Other: ML20258A284, ML20269A465, ML20276A192, ML20303A199, ML21036A060, ML21067A504, ML21067A507, ML21084A182, ML21091A004, ML21097A027, ML21145A217, ML21217A187, ML21239A064, ML21239A066, ML21239A068, ML21256A067, ML21256A069, ML21312A002, ML21312A003, ML21312A007, PMNS20211071, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue, PMNS20211128, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - an Inconsistency in Documentation Regarding Reactor Coolant Pump Code Case N 481, TLAA 4.7.6
|
MONTHYEARML20246G6972020-08-24024 August 2020 Application for Subsequent Renewed Operating Licenses Project stage: Request ML20269A4652020-10-0606 October 2020 SLRA - Portal Letter Project stage: Other ML20276A1922020-10-0909 October 2020 Subsequent License Renewal Aging Management Audit Plan Project stage: Other ML20258A2842020-10-13013 October 2020 SLRA - Acceptance and Opportunity for Hearing Letter Project stage: Other ML20303A1992020-10-29029 October 2020 Subsequent License Renewal Safety Project Management Assignment Project stage: Other ML21035A3032021-02-0404 February 2021 (Naps), Units 1 and 2 - Update to Subsequent License Renewal Application (SLRA) Supplement 1 Project stage: Supplement ML21063A5602021-03-0404 March 2021 Final Request for Additional Information Set 1 - North Anna SLRA Safety Review (EPID L-2020-SLR-0000) - Enclosure Project stage: RAI ML21063A5522021-03-0404 March 2021 Final Request for Additional Information Set 1 - North Anna SLRA Safety Review (EPID L-2020-SLR-0000) - Email Project stage: RAI ML21067A5042021-03-0808 March 2021 Final Request for Confirmation of Information (RCI) Set 1 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: Other ML21067A5072021-03-0808 March 2021 Final Request for Confirmation of Information (RCI) Set 1 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: Other ML21076B0252021-03-17017 March 2021 Update to Subsequent License Renewal Application, Supplement 2 Project stage: Supplement ML21084A1822021-03-24024 March 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information for the Safety Review - Set 1 Project stage: Other ML21091A0042021-04-0101 April 2021 SLRA Safety Review - Withdrawn Requests for Information (EPID No. L-2020-SLR-0000) - Enclosure 2 Project stage: Other ML21091A1872021-04-0101 April 2021 Response to NRC Request for Additional Information Regarding Safety Review - Set 1 & Clarification to Aging Management of Fire Protection System Lined Ductile Iron Valves Project stage: Supplement ML21091A0022021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: RAI ML21091A0032021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure 1 - RAIs Project stage: RAI ML21036A0602021-04-0808 April 2021 Report for the Aging Management Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML21097A0272021-04-14014 April 2021 Request for Withholding from Public Disclosure Regarding Subsequent License Renewal Application Project stage: Other ML21104A0372021-04-15015 April 2021 Request for Withholding Information Regarding Subsequent License Renewal Application Project stage: Withholding Request Acceptance ML21119A2872021-04-29029 April 2021 (Naps), Unit 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 2 and Flow Accelerated Corrosion Program Enhancement Completion Project stage: Response to RAI ML21123A2972021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail Project stage: RAI ML21123A2982021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: RAI PMNS20210548, Discussion of Dominions Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-05-12012 May 2021 Discussion of Dominions Response to Select Staff RAIs on North Anna Subsequent License Renewal Application Project stage: RAI ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting Project stage: RAI ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides Project stage: Other ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides Project stage: Meeting ML21147A2932021-05-27027 May 2021 (Naps), Units 1 and 2 Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 3 and Administrative Change to SLRA Table A4.0-1, Item 25 Project stage: Response to RAI ML21221A1482021-05-27027 May 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides Project stage: RAI PMNS20210666, Discussion of Dominions Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-05-27027 May 2021 Discussion of Dominions Response to Select Staff RAIs on North Anna Subsequent License Renewal Application Project stage: RAI ML21145A2122021-06-0909 June 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Memoranda Project stage: RAI ML21145A2152021-06-0909 June 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Enclosure 2 - List of Attendees Project stage: RAI ML21145A2132021-06-0909 June 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Enclosure 1 - Summary