Letter Sequence Other |
---|
EPID:L-2020-SLE-0000, Comment (1) of Kevin Quigley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement
Results
Other: ML20246G698, ML20258A284, ML20269A465, ML20274A111, ML20274A198, ML20307A177, ML20322A052, ML20337A022, ML20351A388, ML21025A340, ML21181A186, ML23062A466, ML24206A043
|
MONTHYEARML20246G6982020-08-24024 August 2020 Appendix E: Applicant'S Environmental Report Subsequent Operating License Renewal Stage North Anna Power Station Units 1 and 2 Project stage: Other ML20269A4652020-10-0606 October 2020 SLRA - Portal Letter Project stage: Other ML20258A2842020-10-13013 October 2020 SLRA - Acceptance and Opportunity for Hearing Letter Project stage: Other ML20274A1112020-10-19019 October 2020 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID No. L-2020-SLE-0000) - Letter to Applicant Project stage: Other ML20274A1982020-10-19019 October 2020 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID No. L-2020-SLE-0000) - Federal Register Notice Project stage: Other PMNS20201188, Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application2020-10-28028 October 2020 Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML20307A1772020-11-0404 November 2020 NRC Presentation North Anna Power Station, Units 1 and 2 Subsequent License Renewal Review Project stage: Other ML20317A2062020-11-12012 November 2020 Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML20324A6792020-11-13013 November 2020 Comment (1) of Kevin Quigley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6802020-11-13013 November 2020 Comment (2) from Luther Jones on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6812020-11-13013 November 2020 Comment (3) from Frederick Gerloff on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6822020-11-13013 November 2020 Comment (4) from Keith Scott on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6832020-11-13013 November 2020 Comment (5) from Joseph Sucha on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6852020-11-14014 November 2020 Comment (6) from Thomas Owens on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6862020-11-14014 November 2020 Comment (7) from Nancy Ashberry on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0512020-11-14014 November 2020 Comment (8) of Lisa Hicks-Thomas on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A0532020-11-15015 November 2020 Comment (9) of Martin Blough on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0582020-11-16016 November 2020 Comment (12) from Melissa Haley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0572020-11-16016 November 2020 Comment (11) of Lauren Lopez on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A0542020-11-16016 November 2020 Comment (10) of Michael Hamby on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20329A4392020-11-17017 November 2020 Pamunkey Consultation Request_North Anna Power Station_17NOV20 Project stage: Request ML20325A0602020-11-17017 November 2020 Comment (13) of Terry Clouthier on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1242020-11-18018 November 2020 Comment (42) of Edmond Longest on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1032020-11-18018 November 2020 Comment (29) of Steven Eisenrauch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1202020-11-18018 November 2020 Comment (41) of Robert Fleshman on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1182020-11-18018 November 2020 Comment (40) of Donald Sharp on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0612020-11-18018 November 2020 Comment (14) of Kevin Cordray on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0622020-11-18018 November 2020 Comment (15) from Jason Evans on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0632020-11-18018 November 2020 Comment (16) of Tracy Gill on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0652020-11-18018 November 2020 Comment (17) of Tommy Flynn on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0662020-11-18018 November 2020 Comment (18) from Jim Norvelle on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0682020-11-18018 November 2020 Comment (19) of Ronald Buchanan on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0712020-11-18018 November 2020 Comment (20) of Harold Vaughan on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0722020-11-18018 November 2020 Comment (21) of Mel Holley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0732020-11-18018 November 2020 Comment (22) of Sarah Marshall on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0742020-11-18018 November 2020 Comment (23) of Andrew Moncol on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0752020-11-18018 November 2020 Comment (24) of Richard Zuercher on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A0922020-11-18018 November 2020 Comment (25) of J. Crouch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0942020-11-18018 November 2020 Comment (26) from J. Crouch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0972020-11-18018 November 2020 Comment (27) from Jenna Brown on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1012020-11-18018 November 2020 Comment (28) from Ralph Joyce on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1042020-11-18018 November 2020 Comment (30) of David Strole