Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML20258A284, ML20269A465, ML20276A192, ML20303A199, ML21036A060, ML21067A504, ML21067A507, ML21084A182, ML21091A004, ML21097A027, ML21145A217, ML21217A187, ML21239A064, ML21239A066, ML21239A068, ML21256A067, ML21256A069, ML21312A002, ML21312A003, ML21312A007, PMNS20211071, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue, PMNS20211128, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - an Inconsistency in Documentation Regarding Reactor Coolant Pump Code Case N 481, TLAA 4.7.6
|
MONTHYEARML20246G6972020-08-24024 August 2020 Application for Subsequent Renewed Operating Licenses Project stage: Request ML20269A4652020-10-0606 October 2020 SLRA - Portal Letter Project stage: Other ML20276A1922020-10-0909 October 2020 Subsequent License Renewal Aging Management Audit Plan Project stage: Other ML20258A2842020-10-13013 October 2020 SLRA - Acceptance and Opportunity for Hearing Letter Project stage: Other ML20303A1992020-10-29029 October 2020 Subsequent License Renewal Safety Project Management Assignment Project stage: Other ML20352A3942020-12-17017 December 2020 Proposed License Amendment Request to Change Battery Surveillance Requirements Project stage: Request ML21035A3032021-02-0404 February 2021 (Naps), Units 1 and 2 - Update to Subsequent License Renewal Application (SLRA) Supplement 1 Project stage: Supplement ML21063A5602021-03-0404 March 2021 Final Request for Additional Information Set 1 - North Anna SLRA Safety Review (EPID L-2020-SLR-0000) - Enclosure Project stage: RAI ML21063A5522021-03-0404 March 2021 Final Request for Additional Information Set 1 - North Anna SLRA Safety Review (EPID L-2020-SLR-0000) - Email Project stage: RAI ML21067A5072021-03-0808 March 2021 Final Request for Confirmation of Information (RCI) Set 1 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: Other ML21067A5042021-03-0808 March 2021 Final Request for Confirmation of Information (RCI) Set 1 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: Other ML21076B0252021-03-17017 March 2021 Update to Subsequent License Renewal Application, Supplement 2 Project stage: Supplement ML21084A1822021-03-24024 March 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information for the Safety Review - Set 1 Project stage: Other ML21091A0032021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure 1 - RAIs Project stage: RAI ML21091A0042021-04-0101 April 2021 SLRA Safety Review - Withdrawn Requests for Information (EPID No. L-2020-SLR-0000) - Enclosure 2 Project stage: Other ML21091A0022021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: RAI ML21091A1872021-04-0101 April 2021 Response to NRC Request for Additional Information Regarding Safety Review - Set 1 & Clarification to Aging Management of Fire Protection System Lined Ductile Iron Valves Project stage: Supplement ML21036A0602021-04-0808 April 2021 Report for the Aging Management Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML21097A0272021-04-14014 April 2021 Request for Withholding from Public Disclosure Regarding Subsequent License Renewal Application Project stage: Other ML21104A0372021-04-15015 April 2021 Request for Withholding Information Regarding Subsequent License Renewal Application Project stage: Withholding Request Acceptance ML21119A2872021-04-29029 April 2021 (Naps), Unit 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 2 and Flow Accelerated Corrosion Program Enhancement Completion Project stage: Response to RAI ML21119A3402021-04-29029 April 2021 Preparation and Scheduling of Operator Licensing Examinations Project stage: Request ML21123A2972021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail Project stage: RAI ML21123A2982021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: RAI PMNS20210548, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-05-12012 May 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application Project stage: RAI ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides Project stage: Other ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting Project stage: RAI PMNS20210666, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application2021-05-27027 May 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application Project stage: RAI ML21221A1482021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides Project stage: RAI ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides Project stage: Meeting ML21147A2932021-05-27027 May 2021 (Naps), Units 1 and 2 Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 3 and Administrative Change to SLRA Table A4.0-1, Item 25 Project stage: Response to RAI ML21145A2122021-06-0909 June 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Memoranda Project stage: RAI ML21145A2132021-06-0909 June 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Enclosure 1 - Summary Project stage: RAI ML21145A2152021-06-0909 June 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Enclosure 2 - List of Attendees Project stage: RAI ML21166A3512021-06-15015 June 2021 Safety RAIs - Set 4 - Draft Project stage: Draft RAI PMNS20210777, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined2021-06-15015 June 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined Project stage: RAI PMNS20210778, Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined2021-06-23023 June 2021 Discussion of Dominion'S Response to Select Staff RAIs on North Anna Subsequent License Renewal Application - Topics to Be Determined Project stage: RAI ML21174A3042021-06-23023 June 2021 SLRA RAI Response Public Meeting - 21-06-24 Project stage: RAI ML21174A1952021-06-23023 June 2021 Safety RAIs - Set Y - Draft - Enclosure Project stage: Draft RAI ML21188A1652021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure Project stage: RAI ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: RAI ML21210A3962021-07-29029 July 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 4 and Supplement 3 Project stage: Supplement ML21217A1872021-08-0505 August 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application First 10 CFR 54.21 (B) Annual Amendment Project stage: Other ML21221A1362021-08-10010 August 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application Project stage: RAI ML21221A1382021-08-10010 August 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Meeting Summary Project stage: RAI ML21221A1412021-08-10010 August 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Attendees Project stage: RAI PMNS20211071, Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue2021-08-13013 August 2021 Discussion Between NRC and Dominion Regarding the North Anna Subsequent License Renewal - Safety Issue - Cyclic Fatigue Project stage: Other ML21225A5642021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Presentation Project stage: Meeting ML21225A5512021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Transmittal E-mail Project stage: Meeting ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email Project stage: Draft RAI 2021-04-29
[Table View] |
|
---|
Category:Legal-Affidavit
MONTHYEARML23096A2982023-04-0606 April 2023 Units 1 and 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion ML22353A6202022-12-19019 December 2022 Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . ML21264A5372021-09-20020 September 2021 Framatome, Inc. - Affidavit for Philip A. Opsal ML21259A0852021-09-15015 September 2021 North Ann, and Surry, Units 1 and 2, Millstone, Units 2 and 3, Request for Approval of Appendix E of Fleet Report DOM-NAF-2-A Qualification of the Framatome BWU-I CHF Correlation in the Vipre-D Computer Code Response to Request for Addition ML21264A5362021-09-10010 September 2021 Westinghouse Electric Company LLC - Affidavit for Camille T. Zozula ML21133A2852021-05-13013 May 2021 Stations, Units 1 & 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix E Fleet Report DOM-NAF-2-A Qualification of the Framatome Bwui CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21084A1822021-03-24024 March 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information for the Safety Review - Set 1 ML21042B3212021-02-11011 February 2021 Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML20246G6972020-08-24024 August 2020 Application for Subsequent Renewed Operating Licenses ML20149K6732020-05-28028 May 2020 PWR Owners Group, Affidavit of Zachary S. Harper ML20149K6942020-05-28028 May 2020 Response to Request for Additional Information, to Proposed License Amendment Requests Addition of Analytical Methodology to the Core Operating Limits Report for a Small Break Loss of Coolant Accident ML20149K6742020-05-26026 May 2020 PWR Owners Group, Affidavit of Philip A. Opsal ML20087G3072020-03-19019 March 2020 ASME Section XI Inservice Inspection Program Proposed Inservice Inspection Alternative N1-I5-NDE-003 ML19196A1092019-07-0909 