Project stage: RAI PMNS20210777, Discussion of Dominions Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined2021-06-15015 June 2021 Discussion of Dominions Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined Project stage: RAI ML21166A3512021-06-15015 June 2021 Safety RAIs - Set 4 - Draft Project stage: Draft RAI ML21174A3042021-06-23023 June 2021 SLRA RAI Response Public Meeting - 21-06-24 Project stage: RAI PMNS20210778, Discussion of Dominions Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined2021-06-23023 June 2021 Discussion of Dominions Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined Project stage: RAI ML21174A1952021-06-23023 June 2021 Safety RAIs - Set Y - Draft - Enclosure Project stage: Draft RAI ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: RAI ML21188A1652021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: RAI ML21210A3962021-07-29029 July 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 4 and Supplement 3 Project stage: Supplement ML21217A1872021-08-0505 August 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application First 10 CFR 54.21 (B) Annual Amendment Project stage: Other ML21221A1362021-08-10010 August 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application Project stage: RAI ML21221A1412021-08-10010 August 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Attendees Project stage: RAI ML21221A1382021-08-10010 August 2021 Meeting Summary: Discussion of Dominions Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Meeting Summary Project stage: RAI ML21225A5642021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Presentation Project stage: Meeting PMNS20211071, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue2021-08-13013 August 2021 Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue Project stage: Other ML21225A5512021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Transmittal E-mail Project stage: Meeting ML21238A0982021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: Draft RAI ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: Draft RAI ML21238A2972021-08-26026 August 2021 Subsequent License Renewal Application Supplement 4 Project stage: Supplement 2021-04-08
[Table View] |
Text
NORTH ANNA POWER STATION, UNITS 1 AND 2 (NAPS)
SUBSEQUENT LICENSE RENEWAL APPLICATION (SLRA)
REQUESTS FOR CONFORMATION OF INFORMATION (RCIS)
SAFETY - SET 1 RCI No.
Description Dominion Energy's Response B2.1.27-A Based on the review of procedure 0-EPM-2303-01, Inspection of Service Water Cathodic Protection System, Revision 15, the staff noted that the acceptance range for instant-off potentials includes an upper bound of -1,200 mV.
During its audit, the staff reviewed the previous revision of procedure 0-EPM 2303 01 (i.e., Revision 14) and noted the acceptance range for instant-off potentials included an upper bound of -1,500 mV. Confirm that Revision 15 of procedure 0 EPM 2303 01 includes a limiting critical potential of -1,200 mV.
B2.1.27-B Based on the review of NAS 74, Yard Water and Fire Protection Systems for North Anna Power Station, Revision 4, the staff noted that buried fire protection piping is cast iron with a cement mortar lining and bituminous coating.
Confirm that in scope buried gray cast iron piping is specified to be externally coated with a bituminous coating.
B2.1.27-C Based on the review of Design Change No.04-018, Underground Fire Protection Piping Replacement/ North Anna, Units 1&2, dated May 18, 2006, the staff noted that buried ductile iron fire protection lines are coated with an asphaltic exterior coating.
Confirm that in scope buried ductile iron piping is specified to be externally coated with an asphaltic coating.
B2.1.27-D Based on the review of 11715-FV-46A-8, Underground Fuel Oil Storage Tanks I EG TK 2A & 2B, Revision 8, the staff noted buried fuel oil storage tanks are externally coated with a minimum of 16 mils of Koppers Bitumastic 300-M or equal.
Confirm that in scope buried steel tanks exposed to soil are specified to be externally coated with Koppers Bitumastic 300-M or equal.
RCI No.
Description Dominion Energy's Response B2.1.27-E As amended by letter dated February 4, 2021, Enhancement No. 3 for the Buried and Underground Piping and Tanks program states the following:
The following buried piping materials will be replaced before the last five years of the inspection period prior to entering the subsequent period of extended operation. (Added -
Supplement 1): (a) the buried copper piping between the fire protection jockey pump and the hydropneumatic tank will be replaced with carbon steel; and (b) the buried carbon steel fill line piping for the security diesel fuel oil tank will be replaced with corrosion resistant material that does not require inspection (e.g.,
titanium alloy, super austenitic, or nickel alloy materials).
