002 Radiation Safety Baseline Inspection Information Request
ML22032A096
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 02/01/2022
From: Kellner R
NRC/RGN-II
To: Page B
Virginia Electric & Power Co (VEPCO)
References
Download: ML22032A096 (7)


Text

From: Kellner, Bob To: Bob Page (robert.page@dominionenergy.com)

Subject:

NRC 2022 Radiation Safety Inspection - North Anna 2022002 Date: Thursday, January 20, 2022 9:33:00 AM Attachments: North Anna 2022-002 Radiation Safety Baseline Inspection Information Request.pdf

Bob, Thank you for confirming that you will be the point of contact for the upcoming scheduled Radiation Safety Inspection at North Anna.

Attached is the Request for Information for the inspection. The request includes a list of the documents we routinely request for Inspection Procedures (IPs) 71124.01, 71124.03, 71124.04, 71124.05, and 71151. If you plan to upload the requested documents to CERTREC, using software to zip the numerous files into a single file prior to upload has proven to be very efficient.

The current plan is to be onsite the weeks of March 14-18 and March 28-April 1, 2022. As of now, Jonathan Rivera and I will be the inspectors coming onsite. I will be onsite the first

& second week and Jonathan will be onsite the second week.

Depending on how things evolve, and if work travel is limited due to COVID-19, we may have to pursue some combination of partial, remote, or reduced on-site inspection time to complete the inspection activities. Please update me if Dominion or North Anna decides to modify, reduce, or limit onsite access. I will you let you know if I receive any information on restriction of travel from NRC management.

Please let me know if you have any questions.

Regards, Bob Robert Kellner Senior Health Physicist USNRC/Region II/DRS/EB3 Marquis One Tower Suite 1200 245 Peachtree Center Ave, NE Atlanta, GA 30303-1257 (404) 997-4508

ML22032A096 North Anna Power Station Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2022002 During the weeks of March 14 - 18 and March 28 - April 1, 2022, the NRC will perform a baseline Radiation Safety Inspection at the North Anna Power Station (NRC Inspection Procedures 71124.01, 71124.03, 71124.04, 71124.05, and 71151).

Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than March 7, 2022.

If there are any questions about this inspection or the material requested, please contact the lead inspector, Robert Kellner at 404-997-4508, or the Engineering Branch 3 Branch Chief, Binoy Desai, at 404-997-4519.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading- rm/adams.html.

PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.

Document Request List Occupational and Public Radiation Safety Cornerstones Inspection Dates: March 14 - 18 and March 28 - April 1, 2022 Documents Due to Region II by: March 7, 2022 Inspection Procedures: IP 71124.01 Radiological Hazard Assessment and Exposure Controls IP 71124.03 In-plant Airborne Radioactivity Control and Mitigation IP 71124.04 Occupational Dose Assessment IP 71124.05 Radiation Monitoring Instrumentation IP 71151 Performance Indicator Verification Lead Inspector and Mailing Address:

Robert Kellner U.S. Nuclear Regulatory Commission Senior Health Physicist Region II US NRC Region II ATTN: Robert Kellner (404) 997-4508 245 Peachtree Center Ave., N.E Robert.Kellner@nrc.gov Suite 1200 Atlanta, GA 30303 Note: Current version of these documents is expected unless specified otherwise. Secure file server access (Certrec, SharePoint, etc.), or electronic media (CD/DVD), is preferred. To the extent possible, please organize the information as it is arranged below. Experience has shown that poorly organized files can lead to a less efficient inspection and places additional burden on licensee staff. During the inspection, the inspectors may request additional documents. To the extent possible, please organize the information as it is arranged below. Pay attention to the date ranges for the items requested as they may change from item to item. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.

Documentation is requested from March 1, 2021 to present for IPs 71124.01 and 71151.

Documentation for IP 71124.03, IP 71124.04, and IP 71124.05 is requested from September 1, 2020 to present. We would prefer as much of the information as possible in electronic form. An index of the files is also helpful. For those items requesting a list of documents/areas, the inspector will may select documents/areas from the list for on-site review.