July 2019 Stations, Units 1 and 2 - Proposed License Amendment Requests Re Addition of Analytical Methodology to the Core Operating Limits Report for a Small Break Loss of Coolant Accident (SBLOCA) Response to Request for Additional. ML18198A1182018-07-12012 July 2018 Transmittal of Proposed License Amendment Request (LAR) Addition of Analytical Methodology to COLR Small Break Loss of Coolant Accident (SBLOCA) ML18093B0762018-03-28028 March 2018 SME Section XI Inservice Inspection Program Request for Proposed Alternative N2-14-NDE-007 ML17207A1732016-12-13013 December 2016 Enclosure 4: Affidavit of Electric Power Research Institute, Inc and Areva ML17207A1742016-12-13013 December 2016 Enclosure 5: Affidavit of Westinghouse Electric Co, LLC ML17207A1722016-11-18018 November 2016 Enclosure 3: Affidavit of Westinghouse Electric Co, LLC ML17207A1712016-10-31031 October 2016 Enclosure 2: Affidavit of Areva Np, Inc ML13037A3012013-01-29029 January 2013 Response to March 12, 2012 Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 1, Integrated Assessment Approach 2023-04-06
[Table view] Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] |
Text
PROPRIETARY INFORMATION -WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 10 CFR 50 10 CFR 51 August24,2020 10 CFR 54 United States Nuclear Regulatory Commission Serial No.: 20-115 Attention: Document Control Desk NRA/DEA: RO Washington, D.C. 20555-0001 Docket Nos.: 50-338/339 License Nos.: NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 APPLICATION FOR SUBSEQUENT RENEWED OPERATING LICENSES Pursuant to 10 CFR Parts 50, 51, and 54, Virginia Electric and Power Company (Dominion Virginia Power or Dominion) is submitting this Application for Subsequent Renewed Operating Licenses for North Anna Power Station (NAPS) Units 1 and 2. The existing Renewed Facility Operating Licenses, Nos. NPF-4 and NPF-7 for NAPS Units 1 and 2, respectively, currently expire as follows:
- At midnight on April 1, 2038 for Unit 1
- At midnight on August 21, 2040 for Unit 2 Virginia Electric and Power Company seeks to extend the respective operating terms by 20 years beyond the current renewed license expiration dates.
The enclosed Subsequent License Renewal Application (SLRA) contains the information required by 10 CFR Parts 54 and 51 and meets the submittal timeliness requirements of 10 CFR 54.17(c) and 10 CFR 2.109(b).
As required by 10 CFR 54.21(b), current licensing basis changes which have a material effect on the content of this application will be submitted at least annually while the application is under NRG review and at least three months prior to the scheduled completion of the NRG review.
Appendix A, Table A4.0-1, of the enclosed NAPS SLRA provides a list of commitments made in this application. This list will be updated as required throughout the SLRA review process.
ifhe Application for Subsequent Renewed Operating Licenses for NAPS Units 1 and 2 consists of the following five
Enclosures:
Enclosure 1: North Anna Power Station Subsequent License Renewal Application Enclosure Summary Enclosure 2: Application for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 A /) 3 5 AJR~ contains information that is being withheld from public disclosure under 10 CFR 2.390.
Upon separation from Enclosure 5, this letter is decontrolled.
Serial No.: 20-115 Docket Nos.: 50-338/339 SLRA Submittal Page 2 of 8 Enclosure 3: North Anna Power Station Subsequent License Renewal Application (CD-ROM titled, "NAPS_SLRA")
Enclosure 4: Non-proprietary Reference Documents and a Redacted Version of a Proprietary Reference Document (Public Version)
Enclosure 5: 10 CFR 2.390 Withheld Proprietary Document The NAPS SLRA (Enclosure 3), which includes the Environmental Report, is being submitted on CD-ROM. The CD-ROM labeled, "NAPS_SLRA," contains the following two files (file size specified in parenthesis):
001 NAPS_SLRA_(Public).pdf (9,099,909 bytes) 002 NAPS_Environmental_Report_(Public).pdf (35,809,495 bytes)
Since Enclosure 5 contains proprietary information, it is supported by an affidavit signed by the owner of the information (Enclosure 2). The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b )(4) of 10 CFR 2.390.
Accordingly, it is respectfully requested that the proprietary information be withheld from public disclosure in .accordance with 10 CFR 2.390. A redacted, non-proprietary version is provided in Enclosure 4 as noted above.
