{{#Wiki_filter:ACCELERATED DTRIBUTION DEMON+RATION SYSTEM REGULATORY INFORMATION DISTRIBUTION'SYSTEM (RIDS)ACCESSION NBR:9209210134 DOC.DATE: 92/09/07 NOTARIZED:
{{#Wiki_filter:ACCELERATED DTRIBUTION DEMON+RATION SYSTEM REGULATORY INFORMATION DISTRIBUTION'SYSTEM               (RIDS)
NO DOCKET'g FACIL:5Ci250 Turkey Point Plant', Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.
ACCESSION NBR:9209210134             DOC.DATE:   92/09/07     NOTARIZED: NO           DOCKET 'g FACIL:5Ci250 Turkey Point Plant', Unit 3, Florida Power and Light                   C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light                   C 05000251 AUTH. NAME           AUTHOR AFFILIATION PLUNKETT,T.F.       Florida   Power & Light Co.
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document             Control Desk)


==SUBJECT:==
==SUBJECT:==
Special rept:on 920824,Hurricane Andrew struck plant w/both units in Mode 4.Sample line from plant vent stack to SPING-4 severed.Caused by extreme weather due to hurricane.
Special rept:on 920824,Hurricane Andrew struck plant w/both units in Mode 4.Sample line from plant vent stack to SPING-4 severed. Caused by extreme weather due to hurricane. Plant Change/Mod 92-104 issued to repair sample line.                                       0 DZSTRZBUTZON CODE:     ZE22D     COPZES RECEZVED:LTR         I ENCL     SZZE:
Plant Change/Mod 92-104 issued to repair sample line.DZSTRZBUTZON CODE: ZE22D COPZES RECEZVED:LTR I ENCL SZZE: TITLE: 50.73/50.9 L'icensee Event Report (LER), lnciden Rpt, etc.0 NOTES:NRR RAGHAVANgL NRR RAGHAVANiL.
TITLE: 50.73/50.9 L'icensee Event Report (LER), lnciden                 Rpt, etc.
05000250 i 05000251 RECIPIENT ID CODE/NAME PD2-2 LA AULUCK,R INTERNAL: ACNW AEOD/DSP/TPAB NRR/DET/EMEB 7E NRR/DLPQ/LPEB10 NRR/DREP/PRPB11 NRR/DST/SICB8H3 NRR/DST/SRXB 8E RES/DER/EIB EXTERNAL EG&G BRYCE i J H NRC PDR NSIC POOREiW.NOTES: COPIES LTTR ENCL.1 1 1 1 2 2 1 1 1 1 1 1 2 2 1'1 1 1 1 2 2 1 1 1 l.1, 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DOA AEOD/ROAB/DSP NRR/DLPQ/LHFB10 NRR/DOEA/OEAB NRR/DST/SELB 8D RR PLB8D1 REG FILE 02 RGN2 LE 01 C, E ST LOBBY WARD NSIC MURPHY,G.A NUDOCS FULL TXT COPIES LTTR ENCL 1 1 1 1 2 2 1'1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL RIDS RECIPIENTS:
NOTES:NRR RAGHAVANgL                                                                 05000250  i NRR RAGHAVANiL.                                                                 05000251 RECIPIENT             COPIES              RECIPIENT          COPIES ID CODE/NAME           LTTR ENCL          ID  CODE/NAME      LTTR ENCL PD2-2 LA                 . 1      1    PD2-2 PD                  1    1 AULUCK,R                   1      1 INTERNAL: ACNW                         2      2    AEOD/DOA                  1    1 AEOD/DSP/TPAB               1      1    AEOD/ROAB/DSP            2    2 NRR/DET/EMEB 7E             1      1    NRR/DLPQ/LHFB10          1' NRR/DLPQ/LPEB10             1      1    NRR/DOEA/OEAB            1    1 NRR/DREP/PRPB11             2      2    NRR/DST/SELB 8D          1    1 NRR/DST/SICB8H3             1'              RR        PLB8D1      1    1 NRR/DST/SRXB 8E             1      1    REG FILE          02      1    1 RES/DER/EIB                 1      1    RGN2          LE  01      1    1 C,
PLEASE HELP US TO REDUCE O'ASTE!COh'TACT THE DOCUMENT CONTROL DESK.ROOM Pl-S7 (EXT.504-2065)TO ELIMINATE YOUR NAM" FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 30 ENCL 30 P.O.Box 029100, Miami, FL, 33102-9100 SEP 07 1992 L-92-261 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
EXTERNAL   EG&G BRYCE i J H           2     2     E    ST LOBBY WARD        1     1 NRC PDR                    1     1     NSIC MURPHY,G.A           1    1 NSIC POOREiW.              1      l. NUDOCS FULL TXT           1     1 NOTES:                                  1,    1 NOTE TO ALL RIDS RECIPIENTS:
Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Special Report-Plant Vent Exhaust High Range Noble Gas Effluent Monitor Ino erable for Greater Than Seven Da s In accordance with Technical Specification 6.9.2, the attached Special Report is provided for information.
PLEASE HELP US TO REDUCE O'ASTE! COh'TACT THE DOCUMENT CONTROL DESK.
Should there be any questions on this information, please contact us~Very truly yours, y<(l:)nY h.c~.;:;;: T.F.Plunkett Vice President Turkey Point Nuclear TFP/GS attachment cc: Stewart D.Ebneter, Regional Administrator, Region II;USNRC Senior Resident Inspector, USNRC, Turkey Point Plant'7209210134 920907 PDR ADOCK 05000250 S PDR ,aa FPi Cicoop con',paoy g.Yi
ROOM Pl-S7 (EXT. 504-2065) TO ELIMINATE YOUR NAM" FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
'SPECIAL REPORT~Pur osei This Special Report is being filed in accordance with the re-quirements of Technical Specification 3.3.3.3, Table 3.3-5, Action 34, which requires the submission of a Special Report pursuant to TS 6.9.2 if the Special Particulate, Iodine, and Noble Gas Monitor (SPING-4)is not returned to operable status within 7 days.Event and Action Taken: On August 24, 1992, at approximately 0430, Hurricane Andrew struck Turkey Point.At that time, both units were in Mode 4.The winds due to the hurricane resulted in severing of the sample line from the Plant Vent Stack to the SPING-4.The deficiency was identified on August 26, during a walkdown to assess damage to plant systems due to the hurricane.
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 30   ENCL   30
Technical Specification (TS)3.3.3.3, Tabl'e 3.3-5, Item 19.a requires the High Range-Noble Gas Monitor in the Plant Vent Exhaust to be operable at all times.(This function is performed by the SPING-4).Upon the SPING-4 becoming inoperable, TS Action 34'requires initiation of the preplanned alternate method of monitoring the appropriate parameter, within 72 hours.This was initiated on August 26, 1992, in accordance with procedure NC-22C,"SPING and DAM Monitor Channel Check." This procedure requires the installation of a sampling pump and iodine and particulate filter holders.The filters are then analyzed weekly, with noble gas activity being analyzed each 12 hours.Cause of the Ino erabilit The cause of the SPING-4 becoming inoperable was the extreme weather due to Hurricane Andrew.Plans and Schedule for Restorin the S stem to 0 erable Status Plant Change/Modification (PCM)92-104 has been issued.This PCM addresses repair of the SPING-4 sample line, along with other repairs.The PCM will be implemented prior to either Turkey Point Unit s entry into mode 2.Upon implementation of this PCM, the SPING-4 will be returned to operability.}}
 
