJOR QUTAGES AND I l  ;
3. LICENSED THERMAL POWER (MWTis 3293 I ONE MAJOR POWER REDUCTION l l 1 4 NAMEPLATE R ATING (GROSS MWEl a 1152 l 1 1 I
5. DESIGN ELECTRICAL RATING (NET MWEl s 1065 1 1 1 i
6. MAXIMUM DEPENDA4LE CAPACITY (GROSS MWEl f 1098 l l l . I
7. MAXIMUM DEPENDA8LE CAPACITY (NET MWEls 1051 l l
8. IF CHANGES OCCUR IN CAPACITY RATING 7 (ITEMS NUWdER 3 THRDUGH 71 SINCE LAST REPORT, GIVE RE ASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWEls
10. REASONS FOR RESTRICTIDMS, IF ANYI THIS MONTH YR-TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD T20 4,040 56,184
12. NUMBER OF HOURS RE ACTOR WAS CRITICAL 669.9 4,09 3.3 41,848.7
13. RE ACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.3 14 Houas GENERATOR ON-LINE 632.7 3,839 0 40,821.8
15. UNIT RESERVE 5NUTDOWN HOURS 0.0 0.0 0.0 l 16. GROSS THERMAL ENERGY GENERATED (MWHi 1,935,647 11,457,326 118,222,970 1
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 649,400 3,815,220 38,873,450
18. NET ELECTRICAL ENERGY GENERATED (MWHI 623,838 3,632,242 37,248,027
19. UNIT SERVICE FACTOR 87.9 47.7 72.7
20. UNIT AVAILA8ILITY FACT 0a 87.9 47.7 72.7
21. UNIT CAPACITY FACTOR (USING MDC NET) 82.4 43.0 63.1
22. UNIT CAPACITY FACTOR (USING DER NET) 81.4 42.4 62.3
23. UNIT FORCED OUTAGE RATE 12.1 3.6 6.1 24 SnuTDOWNS SCHEDULED OVER NEXT 4 MONTHS (TYPE, DATE, AND DURATIDN OF E ACHi s
25. IF 5HUTDOWN AT END OF REPORT PERIDO, ESTIMATED DATE OF STARTUP
26. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATIOMI: PDRECAST ACHIE VE D INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

. H P t R 41 [ N(, D A l a P f Prp t DOCKET NO. 50 - 278 OATE DECEM8ER 10, 1980 COMPLETED BY PHILADELPHI A ELECTRIC COMFANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLE AR TELEPHONE (215) 841-5022 OPERATTNG STATUS

1. UNIT N AME PE ACH BOTTOM UNIT 3 l NOTEst THIS UNIT EXPERIENCED NO l

-_. l l

2. REPORTING PERIDOS NOVEMBER, 1980 l MAJOR DUTAGES AND ONE I I l
3. LICENSED THERMAL POWERIMWTis 3293 l MAJOR POWER
  • REDUCTION I I l 4 NAMEPLATE RATING (GROS 5 MWEla 1152 l l

...  ;

l S. DESIGN ELECTRICAL RATING INET MWEls 1065 I I

1 1
6. MAXIMUM DEPENDA8LE CAPACITY (GROS $ MWEls 1098 l l l 1
7. MAXIMUM DEPENDA8LE CAPACITY INET MWE l s 1035 l 1
8. IF CHANGES DCCUR IN CAP ACITY RATINGS IITEMS NUMSER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY INET MWEls
10. REASDNS FOR RESTRICTIONS, IF ANY:

THIS MONTH VR-TO-0 ATE CUMULATIVE

11. HDURS IN RE PORTING PERIOD 720 8,D40 52,080
12. NUMBER OF HOURS RE ACTOR WAS CRITICAL .720.0 6,e64.4 41,512.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOUR S GENE R ATOR OM-LINE 720.0 6,461.8 40,393 6 IS. UNIT RESERVE SHUTDOWN HOUR $ 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,320 694 20,592,130 114,811,284 l
17. GROSS ELECTRIC AL ENERGY GENERATED IMWHI 771,490 6,837,400 37,423,260
18. NET ELECTRICAL ENERGY GENERATED (MWM) 742,603 6,581,544 35,926,384

( 19 UNIT SERVICE FACTOR 100.0 80.4 77.6 l

i 20. UNIT AVAILA8ILITY FACTDR 100.0 80.4 77.6 1

21. UNIT C APACITY FACTOR (USING MOC NET) 99.7 79.1 66.7
22. UNIT CAPACITY FACTOR (USING DER NET) 96.8 .76.9 64.8
23. UNIT FDRCED OUT AGE RATE 0.0 10.5 7.4
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND OURATION OF EACHis REFUELING / MAINTENANCE, 3/7/81, SIXTEEN WEEKS
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTup
26. UNIT S IN TEST STATUS (PRIDR TO COMMERCI AL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATIOM -

~-- - -- - - , - -- o , , . -w. , ---n. ,,a. -w, - , , . - -- ~ --

locact 240. >u-ar, Attachment to Monthly Operating Report hr November 1080 REFUEING INFORMATION s

1. Name of facility:

Peach Bottonit! nit 2

2. Scheduled date for nort rettioling shutdown:

January 2, 1982 l 3 Scheduled date for restart following reftaeling:

\ .