Miscellaneous

1. Plant Management, Radiation Protection, and Chemistry organizational charts
2. List of primary contacts for each inspection area w/phone numbers
3. Corrective Action Program (CAP) procedure(s)
4. List of radiation protection procedures, including title and number
5. Most recent 10 CFR 61 analysis for the DAW waste stream
6. Outage schedule, including work activities to be conducted during the weeks of the inspection (e.g. Gantt chart or similar list)

Page 2 of 6

71124.01 - Radiological Hazard Assessment and Exposure Controls (Last inspected March 2021)

1. Site and corporate procedures related to RP controls (e.g., Posting, labeling, surveys, survey frequency, RWPs, contamination control, HRA/LHRA/VHRA control, key control, control of divers, special controls during fuel offload, hot spots, ISFSI Controls, etc.)
2. Procedures related to release of personnel and materials (e.g., release surveys, decontamination, guidance for alarm follow-up, etc.)
3. List of planned outage & active online Radiation Work Permits (RWPs), including dose and dose rate limits.
4. List of locations, or plant maps indicating the location, of LHRAs and VHRAs. Include areas with the potential to become a LHRA during routine operations or outages.
5. List of all non-fuel items stored in spent fuel pool (e.g., used filters, irradiated hardware, etc.).
6. Technical basis documents (white paper, engineering calculation, etc.) related to the facility beta-gamma and alpha radiation characterization.
7. Outage ALARA report from the previous refueling outage.
8. ALARA planning packages for the 3 highest dose jobs for the upcoming refueling outage.
9. All self-assessments or audits covering radiological hazard assessment and exposure controls and HP controls since March 1, 2021 (if none, then provide the two most recent).
10. List of Corrective Action Program (CAP) documents (CR, NRC, AR, etc.) related to RP controls (e.g., radworker error, HP technician error, posting issues, Nationally Tracked Sources issue, HRA/LHRA/VHRA issues, survey problems, ALARA, etc.) generated since March 1, 2021. This should be a list of corrective action documents containing a CAP document number and a brief description, not complete documents.

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation (Last inspected March 2020)

1. Procedures related to airborne monitoring and control (e.g., use of purge systems, use of portable HEPA/charcoal units, temporary ventilation enclosures, use of CAMs, air sampling guidance, Alpha air sampling, etc.), as applicable
2. Procedures related to the use of respiratory protection devices, (e.g., SCBA, TEDE-ALARA guidance, PAPRs, storage, maintenance, training, QA, fit-testing, etc.)
3. Copy of the last 2 grade D air testing certificates for each supplied air system and SCBA filling station
4. Documentation of the last 2 surveillances performed on SCBAs available for emergency use, and negative pressure respirators designated as in storage but available for use.
5. Two most recent surveillances that verify the flow rates for the following ventilation systems:

a) Auxiliary Building Ventilation System b) Decontamination and Waste Solidification Building Ventilation c) Fuel Handling Building Exhaust System

6. Two most recent HEPA filter DOP and charcoal test results for the following ventilation systems:

a) Main Control Room and Emergency Switchgear Room Emergency Ventilation System (MCR/ESGR) b) Auxiliary Building Ventilation System

7. Most recent audit or self-assessment covering airborne controls and respiratory protection
8. List of CRs related to airborne monitoring and respiratory protection since March 1, 2020.

This should be a list of corrective action documents containing a CR number and brief description, not full CRs.

Page 3 of 6

9. Available for onsite review during inspection a) Inventory, inspection and maintenance records for respiratory protection devices and SCBA equipment b) Training records, including fit tests, for SCBA qualified individuals c) List of all licensed operators qualified to wear an SCBA d) List of site ERO personnel qualified to wear an SCBA e) List of all RP personnel qualified to wear an SCBA f) Training/qualification certificates for all onsite and/or vendor personnel qualified to repair SCBA that performed maintenance or repairs from March 1, 2020 to present.

71124.04 - Occupational Dose Assessment (Last inspected March 2020)

1. Procedures related to occupational dose assessment (e.g., dosimetry issuance and use, unusual dosimetry occurrences, multi-badging/extremity dosimetry/badge relocation, Effective Dose Equivalent, personnel contamination events, storage/care of personal dosimeters, in-vivo and in-vitro internal dose assessment, skin dose assessment, QC for whole body counter, use of passive monitoring if applicable, declared pregnant workers)
2. NVLAP accreditation documentation for CY 2021, and the current year for worker dosimetry used by the site
3. List of all positive whole-body counts, in vitro, or air sampling analyses which resulted in a CEDE equal to or exceeding 10 millirem since March 1, 2020. [Note: only a listing should be provided for use by the inspectors to select a sample of issues for review during the onsite inspection]
4. List of all Level III personnel contamination events identified since March 1, 2020. [Note:

only a listing should be provided for use by the inspectors to select a sample of issues for review during the onsite inspection.]

5. Most recent neutron characterization (including the ISFSI area)
6. Most recent alpha characterization
7. Last 18 months of area TLD results for general plant areas (not REMP TLDs)
8. Copies of current WBC libraries (e.g., routine, medical, investigative, etc.)
9. Most recent audit or self-assessment of the dosimetry program and/or the most recent audit of the lab that processes site dosimetry
10. List of CRs generated since March 1, 2020 for internal or external dosimetry issues/events. This should be a list of corrective action documents containing a CR number and brief description, not full CRs.