P.O. Box 029100, Miami, FL, 33102-9100 SEP     07     1992 L-92-261 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Re:   Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Special Report Plant Vent Exhaust High Range Noble Gas Effluent Monitor Ino erable for Greater Than Seven             Da s In accordance with Technical Specification 6.9.2, the attached Special Report is provided for information.
Should there be any questions on this information, please contact us ~
Very truly   yours, y<(l:)nY T. F. Plunkett h         . c~ .;:;;:
Vice President Turkey Point Nuclear TFP/GS attachment cc:   Stewart D. Ebneter, Regional Administrator, Region II;             USNRC Senior Resident Inspector, USNRC, Turkey Point Plant
'7209210134 920907 ADOCK 05000250 PDR S                     PDR                                                   g. Yi
            ,aa FPi Cicoop con',paoy
 
                            'SPECIAL REPORT
~Pur osei This Special Report is being filed in accordance with the re-quirements of Technical Specification 3.3.3.3, Table 3.3-5, Action 34, which requires the submission of a Special Report pursuant to TS 6.9.2 Noble Gas    Monitor if the Special Particulate, Iodine, and (SPING-4)   is not returned to operable status within   7 days.
Event and Action Taken:
On   August 24, 1992, at approximately 0430, Hurricane Andrew struck Turkey Point. At that time, both units were in Mode 4.
The winds due to the hurricane resulted in severing of the sample line from the Plant Vent Stack to the SPING-4. The deficiency was identified on August 26, during a walkdown to assess damage to plant systems due to the hurricane.
Technical Specification (TS) 3.3.3.3, Tabl'e 3.3-5, Item 19.a requires the High Range-Noble Gas Monitor in the Plant Vent Exhaust to be operable at all times.         (This function is performed by the SPING-4). Upon the SPING-4 becoming inoperable, TS Action 34 'requires initiation of the preplanned alternate method of monitoring the appropriate parameter, within 72 hours. This was initiated on August 26, 1992, in accordance with procedure NC-22C, "SPING and DAM Monitor Channel Check." This procedure requires the installation of a sampling pump and iodine and particulate filter holders. The filters are then analyzed weekly, with noble gas activity being analyzed each 12 hours.
Cause   of the Ino erabilit The cause of the SPING-4 becoming inoperable       was the extreme weather due to Hurricane Andrew.
Plans and Schedule   for Restorin the     S stem to 0 erable Status Plant Change/Modification (PCM) 92-104 has been issued. This PCM addresses repair of the SPING-4 sample line, along with other repairs. The PCM will be implemented prior to either Turkey Point Unit s entry into mode 2. Upon implementation of this PCM, the SPING-4 will be returned to operability.}}