F6bruary 13, 1982 L

[ 14 Will refueling or resumption of operation thereafter require a

+=ah=iaal specification change or other 11a==== aumandment? ,

Yes.

If answer is yes, what,'in general, will there be?

Toohnical Specifications to sooommodate reload fusel.

Modifloations to reactor oore operating limits are earpooted.

5 Sobeduled date(s) for submitting proposed licanning action and

%gting information:

November 13, 1981

6. I + gt t licensing ocasiderations assooisted with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant abanges in feel design, new operating procedures Bone earpooted.

l  !

7 TM number of fuel asamblies (a) in the oore and (b) in the spent  ;

Jesi storman pools (a) core - 7614 Fuel Assemblies (b) Fuel Pool - 910 Ftaal Assemblies -

l 8. The present 14a==w spent ftsel pool storage espeoity and the size l cf any increase la licensed storage espacity that has been requested

or is p1mem*4, in number of final assemblies

The spent ftaal pool eterego capacity has been relicensed for 2816 final assemblies.

9 The projected date of tt.e last refueling that een be disaharged to the opent ftsel pool assuming the present liosamed empemity.

  • 'T' September,1990 D""Dr B

,ccJ c .W.. .3

JA>cks t, No. S0-2IO

, Attachment to Monthly Operating Report For November 1980 1

1

1. Mene of facility:

Peach Bottom thit 3 1

2. aah'ad date for next renseling shutdown: l Merah 7, 1961 3 helad date for restart following refueling:

June 27, 1961

4. Will refueling or resumption of operstioa. thereafter require a technical specification oberge or other license assedmont?

Yes. .

If onewer le yes, idiate in general, will Abese be?

i Technical specification oheness to " to reload fuel.

Modifloations to remotcc oore operating limits are expooted.

5 aa u 'ad date(s) for euhaitting proposed 'ia===iar eation and supporting information:

Marsh 6, 1961

6. Importent 14--i=- ==1 Ammtions assoSisted With refMeling, e.g. ,

new or different fuel decian or supplier, imurerieved design or performarm emelysis methode, eipitioent ebensee in feel design, new operating procedures:

None expected.

7 Tae mmber of fuel seassblies (a) in the oore and (b) in the = pent fuel stores pools (a) cor. - 76k Fuel Assemblies (b) Puel Fool - 712 Irradiated Fuel assemblies l 8. h present 11a===ad opent fuel pool etereas esposity and the eiso of any inorsees in lia===ad stozuge omstoity that has been requesi,e.1 or is planned, in number of fuel meesmblies:

N spent fuel pool storess aspeoity hoe been relioensed for 2816 Aaal eseeablies.

9 The projected date of the lost refueling ht een be Atenhap to the opent fuel pool assumir4r the present lia==ad ospesity:

September,1991

PEACH BOTTOM ATOMIC POWER STATION NARRATIVE

SUMMARY

OF OPEHATING EXPERIENCES NOVEMBER 1980  ;

UNIT 2 OPER ATI0ilS On November 1, adjustments to the jet compressor steam pressure caused a brief load reduction to 67% due to a decrease in condenser vacuum. Between November 2 and November 3, load was reduced 100 MWe for approximately four hours due to river temperatures difference. On November 5, the unit was removed from service to correct an EHC oil leak on #4 turbine control valve. Coincident with the EHC oil leak HPCI was declared inoperable for approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to correct a failed resistor in its EGM ricvcenor. The unit was returned to service on November 6. On November 14, the unit was removed from service due to a HPCI testable check valve leak. During reactor shutdown a low steam pressure scram occurred due to the mode switch not being taken out of "RUN". The unit was returned to service on November 16. Failure of a recirculation pump speed controller caused a high APRM flux scram the next day. The unit was returned to service on November 18 and reached full power on November 21. Load was reduced between November 22 & 23 to accommodate a control rod pattern adjustment.

UNIT 3 OPERATIONS Power recovery from the late October outage was completed by November 2, when the A-1 water box was removed from service due to tube leaks. On November 3, a load reduction of 150 MWe was necessary to accommodate a control rod pattern adjustment. On November 6, power was reduced to approximately 560 MWe due to a brief loss of the 'B' recirculation pump caused by the failure of a reactor level switch. On November 23, it was necessary to l manually isolate the reactor' water clean-up system because of a minor pipe leak between the inlet isolation valves. Repairs are in progress. Between November 29 & 30, a power reduction was taken to adjust the control rod pattern.

l i

l _ . _ , . - - - - ,-.