on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1052020-11-18018 November 2020 Comment (31) from Carl Eng on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1072020-11-18018 November 2020 Comment (32) of Angela Baker on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1092020-11-18018 November 2020 Comment (33) of Adam Perry on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A1102020-11-18018 November 2020 Comment (34) of Terrance Perrone on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1112020-11-18018 November 2020 Comment (35) of Greg Boutchyard on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1122020-11-18018 November 2020 Comment (36) from Robert George on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1132020-11-18018 November 2020 Comment (37) of Shawn Williams on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A1152020-11-18018 November 2020 Comment (38) of Eric Hendrixson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request 2020-11-14
[Table View] |
|
---|
Category:Audit Plan
MONTHYEARML23223A0402023-08-25025 August 2023 Audit Plan License Amendment Request for Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23062A4662023-03-0808 March 2023 License Renewal Second Environmental Site Audit Plan Regarding the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML20337A0222020-12-0404 December 2020 License Renewal Severe Accident Mitigation Alternatives Audit Plan Regarding the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application (EPID No.: L-2020-SLE-0000) (Docket No.: 50-338 and 50-339) ML20322A0522020-11-19019 November 2020 License Renewal Environmental Site Audit Plan Regarding the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML20276A1922020-10-0909 October 2020 Subsequent License Renewal Aging Management Audit Plan ML20099F8732020-04-17017 April 2020 Audit Proposed License Amendment Request for the Addition of Westinghouse Topical Report WCAP-16996-P-A, Revision 1 (EPID L-2019-LLA-0243 and EPID L-2019-LLA-0236 ML19338C6902019-12-10010 December 2019 Audit Plan License Amendment Request for Small Break Loss of Coolant Accident Methodology (Epids L-2018-LLA-0195 and L-2018-LLA-0215) ML19165A0172019-07-0303 July 2019 Audit Plan License Amendment Request for Flood Protection Dike Modification ML17177A4462017-07-0606 July 2017 Audit Plan for Licensee Responses Concerning Seismic Hazard Reevaluations Related to Request for Information -(50.54(F) Letter) Regarding Recommendation 2.1 of the Near-Term Task Force ML16259A1892016-12-0505 December 2016 Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML16098A5302016-04-14014 April 2016 Audit Plan - Application for Amendment North Anna Power Station, Units 1 and 2. the Proposed License Amendment Revises the Issues Identified in Westinghouse Documents NSAL-09-5, Rev 1 and NSAL-15-1 ML16091A4542016-04-12012 April 2016 Audit Plan Regarding Application for License Amendment, Issues Identified in Westinghouse Documents NSAL-09-05, REV1 and NSAL-15-1 ML14356A0032015-02-10010 February 2015 Audit of Licensee Responses to the Expedited Seismic Evaluation Process to Support Implementation of Near-Term Task Force Recommendation 2.1, Seismic L-12-049, Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 (TAC Nos. MF0998, MF0999, MF0986, and MF0987)2014-04-24024 April 2014 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 (TAC Nos. MF0998, MF0999, MF0986, and MF0987) ML14112A3022014-04-24024 April 2014 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 ML14083A6202014-03-26026 March 2014 Nuclear Regulatory Commission Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051 2023-08-25
[Table view] Category:Letter
MONTHYEARIR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to Prni High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code 05000339/LER-2024-001, Loss of Generator Field for 2J EDG During 2-PT-82.282024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240102024-05-24024 May 2024 NRC Fire Protection Team Inspection (FPTI) Report 05000338/2024010 and 05000339/2024010 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 ML24086A4292024-03-25025 March 2024 Response to Request for Additional Information Associated with Alternative Request N1-I5-NDE-007 Request to Deter Additional Required Reactor Coolant Pump Casing Inspection 2024-09-24
[Table view] |
Text
December 4, 2020 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, VA 23060
SUBJECT:
LICENSE RENEWAL SEVERE ACCIDENT MITIGATION ALTERNATIVES AUDIT PLAN REGARDING THE NORTH ANNA POWER STATION, UNIT NUMBERS 1 AND 2, SUBSEQUENT LICENSE RENEWAL APPLICATION (EPID NUMBER: L-2020-SLE-0000) (DOCKET NUMBERS: 50-338 and 50-339)
Dear Mr. Stoddard:
The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing the Virginia Electric and Power Companys subsequent license renewal application for North Anna Power Station, Unit Nos. 1 and 2. The NRC staff plans to conduct an in-office audit of new and significant information related to the severe accident mitigation alternatives, beginning December 9, 2020, by teleconference and online reference portal (Agencywide Documents Access and Management System Accession No. ML20269A465). The audit activities will be conducted in accordance with the audit plan provided in Enclosure 1. The list of audit questions is provided in Enclosure 2.