Latest revision as of 07:49, 22 October 2019

Special Rept:On 920824,Hurricane Andrew Struck Plant W/Both Units in Mode 4.Sample Line from Plant Vent Stack to SPING-4 Severed.Caused by Extreme Weather Due to Hurricane.Plant Change/Mod 92-104 Issued to Repair Sample Line
ML17349A382
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/07/1992
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-261, NUDOCS 9209210134
Download: ML17349A382 (3)


Text

ACCELERATED DTRIBUTION DEMON+RATION SYSTEM REGULATORY INFORMATION DISTRIBUTION'SYSTEM (RIDS)

ACCESSION NBR:9209210134 DOC.DATE: 92/09/07 NOTARIZED: NO DOCKET 'g FACIL:5Ci250 Turkey Point Plant', Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION PLUNKETT,T.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special rept:on 920824,Hurricane Andrew struck plant w/both units in Mode 4.Sample line from plant vent stack to SPING-4 severed. Caused by extreme weather due to hurricane. Plant Change/Mod 92-104 issued to repair sample line. 0 DZSTRZBUTZON CODE: ZE22D COPZES RECEZVED:LTR I ENCL SZZE:

TITLE: 50.73/50.9 L'icensee Event Report (LER), lnciden Rpt, etc.

NOTES:NRR RAGHAVANgL 05000250 i NRR RAGHAVANiL. 05000251 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA . 1 1 PD2-2 PD 1 1 AULUCK,R 1 1 INTERNAL: ACNW 2 2 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DSP 2 2 NRR/DET/EMEB 7E 1 1 NRR/DLPQ/LHFB10 1' NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 NRR/DREP/PRPB11 2 2 NRR/DST/SELB 8D 1 1 NRR/DST/SICB8H3 1' RR PLB8D1 1 1 NRR/DST/SRXB 8E 1 1 REG FILE 02 1 1 RES/DER/EIB 1 1 RGN2 LE 01 1 1 C,

EXTERNAL EG&G BRYCE i J H 2 2 E ST LOBBY WARD 1 1 NRC PDR 1 1 NSIC MURPHY,G.A 1 1 NSIC POOREiW. 1 l. NUDOCS FULL TXT 1 1 NOTES: 1, 1 NOTE TO ALL RIDS RECIPIENTS:

PLEASE HELP US TO REDUCE O'ASTE! COh'TACT THE DOCUMENT CONTROL DESK.

ROOM Pl-S7 (EXT. 504-2065) TO ELIMINATE YOUR NAM" FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 30 ENCL 30

P.O. Box 029100, Miami, FL, 33102-9100 SEP 07 1992 L-92-261 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Special Report Plant Vent Exhaust High Range Noble Gas Effluent Monitor Ino erable for Greater Than Seven Da s In accordance with Technical Specification 6.9.2, the attached Special Report is provided for information.

Should there be any questions on this information, please contact us ~

Very truly yours, y<(l:)nY T. F. Plunkett h . c~ .;:;;:

Vice President Turkey Point Nuclear TFP/GS attachment cc: Stewart D. Ebneter, Regional Administrator, Region II; USNRC Senior Resident Inspector, USNRC, Turkey Point Plant

'7209210134 920907 ADOCK 05000250 PDR S PDR g. Yi

,aa FPi Cicoop con',paoy

'SPECIAL REPORT

~Pur osei This Special Report is being filed in accordance with the re-quirements of Technical Specification 3.3.3.3, Table 3.3-5, Action 34, which requires the submission of a Special Report pursuant to TS 6.9.2 Noble Gas Monitor if the Special Particulate, Iodine, and (SPING-4) is not returned to operable status within 7 days.

Event and Action Taken:

On August 24, 1992, at approximately 0430, Hurricane Andrew struck Turkey Point. At that time, both units were in Mode 4.

The winds due to the hurricane resulted in severing of the sample line from the Plant Vent Stack to the SPING-4. The deficiency was identified on August 26, during a walkdown to assess damage to plant systems due to the hurricane.

Technical Specification (TS) 3.3.3.3, Tabl'e 3.3-5, Item 19.a requires the High Range-Noble Gas Monitor in the Plant Vent Exhaust to be operable at all times. (This function is performed by the SPING-4). Upon the SPING-4 becoming inoperable, TS Action 34 'requires initiation of the preplanned alternate method of monitoring the appropriate parameter, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This was initiated on August 26, 1992, in accordance with procedure NC-22C, "SPING and DAM Monitor Channel Check." This procedure requires the installation of a sampling pump and iodine and particulate filter holders. The filters are then analyzed weekly, with noble gas activity being analyzed each 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Cause of the Ino erabilit The cause of the SPING-4 becoming inoperable was the extreme weather due to Hurricane Andrew.

Plans and Schedule for Restorin the S stem to 0 erable Status Plant Change/Modification (PCM)92-104 has been issued. This PCM addresses repair of the SPING-4 sample line, along with other repairs. The PCM will be implemented prior to either Turkey Point Unit s entry into mode 2. Upon implementation of this PCM, the SPING-4 will be returned to operability.