71124.05 - Radiation Monitoring Instrumentation (Last inspected March 2020)

1. Radiation Protection and Maintenance procedures/guidance documents, as applicable, for the following:

a) Calibration and functional test/source checks of portable radiation detection instruments b) Calibration and functional tests of small article monitor, personnel contamination monitor, portal monitor, counting room equipment, electronic alarming dosimeters, whole body counting equipment, and continuous air monitors c) Collection and analysis of high-range, post-accident effluent samples d) Determination of set-points for area radiation monitor, CAM, PCM, PM, and SAM equipment used for area and personnel monitoring equipment e) QA program (inter-laboratory comparison program) for count room instruments

2. The last 2 calibration records for each of the following instruments:

Page 4 of 6

a) U-1 Containment High-Range Radiation Monitors (CHRRMS) b) Technical Support Center Area Radiation Monitors (1-RM-RMS-184/185/186) c) Steam generator blowdown Radiation Monitors (1-SS-RM-122, 123, and 124) d) Containment Particulate and Noble Gas Radiation Monitors (1-RM-RMS-159 and 160) e) Liquid Waste Effluent Monitor (1-LW-RM-110,111) f) Ventilation Vent A (1-VG-RM-179-1) [Normal-Range Noble Gas Effluent Monitor]

g) Ventilation Vent B (1-VG-RM-180-2) [High Range Noble Gas Effluent Monitor]

3. Documentation showing traceability to NIST and/or the primary calibration for the radioactive sources used to calibrate the instruments in item in item 2 above.
4. Chart or procedure listing EALs associated with radiation monitors
5. Emergency plan documents identifying which radiation monitors are used to determine emergency action levels (EALs).
6. Provide a current list of in service (available for use) SAMs, PCMs, PMs, air samplers, continuous air monitors (CAMs), portable radiation detection instruments, counting room (RP and Chemistry), and Whole-Body Counters. [Note: The list will be used to select monitors for evaluation during the onsite inspection.)
7. Most recent test record of the instrument calibrator (e.g., Shepherd validation testing/dose rate curves).
8. Design documents and/or calculations showing how the alarm setpoints for the following instruments are determined:

a) PCMs and PMs at the RCA and Protected Area exit points b) CAMs

9. Results of the counting room and whole-body counter Inter-Laboratory Comparison Program for 2020 and 2021.
10. Most recent Radiation Monitoring System engineering performance review/evaluation or system health report, if applicable.
11. Most recent audit or self-assessment covering RP instruments (portables, RCA exit point, WBC, count room). Include any reviews conducted of vendor facilities, as applicable.
12. List of CAP documents (CR, NRC, AR, etc.) related to portable instruments, area monitors, CAMs, RCA release point monitors, WBCs, and count room instruments generated since March 1, 2020. This should be a list of corrective action documents containing a CAP document number and a brief description, not complete documents.

71151 - Performance Indicator Verification (Occupational and Public Cornerstones)

(Last inspected March 2021)

1. Site, Corporate, and radiation protection specific procedure(s) for identifying, reporting, tracking, and correcting performance indicator (PI) occurrences.
2. Monthly PI reports since March 1, 2021, and copies of associated condition reports for any Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual (RETS/ODCM) Radiological Effluent occurrences.
3. List of all CAP documents related to effluent dose/ODCM issues using search keywords such as RETS/ODCM, abnormal or unmonitored release, offsite dose, and effluent release, etc. since March 1, 2021. This should be a list of corrective action documents containing a CR number and brief description, not full CRs.
4. List of all CAP documents related to occupational radiological controls using search keywords such as HRA, LHRA, VHRA, unintended dose, unlocked door, ALARA, since March 1, 2021. This should be a list of corrective action documents containing a CR number and brief description, not full CRs.
5. Most recent gaseous and liquid effluent evaluation of dose to the public (year-to-Page 5 of 6

date doses).

6. List of electronic dosimeter alarms since March 1, 2021 (dose and dose rate).

Assistance Requested During On-Site Inspection

  • Identification of radiological work activities available during the inspection week for observation, including notification of pre-job briefings, notification of risk significant work activities, and location of audio/visual surveillance for remote job coverage.
  • Health physics assistance in coordinating observation of radiological job coverage activities and performing plant walk-downs.
  • Identification of any installed radiation monitoring calibration activities planned that may be available for inspector observation during the inspection.

Inspector Contact Information: Mailing Address:

Robert Kellner U.S. Nuclear Regulatory Commission Sr. Health Physicist US NRC Region II (404) 997-4508 ATTN: Mr. Robert Kellner robert.kellner@nrc.gov 245 Peachtree Center Ave., N.E Suite 1200 Atlanta, GA 30303 Page 6 of 6