During a telecom on June 2, 2020, the NRC informed Dominion of the delay in the
, issuance of a forthcoming Interim Staff Guidance . (ISG) document related to aging management review and inspection requirements of Reactor Vessel Internals for the subsequent license renewal period. The NRC staff also communicated to Dominion that the technical basis for the ISG, using updated industry guidance documents during the presentation by industry members of the Nuclear Energy Institute at public meetings conducted on February 20, 2020 and April 7, 2020 [Agencywide Document Access and Management System (ADAMS) Accession Nos. ML20036E364 and ML20098D185, respectively], was found to be acceptable by the NRC staff. Based on the discussion, the NRC informed Dominion that a detailed "Gap Analysis" was not required to be incorporated into Appendix C of the SLRA, but necessary supporting information should be made available for NRC review during the Safety review phase. At the end of the telecom, Dominion affirmed that following issuance of the ISG, a separate review would be performed to ensure the various elements of the ISG were evaluated. If information presented in the NAPS SLRA required a change, then a supplement would be provided later, at a mutually agreed upon date.
Serial No.: 20-115 Docket Nos.: 50-338/339 SLRA Submittal Page 3 of 8 If there are any questions regarding this submittal or if additional information is needed, please contact Mr. Paul Aitken at (804) 273-2818.
Sincerely, Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain, who is Vice President - Nuclear Engineering and Fleet Support of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
i----------Aeknowledged-before-mathis-d.!:I +k day~o~f~A'----'-"L\~jt'Y"'"":S""t:.___'--',2=-:0=--=2:.: .0.:_._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
My Commission Expires: 12 j31 \ zo Commitments made in this letter:
The Licensee Commitments identified in Table A4.0-1 of Appendix A, UFSAR Supplement, are proposed to support approval of the subsequent renewed operating licenses and may change during the NRC review period.
Serial No.: 20-115 Docket Nos.: 50-338/339 SLRA Submittal Page 4 of 8
Enclosures:
- North Anna Power Station Subsequent License Renewal Application Enclosure Summary - Application for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 Attachment 1 - CAW-20-4998, Affidavit for WCAP-11163-P, Revision 2 - North Anna Power Station Subsequent License Renewal Application (CD-ROM titled: "NAPS_SLRA") - Non-proprietary Reference Documents and a Redacted Version of a Proprietary Reference Document (Public Version)
Attachment 1 - PWROG-18005-NP, Revision 2 Attachment 2-WCAP -18353-NP, Revision 0 Attachment 3-WCAP -18364-NP, Revision 1 Attachment 4-WCAP-11164-NP, Revision 2 (Redacted version of WCAP-11163-P) - 10 CFR 2.390 Withheld Proprietary Document Attachment 1 - WCAP-11163-P, Revision 2
Serial No.: 20-115 Docket Nos.: 50-338/339 SLRA Submittal Page 5 of 8 cc: (Enclosure 3 CD-ROM copy only)
U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257 NRG Senior Resident Inspector North Anna Power Station Mr. David Drucker NRG Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop O 11 F1 11555 Rockville Pike
--~
Rockv1ff~lVTarylancr20852;;;2'138*--------
Mr. Tam Tran NRG Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop O 11 F1 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. G. Edward Miller NRG Senior Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop O-9E3 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. Marcus Harris Old Dominion Electric Cooperative Innsbrook Corporate Center, Suite 300 4201 Dominion Boulevard Glen Allen, Virginia 23060
Serial No.: 20-115 Docket Nos.: 50-338/339 SLRA Submittal Page 6 of 8 State Health Commissioner Virginia Department of Health James Madison Building - 7th Floor 109 Governor Street Room 730 Richmond, Virginia 23219 Mr. David K. Paylor, Director Virginia Department of Environmental Quality P.O. Box 1105 Richmond, Virginia 23218 Ms. Melanie D. Davenport, Director Water Permitting Division Virginia Department of Environmental Quality P.O. Box 1105 Richmond, Virginia 23218 Ms. Bettina Rayfield, Manager Office of Environmental Impact Review Virginia Department of Environmental Quality P.O. Box 1105 Richmond, Virginia 23218 Mr. Michael Dowd, Director Air Division Virginia Department of Environmental Quality P.O. Box 1105 Richmond, Virginia 23218 Mr. Justin Williams, Director Division of Land Protection and Revitalization Virginia Department of Environmental Quality P.O. Box 1105 Richmond, Virginia 23218 Mr. James Golden, Regional Director Virginia Department of Environmental Quality Piedmont Regional Office 4949-A Cox Road Glen Allen, Virginia 23060