If you have any questions, please contact me by e-mail at Tam.Tran@nrc.gov.
Sincerely, Tam M. Digitally signed by Tam M. Tran Tran Date: 2020.12.04 12:20:01 -05'00' Tam Tran, Project Manager Environmental Review License Renewal Branch Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards Docket Nos. 50-338 and 50-339
Enclosures:
As stated cc w/encls: Listserv
ML20337A022 *via email OFFICE PM:REFS LA:REFS BC:REFS PM:REFS NAME TTran *AWalker-Smith RElliott TTran DATE 12/01/2020 12/01/2020 12/03/2020 12/04/2020 LICENSE RENEWAL AUDIT PLAN FOR NEW AND SIGNIFICANT INFORMATION RELATED TO THE SEVERE ACCIDENT MITIGATION ALTERNATIVES NORTH ANNA POWER STATION, UNITS 1 AND 2
1. Background
By letter dated August 24, 2020 (Agencywide Documents Access and Management Systems (ADAMS) Package Accession No. ML20246G703), Dominion Energy Virginia (Dominion Energy or the applicant), submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) an application to renew the North Anna Power Station, Units 1 and 2 (North Anna), renewed facility operating licenses NPF-4 and NPF-7. The staff is reviewing the information contained in the environmental report (ER) of the license renewal application (LRA) per Title 10 of the Code of Federal Regulations (10 CFR) Part 51.
As part of the staffs review, a severe accident mitigation alternatives (SAMA) audit will be conducted for Surrys Subsequent License Renewal Application (SLRA). This audit is conducted with the intent to gain understanding, to verify information, and to identify information that will require docketing to support the basis of the licensing or regulatory decision.
Specifically, the NRC staff will identify pertinent SAMA information and data and obtain clarifications regarding information provided in the ER.
Per NRC guidance, the NRC staff prepares a regulatory audit plan that provides a clear overview of audit activities and scope, team assignments, and schedule.
- 2. Audit Bases License renewal requirements are specified in 10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants. Licensees are required by 10 CFR 54.23 to submit an ER that complies with the requirements in 10 CFR Part 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, as part of the LRA.
Review guidance for the staff is provided in NUREG-1555, Standard Review Plans for Environmental Reviews for Nuclear Power Plants: Supplement 1 - Operating License Renewal.
Section 51.53(c)(3)(ii)(L) of 10 CFR states that If the staff has not previously considered severe accident mitigation alternatives for the applicant's plant in an environmental impact statement or related supplement or in an environmental assessment, a consideration of alternatives to mitigate severe accidents must be provided. North Anna provided a SAMA analysis in the 2001 ER for initial license renewal. The ER was reviewed by the NRC in 2003. Thus, the applicants ER must contain any new and significant information of which the applicant is aware (10 CFR 51.53(c)(iv)) and the NRC staff must consider whether such information affects prior generic environmental determinations, reflected in the Category 1 issues in Table B-1.
- 3. Audit Scope The scope of the SAMA audit is to review the new and significant evaluation as it relates to the SAMA analysis and results as documented in the North Anna SLRA ER and supporting documents.