Confirm the following:
(1) that the piping referenced in part (a) is the only in-scope (within scope of subsequent licensing renewal) buried copper alloy piping; and (2) that the piping referenced in part (b) is the only in scope (within scope of subsequent licensing renewal) buried steel piping in the security system.
B2.1.34-A Based on the audit review of ER-NA-INS-1047, Revision 10, Monitoring of Structures North Anna Power Station, the staff verified that the component referenced as valve body in SLRA Table 3.5.2-15, Structures and Components Supports - Flood Protection Dike - Aging Management Evaluation, is included in the inspection of component reference as steel culvert in Attachment 6 of ER-NA-INS-104, List of Earthen Structures.
of ER-NA-INS-104 states that the steel culvert associated with the flood wall west of Turbine Building is inspected in accordance with Procedure 1-PT-9.3. Procedure 1-PT-9.3 indicates that exposed portions of the drainpipe and valves associated with the flood wall are inspected.
Confirm that the component referenced as valve body in SLRA Table 3.5.2-15, Structures and Component Supports - Flood
RCI No.
Description Dominion Energy's Response Protection Dike - Aging Management Evaluation, is included in the inspection of the component referenced as steel culvert in of ER-NA-INS-104, List of Earthen Structures.
TLAA 4.7.4-A Based on the audit review of Calculation 11715-NMB-282-FC, Revision 0, Addendum 00B, Thermal Stress Analysis of Fuel Pool Liner - Fuel Pool Liner Fatigue Evaluation for 80 Years Plant Life, NAPS Units 1 & 2 and supporting referenced Calculation CE-1272, Revision 0, Analysis of Surry Fuel Pool Liner at 212 Degrees Fahrenheit, the staff noted that Dominion calculated the limiting cumulative damage (or cumulative usage factor) due to fatigue effects of thermal cyclic loadings for the controlling component (i.e., plate-stiffener weld) of the SFP liner from the three design conditions described in the SLRA to be 0.75. This is less than the acceptance criterion of 1.0.
Confirm that the limiting cumulative damage (or cumulative usage factor) due to fatigue effects of thermal cyclic loadings calculated for the controlling component (i.e., plate-stiffener weld) of the SFP liner from the three design conditions described in SLRA Section 4.7.4 to be 0.75.
3.5.2.2.2.6-A Based on the audit review of ETE-SLR-2020-2204, Assessment of Radiation Effects on Reactor Vessel Supports for NAPS Units 1 & 2, Revision 0, the staff noted that the observed difference in critical stress values for Cases 2 and 4 in ETE-SLR-2020-2204 are small and that Case 2 bounds Case 3, and that Case 4 was analyzed as a quality check for the effect of higher levels of irradiation (reflected by the 62.9 ski yield stress) on the values of critical stress and that Cases 3 and 4 need not be included in SLRA Section 3.5.2.2.2.6.
Confirm that observed difference in critical stress values for Cases 2 and 4 in ETE-SLR-2020-2204 are small Confirm that Case 2 bounds Case 3 Confirm that Case 4 was analyzed as a quality check for the effect of higher levels of irradiation (reflected by the 62.9 ksi yield stress) on the values of critical stress
RCI No.
Description Dominion Energy's Response Confirm that Cases 3 and 4 need not be included in SLRA Section 3.5.2.2.2.6.
3.5.2.2.2.6-B Based on the audit review of ETE-SLR-2020-2204, Assessment of Radiation Effects on Reactor Vessel Supports for NAPS Units 1 & 2, Revision 0, the staff noted that the inner surface flaw analyzed in Table 1 is for a flaw that that has a depth of 1/4T; and stresses in Figures 1 through 4 of ETE-SLR-2020-2204 was back calculated from the applied stress intensity factor (K) set equal to KIC and that the critical stress in Table 1 of SLRA Section 3.5.2.2.2.6 came from these plots.
Confirm that the inner surface flaw analyzed in Table 1 is for a flaw that that has a depth of 1/4T Confirm stresses in Figures 1 through 4 of ETE-SLR-2020-2204 was back calculated from the applied stress intensity factor (K) set equal to KIC Confirm that the critical stress in Table 1 of SLRA Section 3.5.2.2.2.6 came from these plots.