ML21225A551

From kanterella
Jump to navigation Jump to search

Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Transmittal E-mail
ML21225A551
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 08/13/2021
From: Aitken P
Dominion Energy Co
To: Lois James
NRC/NRR/DNRL/NLRP
James L, NRR/DNRL/NLRP, 301-415-3306
Shared Package
ML21225A549 List:
References
EPID L-2020-SLR-0000
Download: ML21225A551 (1)


Text

From: paul.aitken@dominionenergy.com To: James, Lois

Subject:

[External_Sender] Public Meeting - FP Piping Cyclic Loading Date: Friday, August 13, 2021 8:52:42 AM Attachments: image001.png NAPS FP Piping - Cyclic Loading Response (Draft).pdf Lois Please find attached a draft summary of the item related to cracking due to cyclic loading of the buried FP piping in support of the upcoming public meeting.

Paul Aitken Engineering Manager Subsequent License Renewal Dominion Energy Services, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 (804) 273-2818 (Office)

(804) 356-9590 (Cell)*

  • Due to COVID-19 I will be working remotely. I am available by email and the cell number above.

CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.