Serial No.: 20-115 Docket Nos.: 50-338/339 SLRA Submittal Page 7 of 8 Mr. Craig R. Nicol, Regional Director Virginia Department of Environmental Quality Tidewater Regional Office 5636 Southern Boulevard Virginia Beach, Virginia 23462 Ms. Jewel Bronaugh, Commissioner Virginia Department of Agriculture & Consumer Services 102 Governor Street Richmond, Virginia 23219 Mr. Jason Bulluck, Director Virginia Department of Conservation & Recreation Virginia Natural Heritage Program 600 East Main Street, 24th Floor Richmond, Virginia 23219 1~--------1Mr_RoberLW~D~unca11,~D~i~re~c~to=r~----------------------~
Virginia Department of Wildlife Resources P.O. Box 90778 Henrico, Virginia 23228 Mr. Allen Knapp, Director Virginia Department of Health Office of Environmental Health Services 109 Governor Street, 5th Floor Richmond, Virginia 23129 Ms. Julie Lagan, Director Virginia Department of Historic Resources State Historic Preservation Office 2801 Kensington Avenue Richmond, Virginia 23221 Mr. Steven G. Bowman, Commissioner Virginia Marine Resources Commission 2600 Washington Avenue Newport News, Virginia 23607
Serial No.: 20-115 Docket Nos.: 50-338/339 SLRA Submittal Page 8 of 8 Dr. Mary Fabrizio, Professor Virginia Institute of Marine Science School of Marine Science 7509 Roper Road, Nunnally Hall 135 Gloucester Point, Virginia 23062 Ms. Angel Deem, Director Virginia Department of Transportation Environmental Division 1401 East Broad Street Richmond, Virginia 23219 Mr. Stephen Moret, President Virginia Economic Development Partnership 901 East Byrd Street Richmond, Virginia 23219 Mr. William F. Stephens, Director Virginia State Corporation Commission Division of Public Utility Regulation 1300 East Main Street, 4th Floor, Tyler Building Richmond, Virginia 23219 Mr. Jeff Caldwell, Director Virginia Department of Emergency Management 10501 Trade Road Richmond, Virginia 23236 Mr. Bruce Sterling, Chief Regional Coordinator Virginia Department of Emergency Management 1070 University Boulevard Portsmouth, Virginia 23703
Serial No.: 20-115 Docket Nos.: 50-338/339 Enclosure 1 NORTH ANNA POWER STATION SUBSEQUENT LICENSE RENEWAL APPLICATION ENCLOSURE
SUMMARY
Virginia Electric and Power Company (Dominion Energy Virginia)
North Anna Power Station Units 1 and 2
Serial No.: 20-115 Docket Nos.: 50-338/339 Enclosure 1 Page 2 of 2 ENCLOSURE
SUMMARY
Enclosure 1 - North Anna Power Station Subsequent License Renewal Application Enclosure Summary Enclosure 2 - Application for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390
Attachment:
CAW-20-4998 - Westinghouse Affidavit for WCAP-11163-P, Revision 2, "Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for North Anna Units 1 and 2 Nuclear Power Plants for the Subsequent License Renewal Program (80 Years) Leak-Before- Break Evaluation," January 2020 (Proprietary)
Enclosure 4 - Non-proprietary Reference Documents and a Redacted Version of a Proprietary Referenc_e_Document-(P1;1blic-Versioff) 1 - - - - - ~ ~ _Attachment
- _-~ 1: PWROG-18005-NP, Revision 2, "Determination of Unirradiated RTNOT and Upper-Shelf Energy Values of the North Anna Units 1 and 2 Reactor Vessel Materials," September 2019 Attachment 2: WCAP-18353-NP, Revision 0, "Reactor Internals Fluence Evaluation for a Westinghouse 3-Loop Plant with Two Units -
Subsequent License Renewal," October 2018 Attachment 3: WCAP-18364-NP, Revision 1, "North Anna Units 1 and 2 Time-Limited Aging Analysis on Reactor Vessel Integrity for Subsequent License Renewal (SLR)," March 2020 Attachment 4: WCAP-11164-NP, Revision 2, "Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for North Anna Units 1 and 2 Nuclear Power Plants for the Subsequent License Renewal Program (80 Years) Leak-Before- Break Evaluation," January 2020 (Redacted version of WCAP-11163-P)
Enclosure 5 - 10 CFR 2.390 Withheld Proprietary Document
Attachment:
WCAP-11163-P, Revision 2, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for North Anna Units 1 and 2 Nuclear Power Plants for the Subsequent License Renewal Program (80 Years) Leak-Before- Break Evaluation," January 2020
Serial No.: 20-115 Docket Nos.: 50-338/339 Enclosure 2 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390 Virginia Electric and Power Company (Dominion Energy Virginia)
North Anna Power Station Units 1 and 2
Serial No.: 20-115 Docket Nos.: 50-338/339 Enclosure 2 Attachment CAW-20-4998 WESTINGHOUSE AFFIDAVIT FORWCAP-11163-P. REVISION 2 Virginia Electric and Power Company
{Dominion Energy Virginia)
North Anna Power Station Units 1 and 2
Westinghouse Non-Proprietary Class 3 CA W-20-4998 Page I of3 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:
COUNTY OF BUTLER:
(1) I, Camille T. Zozula, have been specifically delegated and authorized to apply for withholding and execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse).