Enclosure 1
- 4. Information and Other Material Necessary for the Audit As described in the list of audit questions (Enclosure 2).
- 5. Team Assignments Name Responsibility J. Dozier Senior Reliability and Risk Analyst E. Dickson Physical Scientist T. Tran Project Manager
- 6. Logistics The regulatory audit will begin as an in-office audit (at NRC Headquarter using Microsoft Teams and/or North Anna online reference portal ADAMS Accession No. ML20269A465)) on December 9, 2020. Discussions between the NRC staff and Dominion Energy staff will be held regarding topics and questions identified in Enclosure 2, list of audit questions.
- 7. Special Requests The NRC staff requests the applicant to make available the license renewal application program basis documentation and other documents as requested for independent searches by the NRCs audit team via the electronic document portal.
- 8. Deliverables An audit summary report is scheduled to be issued by NRC staff within 90 days from the end of the audit.
LIST OF AUDIT QUESTIONS NORTH ANNA POWER STATION, UNITS 1 AND 2 SUBSEQUENT LICENSE RENEWAL APPLICATION REVIEW IN-OFFICE SEVERE ACCIDENT MITIGATION ALTERNATIVES AUDIT Specific questions to be discussed during the audit:
- 1. In the Environmental Report (ER), Dominion indicated that it is following the guidance in Nuclear Energy Institute (NEI) 17-04, Model SLR New and Significant Assessment Approach for SAMA, Revision 1, for providing severe accident mitigation alternatives (SAMA) new and significant information. NEI 17-04 specifies, Further documentation of the new and significant information review is listed in Section 3.5.2. Furthermore NEI 17-04 indicates, Such documentation should be available to the NRC [U.S. Nuclear Regulatory Commission] either in the SLR [Subsequent License Renewal] ER (at the SLR applicant's discretion), or in supplemental information for review via E-document reading room, audit, and RAIs [requests for additional information].
Specifically, the staff would like to briefly discuss the probabilistic risk assessment revisions and changes to the risk models since the 40-to-60-year license renewal application (focusing on changes made at the plant that have significantly reduced or increased risk).
- 2. NEI 17-04 Section 3.1 Data Collection specifies:
Use the latest risk models that are available for internal events (including internal flooding) and for each of the external events contributors identified for evaluation in NEI 05-01 [Severe Accident Mitigation Alternatives (SAMA) Analysis Guidance Document, Revision A, November 2005].
NEI 05-01 specifies:
The IPEEE [Individual Plant Examination of External Events] identified the highest risk externally initiated accident sequences and potential means of reducing the risk posed by those sequences. Typically, the following external events were evaluated:
- 1. Internal fires
- 2. Seismic events
- 3. Other external events such as high wind events, external flooding, transportation and nearby facility accidents Explain how Other external events such as high wind events, external flooding, transportation and nearby facility accidents were considered in the North Anna SAMA New and Significant Evaluation? Discuss recommendations to reduce risk due to each of these external events. Page E-4-91 of the Dominion ER provides:
Enclosure 2
Therefore, if external events were included, the absolute value reduction in maximum benefit (MB) of some SAMAs would be larger; however, there is confidence that the methodology of percentage reduction in MB due to internal events results in a conservative analysis.
Please be prepared to discuss this further at the audit.
- 4. Was there any North Anna or other facility external event SAMAs evaluated? If so, briefly describe. If not, indicate the reason why not.
- 5. Describe any North Anna power uprates and impacts on risk at North Anna. What was the change in core damage frequency and large early release frequency as a result of any power uprate.
- 6. Did Dominion evaluate all of the items in the 2013 Generic Environmental Impact Statement SAMA Summary Table E-19 (including low power, uncertainties, and the Biological Effects of Ionizing Radiation (BEIR) Report)?
- 7. Tables E4.15-1 and E4.15-2 of the ER provides the groupings and reduction in maximum benefit of SAMAs. Please be prepared to discuss these results.