(2) I am requesting the proprietary portions of WCAP-11163-P, Revision 2 be withheld from public disclosure under IO CFR 2.390.
(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged, or as confidential commercial or finam.:ial infurmalion.
(4) Pursuant to 10 CFR 2.390, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse and is not customarily disclosed to the public.
(ii) Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar technical evaluati0n justifications and licensing defense services for commercial power reactors without commensurate expenses.
Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
Westinghouse Non-Proprietary Class 3 CA W-20-4998 Page 2 of3 AFFIDAVIT (5) Westinghouse has policies in place to identify proprietary information. Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data, including test data, relative to a process ( or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage ( e.g., by optimization or improved mark.dability ).
(c) Its use by a competitor would reduce his expenditure ofresources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f) It contains patentable ideas, for which patent protection may be desirable.
(6) The attached documents are bracketed and marked to indicate the bases for withholding. The justification for withholding is indicated in both versions by means of lower case letters (a) through (f) located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such information. These
Westinghouse Non-Proprietary Class 3 CA W-20-4998 Page3 of3 AFFIDAVIT lower case letters refer to the types of information Westinghouse customarily holds in confidence identified in Sections (5)(a) through (t) of this Affidavit.
l declare that the avennents of fact set forth in this Affidavit are true and correct to the best of my knowledge, information, and belief.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on: l1 ,jCLVJ wW I I i
1 l.
i
l.Jti!ity Cu~tomer_ Instru_cti~ns Include the following informationJn the TRANSMITTAL LETTER to NRC. This is_ not part ... - of the affidavit.
Enclosed is:
(I) CA W-20-4998 (2) WCAP-11163-P, Revision 2, "Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for North Anna Units 1 and 2 Nuclear Power Plants for the Subsequent License Renewal Program (80 Years) Leak-Before-Break Evaluation," January 2020 (Proprietary).
(3) WCAP-11164-NP, Revision 2, "Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for North Anna Units 1 and 2 Nuclear Power Plants for the Subsequent License Renewal Program (80 Years) Leak-Before-Break Evaluation," January 2020 (Non-Proprietary).
The enclosure contains information proprietary to Westinghouse Electric Company LLC
("Westinghouse"), it is supported by an Affidavit signed by Westinghouse, the owner of the information. The Affidavit sets forth the basis on which the information may be withheld from public disclosure by the Nuclear Regulatory Commission ("Commission") and addresses with specificity the considerations listed in paragraph (b )(4) of Section 2.390 of the Commission's regulations.
Accordingly, it is respectfully requested that the information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.390 of the Commission's regulations.
Correspondence with respect to the copyright or proprietary aspects of the items listed above or the supporting Westinghouse Affidavit should reference CA W-20-4998 and should be addressed to Camille T. Zozula, Manager, Infrastructure & Facilities Licensing, Westinghouse Electric Company, 1000 Westinghouse Drive, Suite 165, Cranberry Township, Pennsylvania 16066.